OPERATLNG DATA REPORT DOCKET NO. 80~/83 DATE | OPERATLNG DATA REPORT DOCKET NO. | ||
80~/83 DATE Tutv A de 1 COh!PLETED BY cec i< | |||
TELEPHONE 707/ Y 43 ~' 2 7 8 7 OPERATING STATUS | TELEPHONE 707/ Y 43 ~' 2 7 8 7 OPERATING STATUS | ||
: 1. Unit Name: | : 1. Unit Name: | ||
: 2. Reposting Period: | HUMdoLor EAv ?dWEA, LAAJ7*-llsjtr3 Notes | ||
: 3. Licensed Thermal Power (MWt): | : 2. Reposting Period: | ||
: 4. Namcplate Rating (Gross blWe): | cum-19 F1 | ||
: 5. Design Electrical Rating (Net SIWE): | : 3. Licensed Thermal Power (MWt): | ||
: 6. Sfaximum Dependable Capacity (Gross alWe): | 2 '2 O | ||
: 7. Maximum Dependable Capacity (Net SIWE): | : 4. Namcplate Rating (Gross blWe): | ||
6E | |||
: 5. Design Electrical Rating (Net SIWE): | |||
86 | |||
: 6. Sfaximum Dependable Capacity (Gross alWe): | |||
4 S' | |||
: 7. Maximum Dependable Capacity (Net SIWE): | |||
4S | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
A//A | A//A | ||
: 9. Power Level To Which Restricted. lf Any (Net MWe): | : 9. Power Level To Which Restricted. lf Any (Net MWe): | ||
: 10. Reasons For Restrictions,if Any: | N!A | ||
This Month | : 10. Reasons For Restrictions,if Any: | ||
: 12. Number Of Hours Reactor Was Critical | AI/A This Month Yr..to Date Cumulatise I1. Hours In Reporting Pc:.od | ||
: 13. Reactor Reserve Shutdown Hours | ""72 o 443 4-3 | ||
: 14. Hours Generator On.Line | ,2c 9, 6M | ||
: 15. Unit Reserve Shutdown Hours | : 12. Number Of Hours Reactor Was Critical O | ||
: 16. Gross Thermal Energy Generated (MWH) | o T6171 | ||
: 17. Gross Electrical Energy Generated (51WH) | : 13. Reactor Reserve Shutdown Hours O | ||
: 18. Net Electrical Energy Generated (MWH) | O O | ||
: 19. Urtit Service Factor | : 14. Hours Generator On.Line o | ||
: 20. Unit Availability Factor | O 97262. | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 15. Unit Reserve Shutdown Hours o | ||
: 22. Unit Capacity Factor (Using DER Net) | o O | ||
: 23. Unit Forced Outage Rate | : 16. Gross Thermal Energy Generated (MWH) | ||
O M | |||
/C 4/ 8, '/5/a | |||
: 17. Gross Electrical Energy Generated (51WH) o o | |||
% 77% 732 | |||
: 18. Net Electrical Energy Generated (MWH) o | |||
/) | |||
% 52% 8 13 | |||
: 19. Urtit Service Factor O | |||
o | |||
: 46. 4 #/c | |||
: 20. Unit Availability Factor O | |||
o 1/6 404 | |||
: 21. Unit Capacity Factor (Using MDC Net) o O | |||
3+. '*> '7 | |||
: 22. Unit Capacity Factor (Using DER Net) o d | |||
33 2% | |||
: 23. Unit Forced Outage Rate o | |||
d | |||
/. 9/ % | |||
: 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date, and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date, and Duration of Each): | ||
A//A | A//A | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operation): | W 0 " M 'It' / 0 ^' /d6 | ||
INITIAL ELECTRICITY COM31ERCIAL OPER A TION (u/7 7 ) | : 26. Units in Test Status (Prior to Commercial Operation): | ||
