ML20236X244: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 20: Line 20:


==Dear Mr. Chairman:==
==Dear Mr. Chairman:==
The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.
The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.
The notice requests public comments on whether the NRC should proceed with rulemaking to modify the event reporting requirements in 10 CFR 50.72,"Immediate notification requirements for operating nuclear power reactors," and 50.73, " Licensee event report system," and, if so, the general nature of the modifications that should be made. Several concrete proposals are also provided for comment. This includes a proposal that would (1) clarify the requirements for reporting of design issues, and (2) limit such reporting to design issues that exceed a specified level of significance it also includes a proposal that would extend the required reporting times, consistent with the NRC's needs for prompt reporting. Finally, the notice also requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more risk-informed.
The notice requests public comments on whether the NRC should proceed with rulemaking to modify the event reporting requirements in 10 CFR 50.72,"Immediate notification requirements for operating nuclear power reactors," and 50.73, " Licensee event report system," and, if so, the general nature of the modifications that should be made. Several concrete proposals are also provided for comment. This includes a proposal that would (1) clarify the requirements for reporting of design issues, and (2) limit such reporting to design issues that exceed a specified level of significance it also includes a proposal that would extend the required reporting times, consistent with the NRC's needs for prompt reporting. Finally, the notice also requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more risk-informed.
Line 26: Line 25:


==Enclosure:==
==Enclosure:==
As stated cc w/ encl.: Senator Bob Graham                                                                                                                     !
As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:
Distribution w/ encl.:                                                                                                                             !
File Center i
File Center                                                                                                                                         i Public RRAB R/F SPD R/F                                                                                                                                             l AEOD R/F                                                                                                                                   \
Public RRAB R/F SPD R/F
                                                                                                                                                        . o   l
\\
                                                                                                                                                              \
l AEOD R/F
9808070226 PDR      ORO 98073k                                                                                                                       '
. o l
Eugggygp PDR
\\
                                                                                                                                                        \y}l l
9808070226 98073k
          *See previous concurrence                                                                                                                           I g g, i F'W Ix0&fMd
\\y}l PDR ORO Eugggygp PDR l
                                                                                                                                            \       l l         G:\TAS\8717_SEN.LET                                                                                 , < p_sy { 0-i                                         ,
*See previous concurrence Ix0&fMd I
l                                                                                                          yL To recetvo a copy of this document. indicate in the box: "C" = Copy without attachment / enclosure *E' = Copy with attachment / enclosure
g g, i F'W
          *N* = No copy OFFICE       RRAB             C       C:RRA             C     D:SPD             C     D:AEOD           C     D:OCA           C B                                                                               13 j NAME         DAllison:mmk             PBaranowsky             CRossi                   TTMartin                 DFNfd6ttn l           DATE         07/17/98*               07/17/98*               7 /17/98*               7/17/98*                     W3 OFFICIAL RECORD COPY                                                 -. c-
\\
    .a -       . . -                                --                          __                                          o uw~o< A 2: R
l l
G:\\TAS\\8717_SEN.LET
, < p_sy { 0-i l
yL To recetvo a copy of this document. indicate in the box: "C" = Copy without attachment / enclosure *E' = Copy with attachment / enclosure
*N* = No copy OFFICE RRAB C
C:RRA C
D:SPD C
D:AEOD C
D:OCA C
B 13 j NAME DAllison:mmk PBaranowsky CRossi TTMartin DFNfd6ttn l
DATE 07/17/98*
07/17/98*
7 /17/98*
7/17/98*
W3 OFFICIAL RECORD COPY
.a -
o o< A 2: R c-uw~


s The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety                                                                                   i Committee on Environment and Public Works United States Senate Washington, DC 20510                                                                                                                 <
s The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety i
Committee on Environment and Public Works United States Senate Washington, DC 20510


==Dear Mr. Chairman:==
==Dear Mr. Chairman:==
 
The NRC has sent to the Office of the Federal Register for publication the enclosed ance notice of proposed rulemaking to modify reporting requirements for nuclear power actors.
The NRC has sent to the Office of the Federal Register for publication the enclosed                                             ance notice of proposed rulemaking to modify reporting requirements for nuclear power actors.
The notice requests public comments on whether the NRC should proceed wit lemaking to modify the event reporting requirements in 10 CFR 50.72, "Immediate notifi son requirements for operating nuclear power reactors," and 50.73, " Licensee event report stem," and, if so, the general nature'of the modifications that should be made. Several con te proposals are also provided for comment. This includes a proposal that would (1) clari e requirements for reporting of design issues, and (2) limit such reporting to design i ues that exceed a specified level of significance. It also includes a proposal that would ext d the required reporting times, consistent with the NRC's needs for prompt reporting. Final, the notice also requests public comments on other reactor reporting requirements, beyo 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more r'
The notice requests public comments on whether the NRC should proceed wit                                               lemaking to modify the event reporting requirements in 10 CFR 50.72, "Immediate notifi son requirements for operating nuclear power reactors," and 50.73, " Licensee event report stem," and, if so, the general nature'of the modifications that should be made. Several con te proposals are also provided for comment. This includes a proposal that would (1) clari                                     e requirements for reporting of design issues, and (2) limit such reporting to design i ues that exceed a specified level of significance. It also includes a proposal that would ext d the required reporting times, consistent with the NRC's needs for prompt reporting. Final , the notice also requests public comments on other reactor reporting requirements, beyo 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more r' -informed.
-informed.


