"      ""                                        BEFORE THE L                             UNITED STATES NUCLEAR REGULATORY COMMISSION t
k 3
BEFORE THE L
UNITED STATES NUCLEAR REGULATORY COMMISSION t
In the Matter of the Facility Operating' License)
In the Matter of the Facility Operating' License)
                                                                    )
)
of:                       )
of:
                                                                    )
)
PUBLIC SERVICE COMPANY OF COLORADO                 )
)
PUBLIC SERVICE COMPANY OF COLORADO
)
Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility. Operating License, License No. DPR-34, is submitted for NRC review and approval.
Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility. Operating License, License No. DPR-34, is submitted for NRC review and approval.
Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By A. Clegg Crawford Vice President Nuclear Operations KELLY, STANSFIELD & 0'DONNELL James K. Tarpey Mark A. Davidson Public Service Company Building Denver, Colorado   80202 Attorneys for Applicant gg92gg(( h,         ,gf P
Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By A. Clegg Crawford Vice President Nuclear Operations KELLY, STANSFIELD & 0'DONNELL James K. Tarpey Mark A. Davidson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant gg92gg(( h,
L________-_______-.     .-
,gf P
L________-_______-.


___,.__..._---.._-.---_r-. x.
___,.__..._---.._-.---_r-.
x.
y'..._
y'..._
ATTACHMENT 1 TO P-89341
ATTACHMENT 1 TO P-89341
Line 41: Line 47:


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES LCO's 4.1.2 through 4.1.6, SR's 5.1.1, 5.1.2, 5.1.3, and 5.1.5 were superseded by the Interim Technical Specifications, by which PSC currently operates. This proposed amendment deletes the above listed LCO's and SR's, and adds a new Reactivity Control                                     Section which supersedes the Interim Technical                       Specifications.             The Reactivity Control Section is derived from the Technical Specification Upgrade Program (TSUP) as evaluated in Reference (2). Definitions Section 2.0, and Administrative Controls Section AC 7.1 are also revised to accommodate and reflect tho Technical Specifications, as amended.
OF PROPOSED CHANGES LCO's 4.1.2 through 4.1.6, SR's 5.1.1, 5.1.2, 5.1.3, and 5.1.5 were superseded by the Interim Technical Specifications, by which PSC currently operates.
Where applicable, specific relationships between current Technical Specifications / Interim Specifications, TSUP, and this submittal will be   identified for clarity.                     Other supporting changes will                                                         be identified and summarized as applicable.
This proposed amendment deletes the above listed LCO's and SR's, and adds a new Reactivity Control Section which supersedes the Interim Technical Specifications.
Specification       Description of Change 2.3.b               CHANNEL FUNCTIONAL TEST is added to the definition title. The definition remains unchanged.
The Reactivity Control Section is derived from the Technical Specification Upgrade Program (TSUP) as evaluated in Reference (2). Definitions Section 2.0, and Administrative Controls Section AC 7.1 are also revised to accommodate and reflect tho Technical Specifications, as amended.
2.18                 Surveillance Interval                         is revised to delete the restriction associated with the termination of surveillance to those having an interval of one month or less.
Where applicable, specific relationships between current Technical Specifications / Interim Specifications, TSUP, and this submittal will be identified for clarity.
2.23                 CALCULATED BULK CORE TEMPERATURE is revised to reference the explanation in LC0 4.0.4.
Other supporting changes will be identified and summarized as applicable.
2.24                 Minor editorial changes are made to the CORE AVERAGE INLET TEMPERATURE definition, adopting the TSUP definition.
Specification Description of Change 2.3.b CHANNEL FUNCTIONAL TEST is added to the definition title. The definition remains unchanged.
2.25 through         Definitions are added from the TSUP 2.31               definitions section.
2.18 Surveillance Interval is revised to delete the restriction associated with the termination of surveillance to those having an interval of one month or less.
2.27                 This definition is different from the TSUP in that the reactor power was changed to THERMAL POWER.
2.23 CALCULATED BULK CORE TEMPERATURE is revised to reference the explanation in LC0 4.0.4.
Section 4.1         Reactor Core and Reactivity Control Section LCO's 4.1.2,                 4.1.3,   4.1.4,       4.1.5, and           4.1.6 are superseded by proposed specifications in the new Reactivity Control Section.                         The core reload design requirements have been deleted since there will be no more core reloads.                           See the later discussion for the proposed Reactivity Control Section.
2.24 Minor editorial changes are made to the CORE AVERAGE INLET TEMPERATURE definition, adopting the TSUP definition.
2.25 through Definitions are added from the TSUP 2.31 definitions section.
2.27 This definition is different from the TSUP in that the reactor power was changed to THERMAL POWER.
Section 4.1 Reactor Core and Reactivity Control Section LCO's 4.1.2, 4.1.3, 4.1.4, 4.1.5, and 4.1.6 are superseded by proposed specifications in the new Reactivity Control Section.
The core reload design requirements have been deleted since there will be no more core reloads.
See the later discussion for the proposed Reactivity Control Section.


