ML20215E753: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
{{#Wiki_filter:.
{{#Wiki_filter:.
1
1
    ..      .=
.=
AVERAGE DAILY UNIT PONER LEVEL DOCKET No. 50 - 352 UNIT LIHERICK                   UNIT 1 DATE DECEtBER 15, 1986 CONPANY PHILADELPHIA ELECTRIC CottPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 MONTH NOVEtBER 1986 DAY     AVERAGE DAILY PONER LEVEL               DAY             AVERAGE DAILY PONER LEVEL tittE-NET)                                             It94E-NET) 1                     1054                   17                             1055 2                     1048                   18                             1052 3                     1055                   19                             1051 4                     1052                   20                             1053 5                     1056                   21                             1044 6                     1055                   22                             1044 7                     1052                     23                             1043 0                     1047                     24                             1033 9                     1044                     25                             1034 10                     1056                     26                             1031 11                     1059                     27                             1031 12                     1057                     28                               923 13                     1059                     29                               706 14                     1058                     30                               961                                                 '
AVERAGE DAILY UNIT PONER LEVEL DOCKET No. 50 - 352 UNIT LIHERICK UNIT 1 DATE DECEtBER 15, 1986 CONPANY PHILADELPHIA ELECTRIC CottPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 MONTH NOVEtBER 1986 DAY AVERAGE DAILY PONER LEVEL DAY AVERAGE DAILY PONER LEVEL tittE-NET)
15                     1057 16                     1056 8612230103 861130 PDR       ADOCK 05000352 R                                   POR Ps'O 3
It94E-NET) 1 1054 17 1055 2
1048 18 1052 3
1055 19 1051 4
1052 20 1053 5
1056 21 1044 6
1055 22 1044 7
1052 23 1043 0
1047 24 1033 9
1044 25 1034 10 1056 26 1031 11 1059 27 1031 12 1057 28 923 13 1059 29 706 14 1058 30 961 15 1057 16 1056 8612230103 861130 PDR ADOCK 05000352 R
POR Ps'O 3


OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE DECEt1BER 15,1986 COHPLETED BY PHILADELPHIA ELECTRIC COMPANY H.H.ALDEN ENGIllEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE DECEt1BER 15,1986 COHPLETED BY PHILADELPHIA ELECTRIC COMPANY H.H.ALDEN ENGIllEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 OPERATING STATUS
: 1. tMIT NAIEt LIHERICK                         UNIT 1                                               l HOTESt UNIT 1 EXPERIENCED ONE                                               l l                                                                             l
: 1. tMIT NAIEt LIHERICK UNIT 1 l HOTESt UNIT 1 EXPERIENCED ONE l
: 2. REPORTING PERI 003 NOVEfBER, 1986                                                               l               SCHEDULED LOAD REDUCTION.                                     l
l l
                                    .............. ........ .                                            l                                                                              l
: 2. REPORTING PERI 003 NOVEfBER, 1986 l
: 5. LICENSED THERHAL PONERtINT)                                                         3293         l                                                                               l
SCHEDULED LOAD REDUCTION.
                                                          . .............                                l                                                                              l C. NAHEPLATE RATING IGROSS tHE)8                                                       1138       l                                                                               l l                                                                               l
l l
: 5. DESIGN ELECTRICAL RATING INET PHE):                                                 1055       l                                                                               l l                                                                               l
l
: 6. MAXItut DEPENDABLE CAPACITY tGROSS INE)i 1092                                                   l                                                                               l l                                                                               l
: 5. LICENSED THERHAL PONERtINT) 3293 l
: 7. MAXINUM DEPENDABLE CAPACITY INET PNE32                                             1055         l                                                                               l
l l
l C. NAHEPLATE RATING IGROSS tHE)8 1138 l
l l
l
: 5. DESIGN ELECTRICAL RATING INET PHE):
1055 l
l l
l
: 6. MAXItut DEPENDABLE CAPACITY tGROSS INE)i 1092 l
l l
l
: 7. MAXINUM DEPENDABLE CAPACITY INET PNE32 1055 l
l
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEHS NUtSER 5 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEHS NUtSER 5 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
: 9. PONER LEVEL TO NHICH RESTRICTED, IF At# (NET INEls
: 9. PONER LEVEL TO NHICH RESTRICTED, IF At# (NET INEls
: 10. REASONS FOR RESTRICTIONS, IF ANY THIS HONTH                 YR-TO-DATE                       CUHULATIVE
: 10. REASONS FOR RESTRICTIONS, IF ANY THIS HONTH YR-TO-DATE CUHULATIVE
: 11. HOURS IN REPORTING PERIOD                                                                                     720                   7,272                             7,272
: 11. HOURS IN REPORTING PERIOD 720 7,272 7,272
: 12. NUtBER OF HOURS REACTOR NAS CRITICAL                                                                       720.0               5,973.0                           5,973.0 f
: 12. NUtBER OF HOURS REACTOR NAS CRITICAL 720.0 5,973.0 5,973.0 f
                                                                                                  . ==                   .    ............                      ............
.==
: 15. REACTOR RESERVE SHUT 00 m HOURS                                                                               0.0                     0.0                               0.0 1% HOURS GENERATOR ON-LIllE                                                                                     720.0               5.892.0                           5.892.0
: 15. REACTOR RESERVE SHUT 00 m HOURS 0.0 0.0 0.0 1% HOURS GENERATOR ON-LIllE 720.0 5.892.0 5.892.0
: 15. UNIT RESERVE SHUTDom HOURS                                                                                   0.0                     0.0                               0.0
: 15. UNIT RESERVE SHUTDom HOURS 0.0 0.0 0.0
: 15. GROSS THERilAL EllER3Y CENERATED ttenil                                                       2,320,608                   19,175,667                         19,175,667
: 15. GROSS THERilAL EllER3Y CENERATED ttenil 2,320,608 19,175,667 19,175,667
: 17. CROSS ELECTRICAL Et1ERGY GENERATED ttMH)                                                           770,530                 6.319,510                         6,3i9,510
: 17. CROSS ELECTRICAL Et1ERGY GENERATED ttMH) 770,530 6.319,510 6,3i9,510
: 18. NET ELECTRICAL ENERGY GENERATED ItSul)                                                             742,206                 6,070,822                         6.070,822 l
: 18. NET ELECTRICAL ENERGY GENERATED ItSul) 742,206 6,070,822 6.070,822 l
PAGE 1 0F 2
PAGE 1 0F 2


