TXX-5002, Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing.Technical Disposition of Nonconformance & Resolution of Design Changes to Be Complete by 860930.Next Rept by 861021: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:& | {{#Wiki_filter:& | ||
Log # TXX-5002 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY MK V W AY TOWER , 400 NORT,8 UtJVE NTREET. I.H. N i . DAIJ.AM. TEX AM 7530 8 September 5, 1986 | Log # TXX-5002 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY MK V W AY TOWER, 400 NORT,8 UtJVE NTREET. I.H. N i. DAIJ.AM. TEX AM 7530 8 September 5, 1986 | ||
, lygy ;,c,9l,7,*,'t, Y | |||
SEP I 01986 Mr. Eric H. Johnson, Director | . Y SEP I 01986 Mr. Eric H. Johnson, Director L | ||
V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | J Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET NO. 50-446 G0ULD BATTERY RACKS TRANSVERSE BRACING SDAR: | DOCKET NO. 50-446 G0ULD BATTERY RACKS TRANSVERSE BRACING SDAR: | ||
CP-86-46 (INTERIM REPORT) | |||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4900, dated July 11, 1986. | On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4900, dated July 11, 1986. | ||
/ | / | ||
( | The specific issue involves a design change to Gould battery racks which | ||
( | |||
revises the transverse bracing mounting bolt design from a two-bolt to a one-bolt configuration. This issue is applicable to all Class lE battery racks in Unit 2. | |||
Currently, the technical disposition of the nonconformance and resolution of the associated design changes are in preparation. Completion of these activities is currently scheduled for September 30, 1986. | |||
We are continuing our evaluation and anticipate submitting our next report by October 21, 1986. | We are continuing our evaluation and anticipate submitting our next report by October 21, 1986. | ||
Very truly yours, flA$f g9QQgy$I8 | Very truly yours, flA$f g9QQgy$I8 6 | ||
W. G. Counsil S | |||
JCH/amb c - NRC Region IV (0 + 1 copy) | JCH/amb c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 il 0 a s,n s,uos or rua. vruuruun uwuse nom.aur | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 il 0 i | |||
a s,n s,uos or rua. vruuruun uwuse nom.aur | |||
%-(Oli h}} | |||
Latest revision as of 02:21, 4 December 2024
| ML20214N537 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/05/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| REF-PT21-86-327-000 CP-86-46, PT21-86-327, PT21-86-327-000, TXX-5002, NUDOCS 8609160339 | |
| Download: ML20214N537 (1) | |
Text
&
Log # TXX-5002 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY MK V W AY TOWER, 400 NORT,8 UtJVE NTREET. I.H. N i. DAIJ.AM. TEX AM 7530 8 September 5, 1986
, lygy ;,c,9l,7,*,'t, Y
. Y SEP I 01986 Mr. Eric H. Johnson, Director L
J Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-446 G0ULD BATTERY RACKS TRANSVERSE BRACING SDAR:
CP-86-46 (INTERIM REPORT)
Dear Mr. Johnson:
On June 11, 1986, we verbally notified your Mr. C. Hale of a deficiency involving a design change to vendor supplied equipment being made without formal evaluation by the vendor. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4900, dated July 11, 1986.
/
The specific issue involves a design change to Gould battery racks which
(
revises the transverse bracing mounting bolt design from a two-bolt to a one-bolt configuration. This issue is applicable to all Class lE battery racks in Unit 2.
Currently, the technical disposition of the nonconformance and resolution of the associated design changes are in preparation. Completion of these activities is currently scheduled for September 30, 1986.
We are continuing our evaluation and anticipate submitting our next report by October 21, 1986.
Very truly yours, flA$f g9QQgy$I8 6
W. G. Counsil S
JCH/amb c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 il 0 i
a s,n s,uos or rua. vruuruun uwuse nom.aur
%-(Oli h