OPERATING DATA REPORT 4 | |||
DOCKET NO. | |||
50-443 DATE 11/09/87 COMPLETED BY P. Nardone | |||
.) | |||
TELEPHONE (603) 474-9521 (Ext. 3116) | TELEPHONE (603) 474-9521 (Ext. 3116) | ||
OPERATING STATUS | OPERATING STATUS t | ||
1. | |||
Unit Name: | |||
Seabrook Station Unit 1 2. | |||
Reporting Period: | |||
OCTOBER 1987 3. | |||
1148 | Licensed Thermal Power (MWt): | ||
3411 4. | |||
Nameplate Rating (Gross MWe): | |||
1197 5. | |||
Since Last Report, Give Reasons: | Design Electrical Rating (Net MWe): | ||
1148 | |||
: 10. Peasons For Restrictions, If Any: | ) | ||
This Month | 6. | ||
: 11. Hours In Reporting Period | Maximum Dependable Capacity (Gross MWe): | ||
: 12. Number Of Hours Reactor Was Critical | 1197 (Initial design value) 7. | ||
: 13. Reactor Reserve Shutdown Hours | Maximum Dependable Capacity (Net MWe): | ||
: 14. Hours Generator On-Line | 1148 (Initial design value) 8. | ||
: 15. Unit Reserve Shutdown Hours | If Changes Occur in Capacity Ratings (Items Number 3 Through 7) | ||
: 16. Gross Thermal Energy Generated (MWH) | Since Last Report, Give Reasons: | ||
: 17. Gross Elec. Energy Generated (MWH) | Not Applicable 9. | ||
: 18. Net Electrical Energy Generated (MWH) | Power Level To Which Restricted, If Any (Net MWe): | ||
: 19. Unit Service Factor | Zero power | ||
: 20. Unit Availability Factor | : 10. Peasons For Restrictions, If Any: | ||
: 21. Unit Capacity Factor (Using MDC Net) | License issued on 10/17/86 is a zero power license which allows fuel loading and performance of non-nuclear testing. | ||
: 22. Unit Capacity Factor (Using DER Net) | This Month Yr.-to-Date Cumulative | ||
: 23. Unit Forced Outage Rate | : 11. Hours In Reporting Period 745.0 7296.0 9121.0 | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0 | ||
Not Scheduled | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable | : 14. Hours Generator On-Line 0.0 0.0 0.0 | ||
: 26. Units In Test Status (Prior to Commercial Operation): | : 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 16. Gross Thermal Energy Generated (MWH) 0 0 | |||
8711160096 871031 | 0 | ||
: 17. Gross Elec. Energy Generated (MWH) 0 0 | |||
0 | |||
: 18. Net Electrical Energy Generated (MWH) 0 0 | |||
0 | |||
: 19. Unit Service Factor 0.0 0.0 0.0 | |||
: 20. Unit Availability Factor 0.0 0.0 0.0 l | |||
: 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 0.0 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
l Not Scheduled i | |||
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable | |||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved l | |||
1 INITIAL CRITICALITY 1987 Not Applicable INITIAL ELECTRICITY 1987 Not Applicable COMMERCIAL OPERATION 1987 Not Applicable i | |||
8711160096 871031 l | |||
1 ADOCK OSO g 3 DR | |||
) | |||
i 4 | |||
__.__.__________._J | |||
5, | 5, | ||
COMPLETED BY | ' AVERAGE DAILY UNIT POWER LEVEL g | ||
DOCKET NO. | |||
50-443 UNIT Seabrook 1 DATE 11/09/87 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 3116) | |||
MONTH OCTOBER, 1987 I | MONTH OCTOBER, 1987 I | ||
DAY | DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
(MWe-Net) 1 0 | |||
16 0 | |||
8 | l 2 | ||
0-17 0 | |||
28 | 3 0 | ||
18 0 | |||
in the reporting month. | 4 0 | ||
19 0 | |||
5 0 | |||
20 0 | |||
6 0 | |||
21 0 | |||
7' 0 | |||
22 0 | |||
8 0 | |||
23 0 | |||
4 9 | |||
0 24 0 | |||
10 0 | |||
25 0 | |||
11 0 | |||
26 0 | |||
12 0 | |||
27 0 | |||
13 0 | |||
28 0 | |||
14-0 29 0 | |||
15 0 | |||
30 0 | |||
31 0 | |||
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day l | |||
in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
l l | l l | ||
l O | l O | ||
4 | 4 o/r4 | ||
- r9 a e | |||
( | e 0 b0N) t v | ||
