{{#Wiki_filter:Stephen L. Smith Engineering Vice President October 1, 2020 ET 20-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:Stephen L. Smith Engineering Vice President October 1, 2020 ET 20-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  


==Reference:==
==Reference:==
NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI, dated July 28, 2004
NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI, dated July 28, 2004  


==Subject:==
==Subject:==
Line 27: Line 27:
WCNOC requests approval of this request by November 12, 2020.
WCNOC requests approval of this request by November 12, 2020.
There are no regulatory commitments contained in this submittal. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Ron Benham at (620) 364-4204.
There are no regulatory commitments contained in this submittal. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Ron Benham at (620) 364-4204.
Sincerely, Stephen L. Smith SLS/rlt
Sincerely, Stephen L. Smith SLS/rlt  


ET 20-0011 Page 2 of 2
ET 20-0011 Page 2 of 2  


==Attachment:==
==Attachment:==
Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI cc: S. S. Lee, (NRC), w/a S. A. Morris (NRC), w/a N. OKeefe (NRC), w/a Senior Resident Inspector (NRC), w/a
Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI cc:
S. S. Lee, (NRC), w/a S. A. Morris (NRC), w/a N. OKeefe (NRC), w/a Senior Resident Inspector (NRC), w/a  


Attachment to ET 20-0011 Page 1 of 3 Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI
Attachment to ET 20-0011 Page 1 of 3 Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI  


Attachment to ET 20-0011 Page 2 of 3 Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)
Attachment to ET 20-0011 Page 2 of 3 Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)
In accordance with 10 CFR 50.55a, Codes and standards, paragraph(g)(4)(iv), and guidance provided in Reference 1, Wolf Creek Nuclear Operating Corporation (WCNOC) requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code.
In accordance with 10 CFR 50.55a, Codes and standards, paragraph(g)(4)(iv), and guidance provided in Reference 1, Wolf Creek Nuclear Operating Corporation (WCNOC) requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code.
: 1.     ASME Code Component(s) Affected All Class 1, 2 and 3 items located in the ASME XI boundaries.
: 1.
: 2.     Requested Date for Approval Approval requested by November 12, 2020.
ASME Code Component(s) Affected All Class 1, 2 and 3 items located in the ASME XI boundaries.
: 3.     Applicable Code Edition and Addenda INTERVAL ISI                               INTERVAL PLANT                              EDITION                             SCHEDULED INTERVAL                                 START END WCGS, Unit 1             4     2007 Edition, through       9/3/2015         9/2/2025 2008 Addenda
: 2.
: 4.     Proposed Subsequent Code Edition and Addenda (or Portion)
Requested Date for Approval Approval requested by November 12, 2020.
: 3.  
 
===Applicable Code Edition and Addenda===
PLANT ISI INTERVAL EDITION INTERVAL START INTERVAL SCHEDULED END WCGS, Unit 1 4
2007 Edition, through 2008 Addenda 9/3/2015 9/2/2025
: 4.
Proposed Subsequent Code Edition and Addenda (or Portion)
WCGS performs Repair/Replacement activities in accordance with ASME Section XI, 2007 Edition through the 2008 Addenda.
WCGS performs Repair/Replacement activities in accordance with ASME Section XI, 2007 Edition through the 2008 Addenda.
Pursuant to 10 CFR 50.55a(g)(4)(iv), WCNOC requests permission to utilize IWA-4540(b) from the 2017 Edition. This subparagraph outlines items that are exempt from pressure testing after repair/replacement activities.
Pursuant to 10 CFR 50.55a(g)(4)(iv), WCNOC requests permission to utilize IWA-4540(b) from the 2017 Edition. This subparagraph outlines items that are exempt from pressure testing after repair/replacement activities.
: 5.     Related Requirements 10 CFR 50.55a(g)(4)(iv) states:
: 5.
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject
Related Requirements 10 CFR 50.55a(g)(4)(iv) states:
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject  


Attachment to ET 20-0011 Page 3 of 3 to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
Attachment to ET 20-0011 Page 3 of 3 to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
10 CFR 50.55a(b)(2) incorporates by reference Section XI, Division 1, of the ASME B&PV Code 2017 Edition as approved in Reference 3, below. WCNOC is requesting to use of IWA-4540(b) of the 2017 Edition of ASME Section XI to utilize the exemptions listed. There are no related requirements or applicable conditions associated with this subparagraph, IWA-4540(b).
10 CFR 50.55a(b)(2) incorporates by reference Section XI, Division 1, of the ASME B&PV Code 2017 Edition as approved in Reference 3, below. WCNOC is requesting to use of IWA-4540(b) of the 2017 Edition of ASME Section XI to utilize the exemptions listed. There are no related requirements or applicable conditions associated with this subparagraph, IWA-4540(b).
: 6.       Duration of Request The duration of this request will continue for the remainder of the sites current Inservice Inspection interval.
: 6.
: 7.       References
Duration of Request The duration of this request will continue for the remainder of the sites current Inservice Inspection interval.
: 7.
References
: 1. NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section Xl, dated July 28, 2004.
: 1. NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section Xl, dated July 28, 2004.
: 2. NRC Memorandum from D. Rudland (Senior Level Advisor, Division of New and Renewed Licenses) to Anna H. Bradford (Director, Division of New and Renewed Licenses),
: 2. NRC Memorandum from D. Rudland (Senior Level Advisor, Division of New and Renewed Licenses) to Anna H. Bradford (Director, Division of New and Renewed Licenses),
Summary of the June 25, 2020, Public Meeting with the Nuclear Industry to Discuss Title 10 of the Code of Federal Regulations Section 50.55a(b)(2)(xxvi) Condition on the Pressure Testing of Class 1, 2, and 3 Mechanical Joints, dated July 8, 2020 (ADAMS Accession No. ML20189A286)
Summary of the June 25, 2020, Public Meeting with the Nuclear Industry to Discuss Title 10 of the Code of Federal Regulations Section 50.55a(b)(2)(xxvi) Condition on the Pressure Testing of Class 1, 2, and 3 Mechanical Joints, dated July 8, 2020 (ADAMS Accession No. ML20189A286)
: 3. Federal Register, 85 FR 26540, dated May 4, 2020 8..       Precedents Entergy Nuclear Operations, Inc., fleet Relief Request was reviewed and found to be comprehensive and applicable to WCNOCs request. Entergy submitted a Relief Request for their fleet on August 12, 2020 titled, Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv).
: 3. Federal Register, 85 FR 26540, dated May 4, 2020 8..
Precedents Entergy Nuclear Operations, Inc., fleet Relief Request was reviewed and found to be comprehensive and applicable to WCNOCs request. Entergy submitted a Relief Request for their fleet on August 12, 2020 titled, Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv).
The NRC approved the Entergy Relief Request on August 18, 2020.}}
The NRC approved the Entergy Relief Request on August 18, 2020.}}

