{{#Wiki_filter:Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 May 18, 2021 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-77 NRC Docket No. 50-327
{{#Wiki_filter:Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 May 18, 2021 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-77 NRC Docket No. 50-327  


==Subject:==
==Subject:==
SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 In accordance with Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specification (TS) 5.6.3.d, enclosed is the Unit 1 Cycle 25 Core Operating Limits Report (COLR), Revision 0 that was issued on April 22, 2021.
SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 In accordance with Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specification (TS) 5.6.3.d, enclosed is the Unit 1 Cycle 25 Core Operating Limits Report (COLR), Revision 0 that was issued on April 22, 2021.
There are no new regulatory commitments in this letter. If you have any questions, please contact Jeffrey Sowa, SQN Site Licensing Manager at (423) 843-8129.
There are no new regulatory commitments in this letter. If you have any questions, please contact Jeffrey Sowa, SQN Site Licensing Manager at (423) 843-8129.
Respectfully, Marshall,          Digitally signed by Marshall, Thomas B.
Respectfully, Thomas Marshall Site Vice President Sequoyah Nuclear Plant  
Thomas B.          Date: 2021.05.18 07:57:46 -04'00' Thomas Marshall Site Vice President Sequoyah Nuclear Plant


==Enclosure:==
==Enclosure:==
Sequoyah Unit 1 Cycle 25 Core Operating Limits Report, Revision 0 cc (Enclosure):
Sequoyah Unit 1 Cycle 25 Core Operating Limits Report, Revision 0 cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN
NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN
: Marshall, Thomas B.
Digitally signed by Marshall, Thomas B.
Date: 2021.05.18 07:57:46 -04'00'


ENCLOSURE SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0
ENCLOSURE SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0  


QA RECORD                                                                                                                                                   L36 210325 800 SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 April 2021 Prepared by:
QA RECORD L36 210325 800 SEQUOYAH UNIT 1 Page 1 of 16 Revision 0 SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 April 2021 Prepared by:
Verner-Dingle,            Digitally signed by Verner-                                                                  Digitally signed by Porter, Mark Donald Dingle, Whitney Kayla Porter, Mark                  DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Porter, Mark Donald, Whitney Kayla              Date: 2021.03.26 17:29:46 -04'00'                              Donald email=mdporter@tva.gov Reason: I am the author of this document
__________________________________________________________/_________________________
__________________________________________________________/_________________________                                   Date: 2021.03.26 17:37:19 -04'00' W. Kayla Verner-Dingle/Mark D. Porter, PWR Fuel Engineering and NSA                                                                                                         Date Verified by:
W. Kayla Verner-Dingle/Mark D. Porter, PWR Fuel Engineering and NSA Date Verified by:
Digitally signed by Bell, Jamel C DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Bell, Jamel C, email=jcbell3@tva.gov Reason: I have reviewed this document
__________________________________________________________/_________________________
__________________________________________________________/_________________________
Location: TVA COC - WFH Date: 2021.03.26 18:05:04 -04'00' Jamel C. Bell, PWR Fuel Engineering                                                                                                                                         Date Reviewed by:
Jamel C. Bell, PWR Fuel Engineering Date Reviewed by:
Digitally signed by Ritchie, John A Ritchie, John A DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Ritchie, John A, email=jaritchie0@tva.gov Reason: I have reviewed this document
__________________________________________________________/_________________________
__________________________________________________________/_________________________
Date: 2021.03.27 07:33:33 -04'00' John A. Ritchie, PWR Fuel Engineering Manager                                                                                                                               Date Digitally signed by Phillips, Eric Phillips, Eric Lewis                              Lewis Date: 2021.03.28 11:32:55 -04'00'
John A. Ritchie, PWR Fuel Engineering Manager Date
__________________________________________________________/_________________________
__________________________________________________________/_________________________
Eric L. Phillips, Reactor Engineering Manager                                                                                                                               Date Approved by:
Eric L. Phillips, Reactor Engineering Manager Date Approved by:
Digitally signed by Hodge, James M.
Hodge,            James            M.              Date: 2021.04.01 16:40:51 -04'00'
_________________________________________________________/_________________________
_________________________________________________________/_________________________
PORC Chairman                                                                                                                                                             Date Reneau, William                                            Digitally signed by Reneau, William Christopher Christopher                                                Date: 2021.04.05 12:34:23 -04'00'
PORC Chairman Date
__________________________________________________________/_________________________
__________________________________________________________/_________________________
Plant Manager                                                                                                                                                             Date Date of PORC           Affected Revision      Approval          Pages                       Reason for Revision 0       See above             All                     Initial issue.
Plant Manager Date Revision Date of PORC Approval Affected Pages Reason for Revision 0
SEQUOYAH UNIT 1                                                      Page 1 of 16                                                                                 Revision 0
See above All Initial issue.
Verner-Dingle, Whitney Kayla Digitally signed by Verner-Dingle, Whitney Kayla Date: 2021.03.26 17:29:46 -04'00' Porter, Mark Donald Digitally signed by Porter, Mark Donald DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Porter, Mark Donald, email=mdporter@tva.gov Reason: I am the author of this document Date: 2021.03.26 17:37:19 -04'00' Digitally signed by Bell, Jamel C DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Bell, Jamel C, email=jcbell3@tva.gov Reason: I have reviewed this document Location: TVA COC - WFH Date: 2021.03.26 18:05:04 -04'00' Ritchie, John A Digitally signed by Ritchie, John A DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Ritchie, John A, email=jaritchie0@tva.gov Reason: I have reviewed this document Date: 2021.03.27 07:33:33 -04'00' Phillips, Eric Lewis Digitally signed by Phillips, Eric Lewis Date: 2021.03.28 11:32:55 -04'00' Hodge, James M.
Digitally signed by Hodge, James M.
Date: 2021.04.01 16:40:51 -04'00' Reneau, William Christopher Digitally signed by Reneau, William Christopher Date: 2021.04.05 12:34:23 -04'00'