i
i


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES                                                                               3
OF PROPOSED CHANGES 3
                  - Specification     Description of Change Section 5.1       Reactor Core and Reactivity Control SR's 5.1.1, 5.1.2,' 5.1.3, and 5.1.5 are superseded by proposed specifications       in the new Reactivity Control Section.     See the later discussion                             for       the l
- Specification Description of Change Section 5.1 Reactor Core and Reactivity Control SR's 5.1.1, 5.1.2,' 5.1.3, and 5.1.5 are superseded by proposed specifications in the new Reactivity Control Section.
See the later discussion for the l
proposed Reactivity Control Section.
proposed Reactivity Control Section.
f SR 5.1.4 is revised to reference LC0 3.1.4 versus LCO 4.1.2.
f SR 5.1.4 is revised to reference LC0 3.1.4 versus LCO 4.1.2.
AC 7.1.3           AC   7.1.3.8.b.1     is revised to reference new specification 3/4.1.5.
AC 7.1.3 AC 7.1.3.8.b.1 is revised to reference new specification 3/4.1.5.
The new Reactivity Control Section includes Definitions Section 1.0, Applicability   Specifications     3/4.0,     and   Reactivity                         Control Specifications which supersede other specifications as described below.
The new Reactivity Control Section includes Definitions Section 1.0, Applicability Specifications 3/4.0, and Reactivity Control Specifications which supersede other specifications as described below.
Section 1.0       The Definitions Section contains a description and table for operational modes as used in                                       the Reactivity       Control     ' Specifications.                         -This definition is derived from the TSUP Definition 1.23 and Table 1.1.
Section 1.0 The Definitions Section contains a description and table for operational modes as used in the Reactivity Control
                  - Section 3/4.0     The Applicability Specifications for LCO's and Surveillance in the Reactivity Control Section are   mostly     taken     from   the TSUP.                         Certain           '
' Specifications.
Specifications       refer     to   current                         Technical i
-This definition is derived from the TSUP Definition 1.23 and Table 1.1.
Specifications,       as     applicable,                 instead of restating a similar Specification from the TSUP.
- Section 3/4.0 The Applicability Specifications for LCO's and Surveillance in the Reactivity Control Section are mostly taken from the TSUP.
Certain Specifications refer to current Technical i
Specifications, as applicable, instead of restating a similar Specification from the TSUP.
Reactivity Applicability LCO 3.0.1 through 3.0.4 are a duplication of the same TSUP Specifications.
Reactivity Applicability LCO 3.0.1 through 3.0.4 are a duplication of the same TSUP Specifications.
LCO     3.0.5   refers to current LC0 4.0.4 for CALCULATED BULK CORE TEMPERATURE.
LCO 3.0.5 refers to current LC0 4.0.4 for CALCULATED BULK CORE TEMPERATURE.
Reactivity Applicability SR's             4.0.1, 4.0.3, and 4.0.4   are a duplication of             the                     same     TSUP Specifications.       SR   4.0.2   refers to Definition 2.18 for SURVEILLANCE INTERVAL adjustments.
Reactivity Applicability SR's 4.0.1, 4.0.3, and 4.0.4 are a duplication of the same TSUP Specifications.
h l
SR 4.0.2 refers to Definition 2.18 for SURVEILLANCE INTERVAL adjustments.
> h l


