{{#Wiki_filter:d                                                                                                      *fo - fr9
{{#Wiki_filter:*fo - fr9 d
'',  y*
#>R MG h
        #>R MG h4                                UNITED STATES s*              Igt            NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20%%001
y*
      %n         &
4 UNITED STATES s
4..4                                     May 12, 1998                                                         {
Ig NUCLEAR REGULATORY COMMISSION t
i Dr. Keith E. Asmussen, Director Licensing, Safety and Nuclear Compliance General Atomics                                                                                               '
WASHINGTON. D.C. 20%%001
P.O. Box 85608 San Diego, CA 92186-9784
%n 4..4 May 12, 1998
{
i Dr. Keith E. Asmussen, Director Licensing, Safety and Nuclear Compliance General Atomics P.O. Box 85608 San Diego, CA 92186-9784


==SUBJECT:==
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE I
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE


==Dear Dr. Asmussen:==
==Dear Dr. Asmussen:==
 
]
                                                                                                                        ]
By {{letter dated|date=March 31, 1998|text=letter dated March 31,1998}}, you submitted the March 31,1998, affidavit of John E. Jones, Secretary and heasurer of General Atomics Technologies Corporation (GATC), along with the enclosed documents, " General Atomic Technologies Corporation, Report and Consolidated Financial Statements December 31,1997 and 1996" and
By {{letter dated|date=March 31, 1998|text=letter dated March 31,1998}}, you submitted the March 31,1998, affidavit of John E. Jones, Secretary and heasurer of General Atomics Technologies Corporation (GATC), along with the enclosed documents, " General Atomic Technologies Corporation, Report and Consolidated Financial Statements December 31,1997 and 1996" and
          " General Atomic Technologies Corporation, Report on Agreed-Upon Procedures, March 13, 1998." It was requested that these enclosures be withheld from public disclosure pursuant to 10 CFR 2.790.
" General Atomic Technologies Corporation, Report on Agreed-Upon Procedures, March 13, 1998." It was requested that these enclosures be withheld from public disclosure pursuant to 10 CFR 2.790.
                                                                                                                        )1 The affidavit stated that the submitted information should be considered exempt from inandatory public disclosure for the following reasons:
)
: 1.     The information sought to be withheld from public disclosure is owned and has been held in confidence by GATC.
The affidavit stated that the submitted information should be considered exempt from inandatory public disclosure for the following reasons:
: 2.     The information constitutes confidential financial information of a privately-held corporation and is customarily held in confidence by GATC.
1.
: 3.     The information is not available in public sources.
The information sought to be withheld from public disclosure is owned and has been held in confidence by GATC.
: 4.     Public disclosure of the information would cause substantial harm to GATC by providing detailed financial information to its competitors and other parties whose interest may be adverse to GATC.
2.
The information constitutes confidential financial information of a privately-held corporation and is customarily held in confidence by GATC.
3.
The information is not available in public sources.
4.
Public disclosure of the information would cause substantial harm to GATC by providing detailed financial information to its competitors and other parties whose interest may be adverse to GATC.
We have reviewed the affidavit and the materialin accordance with the requirements and criteria of 10 CFR 2.790, and on the basis of GATC's statement, we have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
We have reviewed the affidavit and the materialin accordance with the requirements and criteria of 10 CFR 2.790, and on the basis of GATC's statement, we have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of               ,I!
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of
1954, as amended.                                                                         ,
!,I 1954, as amended.
                                            ', 9                                                     l   s   !
)
                                                                                                                      )
', 9 l
9805180327 980512 PDR     ADOCK 05000089 P                     PDR
s 9805180327 980512 PDR ADOCK 05000089 P
PDR


0 2
0 2
Line 49: Line 56:
Sincerely, ORIGINAL SIGNED BY:
Sincerely, ORIGINAL SIGNED BY:
Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:
Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:
E-MAIL                                 HARD COPY PDoyle       .TBurdick               (Docket Rio 50-89/1.83       JRoe TDragoun MMendonca                     AAdams                       CGaskin, NMSS TMichaels SWeiss                       EHylton                     PDND R/F SHolmes       Pisaac                   DMatthews                   PUBLIC WEresian                               MSiemien (OGC)
E-MAIL HARD COPY PDoyle
CBassett A       PD     M     OGg                   :D lton         AA     :    MSiemien       SWeiss
.TBurdick (Docket Rio 50-89/1.83 JRoe TDragoun MMendonca AAdams CGaskin, NMSS TMichaels SWeiss EHylton PDND R/F SHolmes Pisaac DMatthews PUBLIC WEresian MSiemien (OGC)
        /98         5/         A) h98       7 //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\ ADAMS \GA2.790
CBassett A
PD M
OGg
:D lton AA MSiemien SWeiss
/98 5/
A) h98 7 //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ ADAMS \\GA2.790


0 E
0 E
2
2
    . Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copics of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling atoprietary information.
. Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copics of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling atoprietary information.
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. in all review situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. in all review situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.
Sincerely, ORIGINAL SIGNED BY:
Sincerely, ORIGINAL SIGNED BY:
Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management             I Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:
Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management I
E-MAIL                               HARD COPY                                                 I PDoyle       .TBurdick               Docket File 50-89/163         JRoe TDragoun MMendonca                   AAdams                       CGaskin, NMSS TMichaels SWeiss                     EHylton                       PDND R/F SHolmes     Pisaac                   DMatthews                     PUBLIC WEresian                             MSiemien (OGC)
Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:
CBassett A     PDN   M                           :D lton       A,A     :
E-MAIL HARD COPY PDoyle
OGOh MSiemie:1     SWeiss
.TBurdick Docket File 50-89/163 JRoe TDragoun MMendonca AAdams CGaskin, NMSS TMichaels SWeiss EHylton PDND R/F SHolmes Pisaac DMatthews PUBLIC WEresian MSiemien (OGC)
        > /98         5/           \ /Q/98     T //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\ ADAMS \GA2.790
CBassett OGOh A
PDN M
:D lton A,A MSiemie:1 SWeiss
> /98 5/
\\ /Q/98 T //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ ADAMS \\GA2.790