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 1.0       Core Operating Limits Report This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 1 Cycle 25 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 2 of 16 Revision 0 1.0 Core Operating Limits Report This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 1 Cycle 25 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.
The TSs affected by this Report are listed below.
The TSs affected by this Report are listed below.
COLR Section, TS                                                                          Table and/or     COLR Section        Technical Specification                COLR Parameter            Figure      Page (s) 3.1.1   SHUTDOWN MARGIN (SDM)               SDM                                   2.1         3 BOL MTC Limit                        2.2.1        4 Moderator Temperature Coefficient   EOL MTC Limit                         2.2.2         4 3.1.3 (MTC)                              300 ppm Surveillance Limit            2.2.3         4 60 ppm Surveillance Limit            2.2.4         4 3.1.4   Rod Group Alignment Limits         SDM                                   2.1.3         3 Shutdown Bank Insertion Limits        2.3          4 3.1.5   Shutdown Bank Insertion Limits SDM                                   2.1.4         3 Control Bank Insertion Limits     2.4, Figure 1   5, 14 3.1.6  Control Bank Insertion Limits SDM                                   2.1.5         3 PHYSICS TESTS Exceptions -
TS Section Technical Specification COLR Parameter COLR
3.1.8                                       SDM                                   2.1.6         3 MODE 2 RTP FQ                                    2.5.1         6 K(Z)                             2.5.2, Figure 2 6, 15 NSLOPEAFD                             2.5.3         6 PSLOPEAFD                             2.5.4         6 Heat Flux Hot Channel Factor 3.2.1 (FQ(X,Y,Z))                        NSLOPEf2(I)                         2.5.5         6 f2(I)
: Section, Table and/or Figure COLR Page (s) 3.1.1 SHUTDOWN MARGIN (SDM)
PSLOPE                                2.5.6         6 FQ(X,Y,Z) Appropriate Factor         2.5.7         6 TS LCO 3.2.1 Required Action A.3     2.5.8         6 MAP(X,Y,Z)                       2.6.1, Table 2   6, 11 RRH                                   2.6.2         6 Nuclear Enthalpy Rise Hot Channel  TRH                                   2.6.3         6 3.2.2 Factor (FH(X,Y))                  FH(X,Y) Appropriate Factor           2.6.4         7 TS 3.2.2 Required Action A.4         2.6.5         7 TS 3.2.2 Required Action B.1         2.6.6         7 3.2.3   AXIAL FLUX DIFFERENCE (AFD)         AFD Limits                       2.7, Figure 3   7, 16 Reactor Trip System (RTS)           QTNL, QTPL, QTNS, and QTPS           2.8.1        8 3.3.1 Instrumentation                    QPNL, QPPL, QPNS, and QPPS           2.8.2         9 3.9.1   Boron Concentration                 Refueling Boron Concentration         2.9         9 CORE OPERATING LIMITS 5.6.3                                       Analytical Methods                  Table 1      10 REPORT (COLR)
SDM 2.1 3
SEQUOYAH UNIT 1                       Page 2 of 16                        Revision 0
3.1.3 Moderator Temperature Coefficient (MTC)
BOL MTC Limit EOL MTC Limit 300 ppm Surveillance Limit 60 ppm Surveillance Limit 2.2.1 2.2.2 2.2.3 2.2.4 4
4 4
4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3
3.1.5 Shutdown Bank Insertion Limits Shutdown Bank Insertion Limits SDM 2.3 4
2.1.4 3
3.1.6 Control Bank Insertion Limits Control Bank Insertion Limits 2.4, Figure 1 5, 14 SDM 2.1.5 3
3.1.8 PHYSICS TESTS Exceptions -
MODE 2 SDM 2.1.6 3
3.2.1 Heat Flux Hot Channel Factor (FQ(X,Y,Z))
FQ RTP 2.5.1 6
K(Z) 2.5.2, Figure 2 6, 15 NSLOPEAFD 2.5.3 6
PSLOPEAFD 2.5.4 6
NSLOPEf2(I) 2.5.5 6
PSLOPEf2(I) 2.5.6 6
FQ(X,Y,Z) Appropriate Factor 2.5.7 6
TS LCO 3.2.1 Required Action A.3 2.5.8 6
3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FH(X,Y))
MAP(X,Y,Z) 2.6.1, Table 2 6, 11 RRH 2.6.2 6
TRH 2.6.3 6
FH(X,Y) Appropriate Factor 2.6.4 7
TS 3.2.2 Required Action A.4 2.6.5 7
TS 3.2.2 Required Action B.1 2.6.6 7
3.2.3 AXIAL FLUX DIFFERENCE (AFD)
AFD Limits 2.7, Figure 3 7, 16 3.3.1 Reactor Trip System (RTS)
QTNL, QTPL, QTNS, and QTPS QPNL, QPPL, QPNS, and QPPS 2.8.1 8
Instrumentation 2.8.2 9
3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9
5.6.3 CORE OPERATING LIMITS REPORT (COLR)
Analytical Methods Table 1 10