EEYE | c 5 a/ | ||
3 x i | |||
n e1 0E t | |||
M1 234 | e S1 P 6( | ||
e | c r | ||
( | |||
iE e | eor r | ||
c m | |||
n | |||
) | |||
3 | rt u EEYE one amh o) n OMTBN C oR rot i0i NAA O | ||
i mcrnt | |||
E | .a N DDH | ||
t | & t t aSf oc=l T | ||
E P cn r | |||
o | mu p | ||
ET TE eA e ccd d nx KI EL s | |||
v Si es eoE CN LE u | |||
e t uuRi( | |||
OU P T a | |||
o | r ll ano t | ||
R | aamiirar D | ||
O | M C | ||
1 | P O | ||
uH D( | d uuot vere C | ||
l | onnt newuh h aauoroDt AC pP( O M M-t e-M1 234 5 | ||
9 3 | |||
T | e e | ||
st t nnr ee o cvp iE e L | |||
d u ed e | R n | ||
FS o | S | ||
_o N | |||
i O | |||
t I | |||
7 a | |||
T 8 | |||
H n | |||
C 9 | |||
T i | |||
U N | |||
m 1 | |||
D 3 | |||
O a | |||
E r | |||
M x | |||
R R | |||
f o | |||
E E | |||
ogt S | |||
R B | |||
nc I | |||
) | |||
e | |||
) | |||
E O | |||
di a H | |||
n s | |||
n W | |||
T ot e T | |||
i n | |||
i O | |||
C P | |||
: h. t R a | |||
e a | |||
O t u R | |||
l c | |||
l eh n O | |||
p ni p | |||
D N | |||
NS w F | |||
x oL x | |||
o E | |||
i E | |||
A D | |||
S | |||
( t t & | |||
( | |||
H E | |||
s c | |||
S T | |||
I ee ig r | |||
N N | |||
R rT rn o | |||
W O | |||
2 T | |||
u ti r) | |||
O M | |||
n N | |||
l r snern D | |||
o E | |||
i o eivEi T | |||
T s | |||
a R ai a | |||
U R | |||
a O | |||
F e rtl l H | |||
O e | |||
N c | |||
yT aap S | |||
P R | |||
t ngr rnx E | |||
nanort oE T | |||
R enit osi( | |||
1 mel at i t N | |||
n | |||
: pt el anar U | |||
o) ninuurire i s ouif gemeh t r s q a e e pd pt au aEMRROAOO ro e-uH RABCDEFGH D( | |||
2 l epy T | |||
de l | |||
d u ed e | |||
ce t | |||
rh a | |||
oc D | |||
FS | |||
.o N | |||
FS 1 | |||
;;l | |||
1 | 1 e | ||
5 6 c | |||
7 n 9 1 | |||
s 3 8 k o 1 | |||
ti 4 / o d 4 3 cd 4 9 o r 7 | |||
e | e | ||
- 0 r a 4 re 0 / b N t | |||
S P 0 | rv 5 | ||
( | 1 a | ||
) | |||
x 1 | |||
ol 1 | |||
e 3 | |||
E cav. | |||
o | S P 0 | ||
( | |||
f 6 | |||
o o | |||
( | |||
a | t ye 1 | ||
M | bc e n | ||
C | . e e y e e | ||
STPI STDWI STCT STCB STDT STCD CTWM | vde r | ||
o t | |||
m B n | |||
e | g N | ||
ler e | |||
N : a o | |||
a O | |||
ase | |||
.t | |||
. D N d h P | |||
I v uf dr | |||
~t | |||
' t e | |||
C yce lt e | |||
p T | |||
ar ea e | |||
t k | |||
i e l | |||
A l | |||
t is c | |||
n l | |||
e frn a | |||
o U | |||
p T E | |||
rei fd m | |||
C en e | |||
D o | |||
N tig 4 | |||
4 4 | |||
4 4 | |||
gz C | |||
A tln 1 | |||
1 1 | |||
1 1 | |||
ni N | |||
u i it E | |||
ber V | |||
V V | |||
V V | |||
si T | |||
T v | |||
un N | |||
N dlr W | |||
W W | |||
W W | |||
ou E | |||
I eae S | |||
S S | |||
S S | |||
h M | |||
A lvc d | |||
P M | |||
u a s | |||
s s | |||
s s | |||
re I | |||
ad p a | |||
a a | |||
a a | |||
ec U | |||
hes ta Q | |||
rp e | |||
e e | |||
e e | |||
rl E | |||
e pd m | |||
m m | |||
m m | |||
ap vin a | |||
a a | |||
a a | |||
te D | |||
Ora S | |||
S S | |||
S S | |||
SR E | |||
TAL ER e | |||
yv Y | |||
p al p | |||
T me ra m | |||
E r | |||
uv pV r | |||
u F | |||
oX Pl S | |||
ee Pe n | |||
A 7 tH a | |||
c vw v | |||
a S 8 a | |||
rV rr lo rl F | |||
9 rt e | |||
ei aT ea R | |||
1 e | |||
eee wc wc V | |||
wV er O | |||
v nk v or oe g | |||
o B ki T | |||
l ecl Ti TR en Te 7 aA F | |||
R N | |||
a | |||
- Gaa c 9 gi g 2 t | |||
Y E E | |||
4AXV 3A JV 6 A ge 3A gs 4Arl 4 A gr Bnp R B N | |||
1 H | |||
1 l | |||
5 nR 1 | |||
ns 3 ao 5 na N IU A O O | |||
n t | |||
- nert ni nia nho nih Fn - | |||
M T P | |||
ViWe Visee Vilt VilP VicC Vilc ite M C M | |||
- aCl aetl aos - ao- | |||
- as aos A a sk U O O | |||
W rC n W ri a n Wroe Wroy W ri o W r oi Brea S | |||
C STPI STDWI STCT STCB STDT STCD CTWM | |||
~ | |||