OPERATING DATA REPORT (CONTINUED)                                             DOCKET NO. 50 - 352 DATE DECEMBER 15, 1986 THIS HONTH               YR-TO-DATE                 Cu1ULATIVE
OPERATING DATA REPORT (CONTINUED)
: 19. UNIT SERVICE FACTOR                                       100.0                       81.4                       81.0
DOCKET NO. 50 - 352 DATE DECEMBER 15, 1986 THIS HONTH YR-TO-DATE Cu1ULATIVE
: 20. UNIT AVAILABILITY FACTOR                                   100.0                       81.0                       81.0
: 19. UNIT SERVICE FACTOR 100.0 81.4 81.0
: 21. UNIT CAPACITY FACTOR IUSING HDC NET)                         97.7                       79.1                       79.1
: 20. UNIT AVAILABILITY FACTOR 100.0 81.0 81.0
: 22. UNIT CAPACITY FACTOR FUSING DER NET)                         97.7                       79.1                       79.1
: 21. UNIT CAPACITY FACTOR IUSING HDC NET) 97.7 79.1 79.1
: 23. UNIT FORCED OUTAGE RATE                                       0.0                       3.9                       3.9
: 22. UNIT CAPACITY FACTOR FUSING DER NET) 97.7 79.1 79.1
: 23. UNIT FORCED OUTAGE RATE 0.0 3.9 3.9
: 24. SHUTD0lMS SCHEDULED OVER NEXT 6 MONTHS ITYPE, DATE, AND DURATION OF EACH)2 REFUELING OUTAGE HAY 30, 1987 TO AUGUST 28, 1987
: 24. SHUTD0lMS SCHEDULED OVER NEXT 6 MONTHS ITYPE, DATE, AND DURATION OF EACH)2 REFUELING OUTAGE HAY 30, 1987 TO AUGUST 28, 1987
: 25. IF SHUTDolN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
: 25. IF SHUTDolN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
: 26. LMITS IN TEST STATUS (PRIOR TO Cott1ERCIAL OPERATION):                 FORECAST               ACHIEVED
: 26. LMITS IN TEST STATUS (PRIOR TO Cott1ERCIAL OPERATION):
  ,                        INITIAL CRITICALITY                                   12/19/84             12/22/84 INITIAL ELECTRICITY                             HID APRIL 85 4/13/85 C0ft1ERCIAL OPERATION                             IST QTR 86               2/01/86 l
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 C0ft1ERCIAL OPERATION IST QTR 86 2/01/86 l
l l
l l
r PAGE 2 OF 2 I
r PAGE 2 OF 2 I
b
b