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.0     Operating Limits The cycle-specific parameter limits for the TS listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports, which describe the methodologies used for this cycle, are listed in Table 1.
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 3 of 16 Revision 0 2.0 Operating Limits The cycle-specific parameter limits for the TS listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports, which describe the methodologies used for this cycle, are listed in Table 1.
The following abbreviations are used in this section:
The following abbreviations are used in this section:
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1     SHUTDOWN MARGIN - SDM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1   For TS 3.1.1, SDM shall be 1.6 %k/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4.
BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SDM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SDM shall be 1.6 %k/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4.
2.1.2   For TS 3.1.1, SDM shall be 1.0 %k/k in MODE 5.
2.1.2 For TS 3.1.1, SDM shall be 1.0 %k/k in MODE 5.
2.1.3   For TS 3.1.4, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.
2.1.3 For TS 3.1.4, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.
2.1.4   For TS 3.1.5, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.
2.1.4 For TS 3.1.5, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.
2.1.5   For TS 3.1.6, SDM shall be 1.6 %k/k in MODE 1 and MODE 2 with keff 1.0.
2.1.5 For TS 3.1.6, SDM shall be 1.6 %k/k in MODE 1 and MODE 2 with keff 1.0.
2.1.6   For TS 3.1.8, SDM shall be 1.6 %k/k in MODE 2.
2.1.6 For TS 3.1.8, SDM shall be 1.6 %k/k in MODE 2.  
SEQUOYAH UNIT 1                    Page 3 of 16                            Revision 0