V ll_
V ll


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES Specification Description of Change 3/4.0 (Cont.) The Bases for LCO's 3.0.1 through 3.0.4 are a duplication of the TSUP Bases, except the example for TSUP Specification 3.7.3 is deleted from the LCO 3.0.3   Basis. The Basis for- LCO                       3.0.5 essentially refers to LCO 4.0.4.
OF PROPOSED CHANGES Specification Description of Change 3/4.0 (Cont.)
The   Bases   for SR's 4.0.1 and 4.0.4 are- a duplication of the TSUP Bases.     The Basis for SR 4.0.2     incorporates     the   Standard                   Technical Specification words as identified in                           Generic Letter 89-14.       The Basis for SR     4.0.3                 is a duplicate   of     the   TSUP   Basis   except                   for editorializing the reference to SR 4.0.2.
The Bases for LCO's 3.0.1 through 3.0.4 are a duplication of the TSUP Bases, except the example for TSUP Specification 3.7.3 is deleted from the LCO 3.0.3 Basis.
3/4.1.1-     New Reactivity Control Section, " Control Rod Pair Operability     Specification,"   replaces                   Interim Specification 3/4.1.1 and is derived from TSUP Specification 3/4.1.1.
The Basis for-LCO 3.0.5 essentially refers to LCO 4.0.4.
Differences between TSUP Specification 3/4.1.1 and the Reactivity Control Specification                         include:
The Bases for SR's 4.0.1 and 4.0.4 are-a duplication of the TSUP Bases.
reformatting, minor editorial changes such as clarifying that immediately is within 10 minutes, SR   4.1.1.a and d were incorporated into one Specification as SR 4.1.1.C, and references were updated.
The Basis for SR 4.0.2 incorporates the Standard Technical Specification words as identified in Generic Letter 89-14.
3/4.1.2       New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Operating," replaces Interim Specification 3/4.1.2 and is derived from TSUP Specification 3/4.1.2.1.
The Basis for SR 4.0.3 is a duplicate of the TSUP Basis except for editorializing the reference to SR 4.0.2.
Differences between TSUP Specification 3/4.1.2.1 and the Reactivity Control     Specification include reformatting, minor editorial changes, reference to LCO 3.1.5 versus 3.1.4.1, and references were updated.
3/4.1.1-New Reactivity Control Section, " Control Rod Pair Operability Specification,"
3/4.1.3       New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Shutdown," replaces Interim Specification 3/4.1.3 and is derived from TSUP Specification 3/4.1.2.2.
replaces Interim Specification 3/4.1.1 and is derived from TSUP Specification 3/4.1.1.
Differences between TSUP Specification 3/4.1.1 and the Reactivity Control Specification include:
reformatting, minor editorial changes such as clarifying that immediately is within 10 minutes, SR 4.1.1.a and d were incorporated into one Specification as SR 4.1.1.C, and references were updated.
3/4.1.2 New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Operating," replaces Interim Specification 3/4.1.2 and is derived from TSUP Specification 3/4.1.2.1.
Differences between TSUP Specification 3/4.1.2.1 and the Reactivity Control Specification include reformatting, minor editorial changes, reference to LCO 3.1.5 versus 3.1.4.1, and references were updated.
3/4.1.3 New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Shutdown," replaces Interim Specification 3/4.1.3 and is derived from TSUP Specification 3/4.1.2.2. -_--_____ - _ _ _


