ML20246N657: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:- - -
{{#Wiki_filter:- - -
                    ,-                1901 Gratiot Street Post O!fice Box 149
1901 Gratiot Street Post O!fice Box 149 St. Louis. Missouri 631E6
                .                  St. Louis. Missouri 631E6
.9.
      .9.                           314 554 4650 1
314 554 4650 1
Union                                                                           0 isr scs ir
Union 0 isr scs ir Etscnuc
                                                                                                      ~~~~~
~~~~~
Etscnuc                                                                                  ""*"'
g May 9, 1989 U.S. Nuclear Regulatory Commission ATTN:
g May 9, 1989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop P1-137 Washington, D.C. 20555 Gentlemen:                                             ULNRC-2003 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.6.1.6 CONTAINMENT VESSEL STRUCTURAL INTEGRITY
Document Control Desk Mail Stop P1-137 Washington, D.C.
20555 Gentlemen:
ULNRC-2003 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.6.1.6 CONTAINMENT VESSEL STRUCTURAL INTEGRITY


==References:==
==References:==
: 1) ULNRC-1173 dated September 18, 1985
1)
: 2) UIERC-1950 dated March 23, 1989
ULNRC-1173 dated September 18, 1985 2)
: 3) NRC {{letter dated|date=May 5, 1989|text=letter dated May 5, 1989}} References 1 and 2 transmitted an amendment request to revise Technical Specification 3/4.6.1.6, related to containment vessel structural integrity. A meeting between the Staff, Wolf Creek Nuclear Operating Corporation and Union Electric personnel was held on May 3, 1989 and is summarized in Reference 3. The attached specification was jointly developed during that meeting and represents a clarification to the versions provided in References 1'and 2. The attached specification meets Staff requirements and it has been determhaed tnat the conclusions of the Safety Evaluation egi Significant Hazards Evaluation transmitted by Reference 1 remain valid.
UIERC-1950 dated March 23, 1989 3)
The Callaway On-Site Review Committee has approved this proposed specification. The Nuclear Safety Review Board previously approved the safety evaluation conclusions provided in Reference 1. If you have any additional questions in this matter, please contact us.
NRC {{letter dated|date=May 5, 1989|text=letter dated May 5, 1989}} References 1 and 2 transmitted an amendment request to revise Technical Specification 3/4.6.1.6, related to containment vessel structural integrity.
A meeting between the Staff, Wolf Creek Nuclear Operating Corporation and Union Electric personnel was held on May 3, 1989 and is summarized in Reference 3.
The attached specification was jointly developed during that meeting and represents a clarification to the versions provided in References 1'and 2.
The attached specification meets Staff requirements and it has been determhaed tnat the conclusions of the Safety Evaluation egi Significant Hazards Evaluation transmitted by Reference 1 remain valid.
The Callaway On-Site Review Committee has approved this proposed specification.
The Nuclear Safety Review Board previously approved the safety evaluation conclusions provided in Reference 1.
If you have any additional questions in this matter, please contact us.
Very truly yours,
Very truly yours,
                                                                                          /
/
Donald F. Schnell DS/plh
Donald F.
Schnell DS/plh


==Attachment:==
==Attachment:==
Proposed Technical Specification Pages 00   t e9o5190491 e90 sop fDR ADOCK 050004e3
Proposed Technical Specification Pages 00 t
                                                                                                              $      I PDC                                                           <
e9o5190491 e90 sop fDR ADOCK 050004e3 I
_ _ _ _ _ . _ _ _ _ _ _ - - - -                                                                                      J
PDC J


1 .
1 l
l                                                 .    .                                                                                      l l ..                                                                                                                                            l l
l l
STATE OF MISSOURI )                                                                     l
l l
                                                                          )   SS CITY OF ST. LOUIS )                                                                     ,
STATE OF MISSOURI )
l
)
SS CITY OF ST. LOUIS )
i 1
i 1
I Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authorit'/ to do.
I Donald F.
Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authorit'/ to do.
so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
r By   /                           '
r By
Donald F. Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this     -    day of                       , 1987
/
                                                                                                                    % 0/M1 BARBARA J. PF FF N01ARY PUBLIC. STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22, 1993 ST. LOUIS COUNTY
Donald F.
Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this day of
, 1987
% 0/M1 BARBARA J. PF FF N01ARY PUBLIC. STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22, 1993 ST. LOUIS COUNTY


cc:                                           Gerald Charnoff, Esq.
cc:
Shaw, Pittman, Potts & Trowbridge                       )
Gerald Charnoff, Esq.
Wa     Ingt n D C. 2bO37 Dr. J. O. Cermak                                           i CFA, Inc.                                               )
Shaw, Pittman, Potts & Trowbridge
)
Wa Ingt n D C.
2bO37 Dr. J. O. Cermak i
CFA, Inc.
)
4 Professional Drive (Suite 110)
4 Professional Drive (Suite 110)
Gaithersburg, MD   20879 R. C. Knop Chief, Reactor Project Branch 1                         I U.S. Nuclear Regulatory Commission                       l Region III 799 Roosevelt Road
Gaithersburg, MD 20879 R.
                                                                  ' Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission                       i RR#1 Steedman, Missouri   65077 Tom Alexion (2)
C. Knop Chief, Reactor Project Branch 1 I
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission F.O. Box 360 Jefferson City, MO 65102 Ron Kucera l                                                                       Department of Natural Resources
U.S.
!                                                                        P.O. Box 176 l                                                                       Jefferson City, MO 65102 l
Nuclear Regulatory Commission l
Region III 799 Roosevelt Road
' Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission i
RR#1 Steedman, Missouri 65077 Tom Alexion (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission F.O. Box 360 Jefferson City, MO 65102 Ron Kucera l
Department of Natural Resources P.O. Box 176 l
Jefferson City, MO 65102 l
l l
l l
l 1
l 1


  .                            .                                                                                                                                                                                                                                                                                                        i bec:                                   D.                 Shafer/A160.761
i bec:
                                                                                                                                                /QA Record (CA-758)
D. Shafer/A160.761
Nuclear Date E210.01                                                                                                                                                                                                             i DFS/ Chrono D. F. Schnell J . ' E. Birk J.                 V. Laux                                                                                                                                                                                           .
/QA Record (CA-758)
M.                 A. Stiller                                                                                                                                                                                       !
Nuclear Date E210.01 i
G.                   L. Ran.iolph                                                                                                                                                                                   j R.                 J ,, Irwin                                                                                                                                                                                       '
DFS/ Chrono D.
H. Wuertenbaechec W.                   R. Campbell                                                                                                                                                                                     ,
F. Schnell J. ' E.
A.               C . Passwater                                                                                                                                                                                     i R.                 P. Wendling D.                 E. Shafer D.                 J. Walker O. Maynard (WCNOC)
Birk J. V.
N.                 P. Goel (Bechtel)
Laux M. A.
T.                   P. Sharkey NSRB (Sandra Auston)
Stiller G.
_ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ . - _ _ _ - - _ . _ - _ - _ _ - - - _ - - - _ - - - - - - - - _ _ - - -          - - - - - - - - - - _ - - _ - - - - - - - - - - - -    - - - - - - - -    - - - - - - - - - - - - -      --    - - - - - - - - - - - - - - - - - - - - - - - - - -}}
L. Ran.iolph j
R.
J,, Irwin H. Wuertenbaechec W.
R. Campbell A. C. Passwater i
R.
P. Wendling D.
E.
Shafer D.
J. Walker O. Maynard (WCNOC)
N. P. Goel (Bechtel)
T.
P. Sharkey NSRB (Sandra Auston)
- - - - - - - - - - - - - - - - - - - - - - - - - -}}

Latest revision as of 22:14, 1 December 2024

Application for Amend to License NPF-30,revising Tech Spec 3/4.6.1.6 Re Containment Vessel Structural Integrity
ML20246N657
Person / Time
Site: Callaway 
Issue date: 05/09/1989
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246N661 List:
References
ULNRC-2003, NUDOCS 8905190491
Download: ML20246N657 (4)


Text

- - -

1901 Gratiot Street Post O!fice Box 149 St. Louis. Missouri 631E6

.9.

314 554 4650 1

Union 0 isr scs ir Etscnuc