ECN H A T N N E O T M N | |||
r r | |||
r r | |||
r r | |||
I T e | |||
e e | |||
e e | |||
e g | |||
A R t | |||
t t | |||
t t | |||
t d | |||
M O a | |||
a a | |||
a a | |||
a l | |||
P W | |||
W W | |||
W W | |||
W B | |||
E E M | |||
V R E | |||
e e | |||
e e | |||
e e | |||
l I | |||
T c | |||
c c | |||
c c | |||
c o | |||
T S | |||
i i | |||
i i | |||
i i | |||
r C | |||
Y v | |||
v v | |||
v v | |||
v t | |||
E S | |||
r r | |||
r r | |||
r r | |||
nr R | |||
e e | |||
e e | |||
e e | |||
oi R | |||
S S | |||
S S | |||
S S | |||
CA O | |||
C 7 | C 7 | ||
7 | 7 7 | ||
A 5 | 7 7 | ||
7 7 | |||
E 8 | |||
8 8 | |||
8 8 | |||
8 8 | |||
T | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
A 5 | |||
5 6 | |||
9 5 | |||
6 0 | |||
D 0 | |||
0 0 | |||
0 1 | |||
1 2 | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
/ | |||
0 0 | |||
0 0 | |||
0 0 | |||
0 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
a | a | ||
' Docket.No. | |||
'50-443 | |||
: 1. ' Name of facility: | ,p+' | ||
: 2. Scheduled date for next refueling shutdown: | 'Date: | ||
11/09/87 Completed By: | |||
P.- Na rdone Telephones. | |||
(603) 474-9521 (Ext. 3116) l REFUELING INFORMATION' REQUEST | |||
: 1. ' Name of facility: | |||
Seabrook Unit 1 | |||
: 2. Scheduled date for next refueling shutdown: | |||
Not Scheduled l | |||
: 3. Scheduled date for restart following refueling:- Not Scheduled | : 3. Scheduled date for restart following refueling:- Not Scheduled | ||
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?, | : 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?, | ||
| Line 150: | Line 487: | ||
: 5. Scheduled 'date(s). for submitting licensing action and supporting information: | : 5. Scheduled 'date(s). for submitting licensing action and supporting information: | ||
Not-Applicable | Not-Applicable | ||
: 6. Important licensing considerations associated with ref ueling, e.g. , | : 6. Important licensing considerations associated with ref ueling, e.g., | ||
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: | new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: | ||
None | None | ||
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | : 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | ||
(a) | (a) | ||
In Core: | |||
193 (b) 0 | |||
: 8. The present licensed spent fuel pool storage capacity and the size Lof any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | : 8. The present licensed spent fuel pool storage capacity and the size Lof any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | ||
Present licensed capacity: | Present licensed capacity: | ||
1236 No increase in storage capacity requested or planned. | |||
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | : 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | ||
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | ||
The current licensed capacity is adequate until at least the year 2007. | The current licensed capacity is adequate until at least the year 2007. | ||
i | |||
g; | g; | ||
George S. Thomor . | >;w, George S. Thomor. | ||
Vice President Nuclear Prodvetion - | ] | ||
a s ,. | UI Vice President Nuclear Prodvetion - | ||
a s,. | |||
Putsc h of New 6 I | |||
: New Hampshire Yankee Division NYN-87129 i | : New Hampshire Yankee Division NYN-87129 i | ||
November 10, 1987 l | November 10, 1987 l | ||
| Line 178: | Line 519: | ||
==Dear Sir:== | ==Dear Sir:== | ||
In accordance with Technical Specification Section 6.8.1.5, enclosed please' find Monthly Operating Report 87-10 covering the operation and shutdown - | |||
In accordance with Technical Specification Section 6.8.1.5, enclosed | 'g | ||
