                                                                June 16', 1998
ist
June 16', 1998
,
,
                      EA 98-319
EA 98-319
                                  ~
~
                  - Mr. Robert A. Fenech
- Mr. Robert A. Fenech
                      Senior Vice President
Senior Vice President
                      Nuclear, Fossil and Hydro Operations -
Nuclear, Fossil and Hydro Operations -
                      Consumers Energy Company '
Consumers Energy Company '
                    :212 West Michigan Avenue
:212 West Michigan Avenue
                    (Jackson, MI 49201
(Jackson, MI 49201
                      SUBJECT:         NRC INSPECTION REPORT 50-155/98003(DNMS)
SUBJECT:
                    . Dear Mr. Fenech:
NRC INSPECTION REPORT 50-155/98003(DNMS)
                    : On May 27,1998, the NRC completed an inspection at your Big Rock Point Nuclear Plant which
. Dear Mr. Fenech:
                                    .
: On May 27,1998, the NRC completed an inspection at your Big Rock Point Nuclear Plant which
                      examined decommissioning activities. The enclosed report presents the results of that
examined decommissioning activities. The enclosed report presents the results of that
                      inspection.
.
                      During the period covered by this inspection, activities in the areas of facility management and
inspection.
                      control, decommissioning support, spent fuel safety, and radiological safety were examined.             !
During the period covered by this inspection, activities in the areas of facility management and
                      Decommissioning milestones included the NRC's approval of the certified fuel handlers training
control, decommissioning support, spent fuel safety, and radiological safety were examined.
                      program and the determination by the NRC that reactor and senior reactor licenses are no longer
!
                      required at Big Rock Point. - Also, the recirculation system lines to the reactor vessel were cut
Decommissioning milestones included the NRC's approval of the certified fuel handlers training
                      and capped, effectively converting the reactor vessel into a tank.
program and the determination by the NRC that reactor and senior reactor licenses are no longer
                      Based on the results of this inspection, one apparent violation was identified and is being
required at Big Rock Point. - Also, the recirculation system lines to the reactor vessel were cut
                      considered for escalated enforcement action in accordance with the " General Statement of Policy
and capped, effectively converting the reactor vessel into a tank.
                      and Procedure for NRC Enforcement Actions (Enforcement Policy )," NUREG-1600. The
Based on the results of this inspection, one apparent violation was identified and is being
                      apparent violation relates to failure of the liquid poison tank discharge dip tube, which rendered
considered for escalated enforcement action in accordance with the " General Statement of Policy
                      the liquid poison system inoperable. This violation is of concem because the inoperability of the
and Procedure for NRC Enforcement Actions (Enforcement Policy )," NUREG-1600. The
                      system was of long duration and it was not identified until after the plant was permanently shut
apparent violation relates to failure of the liquid poison tank discharge dip tube, which rendered
                      down. The circumstances surrounding the apparent violation and the potential significance of
the liquid poison system inoperable. This violation is of concem because the inoperability of the
                      the issue were discussed with members of your staff at the inspection exit meeting on May 27,
system was of long duration and it was not identified until after the plant was permanently shut
                      1998. Because the Big Rock Point Plant is being decommissioned and the poison system will
down. The circumstances surrounding the apparent violation and the potential significance of
                    ; never be retumed to service, it may not be necessary to conduct a predecisional enforcement '
the issue were discussed with members of your staff at the inspection exit meeting on May 27,
                    : conference in order to enable the NRC to make an enforcement decision. Nonetheless, NRC is
1998. Because the Big Rock Point Plant is being decommissioned and the poison system will
                      concemed about potential implications of this issue for operating reactors, as well as any actions
; never be retumed to service, it may not be necessary to conduct a predecisional enforcement '
                      your review of the issue may determine to be warranted for your operating plant.
: conference in order to enable the NRC to make an enforcement decision. Nonetheless, NRC is
                    ' A' Notice of Violation is not presently being issued for this inspection finding. Before the NRC
concemed about potential implications of this issue for operating reactors, as well as any actions
                    . makes its enforcement decision, we are providing you an opportunity to either: (1) respond to the
your review of the issue may determine to be warranted for your operating plant.
                      apparent violation addressed in this inspection report within 30 days of the date of this letter, or
' A' Notice of Violation is not presently being issued for this inspection finding. Before the NRC
                    :(2) request a predecisional enforcement conference. In either case, you are requested to provide
. makes its enforcement decision, we are providing you an opportunity to either: (1) respond to the
                      your evaluation regarding how this issue may pertain to monitoring of any safety related systems
apparent violation addressed in this inspection report within 30 days of the date of this letter, or
                                                                                                                        I
:(2) request a predecisional enforcement conference. In either case, you are requested to provide
                      ,so6aaoaot
your evaluation regarding how this issue may pertain to monitoring of any safety related systems
                      PDR     ADOCK 0
I
                                              a
(l
                                                155
,so6aaoaot
                                                          n                                                                (l
a
      .'
n
                  ' 8_ s       -
PDR
                                              PM        , a
ADOCK 0
  ,
155
          e
PM
        e
.'
' 8_ s
-
, a
,
e
e