4
4


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES Specification   Description of Change 3/4.1.3 (Cont.)' Differences between TSUP Specification 3/4.1.2.2 and the Reactivity Control                                           Specification include reformatting, minor editorial changes, updating references, and the addition of                                                                           "in fueled regions" for clarification in rod pair movement discussions. Refueling Surveillance intervals are changed to eighteen month periodicities, and the word " refueling" was deleted from 4.1.3.c.
OF PROPOSED CHANGES Specification Description of Change 3/4.1.3 (Cont.)'
3/4.1.4         New Reactivity Control Section, " Shutdown Margin,"
Differences between TSUP Specification 3/4.1.2.2 and the Reactivity Control Specification include reformatting, minor editorial changes, updating references, and the addition of "in fueled regions" for clarification in rod pair movement discussions.
Refueling Surveillance intervals are changed to eighteen month periodicities, and the word " refueling" was deleted from 4.1.3.c.
3/4.1.4 New Reactivity Control Section, " Shutdown Margin,"
replaces Interim Specification 3/4.1.4 and is derived from TSUP Specification 3/4.1.3.
replaces Interim Specification 3/4.1.4 and is derived from TSUP Specification 3/4.1.3.
Differences between TSUP Specification 3/4.1.3 and the Reactivity . Control                                             Specification                           include reformatting , the addition of "in fueled regions" for                   clarification                           in   rod-                           pair   movement discussions, and references were updated. The stipulation is also added that the Shutdown Margin shall be assessed prior to the removal of the control rod pair in a region to be refueled or repaired, only until all control rod pairs can be withdrawn                     without                           resulting                             in   reactor criticality.
Differences between TSUP Specification 3/4.1.3 and the Reactivity. Control Specification include reformatting, the addition of "in fueled regions" for clarification in rod-pair movement discussions, and references were updated. The stipulation is also added that the Shutdown Margin shall be assessed prior to the removal of the control rod pair in a region to be refueled or repaired, only until all control rod pairs can be withdrawn without resulting in reactor criticality.
3/4.1.5         New Reactivity Control Section, " Control Rod Pair Position                   and               Worth                 Requirements-Operating,"
3/4.1.5 New Reactivity Control Section, " Control Rod Pair Position and Worth Requirements-Operating,"
replaces Interim Specification 3/4.1.5 and is derived from TSUP Specification 3/4.1.4.1.
replaces Interim Specification 3/4.1.5 and is derived from TSUP Specification 3/4.1.4.1.
Differences between TSUP Specification 3/4.1.4 and the Reactivity Control                                               Specification                           include reformatting and editorial corrections, deletion of the reference to Special Test Exceptions l                     Specification 3.10.1, and references were updated.
Differences between TSUP Specification 3/4.1.4 and the Reactivity Control Specification include reformatting and editorial corrections, deletion of the reference to Special Test Exceptions l
3/4.1.6         New Reactivity Control Section, " Control Rod Pair Position Requirements-Shutdown," replaces Interim Specification 3/4.1.6 and is derived from TSUP
Specification 3.10.1, and references were updated.
;                      Specification 3/4.1.4.2.
3/4.1.6 New Reactivity Control Section, " Control Rod Pair Position Requirements-Shutdown," replaces Interim Specification 3/4.1.6 and is derived from TSUP Specification 3/4.1.4.2.
l I                           - - - - - - - -        -- - - - - -        - - - - - - -        - - - - - - - - - - - - - _ _
l I