8708190424 870630 PDR | Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY COM31ERCIAL OPER A TION (u/7 7 ) | ||
ADOCK 05000133 PDR | ' D (fl 8708190424 870630 PDR ADOCK 05000133 L | ||
R PDR | |||
// L | |||
i | i AVERACE DAILY UNIT POWER LEVEL DOCKET NO. | ||
IO -/ S3 UNIT - H BPP M3 DATE W'Y A. t 9 97 _ | |||
UNIT - H BPP M3 DATE | COMPLETED BY cc vi a s TELEPHONE 70 {/WS-27/7 MONTH Uuue_.. t 9 Ff7 DAY AVERAGE DAILY POWER LEVEL DAY (MWe Nett AVERAGE DAILY POWER LEVEL Olwe Nett i | ||
COMPLETED BY | O 17 2 | ||
DAY (MWe Nett | 18 3 | ||
17 2 | |||
19 20 21 22 7 | 19 20 21 22 7 | ||
23 8 | 23 8 | ||
24 | 24 | ||
~ | |||
9 3 | 9 3 | ||
10 1I 27 12 28 13 29 14 30 N | 10 1I 27 12 28 13 29 14 30 N | ||
15 3, | 15 3, | ||
16 | 16 v | ||
INSTRUCTIONS On | l INSTRUCTIONS On this format, list the average daily unit power leselin MWe. Net for each day in the reE'3r:'"3 '" | ||
p>i77 > | the nearest whole megawatt. | ||
j p>i77 > | |||
l | l | ||
___________________s | ___________________s | ||
MA 7 | |||
3 3W | 3 3W M 2 G | ||
3 | |||
%c-g E | |||
8 R | |||
P 3 | |||
Ond 4h4 g | |||
l 1 | |||
t F | |||
N | |||
( | ( | ||
e 5 H % C- | e C/ | ||
5 H % C-e el s | |||
e | si e | ||
a 7 | |||
3 ms nF c | |||
c | r s a e) o ts nf( | ||
m c | |||
u iDiR o | |||
7 e | |||
e t | |||
cufLE S | |||
v c | |||
i n | |||
orL e | |||
O.EEYE tt rr m | |||
S | |||
r e | r e | ||
o e. | |||
no n | |||
a N MT BN r | |||
t u | |||
s AA D O r | |||
I i t S | |||
r o | |||
c t | |||
E H C.e T N D | |||
- aet ep s.R Gahe E | |||
e r | |||
K T T P I | |||
&ut pSR E | |||
E t | |||
t I | |||
e ie i | |||
C N L L e | |||
n | |||
) | |||
b s yt b | |||
s e | |||
O U P E u | |||
v ipr n1 i | |||
h tnv1 s | |||
e6 h | |||
D M T a | |||
e r | |||
g o | |||
x r C | |||
P EfEE0 E | |||
G a | |||
7 4 | |||
5 g | |||
p g | |||
s 4 | |||
S N | |||
O m | |||
I T | |||
Ehg mca )m C | |||
7 r | |||
U og aSl a | |||
6 D | |||
cp r | |||
9 cix E | |||
1 St aE R | |||
: l l n( | |||
a a R | |||
E duuiroe M | |||
1oL'- | |||
o nnt h E | |||
haant W | |||
eMMA) t O | |||
7t Ml 234 4 | |||
P D | |||
H N | |||
T 3 | |||
A NO SN M | |||
A 8 | |||
W T | |||
f O | |||
R | |||
- u | |||
/ | |||
P D | |||
O ge N | |||
R m | |||
T P | |||
e U | |||
E i | |||
R t | |||
fi a | |||
S nu T | |||
n 3:.b - | |||
I a | |||
N m | |||
U | |||
.h.d E | |||
i | |||
) | |||
.53ej ia n | |||
ia n | |||
e | |||
) | |||
s n | |||
lp e | |||
l t | |||
mIJ p | |||
m | |||
. k ;* | |||
E ic& | |||
x t | |||
H E | |||
( t r | |||
s t | |||
e e | |||
( | |||
uT i g n | |||
r r | |||
n u) l tsi r | |||
i iae ener i n | |||
_I F | |||
RivElp cku-e ai a | |||
c nn yT ala r | |||
t t c o | |||
2 gr nu r | |||
ea or t | |||
mnnt oi ioE i | |||
s 7 | |||
: pt | |||
( | ( | ||
el at nt el a a r ninu ur uie o ui gee chr f | |||
s qa e e pd pf 8, | |||
aEMRROA) O S | |||
e - | |||
- 4 RABCDFFGI I | |||
2 zo te aD 7o d | |||
6 e | |||
a r ninu o ui | 7 d lu ed 6 | ||
RABCDFFGI I | orc e h | ||