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is:
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 4 of 16 Revision 0 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is:
less positive than                 -0.22 x 10-5 k/k/&#xba;F.
less positive than  
2.2.2 The EOL MTC limit is:
-0.22 x 10-5 k/k/&#xba;F.
less negative than or equal to     -4.50 x 10-4 k/k/&#xba;F.
2.2.2 The EOL MTC limit is:
2.2.3 The 300 ppm Surveillance limit is:
less negative than or equal to  
less negative than or equal to     -3.80 x 10-4 k/k/&#xba;F.
-4.50 x 10-4 k/k/&#xba;F.
2.2.4 The 60 ppm Surveillance limit is:
2.2.3 The 300 ppm Surveillance limit is:
less negative than or equal to     -4.20 x 10-4 k/k/&#xba;F.
less negative than or equal to  
2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:
-3.80 x 10-4 k/k/&#xba;F.
Cycle Burnup                   Steps (MWd/mtU)                   Withdrawn 0                     225 to 231 SEQUOYAH UNIT 1              Page 4 of 16                        Revision 0
2.2.4 The 60 ppm Surveillance limit is:
less negative than or equal to  
-4.20 x 10-4 k/k/&#xba;F.
2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:
Cycle Burnup (MWd/mtU)
Steps Withdrawn 0
225 to 231  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1   The control banks shall be limited in physical insertion as shown in Figure 1.
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 5 of 16 Revision 0 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.
2.4.2   Each control bank shall be considered fully withdrawn from the core at 225 steps.
2.4.2 Each control bank shall be considered fully withdrawn from the core at 225 steps.
2.4.3   The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.
2.4.4   Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.
Full Out Position (steps)     Bank Overlap (steps)         Bank Difference (steps) 225                         97                           128 226                         98                           128 227                         99                           128 228                         100                           128 229                         101                           128 230                         102                           128 231                         103                           128 SEQUOYAH UNIT 1                  Page 5 of 16                          Revision 0
Full Out Position (steps)
Bank Overlap (steps)
Bank Difference (steps) 225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.5 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 6 of 16 Revision 0 2.5 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1 FQ RTP
RTP 2.5.1   FQ     =       2.62 2.5.2   K(Z) is provided in Figure 2 2.5.3   NSLOPEAFD =     1.3 2.5.4   PSLOPEAFD =     1.6 2.5.5   NSLOPEf2(I) = 1.6 2.5.6   PSLOPEf2(I) = 2.3 M
=
2.5.7   The appropriate factor for increase in FQ (X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD = 1.3 2.5.4 PSLOPEAFD = 1.6 2.5.5 NSLOPEf2(I) = 1.6 2.5.6 PSLOPEf2(I) = 2.3 2.5.7 The appropriate factor for increase in FQ M(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:
For all cycle burnups, use 2.0%.
For all cycle burnups, use 2.0%.
2.5.8   TS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta-T Trip setpoints (value of K4) at least 1% (in T span) for each 1% that FQC(X,Y,Z) exceeds its limit.
2.5.8 TS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta-T Trip setpoints (value of K4) at least 1% (in T span) for each 1% that FQ C(X,Y,Z) exceeds its limit.
2.6 Nuclear Enthalpy Rise Hot Channel Factor - FH(X,Y) (TS 3.2.2) 2.6.1   MAP(X,Y,Z) is provided in Table 2.
2.6 Nuclear Enthalpy Rise Hot Channel Factor - FH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Table 2.
2.6.2   RRH = 3.34     when 0.8 < P 1.0 RRH = 1.67     when P 0.8 Where RRH = Thermal power reduction required to compensate for each 1% that FH(X,Y) exceeds its limit.
2.6.2 RRH = 3.34 when 0.8 < P 1.0 RRH = 1.67 when P 0.8 Where RRH = Thermal power reduction required to compensate for each 1% that FH(X,Y) exceeds its limit.
P = THERMAL POWER / RATED THERMAL POWER 2.6.3   TRH = 0.0334           when 0.8 < P 1.0 TRH = 0.0167           when P 0.8 Where TRH = Reduction in Overtemperature Delta-T K1 setpoint required to compensate for each 1% that FH(X,Y) exceeds its limit.
P = THERMAL POWER / RATED THERMAL POWER 2.6.3 TRH = 0.0334 when 0.8 < P 1.0 TRH = 0.0167 when P 0.8 Where TRH = Reduction in Overtemperature Delta-T K1 setpoint required to compensate for each 1% that FH(X,Y) exceeds its limit.
P = THERMAL POWER / RATED THERMAL POWER SEQUOYAH UNIT 1                Page 6 of 16                        Revision 0
P = THERMAL POWER / RATED THERMAL POWER  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.6.4   The appropriate factor for increase in FHM (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 7 of 16 Revision 0 2.6.4 The appropriate factor for increase in FH M (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:
For all cycle burnups, use 2.0%.
For all cycle burnups, use 2.0%.
2.6.5   TS LCO 3.2.2 Required Action A.4 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the FH minimum margin.
2.6.5 TS LCO 3.2.2 Required Action A.4 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the FH minimum margin.
2.6.6   TS LCO 3.2.2 Required Action B.1 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the f1(I) minimum margin.
2.6.6 TS LCO 3.2.2 Required Action B.1 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the f1(I) minimum margin.
2.7 Axial Flux Difference - AFD (TS 3.2.3) 2.7.1   The AFD limits are specified in Figure 3.
2.7 Axial Flux Difference - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3.  
SEQUOYAH UNIT 1                Page 7 of 16                        Revision 0


