ML20215N828: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Georgia Pcwer Company | {{#Wiki_filter:Georgia Pcwer Company | ||
-4 Post Offica Box 282 Waynesborn Georgii 30'30 | |||
( | ( | ||
Telephone 404 554 9961 | |||
404 724-8114 | ., C3 ; | ||
? | |||
u d e ice | Ih h' y u 1:f] i | ||
e | ) | ||
404 724-8114 j | |||
o u d e ice e | |||
a Southern Company Services. Inc. | a Southern Company Services. Inc. | ||
Post Office Box 2625 Birmingham. Alabama 35202 Te!ephone 205 870-6011 VOgtle Project October 31, 1986 Director of Nuclear Reactor Regulation | Post Office Box 2625 Birmingham. Alabama 35202 Te!ephone 205 870-6011 VOgtle Project October 31, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention: | ||
Mr. B. J. Youngblood Log: | |||
GN-1146 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 9: STEAM LINE BREAK OUTSIDE CONTAINMENT (PROPRIETARY) | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
During our August 27-28, 1986 meeting concerning the subject item, your staff requested facility response information so that_they could complete their confirmatory analysis.- Attached are: | |||
During our August 27-28, 1986 meeting concerning the subject item, your staff requested facility response information so that_they could complete their confirmatory analysis.- Attached are: | (1) Application for withholding proprietary information with accompanying affidavit; and (2) information requested for FLUD verification. | ||
Accordingly it is respectfully requested that the information which is proprietary to Bechtel Power Corporation be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations. | Accordingly it is respectfully requested that the information which is proprietary to Bechtel Power Corporation be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations. | ||
If your staff requires any additiona1'information, please do not. hesitate to contact me. | If your staff requires any additiona1'information, please do not. hesitate to contact me. | ||
Si cerely, J. A. Bailey Project Licensing Manager JAB /sm Attachment xc: List attached, m' | Si cerely, J. A. Bailey Project Licensing Manager JAB /sm Attachment xc: List attached, m' IBaMi NESda' pl | ||
^ | |||
IBaMi NESda' | ,15 i | ||
r- | r-c L | ||
Director of Nuclear Reactor Regulation File: X7BC35 October 31, 1986 Log: | |||
GN-ll46 Page 2 xc: | |||
R. E. Conway (w/o att.) | |||
R. A. Thomas (w/o att.) | R. A. Thomas (w/o att.) | ||
J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2) | J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2) | ||
| Line 51: | Line 57: | ||
4 r | 4 r | ||
l | l | ||
.}} | |||
Latest revision as of 21:14, 3 December 2024
| ML20215N828 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/31/1986 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19292G201 | List: |
| References | |
| GN-1146, NUDOCS 8611070316 | |
| Download: ML20215N828 (2) | |
Text
Georgia Pcwer Company
-4 Post Offica Box 282 Waynesborn Georgii 30'30
(
Telephone 404 554 9961
., C3 ;
?
Ih h' y u 1:f] i
)
404 724-8114 j
o u d e ice e
a Southern Company Services. Inc.
Post Office Box 2625 Birmingham. Alabama 35202 Te!ephone 205 870-6011 VOgtle Project October 31, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-1146 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 9: STEAM LINE BREAK OUTSIDE CONTAINMENT (PROPRIETARY)
Dear Mr. Denton:
During our August 27-28, 1986 meeting concerning the subject item, your staff requested facility response information so that_they could complete their confirmatory analysis.- Attached are:
(1) Application for withholding proprietary information with accompanying affidavit; and (2) information requested for FLUD verification.
Accordingly it is respectfully requested that the information which is proprietary to Bechtel Power Corporation be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations.
If your staff requires any additiona1'information, please do not. hesitate to contact me.
Si cerely, J. A. Bailey Project Licensing Manager JAB /sm Attachment xc: List attached, m' IBaMi NESda' pl
^
,15 i
r-c L
Director of Nuclear Reactor Regulation File: X7BC35 October 31, 1986 Log:
GN-ll46 Page 2 xc:
R. E. Conway (w/o att.)
R. A. Thomas (w/o att.)
J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2)
B.' Jones, Esquire G. Bockhold, Jr. (w/o att.)
NRC Regional Administrator (w/o att.)
NRC Resident Inspector (w/o att.)
D. Feig R. W. McManus (w/o att.)
L.jt. Gucwa (w/o att.)
Vogtle Project File (w/o att.)
0825V t
4 r
l
.