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES Specification     Description of Change 3/4.1.6 (Cont.)   Differences between TSUP LCO 3.1.4.2                                                                                               and the Reactivity     Control             Specification                                                                                             include reformatting, the addition of "in fueled regions"
OF PROPOSED CHANGES Specification Description of Change 3/4.1.6 (Cont.)
                            'for   clarification-     in         rod                 pair                                                                     movement discussions,   references were updated, and minor editorial corrections. The stipulation is also added that Specification 3/4.1.6 is applicable during Shutdown and Refueling, only until all control     rod     pairs can be withdrawn without
Differences between TSUP LCO 3.1.4.2 and the Reactivity Control Specification include reformatting, the addition of "in fueled regions"
;:                          resulting in reactor criticality. A revision was made to SR 4.1.6.D.1 for technical clarification.
'for clarification-in rod pair movement discussions, references were updated, and minor editorial corrections. The stipulation is also added that Specification 3/4.1.6 is applicable during Shutdown and Refueling, only until all control rod pairs can be withdrawn without resulting in reactor criticality. A revision was made to SR 4.1.6.D.1 for technical clarification.
Additional description is added to the Basis in regards to making all fully inserted ~ control rod pairs incapable of being withdrawn.
Additional description is added to the Basis in regards to making all fully inserted ~ control rod pairs incapable of being withdrawn.
3/4.1.7           New Reactivity Control Section, " Reactivity Change With Temperature," replaces Interim Specification 3/4.1.7 and is derived from TSUP Specification 3/4.1.5. Reformatting changes only were made to the TSUP Specification.
3/4.1.7 New Reactivity Control Section, " Reactivity Change With Temperature," replaces Interim Specification 3/4.1.7 and is derived from TSUP Specification 3/4.1.5.
3/4.1.8           New Reactivity Control Section, " Reserve Shutdown System-Operating," replaces Interim Specification 3/4.1.8 and is derived from TSUP Specification 3/4.1.6.1 Differences between TSUP LCO 3.1.6.1 and the Reactivity     Control             Specif.ication                                                                                             include reformatting,       minor         editorial                             changes,                                                                         and updating references. The Basis is divided between the Reserve Shutdown System Operating and Shutdown Specifications, and edited accordingly.
Reformatting changes only were made to the TSUP Specification.
3/4.1.9           New Reactivity Control Section, " Reserve Shutdown System-Shutdown," replaces Interim Specification 3/4.1.9 and is derived from TSUP Specification 3/4.1.6.2.
3/4.1.8 New Reactivity Control Section, " Reserve Shutdown System-Operating," replaces Interim Specification 3/4.1.8 and is derived from TSUP Specification 3/4.1.6.1 Differences between TSUP LCO 3.1.6.1 and the Reactivity Control Specif.ication include reformatting, minor editorial
I
: changes, and updating references. The Basis is divided between the Reserve Shutdown System Operating and Shutdown Specifications, and edited accordingly.
3/4.1.9 New Reactivity Control Section, " Reserve Shutdown System-Shutdown," replaces Interim Specification 3/4.1.9 and is derived from TSUP Specification 3/4.1.6.2. I


h     *H .
h
l i
*H l
i


==SUMMARY==
==SUMMARY==
OF PROPOSED CHANGES Specification   Description of Change 3/4.1.9 (Cont.) Differences. between TSUP LCO 3.1.6.2         and' the Reactivity     Control   Specification         include reformatting,     minor   editorial     changes,     the addition of       "from   fueled     ' regions"     for clarification in rod pair withdrawal discussions, and updating references. Refueling Surveillance intervals are changed to eighteen months. The Basis is divided between Reserve Shutdown System Operating .and Shutdown Specifications, and edited accordingly.
OF PROPOSED CHANGES Specification Description of Change 3/4.1.9 (Cont.)
An     exception     to   the   applicability       of Specification 3/4.1.9 was added to identify that this specification does not apply if k(eff) s 0.95 with'all control rod pairs withdrawn.
Differences. between TSUP LCO 3.1.6.2 and' the Reactivity Control Specification include reformatting, minor editorial
NOTE:           The numbering system for this proposed Reactivity Control Section is similar to that of the TSUP and the Interim Technical Specifications. The number
: changes, the addition of "from fueled
                            '3' signifies an LCO and a     '4' is an SR.         For example,   3/4.1.9 is the Specification entitled
' regions" for clarification in rod pair withdrawal discussions, and updating references.
                            ' Reserve Shutdown System - Shutdown', 3.1.9 is the LCO, and 4.1.9 is the SR. This numbering scheme applies only to the Reactivity Control Section of the Technical Specifications.       The rest of the Specifications will remain numbered as before; all LCO's are indicated with the number'4', and the SR's are numbered with a   '5'.
Refueling Surveillance intervals are changed to eighteen months. The Basis is divided between Reserve Shutdown System Operating.and Shutdown Specifications, and edited accordingly.
                                                                                                          )
An exception to the applicability of Specification 3/4.1.9 was added to identify that this specification does not apply if k(eff) s 0.95 with'all control rod pairs withdrawn.
1
NOTE:
_____________________________a}}
The numbering system for this proposed Reactivity Control Section is similar to that of the TSUP and the Interim Technical Specifications. The number
'3' signifies an LCO and a
'4' is an SR.
For
: example, 3/4.1.9 is the Specification entitled
' Reserve Shutdown System - Shutdown', 3.1.9 is the LCO, and 4.1.9 is the SR. This numbering scheme applies only to the Reactivity Control Section of the Technical Specifications.
The rest of the Specifications will remain numbered as before; all LCO's are indicated with the number'4', and the SR's are numbered with a
'5'.
)
1 _____________________________a}}