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.8 Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1     Trip Reset Term [f1(I)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(I) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 8 of 16 Revision 0 2.8 Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1 Trip Reset Term [f1(I)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(I) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:
2.8.1.1     QTNL = -20%
2.8.1.1 QTNL = -20%
where QTNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
where QTNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.2     QTPL = +5%
2.8.1.2 QTPL = +5%
where QTPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
where QTPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.1.3     QTNS = 2.50%
2.8.1.3 QTNS = 2.50%
where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QTNL).
where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QTNL).
2.8.1.4     QTPS = 1.40%
2.8.1.4 QTPS = 1.40%
where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QTPL).
where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QTPL).  
SEQUOYAH UNIT 1                  Page 8 of 16                          Revision 0


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 2.8.2     Trip Reset Term [f2(I)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(I) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 9 of 16 Revision 0 2.8.2 Trip Reset Term [f2(I)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(I) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:
2.8.2.1     QPNL = -25%
2.8.2.1 QPNL = -25%
where QPNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
where QPNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.2     QPPL = +25%
2.8.2.2 QPPL = +25%
where QPPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
where QPPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.
2.8.2.3     QPNS = 1.70%
2.8.2.3 QPNS = 1.70%
where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QPNL).
where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QPNL).
2.8.2.4     QPPS = 1.70%
2.8.2.4 QPPS = 1.70%
where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QPPL).
where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QPPL).
2.9 Boron Concentration (TS 3.9.1) 2.9.1     The refueling boron concentration shall be 2052 ppm.
2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be 2052 ppm.  
SEQUOYAH UNIT 1                  Page 9 of 16                          Revision 0