Latest revision as of 17:48, 29 November 2024

Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI
ML20280A232
Person / Time
Site: Wolf Creek 
Issue date: 10/01/2020
From: Shawn Smith
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ET 20-0011
Download: ML20280A232 (5)


Text

Stephen L. Smith Engineering Vice President October 1, 2020 ET 20-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI, dated July 28, 2004

Subject:

Docket No. 50-482: Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI Commissioners and Staff:

In accordance with 10 CFR 50.55a, Codes and standards, paragraph(g)(4)(iv), and guidance provided in the Reference, Wolf Creek Nuclear Operating Corporation (WCNOC) requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)

Code,Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code. The Attachment to this letter provides WCNOCs request, including the basis for the proposed alternative.

WCNOC requests approval of this request by November 12, 2020.

There are no regulatory commitments contained in this submittal. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Ron Benham at (620) 364-4204.

Sincerely, Stephen L. Smith SLS/rlt

ET 20-0011 Page 2 of 2

Attachment:

Request to Use a Provision of a Later Edition of the ASME B&PV Code,Section XI cc:

S. S. Lee, (NRC), w/a S. A. Morris (NRC), w/a N. OKeefe (NRC), w/a Senior Resident Inspector (NRC), w/a

Attachment to ET 20-0011 Page 1 of 3 Request to Use a Provision of a Later Edition of the ASME B&PV Code,Section XI

Attachment to ET 20-0011 Page 2 of 3 Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)

In accordance with 10 CFR 50.55a, Codes and standards, paragraph(g)(4)(iv), and guidance provided in Reference 1, Wolf Creek Nuclear Operating Corporation (WCNOC) requests Nuclear Regulatory Commission (NRC) approval to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code.

1.

ASME Code Component(s) Affected All Class 1, 2 and 3 items located in the ASME XI boundaries.

2.

Requested Date for Approval Approval requested by November 12, 2020.

3.

Applicable Code Edition and Addenda

PLANT ISI INTERVAL EDITION INTERVAL START INTERVAL SCHEDULED END WCGS, Unit 1 4

2007 Edition, through 2008 Addenda 9/3/2015 9/2/2025

4.

Proposed Subsequent Code Edition and Addenda (or Portion)

WCGS performs Repair/Replacement activities in accordance with ASME Section XI, 2007 Edition through the 2008 Addenda.

Pursuant to 10 CFR 50.55a(g)(4)(iv), WCNOC requests permission to utilize IWA-4540(b) from the 2017 Edition. This subparagraph outlines items that are exempt from pressure testing after repair/replacement activities.

5.

Related Requirements 10 CFR 50.55a(g)(4)(iv) states:

Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject

Attachment to ET 20-0011 Page 3 of 3 to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.

10 CFR 50.55a(b)(2) incorporates by reference Section XI, Division 1, of the ASME B&PV Code 2017 Edition as approved in Reference 3, below. WCNOC is requesting to use of IWA-4540(b) of the 2017 Edition of ASME Section XI to utilize the exemptions listed. There are no related requirements or applicable conditions associated with this subparagraph, IWA-4540(b).

6.

Duration of Request The duration of this request will continue for the remainder of the sites current Inservice Inspection interval.

7.

References

1. NRC Regulatory Issue Summary 2004-12, Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section Xl, dated July 28, 2004.
2. NRC Memorandum from D. Rudland (Senior Level Advisor, Division of New and Renewed Licenses) to Anna H. Bradford (Director, Division of New and Renewed Licenses),

Summary of the June 25, 2020, Public Meeting with the Nuclear Industry to Discuss Title 10 of the Code of Federal Regulations Section 50.55a(b)(2)(xxvi) Condition on the Pressure Testing of Class 1, 2, and 3 Mechanical Joints, dated July 8, 2020 (ADAMS Accession No. ML20189A286)

3. Federal Register, 85 FR 26540, dated May 4, 2020 8..

Precedents Entergy Nuclear Operations, Inc., fleet Relief Request was reviewed and found to be comprehensive and applicable to WCNOCs request. Entergy submitted a Relief Request for their fleet on August 12, 2020 titled, Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv).

The NRC approved the Entergy Relief Request on August 18, 2020.