Latest revision as of 19:59, 1 December 2024

Application for Amend to License DPR-34,deleting Limiting Condition for Operation 4.1.2 Through 4.1.6 & Surveillance Requirements 5.1.1,5.1.2,5.1.3 & 5.1.5 & Adding Reactivity Section
ML20247L077
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/14/1989
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20247L060 List:
References
P-89341, NUDOCS 8909220108
Download: ML20247L077 (8)


Text

_

p; '

g.

k 3

BEFORE THE L

UNITED STATES NUCLEAR REGULATORY COMMISSION t

In the Matter of the Facility Operating' License)

)

of:

)

)

PUBLIC SERVICE COMPANY OF COLORADO

)

Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility. Operating License, License No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By A. Clegg Crawford Vice President Nuclear Operations KELLY, STANSFIELD & 0'DONNELL James K. Tarpey Mark A. Davidson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant gg92gg(( h,

,gf P

L________-_______-.

___,.__..._---.._-.---_r-.

x.

y'..._

ATTACHMENT 1 TO P-89341

SUMMARY

OF PROPOSED CHANGES l

l l

SUMMARY

OF PROPOSED CHANGES LCO's 4.1.2 through 4.1.6, SR's 5.1.1, 5.1.2, 5.1.3, and 5.1.5 were superseded by the Interim Technical Specifications, by which PSC currently operates.

This proposed amendment deletes the above listed LCO's and SR's, and adds a new Reactivity Control Section which supersedes the Interim Technical Specifications.

The Reactivity Control Section is derived from the Technical Specification Upgrade Program (TSUP) as evaluated in Reference (2). Definitions Section 2.0, and Administrative Controls Section AC 7.1 are also revised to accommodate and reflect tho Technical Specifications, as amended.

Where applicable, specific relationships between current Technical Specifications / Interim Specifications, TSUP, and this submittal will be identified for clarity.

Other supporting changes will be identified and summarized as applicable.

Specification Description of Change 2.3.b CHANNEL FUNCTIONAL TEST is added to the definition title. The definition remains unchanged.

2.18 Surveillance Interval is revised to delete the restriction associated with the termination of surveillance to those having an interval of one month or less.

2.23 CALCULATED BULK CORE TEMPERATURE is revised to reference the explanation in LC0 4.0.4.

2.24 Minor editorial changes are made to the CORE AVERAGE INLET TEMPERATURE definition, adopting the TSUP definition.

2.25 through Definitions are added from the TSUP 2.31 definitions section.

2.27 This definition is different from the TSUP in that the reactor power was changed to THERMAL POWER.

Section 4.1 Reactor Core and Reactivity Control Section LCO's 4.1.2, 4.1.3, 4.1.4, 4.1.5, and 4.1.6 are superseded by proposed specifications in the new Reactivity Control Section.

