TXX-7072, Interim Deficiency Rept CP-86-08 Re Installation of Super Hilti Kwik Bolts.Initially Reported on 870205.Evaluation Continuing.Next Rept Will Be Submitted by 880224: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. _ _ _ _ _ _ _ _ _ _ _ _ _ _ | ||
~ | ~ | ||
kk i | |||
M | M== | ||
Log # TXX-7072 L | |||
2 File # 10110 E | |||
waa.m c. counsu | E 903.9 | ||
"''' # IU "O' | |||
("} | |||
1UELECTRIC waa.m c. counsu December 9, 1987 Emutne Var Pirmukrit U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 28: | Line 32: | ||
DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT) | DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT) | ||
Gentlemen: | Gentlemen: | ||
On February 5,1987, we verbally notified your Mr. T. F. Westennan of a deficiency involving the control of stamps used to identify Super Hilti Kwik Dolts (llKB). This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our previous report was logged TXX-6889 dated October 19, 1987. | On February 5,1987, we verbally notified your Mr. T. F. Westennan of a deficiency involving the control of stamps used to identify Super Hilti Kwik Dolts (llKB). | ||
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our previous report was logged TXX-6889 dated October 19, 1987. | |||
We are continuing our evaluation of this issue and will submit our next report by February 24, 1988. | We are continuing our evaluation of this issue and will submit our next report by February 24, 1988. | ||
Very truly yours, | Very truly yours, | ||
' 4% | |||
i W. G. Counsil CBC/grr l | i W. G. Counsil CBC/grr l | ||
c - Mr. R. D. Martin, Region IV | c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8712150058 871209 d) | ||
Resident Inspectors, CPSES (3) 8712150058 871209 PDR | PDR ADOCK 05000445 y | ||
s DCD D | |||
400 Mrth Olne Street LB BI Dallas. Texas 75201 0}} | |||
Latest revision as of 08:35, 2 December 2024
| ML20237A519 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/09/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-08, CP-86-8, TXX-7072, NUDOCS 8712150058 | |
| Download: ML20237A519 (1) | |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _
~
kk i
M==
Log # TXX-7072 L
2 File # 10110 E
E 903.9
" # IU "O'
("}
1UELECTRIC waa.m c. counsu December 9, 1987 Emutne Var Pirmukrit U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK SlEAM ELECTRIC STA110N (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSTALLATION OF SUPER HILTI KWIK BOLTS SDAR: CP-86-08 (INTERIM REPORT)
Gentlemen:
On February 5,1987, we verbally notified your Mr. T. F. Westennan of a deficiency involving the control of stamps used to identify Super Hilti Kwik Dolts (llKB).
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our previous report was logged TXX-6889 dated October 19, 1987.
We are continuing our evaluation of this issue and will submit our next report by February 24, 1988.
Very truly yours,
' 4%
i W. G. Counsil CBC/grr l
c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 8712150058 871209 d)
PDR ADOCK 05000445 y
s DCD D