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 Table 1 COLR Methodology Topical Reports
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 10 of 16 Revision 0 Table 1 COLR Methodology Topical Reports
: 1. BAW-10180-A, Revision 1, NEMO-Nodal Expansion Method Optimized, March 1993.
: 1.
BAW-10180-A, Revision 1, NEMO-Nodal Expansion Method Optimized, March 1993.
(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)
: 2. BAW-10169P-A, Revision 0, RSG Plant Safety Analysis - B&W Safety Analysis Methodology for Recirculating Steam Generator Plants, October 1989.
: 2.
BAW-10169P-A, Revision 0, RSG Plant Safety Analysis - B&W Safety Analysis Methodology for Recirculating Steam Generator Plants, October 1989.
(Methodology for TS 3.1.3-Moderator Temperature Coefficient)
(Methodology for TS 3.1.3-Moderator Temperature Coefficient)
: 3. BAW-10163P-A, Revision 0, Core Operating Limit Methodology for Westinghouse-Designed PWRs, June 1989.
: 3.
BAW-10163P-A, Revision 0, Core Operating Limit Methodology for Westinghouse-Designed PWRs, June 1989.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(I), f2(I) limits],
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(I), f2(I) limits],
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)
: 4. EMF-2328(P)(A), Revision 0 PWR Small Break LOCA Evaluation Model, March 2001.
: 4.
EMF-2328(P)(A), Revision 0 PWR Small Break LOCA Evaluation Model, March 2001.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 5. BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, June 2003.
: 5.
BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 6. BAW-10186P-A, Revision 2, Extended Burnup Evaluation, June 2003.
: 6.
BAW-10186P-A, Revision 2, Extended Burnup Evaluation, June 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 7. EMF-2103P-A, Revision 0, Realistic Large Break LOCA Methodology for Pressurized Water Reactors, April 2003.
: 7.
EMF-2103P-A, Revision 0, Realistic Large Break LOCA Methodology for Pressurized Water Reactors, April 2003.
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)
: 8. BAW-10241P-A, Revision 1, BHTP DNB Correlation Applied with LYNXT, July 2005.
: 8.
BAW-10241P-A, Revision 1, BHTP DNB Correlation Applied with LYNXT, July 2005.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
: 9. BAW-10199P-A, Revision 0, The BWU Critical Heat Flux Correlations, August 1996.
: 9.
BAW-10199P-A, Revision 0, The BWU Critical Heat Flux Correlations, August 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
: 10. BAW-10189P-A, CHF Testing and Analysis of the Mark-BW Fuel Assembly Design, January 1996.
: 10.
BAW-10189P-A, CHF Testing and Analysis of the Mark-BW Fuel Assembly Design, January 1996.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
: 11. BAW-10159P-A, BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies, August 1990.
: 11.
BAW-10159P-A, BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies, August 1990.
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])
: 12. BAW-10231P-A, Revision 1, COPERNIC Fuel Rod Design Computer Code, January 2004.
: 12.
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(I) limits])
BAW-10231P-A, Revision 1, COPERNIC Fuel Rod Design Computer Code, January 2004.
SEQUOYAH UNIT 1                  Page 10 of 16                          Revision 0
(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(I) limits])  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation AXIAL(X,Y) ELEVATION   MAP(X,Y,Z)         AXIAL(X,Y)   ELEVATION   MAP(X,Y,Z)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 11 of 16 Revision 0 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation AXIAL(X,Y)
(FT)                                          (FT) 1          1.7084                            1       2.4093 2          1.7084                             2      2.4077 3          1.7083                            3      2.4068 4          1.7082                            4      2.4063 5          1.7081                            5      2.4050 1.03          6          1.7079              1.3           6       2.4043 7          1.7078                            7      2.4034 8          1.7073                            8      2.3923 9          1.7072                            9      2.3053 10          1.7072                            10      2.1479 11          1.7066                            11      2.0305 1         1.8764                            1       2.7078 2          1.8761                             2      2.6846 3          1.8758                             3      2.6349 4          1.8755                            4      2.5983 5          1.8750                            5      2.5933 1.1         6          1.8746              1.4           6       2.6505 7          1.8732                            7      2.6394 8          1.8731                            8      2.5563 9          1.8729                            9      2.4572 10          1.8733                            10      2.2668 11          1.8320                            11      2.1190 1         2.1327                            1       2.8223 2          2.1321                             2       2.7591 3          2.1315                            3      2.6985 4          2.1306                            4      2.6542 5          2.1295                            5      2.6482 1.2         6         2.1290              1.5            6      2.7162 7          2.1286                            7      2.7495 8          2.1274                            8      2.6507 9          2.1254                            9      2.5578 10          2.0247                            10      2.3791 11          1.9355                            11      2.2011 SEQUOYAH UNIT 1            Page 11 of 16                  Revision 0