The core reload design requirements have been deleted since there will be no more core reloads.

See the later discussion for the proposed Reactivity Control Section.

i

SUMMARY

OF PROPOSED CHANGES 3

- Specification Description of Change Section 5.1 Reactor Core and Reactivity Control SR's 5.1.1, 5.1.2,' 5.1.3, and 5.1.5 are superseded by proposed specifications in the new Reactivity Control Section.

See the later discussion for the l

proposed Reactivity Control Section.

f SR 5.1.4 is revised to reference LC0 3.1.4 versus LCO 4.1.2.

AC 7.1.3 AC 7.1.3.8.b.1 is revised to reference new specification 3/4.1.5.

The new Reactivity Control Section includes Definitions Section 1.0, Applicability Specifications 3/4.0, and Reactivity Control Specifications which supersede other specifications as described below.

Section 1.0 The Definitions Section contains a description and table for operational modes as used in the Reactivity Control

' Specifications.

-This definition is derived from the TSUP Definition 1.23 and Table 1.1.

- Section 3/4.0 The Applicability Specifications for LCO's and Surveillance in the Reactivity Control Section are mostly taken from the TSUP.

Certain Specifications refer to current Technical i

Specifications, as applicable, instead of restating a similar Specification from the TSUP.

Reactivity Applicability LCO 3.0.1 through 3.0.4 are a duplication of the same TSUP Specifications.

LCO 3.0.5 refers to current LC0 4.0.4 for CALCULATED BULK CORE TEMPERATURE.

Reactivity Applicability SR's 4.0.1, 4.0.3, and 4.0.4 are a duplication of the same TSUP Specifications.

SR 4.0.2 refers to Definition 2.18 for SURVEILLANCE INTERVAL adjustments.

> h l

V ll

SUMMARY

OF PROPOSED CHANGES Specification Description of Change 3/4.0 (Cont.)

The Bases for LCO's 3.0.1 through 3.0.4 are a duplication of the TSUP Bases, except the example for TSUP Specification 3.7.3 is deleted from the LCO 3.0.3 Basis.

The Basis for-LCO 3.0.5 essentially refers to LCO 4.0.4.

The Bases for SR's 4.0.1 and 4.0.4 are-a duplication of the TSUP Bases.

The Basis for SR 4.0.2 incorporates the Standard Technical Specification words as identified in Generic Letter 89-14.

The Basis for SR 4.0.3 is a duplicate of the TSUP Basis except for editorializing the reference to SR 4.0.2.

3/4.1.1-New Reactivity Control Section, " Control Rod Pair Operability Specification,"

replaces Interim Specification 3/4.1.1 and is derived from TSUP Specification 3/4.1.1.

Differences between TSUP Specification 3/4.1.1 and the Reactivity Control Specification include:

reformatting, minor editorial changes such as clarifying that immediately is within 10 minutes, SR 4.1.1.a and d were incorporated into one Specification as SR 4.1.1.C, and references were updated.

3/4.1.2 New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Operating," replaces Interim Specification 3/4.1.2 and is derived from TSUP Specification 3/4.1.2.1.

Differences between TSUP Specification 3/4.1.2.1 and the Reactivity Control Specification include reformatting, minor editorial changes, reference to LCO 3.1.5 versus 3.1.4.1, and references were updated.

3/4.1.3 New Reactivity Control Section, " Control Rod Pair Position Indication Systems-Shutdown," replaces Interim Specification 3/4.1.3 and is derived from TSUP Specification 3/4.1.2.2. -_--_____ - _ _ _

4

SUMMARY

OF PROPOSED CHANGES Specification Description of Change 3/4.1.3 (Cont.)'

Differences between TSUP Specification 3/4.1.2.2 and the Reactivity Control Specification include reformatting, minor editorial changes, updating references, and the addition of "in fueled regions" for clarification in rod pair movement discussions.

Refueling Surveillance intervals are changed to eighteen month periodicities, and the word " refueling" was deleted from 4.1.3.c.