please' find Monthly Operating Report 87-10 covering the operation and shutdown - | - experience relating to Seabrook Station Unit 1. | ||
Very truly yours, | |||
Very truly yours, | .<s, jlM l | ||
eorg | |||
Enclosure | . Thomas Enclosure cc: Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of ' Prussia, PA 19406 Mr. A. C. Cerne NRC Senior Resident Inspector Seabrook Station J | ||
cc: Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of ' Prussia, PA 19406 Mr. A. C. Cerne NRC Senior Resident Inspector Seabrook Station | Seabrook, NH 03874 9 | ||
l | l P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474-9574 | ||
P.O. Box 300 . Seabrook, NH 03874 . Telephone (603) 474-9574 | . _ _ _ _ _ _}} | ||
Latest revision as of 00:49, 3 December 2024
| ML20236N277 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/31/1987 |
| From: | Nardone P, George Thomas PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NYN-87129, NUDOCS 8711160096 | |
| Download: ML20236N277 (6) | |
Text
_ _ _ _.
l l
\\
'f' s v
OPERATING DATA REPORT 4
DOCKET NO.
50-443 DATE 11/09/87 COMPLETED BY P. Nardone
.)
TELEPHONE (603) 474-9521 (Ext. 3116)
OPERATING STATUS t
1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
OCTOBER 1987 3.
Licensed Thermal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148
)
6.
Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Maximum Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any (Net MWe):
Zero power
- 10. Peasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power license which allows fuel loading and performance of non-nuclear testing.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7296.0 9121.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Elec. Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0 l
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. Unit Forced Outage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Not Scheduled i
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
1 INITIAL CRITICALITY 1987 Not Applicable INITIAL ELECTRICITY 1987 Not Applicable COMMERCIAL OPERATION 1987 Not Applicable i
8711160096 871031 l
1 ADOCK OSO g 3 DR
)
i 4
__.__.__________._J
5,
' AVERAGE DAILY UNIT POWER LEVEL g
DOCKET NO.
50-443 UNIT Seabrook 1 DATE 11/09/87 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 3116)
MONTH OCTOBER, 1987 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
l 2
0-17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7' 0
22 0
8 0
23 0
4 9
0 24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14-0 29 0
15 0
30 0
31 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day l
in the reporting month.
Compute to the nearest whole megawatt.
l l
l O
4 o/r4
- r9 a e
e 0 b0N) t v
c 5 a/
3 x i
n e1 0E t
e S1 P 6(
c r
(
eor r
c m
n
)
rt u EEYE one amh o) n OMTBN C oR rot i0i NAA O
i mcrnt
.a N DDH
& t t aSf oc=l T
E P cn r
mu p
v Si es eoE CN LE u
e t uuRi(
OU P T a
r ll ano t
aamiirar D
M C
P O
d uuot vere C
onnt newuh h aauoroDt AC pP( O M M-t e-M1 234 5
9 3
e e
st t nnr ee o cvp iE e L
R n
S
_o N
i O
t I
7 a
T 8
H n
C 9
T i
U N
m 1
D 3
O a
E r
M x
R R
f o
E E
ogt S
R B
nc I
)
e
)
E O
di a H
n s
n W
T ot e T
i n
i O
C P
- h. t R a
e a
O t u R
l c
l eh n O
p ni p
D N
NS w F
x oL x
o E
i E
A D
S
( t t &
(
H E
s c
S T
I ee ig r
N N
R rT rn o
W O
2 T
u ti r)
O M
n N
l r snern D
o E
i o eivEi T
T s
a R ai a
U R
a O
F e rtl l H
O e
N c
yT aap S
P R
t ngr rnx E
nanort oE T
R enit osi(
1 mel at i t N
n
- pt el anar U
o) ninuurire i s ouif gemeh t r s q a e e pd pt au aEMRROAOO ro e-uH RABCDEFGH D(
2 l epy T
de l
d u ed e
ce t
rh a
oc D
FS
.o N
FS 1
- l
1 e
5 6 c
7 n 9 1
s 3 8 k o 1
ti 4 / o d 4 3 cd 4 9 o r 7
e
- 0 r a 4 re 0 / b N t
rv 5
1 a
)
x 1
ol 1
e 3
E cav.