e 2
e 2
Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of l     this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of l
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information,
this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
;      General Atomics should promptly notify the NRC. General Atomics also should understand         !
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand l
l that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review l     situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.
that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review l
situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.
Sincerely, M
Sincerely, M
l
l Alexander Adams, Jr., Senior Pro' ct Manager l
,                                                  Alexander Adams, Jr., Senior Pro' ct Manager l                                                   Non-Power Reactors and Dec         issioning Project Directorate                           I Division of Reactor Program Management           i Office of Nuclear Reactor Regulation             i Docket Nos.: 50-89                                                                             1 and 50-163 l
Non-Power Reactors and Dec issioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation i
f
Docket Nos.: 50-89 1
and 50-163 f


N l
N l
l' ,
l' General Atomics Docket Nos. 50-89/163 cc:
General Atomics                   Docket Nos. 50-89/163 cc:
Mr. Steve Hsu Radiologic Health Branch State Department of Health Service P.O. Box 942732 Sacramento, California 94234-7320}}
Mr. Steve Hsu Radiologic Health Branch State Department of Health Service P.O. Box 942732 Sacramento, California 94234-7320}}

Latest revision as of 21:01, 3 December 2024

Informs That 980331 Submittal Re Affidavit of Je Jones, Secretary & Treasurer of General Atomics Technologies Corp, Will Be Withheld Per 10CFR2.790 & Section 103(b) of AEC Act of 1954
ML20216B676
Person / Time
Site: General Atomics
Issue date: 05/12/1998
From: Alexander Adams
NRC (Affiliation Not Assigned)
To: Asmussen K
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
References
NUDOCS 9805180327
Download: ML20216B676 (5)


Text

  • fo - fr9 d
  1. >R MG h

y*

4 UNITED STATES s

Ig NUCLEAR REGULATORY COMMISSION t

WASHINGTON. D.C. 20%%001

%n 4..4 May 12, 1998

{

i Dr. Keith E. Asmussen, Director Licensing, Safety and Nuclear Compliance General Atomics P.O. Box 85608 San Diego, CA 92186-9784

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE

Dear Dr. Asmussen:

]

By letter dated March 31,1998, you submitted the March 31,1998, affidavit of John E. Jones, Secretary and heasurer of General Atomics Technologies Corporation (GATC), along with the enclosed documents, " General Atomic Technologies Corporation, Report and Consolidated Financial Statements December 31,1997 and 1996" and

" General Atomic Technologies Corporation, Report on Agreed-Upon Procedures, March 13, 1998." It was requested that these enclosures be withheld from public disclosure pursuant to 10 CFR 2.790.

)

The affidavit stated that the submitted information should be considered exempt from inandatory public disclosure for the following reasons:

1.

The information sought to be withheld from public disclosure is owned and has been held in confidence by GATC.

2.

The information constitutes confidential financial information of a privately-held corporation and is customarily held in confidence by GATC.

3.

The information is not available in public sources.

4.

Public disclosure of the information would cause substantial harm to GATC by providing detailed financial information to its competitors and other parties whose interest may be adverse to GATC.

We have reviewed the affidavit and the materialin accordance with the requirements and criteria of 10 CFR 2.790, and on the basis of GATC's statement, we have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.

Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of

!,I 1954, as amended.

)

', 9 l

s 9805180327 980512 PDR ADOCK 05000089 P

PDR

0 2

Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.

Sincerely, ORIGINAL SIGNED BY:

Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:

E-MAIL HARD COPY PDoyle

.TBurdick (Docket Rio 50-89/1.83 JRoe TDragoun MMendonca AAdams CGaskin, NMSS TMichaels SWeiss EHylton PDND R/F SHolmes Pisaac DMatthews PUBLIC WEresian MSiemien (OGC)

CBassett A

PD M

OGg

D lton AA MSiemien SWeiss

/98 5/

A) h98 7 //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ ADAMS \\GA2.790

0 E

2

. Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copics of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling atoprietary information.

If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. in all review situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.

Sincerely, ORIGINAL SIGNED BY:

Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management I

Office of Nuclear Reactor Regulation Docket Nos.: 50-89 and 50-163 DISTRIBUTION:

E-MAIL HARD COPY PDoyle

.TBurdick Docket File 50-89/163 JRoe TDragoun MMendonca AAdams CGaskin, NMSS TMichaels SWeiss EHylton PDND R/F SHolmes Pisaac DMatthews PUBLIC WEresian MSiemien (OGC)

CBassett OGOh A

PDN M

D lton A,A MSiemie:1 SWeiss

> /98 5/

\\ /Q/98 T //2/98 OFFICIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ ADAMS \\GA2.790

e 2

Withholding from public inspection will not effect the rights, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of l

this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public information, General Atomics should promptly notify the NRC. General Atomics also should understand l

that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes this information. In all review l

situations, if the NRC makes a determination adverse to the above, General Atomics will be notified in advance of any public disclosure.

Sincerely, M

l Alexander Adams, Jr., Senior Pro' ct Manager l

Non-Power Reactors and Dec issioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation i

Docket Nos.: 50-89 1

and 50-163 f

N l

l' General Atomics Docket Nos. 50-89/163 cc:

Mr. Steve Hsu Radiologic Health Branch State Department of Health Service P.O. Box 942732 Sacramento, California 94234-7320