3/4.1.4 New Reactivity Control Section, " Shutdown Margin,"

replaces Interim Specification 3/4.1.4 and is derived from TSUP Specification 3/4.1.3.

Differences between TSUP Specification 3/4.1.3 and the Reactivity. Control Specification include reformatting, the addition of "in fueled regions" for clarification in rod-pair movement discussions, and references were updated. The stipulation is also added that the Shutdown Margin shall be assessed prior to the removal of the control rod pair in a region to be refueled or repaired, only until all control rod pairs can be withdrawn without resulting in reactor criticality.

3/4.1.5 New Reactivity Control Section, " Control Rod Pair Position and Worth Requirements-Operating,"

replaces Interim Specification 3/4.1.5 and is derived from TSUP Specification 3/4.1.4.1.

Differences between TSUP Specification 3/4.1.4 and the Reactivity Control Specification include reformatting and editorial corrections, deletion of the reference to Special Test Exceptions l

Specification 3.10.1, and references were updated.

3/4.1.6 New Reactivity Control Section, " Control Rod Pair Position Requirements-Shutdown," replaces Interim Specification 3/4.1.6 and is derived from TSUP Specification 3/4.1.4.2.

l I

SUMMARY

OF PROPOSED CHANGES Specification Description of Change 3/4.1.6 (Cont.)

Differences between TSUP LCO 3.1.4.2 and the Reactivity Control Specification include reformatting, the addition of "in fueled regions"

'for clarification-in rod pair movement discussions, references were updated, and minor editorial corrections. The stipulation is also added that Specification 3/4.1.6 is applicable during Shutdown and Refueling, only until all control rod pairs can be withdrawn without resulting in reactor criticality. A revision was made to SR 4.1.6.D.1 for technical clarification.

Additional description is added to the Basis in regards to making all fully inserted ~ control rod pairs incapable of being withdrawn.

3/4.1.7 New Reactivity Control Section, " Reactivity Change With Temperature," replaces Interim Specification 3/4.1.7 and is derived from TSUP Specification 3/4.1.5.

Reformatting changes only were made to the TSUP Specification.

3/4.1.8 New Reactivity Control Section, " Reserve Shutdown System-Operating," replaces Interim Specification 3/4.1.8 and is derived from TSUP Specification 3/4.1.6.1 Differences between TSUP LCO 3.1.6.1 and the Reactivity Control Specif.ication include reformatting, minor editorial

changes, and updating references. The Basis is divided between the Reserve Shutdown System Operating and Shutdown Specifications, and edited accordingly.

3/4.1.9 New Reactivity Control Section, " Reserve Shutdown System-Shutdown," replaces Interim Specification 3/4.1.9 and is derived from TSUP Specification 3/4.1.6.2. I

h

  • H l

i

SUMMARY

OF PROPOSED CHANGES Specification Description of Change 3/4.1.9 (Cont.)

Differences. between TSUP LCO 3.1.6.2 and' the Reactivity Control Specification include reformatting, minor editorial

changes, the addition of "from fueled

' regions" for clarification in rod pair withdrawal discussions, and updating references.

Refueling Surveillance intervals are changed to eighteen months. The Basis is divided between Reserve Shutdown System Operating.and Shutdown Specifications, and edited accordingly.

An exception to the applicability of Specification 3/4.1.9 was added to identify that this specification does not apply if k(eff) s 0.95 with'all control rod pairs withdrawn.

NOTE:

The numbering system for this proposed Reactivity Control Section is similar to that of the TSUP and the Interim Technical Specifications. The number

'3' signifies an LCO and a

'4' is an SR.

For

example, 3/4.1.9 is the Specification entitled

' Reserve Shutdown System - Shutdown', 3.1.9 is the LCO, and 4.1.9 is the SR. This numbering scheme applies only to the Reactivity Control Section of the Technical Specifications.

The rest of the Specifications will remain numbered as before; all LCO's are indicated with the number'4', and the SR's are numbered with a

'5'.

)