2 | i F S | ||
te | ) | ||
N 7 | |||
F S | 6 FS 7 | ||
N | 7 19 I | ||
FS | 1 1l' ll | ||
h 0h L | |||
PACIFIC | PACIFIC GAS AND E LE C T RI C C O M PANY 1P f77*EdIC Y | ||
* EUREKA, C ALIFO R NI A 95501 * (707) 443 2787 R.T. NELSON PLANf M ANAGit Nut.*LI AR PLANf OPERATION 1 HUwsot.Df July 13, 1987 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: | 1034 SIXT H $7REET | ||
Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for June, 1987. | * EUREKA, C ALIFO R NI A 95501 * (707) 443 2787 R.T. NELSON PLANf M ANAGit Nut.*LI AR PLANf OPERATION 1 HUwsot.Df July 13, 1987 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: | ||
Docket No. 50-133 License No. DPR-7 Gentlemen: | |||
Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for June, 1987. | |||
These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications. | |||
Sincerely, Sk. | Sincerely, Sk. | ||
R. T. Nelson Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California | R. T. Nelson Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787) | ||
Enclosure cc: | Enclosure cc: | ||
Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 thria Lane, Suite 210 Walnut Creek, California 94596 RTNelson:ss | |||
./ | |||
i i | i i | ||
e | e | ||
I MONTHLY NARRATIVE REPORT OF OPERATING | I MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June, 1987. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications. | ||
AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June, 1987. This report was prepared by the Plant Staff | |||
and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications. | |||
During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. | During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. | ||
l l | l l | ||
l | l | ||
- _ _ _ _.. - - _ - _ _. _ -. _ _ _ _ -. -}} | |||
Latest revision as of 06:39, 2 December 2024
| ML20237K847 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 06/30/1987 |
| From: | Kwok C, Nelson R PACIFIC GAS & ELECTRIC CO. |
| To: | NRC |
| References | |
| NUDOCS 8708190424 | |
| Download: ML20237K847 (5) | |
Text
- - _ _ _ _ _ _ _ _ _ _ _ _. -
OPERATLNG DATA REPORT DOCKET NO.
80~/83 DATE Tutv A de 1 COh!PLETED BY cec i<
TELEPHONE 707/ Y 43 ~' 2 7 8 7 OPERATING STATUS
- 1. Unit Name:
HUMdoLor EAv ?dWEA, LAAJ7*-llsjtr3 Notes
- 2. Reposting Period:
cum-19 F1
- 3. Licensed Thermal Power (MWt):
2 '2 O
- 4. Namcplate Rating (Gross blWe):
6E
- 5. Design Electrical Rating (Net SIWE):
86
- 6. Sfaximum Dependable Capacity (Gross alWe):
4 S'
- 7. Maximum Dependable Capacity (Net SIWE):
4S
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
A//A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N!A
- 10. Reasons For Restrictions,if Any:
AI/A This Month Yr..to Date Cumulatise I1. Hours In Reporting Pc:.od
""72 o 443 4-3
,2c 9, 6M
- 12. Number Of Hours Reactor Was Critical O
o T6171
- 13. Reactor Reserve Shutdown Hours O
O O
- 14. Hours Generator On.Line o
O 97262.