LAdIT SHUTD000tS AND PONER REDUCTIONS                                                                       DOCKET No. 50           352 UNIT NAME LIHERICK                 ' UNIT 1 DATE DECEMBER 15, 1986 REPORT HONTH NOVEMBER, 1986                                                                       COMPLETED BY PHILADELPHIA ELECTRIC COMPANY H.M.ALDEN ENGINEER-IN-CHARGE LICEN3ING SECTION NUCLEAR GENERATION DIVISION TELEPHONE 1215) 841-5022 l             I       l                                     l       l PETH00 0F l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l             lTYPElDURATIONIREASONISHUTTING D0leil                                                     EVENT                   l CODE l                   CODE I                   ACTION TO
LAdIT SHUTD000tS AND PONER REDUCTIONS DOCKET No. 50 352 UNIT NAME LIHERICK
:C.l DATE I Illi (HOURS)! (2) l REACTOR 13) l REPORT S I (4) I                                                                                                           f.5 ) l PREVENT RECURRENCE I             I       I                                     I-       1                     I                                 I                 i                         1 6 l 861128 i Sl                                 0.0                 l     F l           4           l           N/A                   l ZZ l 777777 l PCHER REDUCTION TO ACCott10DATE CONTROL ROD l             l       l                                     l       1                     l                                 l                 l                         l PATTERN ADJUSTHENT.
' UNIT 1 DATE DECEMBER 15, 1986 REPORT HONTH NOVEMBER, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY H.M.ALDEN ENGINEER-IN-CHARGE LICEN3ING SECTION NUCLEAR GENERATION DIVISION TELEPHONE 1215) 841-5022 l
I l
l l PETH00 0F l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l
lTYPElDURATIONIREASONISHUTTING D0leil EVENT l CODE l CODE I ACTION TO
:C.l DATE I Illi (HOURS)! (2) l REACTOR 13) l REPORT S I (4) I f.5 ) l PREVENT RECURRENCE I
I I
I-1 I
I i
1 6 l 861128 i Sl 0.0 l
F l 4
l N/A l ZZ l 777777 l PCHER REDUCTION TO ACCott10DATE CONTROL ROD l
l l
l 1
l l
l l PATTERN ADJUSTHENT.
?
?
I             I       I ----- 1                                       I                     I                                 I                 I                         I I             i       1           -
I I
l        I                     I                                 I                 I                         I
I ----- 1 I
: 11)                                                           (2)                                                                                           II)                                     (4)
I I
      - FORCED                 REASON                                                                                                           HETHOD                                               EXHIBIT G = INSTRUCTIONS                               ,
I I
1 - SCHEDULED                 A - EGUIPMENT FAILURE iEXPLAIN)                                                                                   1 - HANUAL                                         FOR PREPARATION OF DATA
I i
1 l
I I
I I
I 11)
(2)
II)
(4)
- FORCED REASON HETHOD EXHIBIT G = INSTRUCTIONS 1 - SCHEDULED A - EGUIPMENT FAILURE iEXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA
+
+
B - HAINTENANCE OR TEST                                                                                           E - HAHUAL SCRAM.                                   ENTRY SHEETS FOR LICENSEE C - REFUELING                                                                                                   3 - AUTOHATIC SCRAM.                                 EVENT REPORT (LER)
B - HAINTENANCE OR TEST E - HAHUAL SCRAM.
D - RESULATORY RESTRICTION                                                                                       4 - OTHER EEXPLAIN)                                     FILE INUREG-0161)
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOHATIC SCRAM.
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE                                                                                                                                                               15)
EVENT REPORT (LER)
D - RESULATORY RESTRICTION 4 - OTHER EEXPLAIN)
FILE INUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)
G - OPERATIONAL ERROR IEXPLAIN)
G - OPERATIONAL ERROR IEXPLAIN)
H - OTHERIEXPLAIN)                                                                                                                                                   EXHIBIT I - SAME SOURCE
H - OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE
)
)
l 9
l 9
f J
f J
  . - - ~   -e. -,.-      , . . _ , . ~ ~ . - . - _ _ . . , _ , , _ ,                                   ,,,__-_,-_._m_.,_-_-___,._,,,,,.,,,,_,,-.-,____..,-..mm_,.,,..,--..._,-,m.,
. - - ~
-e.
,.. _,. ~ ~. -. - _ _.., _,, _,
,,,__-_,-_._m_.,_-_-___,._,,,,,.,,,,_,,-.-,____..,-..mm_,.,,..,--..._,-,m.,


