05000155/LER-1998-001, Forwards LER 98-001-00 Re Discovery During Facility Decommissioning of Severed Liquid Poison Tank Discharge Pipe.Rept Being Submitted IAW 10CFR50.72(b)(2)(iii) & 10CFR50.73(a)(2)(i)(B): Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
| Title = Forwards LER 98-001-00 Re Discovery During Facility Decommissioning of Severed Liquid Poison Tank Discharge Pipe.Rept Being Submitted IAW 10CFR50.72(b)(2)(iii) & 10CFR50.73(a)(2)(i)(B) | | Title = Forwards LER 98-001-00 Re Discovery During Facility Decommissioning of Severed Liquid Poison Tank Discharge Pipe.Rept Being Submitted IAW 10CFR50.72(b)(2)(iii) & 10CFR50.73(a)(2)(i)(B) | ||
| Plant = | | Plant = | ||
| Reporting criterion = | | Reporting criterion = 10 CFR 50.73(a)(2)(i)(B), 10 CFR 50.73(a)(2)(v) | ||
| Power level = | | Power level = | ||
| Mode = | | Mode = | ||
| Docket = 05000155 | | Docket = 05000155 | ||
| LER year = | | LER year = 1998 | ||
| LER number = 1 | | LER number = 1 | ||
| LER revision = | | LER revision = 0 | ||
| Event date = | | Event date = | ||
| Report date = | | Report date = | ||
| Line 32: | Line 32: | ||
=text= | =text= | ||
{{#Wiki_filter:r | {{#Wiki_filter:r | ||
_L__ | _L__ | ||
ConsumersEnergy i | ConsumersEnergy i | ||
j | j A CMS Energy Comi:any Big Rock Pdnt Nuclear Plant Kenneth P. Peeners i | ||
A CMS Energy Comi:any | 10269 L&31 lbtn Site General Manager Charlevoix, MI 49720 I | ||
4 August 6,1998 | 4 August 6,1998 l | ||
DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - LICENSEE EVENT | Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 i | ||
REPORT 98-001: LIQUID POISON TANK DISCIIARGE PIPE FOUND SEVERED DURING FACILITY DECOMMISSIONING | DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - LICENSEE EVENT l | ||
residual heat, C) Control the release of radioactive material, or D) Mitigate the consequences of an l | REPORT 98-001: LIQUID POISON TANK DISCIIARGE PIPE FOUND SEVERED i | ||
accident; 10 CFR 50.73(a)(2)(i)(B) - Any operation or condition prohibited by the plant's Technical Specifications, and 10 CFR 50.73(a)(2)(v) - Any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to: | DURING FACILITY DECOMMISSIONING l | ||
Licensee Event Report 98-001, LIQUID POISON TANK DISCIIARGE PIPE FOUND l | |||
SEVERED DURING FACILITY DECOMMISSIONING,is attached. This event is reportable l | |||
to the Nuclear Regtilatory Commission in accordance with 10 CFR 50.72(b)(2)(iii)- Any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to A) Shutdown the reactor and maintain it in a safe condition, B) Remove residual heat, C) Control the release of radioactive material, or D) Mitigate the consequences of an l | |||
l accident; 10 CFR 50.73(a)(2)(i)(B) - Any operation or condition prohibited by the plant's Technical Specifications, and 10 CFR 50.73(a)(2)(v) - Any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to: | |||
A) Shutdown the reactor and maintain it in a safe condition, B) Remove residual heat; C) Control the release of radioactive material, or D) Mitigate the consequences of an accident. | A) Shutdown the reactor and maintain it in a safe condition, B) Remove residual heat; C) Control the release of radioactive material, or D) Mitigate the consequences of an accident. | ||
hl '> | hl '> | ||
i Kenneth P Powers Site General Manager | i Kenneth P Powers Site General Manager V | ||
,v | |||
I | /(b l | ||
I CC: Administrator, Region III, USNRC | |||
/ | |||
NRC Resident Inspector - Big Rock Point l | |||
NRR Project Manager - OWFN, USNRC l | |||
ATTACliMENT l | |||
9808170039 980806~ | 9808170039 980806~ | ||
PDR | PDR ADOCK 05000155 S | ||
L___________ | PDR 1 | ||
L___________ | |||
l 1 | |||
ATTACHMENT CONSUMERS ENERGY COMPANY HIG ROCK POINT PLANT DOCKET 50-155 i | ATTACHMENT CONSUMERS ENERGY COMPANY HIG ROCK POINT PLANT DOCKET 50-155 i | ||
LICENSEE EVENT REPORT 98-001: LIQUID POISON TANK DISCHARGE PIPE FOUND SEVERED DURING FACILITY DECOMMISSIONING l | LICENSEE EVENT REPORT 98-001: LIQUID POISON TANK DISCHARGE PIPE FOUND SEVERED DURING FACILITY DECOMMISSIONING l | ||
l | l | ||
}} | }} | ||
{{LER-Nav}} | {{LER-Nav}} | ||
Latest revision as of 09:32, 2 December 2024
| ML20237A703 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 08/06/1998 |
| From: | Powers K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20237A706 | List:
|
| References | |
| NUDOCS 9808170039 | |
| Download: ML20237A703 (2) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 1551998001R00 - NRC Website | |
text
r
_L__
ConsumersEnergy i
j A CMS Energy Comi:any Big Rock Pdnt Nuclear Plant Kenneth P. Peeners i
10269 L&31 lbtn Site General Manager Charlevoix, MI 49720 I
4 August 6,1998 l
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 i
DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - LICENSEE EVENT l
REPORT 98-001: LIQUID POISON TANK DISCIIARGE PIPE FOUND SEVERED i
DURING FACILITY DECOMMISSIONING l
Licensee Event Report 98-001, LIQUID POISON TANK DISCIIARGE PIPE FOUND l
SEVERED DURING FACILITY DECOMMISSIONING,is attached. This event is reportable l
to the Nuclear Regtilatory Commission in accordance with 10 CFR 50.72(b)(2)(iii)- Any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to A) Shutdown the reactor and maintain it in a safe condition, B) Remove residual heat, C) Control the release of radioactive material, or D) Mitigate the consequences of an l
l accident; 10 CFR 50.73(a)(2)(i)(B) - Any operation or condition prohibited by the plant's Technical Specifications, and 10 CFR 50.73(a)(2)(v) - Any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to:
A) Shutdown the reactor and maintain it in a safe condition, B) Remove residual heat; C) Control the release of radioactive material, or D) Mitigate the consequences of an accident.
hl '>
i Kenneth P Powers Site General Manager V
,v
/(b l
I CC: Administrator, Region III, USNRC
/
NRC Resident Inspector - Big Rock Point l
NRR Project Manager - OWFN, USNRC l
ATTACliMENT l
9808170039 980806~
PDR ADOCK 05000155 S
PDR 1
L___________
l 1
ATTACHMENT CONSUMERS ENERGY COMPANY HIG ROCK POINT PLANT DOCKET 50-155 i
LICENSEE EVENT REPORT 98-001: LIQUID POISON TANK DISCHARGE PIPE FOUND SEVERED DURING FACILITY DECOMMISSIONING l
l