H
H
          -
-
        .
.
  .- ,
.- ,
s
s
          ' K. Powers                                                     -2-
' K. Powers
-2-
L
L
l.
l.
            at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce
at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce
            Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your
Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your
            intended response.
intended response.
            If you choose to respond, i.e., option (1), the response should be clearly marked as a " Response
If you choose to respond, i.e., option (1), the response should be clearly marked as a " Response
            to Apparent Violations in inspection Report 50-155/98003(DNMS)" and should include: (1) the
to Apparent Violations in inspection Report 50-155/98003(DNMS)" and should include: (1) the
reason for the apparent violation, or, if contested, the basis for disputing the apparent violation,
,
,
            reason for the apparent violation, or, if contested, the basis for disputing the apparent violation,
(2) the corrective steps that have been taken and the results achieved, (3) the corrective steps
'
'
            (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps
that will be taken to avoid further violations, including any similar violation at your operating plant,
            that will be taken to avoid further violations, including any similar violation at your operating plant,
and (4) the date when full compliance will be achieved. Your response should be submitted
            and (4) the date when full compliance will be achieved. Your response should be submitted
under oath or affirmation and may reference or include previous docketed correspondence, if the
            under oath or affirmation and may reference or include previous docketed correspondence, if the
correspondence adequately addresses the required response. If an adequate response is not
            correspondence adequately addresses the required response. If an adequate response is not
received within the time specified or an extension of time has not been granted by the NRC, the
            received within the time specified or an extension of time has not been granted by the NRC, the
NRC will proceed with its enforcement decision or schedule a predecisional enforcement
            NRC will proceed with its enforcement decision or schedule a predecisional enforcement
conference.
            conference.
In addition, please be advised that the number and characterization of apparent violations
            In addition, please be advised that the number and characterization of apparent violations
described in the enclosed inspection report may change as a result of further NRC review. You
            described in the enclosed inspection report may change as a result of further NRC review. You
will be advised by separate correspondence of the results of our deliberations on this matter.
            will be advised by separate correspondence of the results of our deliberations on this matter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
            In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
            enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
Document Room (PDR). To the extent possible, your response should not include any personal
            Document Room (PDR). To the extent possible, your response should not include any personal
privacy, proprietary, or safeguards information so that it can be placed in the PDR without
            privacy, proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
            redaction.
Sincerely, -
                                                                          Sincerely, -
Original Signed by
                                                                          Original Signed by
l
                                                                                                                                              l
Cynthia D. Pederson, Director
                                                                          Cynthia D. Pederson, Director
Division of Nuclear Materials Safety
                                                                          Division of Nuclear Materials Safety
Docket No. 50-155
            Docket No. 50-155                                                                                                               .
.
            License No. DPR-6
License No. DPR-6
          . Enclosure: Inspection Report 50-155/98003(DNMS)
. Enclosure: Inspection Report 50-155/98003(DNMS)
            See Attached Distnbution
See Attached Distnbution
            DOCUMENT NAME: G:\SEC\BRP98003.DNM
DOCUMENT NAME: G:\\SEC\\BRP98003.DNM
          . To receive a copy of thle document. Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copv
. To receive a copy of thle document. Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copv
              OFFICE           Rlli     m
OFFICE
                                            -
Rlli
                                                      1It Rlli:             m            lE   ElCS               l   Rill         l
-
              NAME         M hen @iiib                       JorgensenF/                       Clayton                 Pederson
1It Rlli:
              DATE-           06/12/98                       06/I'#98       1                 06/ 198                 06/ /98
lE
                                                            OFRCIAL RECORD COPY
ElCS
                                                                                                  --
l
                                                                                                                              _--       _ _ -
Rill
l
m
m
NAME
M hen @iiib
JorgensenF/
Clayton
Pederson
DATE-
06/12/98
06/I'#98
1
06/ 198
06/ /98
OFRCIAL RECORD COPY
--
- -
-


