TXX-6033, Interim Deficiency Rept CP-86-14 Re Brown Boveri 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.Vendor Initiated Evaluation of Design Criteria.Next Rept Will Be Submitted by 861219: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:- - - - - - - - - -                - - - - - - - - - - - -
{{#Wiki_filter:- - - - - - - - - -
s
s Log # TXX-6033 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER 480 NORTH LLIVE STREET. E.B. 88. DALLAS. TEXAR 75201 October 20, 1986 EM"iffE*i T]gg i
'' '                                                                                            Log # TXX-6033 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER 480 NORTH LLIVE STREET. E.B. 88 . DALLAS. TEXAR 75201 October 20, 1986 EM"iffE*i                                                                                   T]gg i   ser2 i ses e.,                             6 Mr. Eric H. Johnson, Director                                                                               -
ser2 i ses e.,
j Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
6 Mr. Eric H. Johnson, Director j
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
Line 26: Line 27:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On March 11, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a weld failure in a component of a Class 1E 6.9kv switchgear breaker. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4941, was submitted on July 29, 1986.
On March 11, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a weld failure in a component of a Class 1E 6.9kv switchgear breaker. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4941, was submitted on July 29, 1986.
During normal maintenance, a 6.9kv switchgear breaker (IA3 cubicle 7: service air compressor) was closed and reopened automatically due to a phase imbalance. Our subsequent investigation revealed that a weld connecting the right hand jack shaft and the lever arm had failed due to inadequate weld fusion. The defective breaker was replaced with a spare.
During normal maintenance, a 6.9kv switchgear breaker (IA3 cubicle 7: service air compressor) was closed and reopened automatically due to a phase imbalance. Our subsequent investigation revealed that a weld connecting the right hand jack shaft and the lever arm had failed due to inadequate weld fusion. The defective breaker was replaced with a spare.
During a subsequent common mode failure analysis, a visual inspection program of all critical breakers and a statistical random sample check on the non-critical breakers was completed using acceptance criteria provided by the breaker manufacturer (Brown Boveri). The initial results of this inspection concluded that the jack shaft welds did not meet the vendor's acceptance criteria in all cases.
During a subsequent common mode failure analysis, a visual inspection program of all critical breakers and a statistical random sample check on the non-critical breakers was completed using acceptance criteria provided by the breaker manufacturer (Brown Boveri). The initial results of this inspection concluded that the jack shaft welds did not meet the vendor's acceptance criteria in all cases.
As a result of these findings, the vendor has initiated an evaluation of the established design criteria, including design testing to verify breaker operability. Our assessment of this issue is contingent upon completion and review of Brown Boveri's evaluation.
As a result of these findings, the vendor has initiated an evaluation of the established design criteria, including design testing to verify breaker operability. Our assessment of this issue is contingent upon completion and review of Brown Boveri's evaluation.
8610280446 861020                           5 DR   ADOCK 0500 a mwom or nw numus nrame mum,
8610280446 861020 DR ADOCK 0500 5
a mwom or nw numus nrame mum,


O ,
O TXX-6033 October 20, 1986 4
TXX-6033 4                              October 20, 1986 Page 2 1
Page 2 1
We anticipate submitting our next report by December 19, 1986.
We anticipate submitting our next report by December 19, 1986.
;i                                                                                                                       Very truly yours, 4Gur W. G. Counsil l                               JCH/mlh
;i Very truly yours, 4Gur W. G. Counsil l
:                              c - NRC Region IV (0 + 1 copy) i                                             Director, Inspection & Enforcement (15 copies)
JCH/mlh c - NRC Region IV (0 + 1 copy) i Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 4
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 4
4 i
4 i
1 h
1 h
Line 47: Line 49:
)
)
I
I
___ . . _ .        _ _ _ _ _ . _ . _ . . _ _ _ . _ , _ . , _ _ _ .          _ _ _ _ . _ . _ _ _ _ _ - . _ _ _ . _ _ _                        ,._ . _. _ ._        ,_}}
,_}}

Latest revision as of 21:45, 3 December 2024

Interim Deficiency Rept CP-86-14 Re Brown Boveri 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.Vendor Initiated Evaluation of Design Criteria.Next Rept Will Be Submitted by 861219
ML20215L058
Person / Time
Site: Comanche Peak  
Issue date: 10/20/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-14, TXX-6033, NUDOCS 8610280446
Download: ML20215L058 (2)


Text

- - - - - - - - - -

s Log # TXX-6033 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER 480 NORTH LLIVE STREET. E.B. 88. DALLAS. TEXAR 75201 October 20, 1986 EM"iffE*i T]gg i

ser2 i ses e.,

6 Mr. Eric H. Johnson, Director j

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 6.9KV SWITCHGEAR BREAKER JACK SHAFT WELD FAILURE SDAR: CP-86-14 (INTERIM REPORT)

Dear Mr. Johnson:

On March 11, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a weld failure in a component of a Class 1E 6.9kv switchgear breaker. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4941, was submitted on July 29, 1986.

During normal maintenance, a 6.9kv switchgear breaker (IA3 cubicle 7: service air compressor) was closed and reopened automatically due to a phase imbalance. Our subsequent investigation revealed that a weld connecting the right hand jack shaft and the lever arm had failed due to inadequate weld fusion. The defective breaker was replaced with a spare.

During a subsequent common mode failure analysis, a visual inspection program of all critical breakers and a statistical random sample check on the non-critical breakers was completed using acceptance criteria provided by the breaker manufacturer (Brown Boveri). The initial results of this inspection concluded that the jack shaft welds did not meet the vendor's acceptance criteria in all cases.

As a result of these findings, the vendor has initiated an evaluation of the established design criteria, including design testing to verify breaker operability. Our assessment of this issue is contingent upon completion and review of Brown Boveri's evaluation.

8610280446 861020 DR ADOCK 0500 5

a mwom or nw numus nrame mum,

O TXX-6033 October 20, 1986 4

Page 2 1

We anticipate submitting our next report by December 19, 1986.

i Very truly yours, 4Gur W. G. Counsil l

JCH/mlh c - NRC Region IV (0 + 1 copy) i Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 4