ELEVATION (FT)
MAP(X,Y,Z)
AXIAL(X,Y)
ELEVATION (FT)
MAP(X,Y,Z) 1.03 1
2 3
4 5
6 7
8 9
10 11 1.7084 1.7084 1.7083 1.7082 1.7081 1.7079 1.7078 1.7073 1.7072 1.7072 1.7066 1.3 1
2 3
4 5
6 7
8 9
10 11 2.4093 2.4077 2.4068 2.4063 2.4050 2.4043 2.4034 2.3923 2.3053 2.1479 2.0305 1.1 1
2 3
4 5
6 7
8 9
10 11 1.8764 1.8761 1.8758 1.8755 1.8750 1.8746 1.8732 1.8731 1.8729 1.8733 1.8320 1.4 1
2 3
4 5
6 7
8 9
10 11 2.7078 2.6846 2.6349 2.5983 2.5933 2.6505 2.6394 2.5563 2.4572 2.2668 2.1190 1.2 1
2 3
4 5
6 7
8 9
10 11 2.1327 2.1321 2.1315 2.1306 2.1295 2.1290 2.1286 2.1274 2.1254 2.0247 1.9355 1.5 1
2 3
4 5
6 7
8 9
10 11 2.8223 2.7591 2.6985 2.6542 2.6482 2.7162 2.7495 2.6507 2.5578 2.3791 2.2011  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 Table 2 (continued)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 12 of 16 Revision 0 Table 2 (continued)
AXIAL(X,Y) ELEVATION   MAP(X,Y,Z)         AXIAL(X,Y) ELEVATION   MAP(X,Y,Z)
AXIAL(X,Y)
(FT)                                        (FT) 1         2.8935                          1       3.0267 2          2.8252                           2       2.9676 3          2.7571                          3        2.8960 4          2.7055                          4        2.8345 5          2.6985                          5        2.8256 1.6          6          2.7776              1.9         6       2.9291 7          2.8428                          7        3.0655 8          2.7401                          8        2.9714 9          2.6471                          9        2.8741 10          2.4862                          10        2.7780 11          2.2766                          11        2.4797 1         2.9545                          1       2.6005 2          2.8786                           2       2.5794 3          2.8103                          3        2.5536 4          2.7522                          4        2.5118 5          2.7457                          5        2.4500 1.7          6          2.8308              >1.9         6       2.4520 7          2.9230                          7        2.6494 8          2.8209                          8        2.5446 9          2.7287                          9        2.4371 10          2.5873                          10        2.2595 11          2.3478                          11        2.0819 1         2.9942                          1       2.7049 2          2.9271                           2       2.6623 3          2.8570                          3        2.6375 4          2.7942                          4        2.5288 5          2.7875                          5        2.5460 1.8          6          2.8823              2.1         6       2.5252 7          2.9967                          7        2.7990 8          2.8980                          8        2.6963 9          2.8027                          9        2.5830 10          2.6853                          10        2.4527 11          2.4156                          11        2.1796 SEQUOYAH UNIT 1            Page 12 of 16                  Revision 0
ELEVATION (FT)
MAP(X,Y,Z)
AXIAL(X,Y)
ELEVATION (FT)
MAP(X,Y,Z) 1.6 1
2 3
4 5
6 7
8 9
10 11 2.8935 2.8252 2.7571 2.7055 2.6985 2.7776 2.8428 2.7401 2.6471 2.4862 2.2766 1.9 1
2 3
4 5
6 7
8 9
10 11 3.0267 2.9676 2.8960 2.8345 2.8256 2.9291 3.0655 2.9714 2.8741 2.7780 2.4797 1.7 1
2 3
4 5
6 7
8 9
10 11 2.9545 2.8786 2.8103 2.7522 2.7457 2.8308 2.9230 2.8209 2.7287 2.5873 2.3478
>1.9 1
2 3
4 5
6 7
8 9
10 11 2.6005 2.5794 2.5536 2.5118 2.4500 2.4520 2.6494 2.5446 2.4371 2.2595 2.0819 1.8 1
2 3
4 5
6 7
8 9
10 11 2.9942 2.9271 2.8570 2.7942 2.7875 2.8823 2.9967 2.8980 2.8027 2.6853 2.4156 2.1 1
2 3
4 5
6 7
8 9
10 11 2.7049 2.6623 2.6375 2.5288 2.5460 2.5252 2.7990 2.6963 2.5830 2.4527 2.1796  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 Table 2 (continued)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 13 of 16 Revision 0 Table 2 (continued)
AXIAL(X,Y) ELEVATION   MAP(X,Y,Z)         AXIAL(X,Y) ELEVATION     MAP(X,Y,Z)
AXIAL(X,Y)
(FT)                                      (FT) 1        2.7475                          1         2.8372 2        2.7275                           2         2.7099 3        2.6457                          3          2.7081 4        2.6125                          4          2.6340 5        2.5774                          5          2.6483 2.3          6        2.5707              2.5         6         2.6284 7        2.9015                          7          3.0303 8        2.7773                          8          2.8965 9        2.6757                          9          2.8111 10        2.4740                          10          2.7019 11        2.2722                          11          2.3542 SEQUOYAH UNIT 1          Page 13 of 16                  Revision 0
ELEVATION (FT)
MAP(X,Y,Z)
AXIAL(X,Y) ELEVATION (FT)
MAP(X,Y,Z) 2.3 1
2 3
4 5
6 7
8 9
10 11 2.7475 2.7275 2.6457 2.6125 2.5774 2.5707 2.9015 2.7773 2.6757 2.4740 2.2722 2.5 1
2 3
4 5
6 7
8 9
10 11 2.8372 2.7099 2.7081 2.6340 2.6483 2.6284 3.0303 2.8965 2.8111 2.7019 2.3542  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 14 of 16 Revision 0 Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and 231steps withdrawn.
* Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and 231steps withdrawn.
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)                                 Steps Withdrawn 0                                             225 to 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.
Steps Withdrawn 0
SEQUOYAH UNIT 1                              Page 14 of 16                                    Revision 0
225 to 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.  