        ^'
^'
  ;7
;7
                s
s
'
'
              R.Fenech                                                     -2-
R.Fenech
              ~ at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce
-2-
              Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your
~ at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce
              intended response;
Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your
)           ' If you choose to respond, the response should be clearly marked as a " Response to Apparent
intended response;
              Violations in Inspection Report 50-155/98003(DNMS)" and should include: - (1) the reason for the
)
      ,        apparent violation, or, if contested, the basis for disputing the apparent violation, (2) the
' If you choose to respond, the response should be clearly marked as a " Response to Apparent
              corrective steps that have been taken and the results achieved, (3) the corrective steps that will
Violations in Inspection Report 50-155/98003(DNMS)" and should include: - (1) the reason for the
              . be taken to avoid further violations, including any similar violation at your operating plant, and (4)-
apparent violation, or, if contested, the basis for disputing the apparent violation, (2) the
              the date when full compliance will be achieved. Your response should be submitted under oath
,
              or affirmation and may reference or include previous docketed correspondence, if the
corrective steps that have been taken and the results achieved, (3) the corrective steps that will
              correspondence adequately addresses the required response. If an adequate response is not
. be taken to avoid further violations, including any similar violation at your operating plant, and (4)-
              received within the time specified or an extension of time has not been granted by the NRC, the                     ,
the date when full compliance will be achieved. Your response should be submitted under oath
            ! NRC will proceed with its enfon:ement decision or schedule a predecisional enforcement
or affirmation and may reference or include previous docketed correspondence, if the
              conference.
correspondence adequately addresses the required response. If an adequate response is not
              In addition, please be advised that the number and characterization of apparent violations
received within the time specified or an extension of time has not been granted by the NRC, the
              described in the enclosed inspection report may change as a result of further NRC review. You
,
              will be advised by separate correspondence of the results of our deliberations on this matter.
! NRC will proceed with its enfon:ement decision or schedule a predecisional enforcement
                                      _
conference.
              In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
In addition, please be advised that the number and characterization of apparent violations
              enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
described in the enclosed inspection report may change as a result of further NRC review. You
              Document Room (PDR). To the extent possible, your response should not include any personal
will be advised by separate correspondence of the results of our deliberations on this matter.
              privacy, proprietary, or safeguards information so that it can be placed in the PDR without                           ]
_
              redaction.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
                                                                          Sincerely,                                               l
enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
                                                                                                                                      l
Document Room (PDR). To the extent possible, your response should not include any personal
                                                                          Original Signed by
privacy, proprietary, or safeguards information so that it can be placed in the PDR without
                                                                                                                                      l
]
                                                                          Cynthia D. Pederson, Director
redaction.
                                                                          Division of Nuclear Materials Safety                         !
Sincerely,
              Docket No. 50-155
l
              License No. DPR-6
l
              Enclosure: Inspection Report 50-155/98003(DNMS)
Original Signed by
              See Attached Distnbution
l
              DOCUMENT NAME: G:\SEC\BRP98003.DNM
Cynthia D. Pederson, Director
              *See Previous Concurrence
Division of Nuclear Materials Safety
    .
!
            l To receive a copy of this document. Indicate in the boafC" = Copy without enclosure "E"= copy with enclosurew"sN h
Docket No. 50-155
          ,      OFFICE -       * Rill                 lE     * Rill                   lE   ElCS -     ._
License No. DPR-6
                                                                                                                    l- Ril(? (   l
Enclosure: Inspection Report 50-155/98003(DNMS)
                  NAME           Leemon:ib                     Jorgensen -                     Clayton Mw Pedafson
See Attached Distnbution
                  DATE-           06/12/98                     06/12/98                       06//6/98-#f;h 06/$98-
DOCUMENT NAME: G:\\SEC\\BRP98003.DNM
                                                              OFRCIAL RECORD COPY.
*See Previous Concurrence
                                                                                                                                      l
.
                                                                                                                                    1 J
l To receive a copy of this document. Indicate in the boafC" = Copy without enclosure "E"= copy with enclosurew"sN h
OFFICE -
* Rill
lE
* Rill
lE
ElCS -
._
l-
Ril(? (
l
,
NAME
Leemon:ib
Jorgensen -
Clayton Mw Pedafson
DATE-
06/12/98
06/12/98
06//6/98-#f;h 06/$98-
OFRCIAL RECORD COPY.
l
1
J