==Enclosure:==
==Enclosure:==
As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:
As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:
File Center Public RRAB R/F SPD R/F -
File Center Public RRAB R/F SPD R/F -
AEOD R/F l                       *See revious concurrence i
AEOD R/F l
I                       H:\DPA\tNHOFE.DKR To receive a copy of this document, Indicate in the box: *C" = Copy without attaddnent/ enclosure T = Copy wNh attactwnent/ enclosure v maw OFFICE                   RRA'u     C   C:RRAB     C     D:SPD             ,0 0:AEf                       D:OCA l                               NAME iDAllison:mmk                     PBaranowsky     CRos!S-= ,. ; TTb6 din                           DRathbun
*See revious concurrence i
                                                                                                  ~~
I H:\\DPA\\tNHOFE.DKR To receive a copy of this document, Indicate in the box: *C" = Copy without attaddnent/ enclosure T = Copy wNh attactwnent/ enclosure v maw OFFICE RRA'u C
DATE                     07/17/98*     07/17/98*       7//7/98                 7 k//98 OFFICIAL RECORD COPY
C:RRAB C
D:SPD
,0 0:AEf D:OCA l
NAME iDAllison:mmk PBaranowsky CRos!S-=,. ;
TTb6 din DRathbun
~~
DATE 07/17/98*
07/17/98*
7//7/98 7 k//98 OFFICIAL RECORD COPY


The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510
The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510


==Dear Mr. Chairman:==
==Dear Mr. Chairman:==
The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.
The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.
The notice requests public comments on whether the NRC should proceed with rulemaki                                                                   to modify tne event reporting' requirements in 10 CFR 50.72 and 50.73 and, if so, the ge                                                               I nature of the modifications that should be made. Several concrete proposals are a                                                                 rovided for comment. - This includes a proposal that would (1) clarify the requirements for                                                               'ng of   j design issues, and (2) limit such reporting to design issues that exceed a specif level of significance, it also includes a proposal that would extend the required reporti times, consistent with the NRC's needs for prompt reporting. Finally, the notice al requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 nd 50.73, that could be simplified and/or made less burdensome and more risk-informed.
The notice requests public comments on whether the NRC should proceed with rulemaki to modify tne event reporting' requirements in 10 CFR 50.72 and 50.73 and, if so, the ge I
nature of the modifications that should be made. Several concrete proposals are a rovided for comment. - This includes a proposal that would (1) clarify the requirements for
'ng of j
design issues, and (2) limit such reporting to design issues that exceed a specif level of significance, it also includes a proposal that would extend the required reporti
: times, consistent with the NRC's needs for prompt reporting. Finally, the notice al requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 nd 50.73, that could be simplified and/or made less burdensome and more risk-informed.


==Enclosure:==
==Enclosure:==
Line 67: Line 94:
l l
l l
l 1
l 1
H:\DPA\lNHOFE.DKR                                                                                                                                         I l
H:\\DPA\\lNHOFE.DKR I
: v.     .    .een e     ni,mm   m v.n.=: v copywouwt sa. chm.no.nck                                                       r copywe.u.chmsw.ummum y a No OFFf$i RRABT R C             C:RRAB           D:SPD                                                     D AEOD                       D:OCA NNfAE     DAllisof .Inynk     PBaranovWor/] CRossi                                                       TTMartin                     DRathbun           ]
l v.
DATE     7Ill98             7 /A98 /77f/       / /98                                                               / /98 OFFICIAL RECORD COPY
.een e ni,mm m v.n.=: v copywouwt sa. chm.no.nck r copywe.u.chmsw.ummum y a No OFFf$i RRABT R C
C:RRAB D:SPD D AEOD D:OCA NNfAE DAllisof.Inynk PBaranovWor ] CRossi TTMartin DRathbun
]
/
DATE 7Ill98 7 /A98 /77f/
/ /98
/ /98 OFFICIAL RECORD COPY
[}}
[}}

Latest revision as of 19:43, 2 December 2024

Informs That Encl Advance Notice of Proposed Rulemaking to Modify Reporting Requirements for Nuclear Power Reactors Has Been Sent to Ofc of Fr for Publication.Notice Requests Public Comments on Whether NRC Should Proceed W/Rulemaking
ML20236X244
Person / Time
Issue date: 07/31/1998
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Inhofe J, Schaefer D
HOUSE OF REP., SENATE, ENVIRONMENT & PUBLIC WORKS
References
CCS, NUDOCS 9808070226
Download: ML20236X244 (2)