- 15. Unit Reserve Shutdown Hours o
o O
- 16. Gross Thermal Energy Generated (MWH)
O M
/C 4/ 8, '/5/a
- 17. Gross Electrical Energy Generated (51WH) o o
% 77% 732
- 18. Net Electrical Energy Generated (MWH) o
/)
% 52% 8 13
- 19. Urtit Service Factor O
o
- 46. 4 #/c
- 20. Unit Availability Factor O
o 1/6 404
- 21. Unit Capacity Factor (Using MDC Net) o O
3+. '*> '7
- 22. Unit Capacity Factor (Using DER Net) o d
33 2%
- 23. Unit Forced Outage Rate o
d
/. 9/ %
- 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date, and Duration of Each):
A//A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
W 0 " M 'It' / 0 ^' /d6
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTRICITY COM31ERCIAL OPER A TION (u/7 7 )
' D (fl 8708190424 870630 PDR ADOCK 05000133 L
R PDR
// L
i AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
IO -/ S3 UNIT - H BPP M3 DATE W'Y A. t 9 97 _
COMPLETED BY cc vi a s TELEPHONE 70 {/WS-27/7 MONTH Uuue_.. t 9 Ff7 DAY AVERAGE DAILY POWER LEVEL DAY (MWe Nett AVERAGE DAILY POWER LEVEL Olwe Nett i
O 17 2
18 3
19 20 21 22 7
23 8
24
~
9 3
10 1I 27 12 28 13 29 14 30 N
15 3,
16 v
l INSTRUCTIONS On this format, list the average daily unit power leselin MWe. Net for each day in the reE'3r:'"3 '"
the nearest whole megawatt.
j p>i77 >
l
___________________s
MA 7
3 3W M 2 G
3
%c-g E
8 R
P 3
Ond 4h4 g
l 1
t F
N
(
e C/
5 H % C-e el s
si e
a 7
3 ms nF c
r s a e) o ts nf(
m c
u iDiR o
7 e
e t
cufLE S
v c
i n
orL e
O.EEYE tt rr m
r e
o e.
no n
a N MT BN r
t u
s AA D O r
I i t S
r o
c t
E H C.e T N D
- aet ep s.R Gahe E
e r
K T T P I
&ut pSR E
E t
t I
e ie i
C N L L e
n
)
b s yt b
s e
O U P E u
v ipr n1 i
h tnv1 s
e6 h
D M T a
e r
g o
x r C
P EfEE0 E
G a
7 4
5 g
p g
s 4
S N
O m
I T
Ehg mca )m C
7 r
U og aSl a
6 D
cp r
9 cix E
1 St aE R
- l l n(
a a R
E duuiroe M
1oL'-
o nnt h E
haant W
eMMA) t O
7t Ml 234 4
P D
H N
T 3
A NO SN M
A 8
W T
f O
R
- u
/
P D
O ge N
R m
T P
e U
E i
R t
fi a
S nu T
n 3:.b -
I a
N m
U
.h.d E
i
)
.53ej ia n
ia n
e
)
s n
lp e
l t
mIJ p
m
. k ;*
E ic&
x t
H E
( t r
s t
e e
(
uT i g n
r r
n u) l tsi r
i iae ener i n
_I F
RivElp cku-e ai a
c nn yT ala r
t t c o
2 gr nu r
ea or t
mnnt oi ioE i
s 7
- pt
(
el at nt el a a r ninu ur uie o ui gee chr f
s qa e e pd pf 8,
aEMRROA) O S
e -
- 4 RABCDFFGI I
2 zo te aD 7o d
6 e
7 d lu ed 6
orc e h
i F S
)
N 7
6 FS 7
7 19 I
1 1l' ll
h 0h L
PACIFIC GAS AND E LE C T RI C C O M PANY 1P f77*EdIC Y
1034 SIXT H $7REET
- EUREKA, C ALIFO R NI A 95501 * (707) 443 2787 R.T. NELSON PLANf M ANAGit Nut.*LI AR PLANf OPERATION 1 HUwsot.Df July 13, 1987 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re:
Docket No. 50-133 License No. DPR-7 Gentlemen:
Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for June, 1987.
These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications.
Sincerely, Sk.
R. T. Nelson Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)
Enclosure cc:
Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 thria Lane, Suite 210 Walnut Creek, California 94596 RTNelson:ss
./
i i
e
I MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June, 1987. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications.
During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained.
l l
l
- _ _ _ _.. - - _ - _ _. _ -. _ _ _ _ -. -