ML20236T881: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
(p, | (p, | ||
+;% | |||
o | AEROTEST OPERATIONS, INC. /pe+# | ||
o 3455 FOSTORIA WAY | |||
* SAN RAMON. CA 94583 * ($10) 866-1212 | * SAN RAMON. CA 94583 * ($10) 866-1212 | ||
* FAX ($10) 866-1716 | * FAX ($10) 866-1716 y | ||
sg-P Ol$0 ' ';?N C | |||
9 1 July 1998 Director ofInspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | |||
==Subject:== | ==Subject:== | ||
Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period 1 July 1997 through 30 June 1998. | Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period 1 July 1997 through 30 June 1998. | ||
Gentlemen: | Gentlemen: | ||
The enclosed report summarizes the ARRR operations from Julyl,1997 through June 30,1998. This submittal complies with the requirements set forth in 10 CFR, part | The enclosed report summarizes the ARRR operations from Julyl,1997 through June 30,1998. This submittal complies with the requirements set forth in 10 CFR, part i | ||
50.59 " Authorization of Changes, Tests and Experiments." Summary forms of monthly operations and imscheduled power reductions are included. | |||
l | f No new or unusual problems have been noted during the year and reactor operations have remained stable with respect to safety and reliability. | ||
Very truly yours, | l | ||
.) | |||
Very truly yours, | |||
/ | |||
Aerotest Operations, Inc. | Aerotest Operations, Inc. | ||
Tu. | Tu. | ||
redo W. Meren | redo W. Meren Reactor Supervisor 1 | ||
Reactor Supervisor 1 | \\ | ||
i | |||
,,(OJ l | |||
l 9807290116 980701 PDR ADOCK 05000228 R | |||
9807290116 980701 PDR | pg l | ||
A SUBSIDIARY OF oEA AEROSPACE,INC. | A SUBSIDIARY OF oEA AEROSPACE,INC. | ||
I | I | ||
.__.___._________.___________.________b}} | |||
Latest revision as of 20:22, 2 December 2024
| ML20236T881 | |
| Person / Time | |
|---|---|
| Site: | Aerotest |
| Issue date: | 07/01/1998 |
| From: | Meren A AEROTEST OPERATIONS, INC. |
| To: | NRC |
| Shared Package | |
| ML20236T882 | List: |
| References | |
| NUDOCS 9807290116 | |
| Download: ML20236T881 (1) | |
Text
-
(p,
+;%
AEROTEST OPERATIONS, INC. /pe+#
o 3455 FOSTORIA WAY
- SAN RAMON. CA 94583 * ($10) 866-1212
- FAX ($10) 866-1716 y
sg-P Ol$0 ' ';?N C
9 1 July 1998 Director ofInspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period 1 July 1997 through 30 June 1998.
Gentlemen:
The enclosed report summarizes the ARRR operations from Julyl,1997 through June 30,1998. This submittal complies with the requirements set forth in 10 CFR, part i
50.59 " Authorization of Changes, Tests and Experiments." Summary forms of monthly operations and imscheduled power reductions are included.
f No new or unusual problems have been noted during the year and reactor operations have remained stable with respect to safety and reliability.
l
.)
Very truly yours,
/
Aerotest Operations, Inc.
Tu.
redo W. Meren Reactor Supervisor 1
\\
i
,,(OJ l
l 9807290116 980701 PDR ADOCK 05000228 R
pg l
A SUBSIDIARY OF oEA AEROSPACE,INC.
I
.__.___._________.___________.________b