    _ _ _ _ _ _ _ _ _ _ _ - - - - _ . - _ - - _ _ _ _ _ _ _ _ - _ _ - - - _ _ _ _ _ _ _ _ . - - - _ - _ - _ - - - -
_ _ _ _ _ _ _ _ _ _ _ - - - - _ . - _ - - _ _ _ _ _ _ _ _ - _ _ - - - _ _ _ _ _ _ _ _ . - - - _ - _ - _ - - - -
                                                                                                                                                                  -,
-,
                                                                                                                                                                    l
l
                                  ..                                                                                                                               !
!
j-     g.
..
                                                              R.' Fenech                                                                             -3-
j-
                                                                                                                                                                    I
g.
                                                              cc w/ encl:                                           K. P. Powers, Plant General Manager           j
R.' Fenech
                                                                                                                    Richard Whale, Michigan Public
-3-
I
cc w/ encl:
K. P. Powers, Plant General Manager
j
Richard Whale, Michigan Public
l_
l_
                                                                                                                      Service Commission
Service Commission
l                                                                                                                   Michigan Department of Environmental Quality
l
                                                                                                                    Department of Attomey General (MI)
Michigan Department of Environmental Quality
                                                                                                                    Emergency Management Division,
Department of Attomey General (MI)
                                                                                                                      Michigan Department of State Police
Emergency Management Division,
                                                                                                                    T. J. Palmisano, Site Vice President
Michigan Department of State Police
                                                                                                                      and General Manager, Palisades Nuclear
T. J. Palmisano, Site Vice President
                                                                                                                      Generating Plant
and General Manager, Palisades Nuclear
                                                              Distribution:
Generating Plant
                                                              Docket File w/paci                                                       [g Q
Distribution:
                                                              PUBLICJE41 w/enci
Docket File w/paci
                                                          - J. Lieberman, OE w/enci
[g Q
                                                              J. Goldberg, OGC w/ enc!
PUBLICJE41 w/enci
                                                              LPM, NRR w/enci
- J. Lieberman, OE w/enci
                                                              Rill PRR w/enci
J. Goldberg, OGC w/ enc!
                                                              C. J. Paperiello, Rill w/enci
LPM, NRR w/enci
                                                              J. L. Caldwell, Rlll w/ encl
Rill PRR w/enci
                                                              C. D. Pederson, Rlll w/enct
C. J. Paperiello, Rill w/enci
                                                              Rill Enf. Coordinator w/onct
J. L. Caldwell, Rlll w/ encl
                                                              SRI, BRP w/enci
C. D. Pederson, Rlll w/enct
                                                            TSS w/enci
Rill Enf. Coordinator w/onct
                                                              LEO w/enci (e-mail)
SRI, BRP w/enci
                                                              DOCDESK w/enci(e-mail)
TSS w/enci
                                                              Greens w/o enci
LEO w/enci (e-mail)
                                                                              C20048'
DOCDESK w/enci(e-mail)
  I
Greens w/o enci
C20048'
I
}}
}}