S P 0
(
f 6
o o
(
t ye 1
bc e n
. e e y e e
vde r
o t
m B n
g N
ler e
N : a o
a O
ase
.t
. D N d h P
I v uf dr
~t
' t e
C yce lt e
p T
ar ea e
t k
i e l
A l
t is c
n l
e frn a
o U
p T E
rei fd m
C en e
D o
N tig 4
4 4
4 4
gz C
A tln 1
1 1
1 1
ni N
u i it E
ber V
V V
V V
si T
T v
un N
N dlr W
W W
W W
ou E
I eae S
S S
S S
h M
A lvc d
P M
u a s
s s
s s
re I
ad p a
a a
a a
ec U
hes ta Q
rp e
e e
e e
rl E
e pd m
m m
m m
ap vin a
a a
a a
te D
Ora S
S S
S S
SR E
TAL ER e
yv Y
p al p
T me ra m
E r
uv pV r
u F
oX Pl S
ee Pe n
A 7 tH a
c vw v
a S 8 a
rV rr lo rl F
9 rt e
ei aT ea R
1 e
eee wc wc V
wV er O
v nk v or oe g
o B ki T
l ecl Ti TR en Te 7 aA F
R N
a
- Gaa c 9 gi g 2 t
Y E E
4AXV 3A JV 6 A ge 3A gs 4Arl 4 A gr Bnp R B N
1 H
1 l
5 nR 1
ns 3 ao 5 na N IU A O O
n t
- nert ni nia nho nih Fn -
M T P
ViWe Visee Vilt VilP VicC Vilc ite M C M
- aCl aetl aos - ao-
- as aos A a sk U O O
W rC n W ri a n Wroe Wroy W ri o W r oi Brea S
C STPI STDWI STCT STCB STDT STCD CTWM
~
ECN H A T N N E O T M N
r r
r r
r r
I T e
e e
e e
e g
A R t
t t
t t
t d
M O a
a a
a a
a l
P W
W W
W W
W B
E E M
V R E
e e
e e
e e
l I
T c
c c
c c
c o
T S
i i
i i
i i
r C
Y v
v v
v v
v t
E S
r r
r r
r r
nr R
e e
e e
e e
oi R
S S
S S
S S
CA O
C 7
7 7
7 7
7 7
E 8
8 8
8 8
8 8
T
/
/
/
/
/
/
/
A 5
5 6
9 5
6 0
D 0
0 0
0 1
1 2
/
/
/
/
/
/
/
0 0
0 0
0 0
0 1
1 1
1 1
1 1
a
' Docket.No.
'50-443
,p+'
'Date:
11/09/87 Completed By:
P.- Na rdone Telephones.
(603) 474-9521 (Ext. 3116) l REFUELING INFORMATION' REQUEST
- 1. ' Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown:
Not Scheduled l
- 3. Scheduled date for restart following refueling:- Not Scheduled
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?,
Unknown at this time.
- 5. Scheduled 'date(s). for submitting licensing action and supporting information:
Not-Applicable
- 6. Important licensing considerations associated with ref ueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
193 (b) 0
- 8. The present licensed spent fuel pool storage capacity and the size Lof any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
The current licensed capacity is adequate until at least the year 2007.
i
g;
>;w, George S. Thomor.
]
UI Vice President Nuclear Prodvetion -
a s,.
Putsc h of New 6 I
- New Hampshire Yankee Division NYN-87129 i
November 10, 1987 l
United States Nuclear Regulatory' Commission Washington, DC 20555 Attention: Document Control' Desk
Reference:
Facility Operating License No. NPF-56, Docket No. 50-443
Subject:
Monthly Operating Report
Dear Sir:
In accordance with Technical Specification Section 6.8.1.5, enclosed please' find Monthly Operating Report 87-10 covering the operation and shutdown -
'g
- experience relating to Seabrook Station Unit 1.
Very truly yours,
.<s, jlM l
eorg
. Thomas Enclosure cc: Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of ' Prussia, PA 19406 Mr. A. C. Cerne NRC Senior Resident Inspector Seabrook Station J
Seabrook, NH 03874 9
l P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474-9574
. _ _ _ _ _ _