Text

~N July 31, 1998 e

1 The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.

The notice requests public comments on whether the NRC should proceed with rulemaking to modify the event reporting requirements in 10 CFR 50.72,"Immediate notification requirements for operating nuclear power reactors," and 50.73, " Licensee event report system," and, if so, the general nature of the modifications that should be made. Several concrete proposals are also provided for comment. This includes a proposal that would (1) clarify the requirements for reporting of design issues, and (2) limit such reporting to design issues that exceed a specified level of significance it also includes a proposal that would extend the required reporting times, consistent with the NRC's needs for prompt reporting. Finally, the notice also requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more risk-informed.

Sincerely, original signed by DKRathbun Dennis K. Rathbun, Director Office of Congrosional Affairs

Enclosure:

As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:

File Center i

Public RRAB R/F SPD R/F

\\

l AEOD R/F

. o l

\\

9808070226 98073k

\\y}l PDR ORO Eugggygp PDR l

  • See previous concurrence Ix0&fMd I

g g, i F'W

\\

l l

G:\\TAS\\8717_SEN.LET

, < p_sy { 0-i l

yL To recetvo a copy of this document. indicate in the box: "C" = Copy without attachment / enclosure *E' = Copy with attachment / enclosure

  • N* = No copy OFFICE RRAB C

C:RRA C

D:SPD C

D:AEOD C

D:OCA C

B 13 j NAME DAllison:mmk PBaranowsky CRossi TTMartin DFNfd6ttn l

DATE 07/17/98*

07/17/98*

7 /17/98*

7/17/98*

W3 OFFICIAL RECORD COPY

.a -

o o< A 2: R c-uw~

s The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety i

Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The NRC has sent to the Office of the Federal Register for publication the enclosed ance notice of proposed rulemaking to modify reporting requirements for nuclear power actors.

The notice requests public comments on whether the NRC should proceed wit lemaking to modify the event reporting requirements in 10 CFR 50.72, "Immediate notifi son requirements for operating nuclear power reactors," and 50.73, " Licensee event report stem," and, if so, the general nature'of the modifications that should be made. Several con te proposals are also provided for comment. This includes a proposal that would (1) clari e requirements for reporting of design issues, and (2) limit such reporting to design i ues that exceed a specified level of significance. It also includes a proposal that would ext d the required reporting times, consistent with the NRC's needs for prompt reporting. Final, the notice also requests public comments on other reactor reporting requirements, beyo 10 CFR 50.72 and 50.73, that could be simplified and/or made less burdensome and more r'

-informed.

Enclosure:

As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:

File Center Public RRAB R/F SPD R/F -

AEOD R/F l

  • See revious concurrence i

I H:\\DPA\\tNHOFE.DKR To receive a copy of this document, Indicate in the box: *C" = Copy without attaddnent/ enclosure T = Copy wNh attactwnent/ enclosure v maw OFFICE RRA'u C

C:RRAB C

D:SPD

,0 0:AEf D:OCA l

NAME iDAllison:mmk PBaranowsky CRos!S-=,. ;

TTb6 din DRathbun

~~

DATE 07/17/98*

07/17/98*

7//7/98 7 k//98 OFFICIAL RECORD COPY

The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The NRC has sent to the Office of the Federal Register for publication the enclosed advance notice of proposed rulemaking to modify reporting requirements for nuclear power reactors.

The notice requests public comments on whether the NRC should proceed with rulemaki to modify tne event reporting' requirements in 10 CFR 50.72 and 50.73 and, if so, the ge I

nature of the modifications that should be made. Several concrete proposals are a rovided for comment. - This includes a proposal that would (1) clarify the requirements for

'ng of j

design issues, and (2) limit such reporting to design issues that exceed a specif level of significance, it also includes a proposal that would extend the required reporti

times, consistent with the NRC's needs for prompt reporting. Finally, the notice al requests public comments on other reactor reporting requirements, beyond 10 CFR 50.72 nd 50.73, that could be simplified and/or made less burdensome and more risk-informed.

Enclosure:

As stated cc w/ encl.: Senator Bob Graham Distribution w/ encl.:

File Center Public RRAB R/F SPD R/F AEOD R/F l

l l

l 1

H:\\DPA\\lNHOFE.DKR I

l v.

.een e ni,mm m v.n.=: v copywouwt sa. chm.no.nck r copywe.u.chmsw.ummum y a No OFFf$i RRABT R C

C:RRAB D:SPD D AEOD D:OCA NNfAE DAllisof.Inynk PBaranovWor ] CRossi TTMartin DRathbun

]

/

DATE 7Ill98 7 /A98 /77f/

/ /98

/ /98 OFFICIAL RECORD COPY

[