Docket No. 50-352 Attachment to Monthly Operating Report for November, 1986 Limerick Generating Station Unit 1 November 1 through November 30, 1986 I. Narrative Summary of Operating Experiences The unit began the report period at 100% power.
Docket No. 50-352 Attachment to Monthly Operating Report for November, 1986 Limerick Generating Station Unit 1 November 1 through November 30, 1986 I.
On November.28, reactor power was reduced to 50% power for rod pattern adjustments. A preconditioning ramp allowed the unit to be restored to 100% power by months end.
Narrative Summary of Operating Experiences The unit began the report period at 100% power.
II. Challenges to the Main Steam Relief Valve System During the month, there were no challenges to the main steam safety-relief valves.
On November.28, reactor power was reduced to 50% power for rod pattern adjustments.
A preconditioning ramp allowed the unit to be restored to 100% power by months end.
II.
Challenges to the Main Steam Relief Valve System During the month, there were no challenges to the main steam safety-relief valves.
o
o


I 4
I 4
                                                                .~
.~
j'           cc: Troy B. Conner, Jr. , Esq.
j' cc: Troy B. Conner, Jr., Esq.
l             Benjamin H. Vogler, Esq.
l Benjamin H. Vogler, Esq.
Mr. Frank R. Romano Mr. Robert L. Anthony
Mr. Frank R. Romano Mr. Robert L. Anthony
'j               Ms. Maureen Mulligan Charles W. Elliott, Esq.
'j Ms. Maureen Mulligan Charles W. Elliott, Esq.
Barry M. Hartman, Esq.
Barry M. Hartman, Esq.
Mr. Thomas Gerusky l               Director, Penna. Emergency g                 Management Agency j               Angus Love, Esq.
Mr. Thomas Gerusky l
.                David Wersan, Esq.
Director, Penna. Emergency g
j               Robert J. Sugarman, Esq.
Management Agency j
;                Kathryn S. Lewis, Esq.
Angus Love, Esq.
Spence W. Perry, Esq.                                 ''
David Wersan, Esq.
}-,              Jay M. Gutierrez, Esq.                              ..
j Robert J. Sugarman, Esq.
1               Atomic Safety 6 Licensing Appeal Board j               Atomic Safety 4 Licensing Board Panel
Kathryn S. Lewis, Esq.
  '              Docket 6 Service Section
}-
        -        E. M. Kelly Timothy R. S. Campbell i
Spence W. Perry, Esq.
Jay M. Gutierrez, Esq.
1 Atomic Safety 6 Licensing Appeal Board j
Atomic Safety 4 Licensing Board Panel Docket 6 Service Section E. M. Kelly Timothy R. S. Campbell i
N 7
N 7
  ?
?
e j
e
3   -
:j 3
S h.
S h.
e
e


ftELATED COHRESPOhDL. hcg
* - - -~
* - - -~
ftELATED COHRESPOhDL. hcg PHILADELPHIA ELECTRIC COMPANY                                                     l 2301 MARKET STREET                               Ji i C P.O. BOX 8699 PHILADELPHIA. PA.19101                       '86 DEC 19 P12:34 1215)8414000 Decemb(fL15~,',1986       ,
PHILADELPHIA ELECTRIC COMPANY l
uuCM g ; 3'-   ,
2301 MARKET STREET Ji i C P.O. BOX 8699 PHILADELPHIA. PA.19101
Docket No. '502 352 @ dih-D Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC       20555
'86 DEC 19 P12:34 1215)8414000 Decemb(fL15~,',1986 uuCM g ; 3'-
Docket No. '50 352 @ dih-D 2
Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Limerick Generating Station Monthly Operating Report Gentlemen Enclosed is the monthly operating report for Limerick Unit 1 for the month of November, 1986, forwarded pursuant to Technical Specification 6.9.1.6.
Limerick Generating Station Monthly Operating Report Gentlemen Enclosed is the monthly operating report for Limerick Unit 1 for the month of November, 1986, forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, W. M. Alden Engineer-In-Charge Licensing Section Nuclear Support Department Attachment cc:   Director, Office of Inspection & Enforcement, USNRC (12 copies)
Very truly yours, W. M. Alden Engineer-In-Charge Licensing Section Nuclear Support Department Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC E. M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
Dr. T. E. Murley, NRC E. M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)
INPO Records Center Mr. D. W. Diefenderfer, General Electric See Attached Service List                                                 ,
INPO Records Center Mr. D. W. Diefenderfer, General Electric See Attached Service List h 563
I h 563
_._}}
                                                                              .  . - .            -      _._}}

