ML20247P474: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ - _ - _ _ _ .     . _ _
{{#Wiki_filter:_ _ - _ - _ _ _.
l
l 1
                            ^
^
                              + -
+
                                  .:                -                                                                                    1
..7 4
          . .7                       ,                                                                                                    4 The information on this page is considered to be appropriate                       !
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790(d)
for public disclosure pursuant to 10 CFR 2.790(d)                         )
)
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR NATERIAL SAFETY AND SAFEGUARDS Report Number:                     70-1100/89-201                                           i License Number:                   SNM-1067 Safeguards Group:                   III Licensee:                           Combustion Engineering, Inc.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR NATERIAL SAFETY AND SAFEGUARDS Report Number:
70-1100/89-201 i
License Number:
SNM-1067 Safeguards Group:
III Licensee:
Combustion Engineering, Inc.
1000 Prospect Hill Road ~
1000 Prospect Hill Road ~
Windsor, Connecticut 06095-0500 Facility Name:                     CE-Windsor Inspection conducted:                   8-1 , 989 Inspector:                                                                     6-II-81 M. C. Williams, MC&A Physical Scientist   Date Signed Physical Security and MC&A Licensing and Inspection Sec ior, SGDB, SGTR, NMSS Approved by:                                   Yf2rf/Ltd                     8i~
Windsor, Connecticut 06095-0500 Facility Name:
Date Signed D.J.Kasgn),SecFionLeader Physical Security and MC&A Licensing and Inspection Section, SGDB, SGTR, NMSS
CE-Windsor Inspection conducted:
8-1, 989 Inspector:
6-II-81 M. C. Williams, MC&A Physical Scientist Date Signed Physical Security and MC&A Licensing and Inspection Sec ior, SGDB, SGTR, NMSS Approved by:
Yf2rf/Ltd 8i~
D.J.Kasgn),SecFionLeader Date Signed Physical Security and MC&A Licensing and Inspection Section, SGDB, SGTR, NMSS


==SUMMARY==
==SUMMARY==
 
Scope:
Scope:       The areas examined during this routine unannounced inspection included SNM accounting measurement controls, MC&A system management and assessment, and follow-up on items identified in prior inspections.
The areas examined during this routine unannounced inspection included SNM accounting measurement controls, MC&A system management and assessment, and follow-up on items identified in prior inspections.
Results: Within the scope of this inspection, no violations or deviations were identified.
Results: Within the scope of this inspection, no violations or deviations were identified.
                                          $[0No$ 0                   7i, ENCLOSURE
$[0No$ 0 7i, ENCLOSURE
_ _ _ _ _ - - _ _ _ _ _ _ - _}}
_ _ _ _ _ - - _ _ _ _ _ _ - _}}

Latest revision as of 19:19, 1 December 2024

Partially Withheld Insp Rept 70-1100/89-201 on 890508-12 (Ref 10CFR2.790(d)).No Violations or Deviations Noted.Major Areas Inspected:Snm Accounting Measurement Controls,Matl Control & Accounting Sys Mgt & Followup Items
ML20247P474
Person / Time
Site: 07001100
Issue date: 05/31/1989
From: Kasun D, Mike Williams
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20247P454 List:
References
70-1100-89-201, NUDOCS 8906060183
Download: ML20247P474 (1)


Text

_ _ - _ - _ _ _.

l 1

^

+

..7 4

The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790(d)

)

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR NATERIAL SAFETY AND SAFEGUARDS Report Number:

70-1100/89-201 i

License Number:

SNM-1067 Safeguards Group:

III Licensee:

Combustion Engineering, Inc.

1000 Prospect Hill Road ~

Windsor, Connecticut 06095-0500 Facility Name:

CE-Windsor Inspection conducted:

8-1, 989 Inspector:

6-II-81 M. C. Williams, MC&A Physical Scientist Date Signed Physical Security and MC&A Licensing and Inspection Sec ior, SGDB, SGTR, NMSS Approved by:

Yf2rf/Ltd 8i~

D.J.Kasgn),SecFionLeader Date Signed Physical Security and MC&A Licensing and Inspection Section, SGDB, SGTR, NMSS

SUMMARY

Scope:

The areas examined during this routine unannounced inspection included SNM accounting measurement controls, MC&A system management and assessment, and follow-up on items identified in prior inspections.

Results: Within the scope of this inspection, no violations or deviations were identified.

$[0No$ 0 7i, ENCLOSURE

_ _ _ _ _ - - _ _ _ _ _ _ - _