Latest revision as of 14:07, 30 November 2024

Forwards Insp Rept 50-155/98-03 on 980407-0527.Violation Noted & Being Considered for Escalated Enforcement Action. Notice of Violation Not Presently Being Issued for Insp Finding
ML20249B304
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/16/1998
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fenech R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20249B305 List:
References
50-155-98-03, 50-155-98-3, EA-98-319, NUDOCS 9806220301
Download: ML20249B304 (4)


See also: IR 05000155/1998003

Text

=C;

m

ist

June 16', 1998

,

EA 98-319

~

- Mr. Robert A. Fenech

Senior Vice President

Nuclear, Fossil and Hydro Operations -

Consumers Energy Company '

212 West Michigan Avenue

(Jackson, MI 49201

SUBJECT:

NRC INSPECTION REPORT 50-155/98003(DNMS)

. Dear Mr. Fenech:

On May 27,1998, the NRC completed an inspection at your Big Rock Point Nuclear Plant which

examined decommissioning activities. The enclosed report presents the results of that

.

inspection.

During the period covered by this inspection, activities in the areas of facility management and

control, decommissioning support, spent fuel safety, and radiological safety were examined.

!

Decommissioning milestones included the NRC's approval of the certified fuel handlers training

program and the determination by the NRC that reactor and senior reactor licenses are no longer

required at Big Rock Point. - Also, the recirculation system lines to the reactor vessel were cut

and capped, effectively converting the reactor vessel into a tank.

Based on the results of this inspection, one apparent violation was identified and is being

considered for escalated enforcement action in accordance with the " General Statement of Policy

and Procedure for NRC Enforcement Actions (Enforcement Policy )," NUREG-1600. The

apparent violation relates to failure of the liquid poison tank discharge dip tube, which rendered

the liquid poison system inoperable. This violation is of concem because the inoperability of the

system was of long duration and it was not identified until after the plant was permanently shut

down. The circumstances surrounding the apparent violation and the potential significance of

the issue were discussed with members of your staff at the inspection exit meeting on May 27,

1998. Because the Big Rock Point Plant is being decommissioned and the poison system will

never be retumed to service, it may not be necessary to conduct a predecisional enforcement '
conference in order to enable the NRC to make an enforcement decision. Nonetheless, NRC is

concemed about potential implications of this issue for operating reactors, as well as any actions

your review of the issue may determine to be warranted for your operating plant.

' A' Notice of Violation is not presently being issued for this inspection finding. Before the NRC

. makes its enforcement decision, we are providing you an opportunity to either: (1) respond to the

apparent violation addressed in this inspection report within 30 days of the date of this letter, or

(2) request a predecisional enforcement conference. In either case, you are requested to provide

your evaluation regarding how this issue may pertain to monitoring of any safety related systems

I

(l

,so6aaoaot

a

n

PDR

ADOCK 0

155

PM

.'

' 8_ s

-

, a

,

e

e

H

-

.

.- ,

s

' K. Powers

-2-

L

l.

at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce

Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your

intended response.

If you choose to respond, i.e., option (1), the response should be clearly marked as a " Response

to Apparent Violations in inspection Report 50-155/98003(DNMS)" and should include: (1) the

reason for the apparent violation, or, if contested, the basis for disputing the apparent violation,

,

(2) the corrective steps that have been taken and the results achieved, (3) the corrective steps

'

that will be taken to avoid further violations, including any similar violation at your operating plant,

and (4) the date when full compliance will be achieved. Your response should be submitted

under oath or affirmation and may reference or include previous docketed correspondence, if the

correspondence adequately addresses the required response. If an adequate response is not

received within the time specified or an extension of time has not been granted by the NRC, the

NRC will proceed with its enforcement decision or schedule a predecisional enforcement

conference.

In addition, please be advised that the number and characterization of apparent violations

described in the enclosed inspection report may change as a result of further NRC review. You

will be advised by separate correspondence of the results of our deliberations on this matter.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response (if you choose to provide one) will be placed in the NRC Public

Document Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

Sincerely, -

Original Signed by

l

Cynthia D. Pederson, Director

Division of Nuclear Materials Safety

Docket No. 50-155

.