Latest revision as of 22:39, 3 December 2024

Monthly Operating Rept for Nov 1986.Related Correspondence
ML20215E753
Person / Time
Site: Limerick 
Issue date: 11/30/1986
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CON-#486-1949 OL, NUDOCS 8612230103
Download: ML20215E753 (7)


Text

.

1

.=

AVERAGE DAILY UNIT PONER LEVEL DOCKET No. 50 - 352 UNIT LIHERICK UNIT 1 DATE DECEtBER 15, 1986 CONPANY PHILADELPHIA ELECTRIC CottPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 MONTH NOVEtBER 1986 DAY AVERAGE DAILY PONER LEVEL DAY AVERAGE DAILY PONER LEVEL tittE-NET)

It94E-NET) 1 1054 17 1055 2

1048 18 1052 3

1055 19 1051 4

1052 20 1053 5

1056 21 1044 6

1055 22 1044 7

1052 23 1043 0

1047 24 1033 9

1044 25 1034 10 1056 26 1031 11 1059 27 1031 12 1057 28 923 13 1059 29 706 14 1058 30 961 15 1057 16 1056 8612230103 861130 PDR ADOCK 05000352 R

POR Ps'O 3

OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE DECEt1BER 15,1986 COHPLETED BY PHILADELPHIA ELECTRIC COMPANY H.H.ALDEN ENGIllEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 841-5022 OPERATING STATUS

1. tMIT NAIEt LIHERICK UNIT 1 l HOTESt UNIT 1 EXPERIENCED ONE l

l l

2. REPORTING PERI 003 NOVEfBER, 1986 l

SCHEDULED LOAD REDUCTION.

l l

l

5. LICENSED THERHAL PONERtINT) 3293 l

l l

l C. NAHEPLATE RATING IGROSS tHE)8 1138 l

l l

l

5. DESIGN ELECTRICAL RATING INET PHE):

1055 l

l l

l

6. MAXItut DEPENDABLE CAPACITY tGROSS INE)i 1092 l

l l

l

7. MAXINUM DEPENDABLE CAPACITY INET PNE32 1055 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEHS NUtSER 5 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
9. PONER LEVEL TO NHICH RESTRICTED, IF At# (NET INEls
10. REASONS FOR RESTRICTIONS, IF ANY THIS HONTH YR-TO-DATE CUHULATIVE
11. HOURS IN REPORTING PERIOD 720 7,272 7,272
12. NUtBER OF HOURS REACTOR NAS CRITICAL 720.0 5,973.0 5,973.0 f

.==

15. REACTOR RESERVE SHUT 00 m HOURS 0.0 0.0 0.0 1% HOURS GENERATOR ON-LIllE 720.0 5.892.0 5.892.0
15. UNIT RESERVE SHUTDom HOURS 0.0 0.0 0.0
15. GROSS THERilAL EllER3Y CENERATED ttenil 2,320,608 19,175,667 19,175,667
17. CROSS ELECTRICAL Et1ERGY GENERATED ttMH) 770,530 6.319,510 6,3i9,510
18. NET ELECTRICAL ENERGY GENERATED ItSul) 742,206 6,070,822 6.070,822 l

PAGE 1 0F 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 - 352 DATE DECEMBER 15, 1986 THIS HONTH YR-TO-DATE Cu1ULATIVE