~~~~~

g May 9, 1989 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop P1-137 Washington, D.C.

20555 Gentlemen:

ULNRC-2003 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.6.1.6 CONTAINMENT VESSEL STRUCTURAL INTEGRITY

References:

1)

ULNRC-1173 dated September 18, 1985 2)

UIERC-1950 dated March 23, 1989 3)

NRC letter dated May 5, 1989 References 1 and 2 transmitted an amendment request to revise Technical Specification 3/4.6.1.6, related to containment vessel structural integrity.

A meeting between the Staff, Wolf Creek Nuclear Operating Corporation and Union Electric personnel was held on May 3, 1989 and is summarized in Reference 3.

The attached specification was jointly developed during that meeting and represents a clarification to the versions provided in References 1'and 2.

The attached specification meets Staff requirements and it has been determhaed tnat the conclusions of the Safety Evaluation egi Significant Hazards Evaluation transmitted by Reference 1 remain valid.

The Callaway On-Site Review Committee has approved this proposed specification.

The Nuclear Safety Review Board previously approved the safety evaluation conclusions provided in Reference 1.

If you have any additional questions in this matter, please contact us.

Very truly yours,

/

Donald F.

Schnell DS/plh

Attachment:

Proposed Technical Specification Pages 00 t

e9o5190491 e90 sop fDR ADOCK 050004e3 I

PDC J

1 l

l l

l l

STATE OF MISSOURI )

l

)

SS CITY OF ST. LOUIS )

i 1

I Donald F.

Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authorit'/ to do.

so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

r By

/

Donald F.

Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this day of

, 1987

% 0/M1 BARBARA J. PF FF N01ARY PUBLIC. STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22, 1993 ST. LOUIS COUNTY

cc:

Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge

)

Wa Ingt n D C.

2bO37 Dr. J. O. Cermak i

CFA, Inc.

)

4 Professional Drive (Suite 110)

Gaithersburg, MD 20879 R.

C. Knop Chief, Reactor Project Branch 1 I

U.S.

Nuclear Regulatory Commission l

Region III 799 Roosevelt Road

' Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission i

RR#1 Steedman, Missouri 65077 Tom Alexion (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission F.O. Box 360 Jefferson City, MO 65102 Ron Kucera l

Department of Natural Resources P.O. Box 176 l

Jefferson City, MO 65102 l

l l

l 1

i bec:

D. Shafer/A160.761

/QA Record (CA-758)

Nuclear Date E210.01 i

DFS/ Chrono D.

F. Schnell J. ' E.

Birk J. V.

Laux M. A.

Stiller G.

L. Ran.iolph j

R.

J,, Irwin H. Wuertenbaechec W.

R. Campbell A. C. Passwater i

R.

P. Wendling D.

E.

Shafer D.

J. Walker O. Maynard (WCNOC)

N. P. Goel (Bechtel)

T.

P. Sharkey NSRB (Sandra Auston)

- - - - - - - - - - - - - - - - - - - - - - - - - -