License No. DPR-6

. Enclosure: Inspection Report 50-155/98003(DNMS)

See Attached Distnbution

DOCUMENT NAME: G:\\SEC\\BRP98003.DNM

. To receive a copy of thle document. Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copv

OFFICE

Rlli

-

1It Rlli:

lE

ElCS

l

Rill

l

m

m

NAME

M hen @iiib

JorgensenF/

Clayton

Pederson

DATE-

06/12/98

06/I'#98

1

06/ 198

06/ /98

OFRCIAL RECORD COPY

--

- -

-

^'

7

s

'

R.Fenech

-2-

~ at your operating reactor plant which contain corrosive fluids. Please contact Mr. Bruce

Jorgensen at (630) 829-9615 within 7 days of the date of this letter to notify the NRC of your

intended response;

)

' If you choose to respond, the response should be clearly marked as a " Response to Apparent

Violations in Inspection Report 50-155/98003(DNMS)" and should include: - (1) the reason for the

apparent violation, or, if contested, the basis for disputing the apparent violation, (2) the

,

corrective steps that have been taken and the results achieved, (3) the corrective steps that will

. be taken to avoid further violations, including any similar violation at your operating plant, and (4)-

the date when full compliance will be achieved. Your response should be submitted under oath

or affirmation and may reference or include previous docketed correspondence, if the

correspondence adequately addresses the required response. If an adequate response is not

received within the time specified or an extension of time has not been granted by the NRC, the

,

! NRC will proceed with its enfon:ement decision or schedule a predecisional enforcement

conference.

In addition, please be advised that the number and characterization of apparent violations

described in the enclosed inspection report may change as a result of further NRC review. You

will be advised by separate correspondence of the results of our deliberations on this matter.

_

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response (if you choose to provide one) will be placed in the NRC Public

Document Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards information so that it can be placed in the PDR without

]

redaction.

Sincerely,

l

l

Original Signed by

l

Cynthia D. Pederson, Director

Division of Nuclear Materials Safety

!

Docket No. 50-155

License No. DPR-6

Enclosure: Inspection Report 50-155/98003(DNMS)

See Attached Distnbution

DOCUMENT NAME: G:\\SEC\\BRP98003.DNM

  • See Previous Concurrence

.

l To receive a copy of this document. Indicate in the boafC" = Copy without enclosure "E"= copy with enclosurew"sN h

OFFICE -

  • Rill

lE

  • Rill

lE

ElCS -

._

l-

Ril(? (

l

,

NAME

Leemon:ib

Jorgensen -

Clayton Mw Pedafson

DATE-

06/12/98

06/12/98

06//6/98-#f;h 06/$98-

OFRCIAL RECORD COPY.

l

1

J

_ _ _ _ _ _ _ _ _ _ _ - - - - _ . - _ - - _ _ _ _ _ _ _ _ - _ _ - - - _ _ _ _ _ _ _ _ . - - - _ - _ - _ - - - -

-,

l

!

..

j-

g.

R.' Fenech

-3-

I

cc w/ encl:

K. P. Powers, Plant General Manager

j

Richard Whale, Michigan Public

l_

Service Commission

l

Michigan Department of Environmental Quality

Department of Attomey General (MI)

Emergency Management Division,

Michigan Department of State Police

T. J. Palmisano, Site Vice President

and General Manager, Palisades Nuclear

Generating Plant

Distribution:

Docket File w/paci

[g Q

PUBLICJE41 w/enci

- J. Lieberman, OE w/enci

J. Goldberg, OGC w/ enc!

LPM, NRR w/enci

Rill PRR w/enci

C. J. Paperiello, Rill w/enci

J. L. Caldwell, Rlll w/ encl

C. D. Pederson, Rlll w/enct

Rill Enf. Coordinator w/onct

SRI, BRP w/enci

TSS w/enci

LEO w/enci (e-mail)

DOCDESK w/enci(e-mail)

Greens w/o enci

C20048'