19. UNIT SERVICE FACTOR 100.0 81.4 81.0
20. UNIT AVAILABILITY FACTOR 100.0 81.0 81.0
21. UNIT CAPACITY FACTOR IUSING HDC NET) 97.7 79.1 79.1
22. UNIT CAPACITY FACTOR FUSING DER NET) 97.7 79.1 79.1
23. UNIT FORCED OUTAGE RATE 0.0 3.9 3.9
24. SHUTD0lMS SCHEDULED OVER NEXT 6 MONTHS ITYPE, DATE, AND DURATION OF EACH)2 REFUELING OUTAGE HAY 30, 1987 TO AUGUST 28, 1987
25. IF SHUTDolN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
26. LMITS IN TEST STATUS (PRIOR TO Cott1ERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 C0ft1ERCIAL OPERATION IST QTR 86 2/01/86 l

l l

r PAGE 2 OF 2 I

b

LAdIT SHUTD000tS AND PONER REDUCTIONS DOCKET No. 50 352 UNIT NAME LIHERICK

' UNIT 1 DATE DECEMBER 15, 1986 REPORT HONTH NOVEMBER, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY H.M.ALDEN ENGINEER-IN-CHARGE LICEN3ING SECTION NUCLEAR GENERATION DIVISION TELEPHONE 1215) 841-5022 l

I l

l l PETH00 0F l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l

lTYPElDURATIONIREASONISHUTTING D0leil EVENT l CODE l CODE I ACTION TO

C.l DATE I Illi (HOURS)! (2) l REACTOR 13) l REPORT S I (4) I f.5 ) l PREVENT RECURRENCE I

I I

I-1 I

I i

1 6 l 861128 i Sl 0.0 l

F l 4

l N/A l ZZ l 777777 l PCHER REDUCTION TO ACCott10DATE CONTROL ROD l

l l

l 1

l l

l l PATTERN ADJUSTHENT.

?

I I

I ----- 1 I

I I

I I

I i

1 l

I I

I I

I 11)

(2)

II)

(4)

- FORCED REASON HETHOD EXHIBIT G = INSTRUCTIONS 1 - SCHEDULED A - EGUIPMENT FAILURE iEXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA

+

B - HAINTENANCE OR TEST E - HAHUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOHATIC SCRAM.

EVENT REPORT (LER)

D - RESULATORY RESTRICTION 4 - OTHER EEXPLAIN)

FILE INUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)

G - OPERATIONAL ERROR IEXPLAIN)

H - OTHERIEXPLAIN)

EXHIBIT I - SAME SOURCE

)

l 9

f J

. - - ~

-e.

,.. _,. ~ ~. -. - _ _.., _,, _,

,,,__-_,-_._m_.,_-_-___,._,,,,,.,,,,_,,-.-,____..,-..mm_,.,,..,--..._,-,m.,

Docket No. 50-352 Attachment to Monthly Operating Report for November, 1986 Limerick Generating Station Unit 1 November 1 through November 30, 1986 I.

Narrative Summary of Operating Experiences The unit began the report period at 100% power.

On November.28, reactor power was reduced to 50% power for rod pattern adjustments.

A preconditioning ramp allowed the unit to be restored to 100% power by months end.

II.

Challenges to the Main Steam Relief Valve System During the month, there were no challenges to the main steam safety-relief valves.

o

I 4

.~

j' cc: Troy B. Conner, Jr., Esq.

l Benjamin H. Vogler, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony

'j Ms. Maureen Mulligan Charles W. Elliott, Esq.

Barry M. Hartman, Esq.

Mr. Thomas Gerusky l

Director, Penna. Emergency g

Management Agency j

Angus Love, Esq.

David Wersan, Esq.

j Robert J. Sugarman, Esq.

Kathryn S. Lewis, Esq.

}-

Spence W. Perry, Esq.

Jay M. Gutierrez, Esq.

1 Atomic Safety 6 Licensing Appeal Board j

Atomic Safety 4 Licensing Board Panel Docket 6 Service Section E. M. Kelly Timothy R. S. Campbell i

N 7

?

e

j 3

S h.

e

ftELATED COHRESPOhDL. hcg

  • - - -~

PHILADELPHIA ELECTRIC COMPANY l

2301 MARKET STREET Ji i C P.O. BOX 8699 PHILADELPHIA. PA.19101

'86 DEC 19 P12:34 1215)8414000 Decemb(fL15~,',1986 uuCM g ; 3'-

Docket No. '50 352 @ dih-D 2

Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen Enclosed is the monthly operating report for Limerick Unit 1 for the month of November, 1986, forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, W. M. Alden Engineer-In-Charge Licensing Section Nuclear Support Department Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

Dr. T. E. Murley, NRC E. M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)

INPO Records Center Mr. D. W. Diefenderfer, General Electric See Attached Service List h 563

_._