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 1.2 1.0 0.8 K(Z)   0.6 Elevation     K(z)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 15 of 16 Revision 0 FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1) 0.0 0.2 0.4 0.6 0.8 1.0 1.2 0
(ft) 0.000       1.0000 0.4                    6.285       1.0000 7.995       1.0000 9.705       1.0000 12.000       1.0000 0.2 0.0 0        2            4              6          8  10          12 Core Height (Feet)
2 4
FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1)
6 8
SEQUOYAH UNIT 1                          Page 15 of 16                  Revision 0
10 12 Core Height (Feet)
K(Z)
Elevation K(z)
(ft) 0.000 1.0000 6.285 1.0000 7.995 1.0000 9.705 1.0000 12.000 1.0000


COLR FOR SEQUOYAH UNIT 1 CYCLE 25 FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)
COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 16 of 16 Revision 0 FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.
If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.}}
SEQUOYAH UNIT 1                              Page 16 of 16                                  Revision 0}}

Latest revision as of 08:54, 29 November 2024

Cycle 25 Core Operating Limits Report, Revision 0
ML21138A872
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/18/2021
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21138A872 (18)


Text

Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 May 18, 2021 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-77 NRC Docket No. 50-327

Subject:

SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 In accordance with Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specification (TS) 5.6.3.d, enclosed is the Unit 1 Cycle 25 Core Operating Limits Report (COLR), Revision 0 that was issued on April 22, 2021.

There are no new regulatory commitments in this letter. If you have any questions, please contact Jeffrey Sowa, SQN Site Licensing Manager at (423) 843-8129.

Respectfully, Thomas Marshall Site Vice President Sequoyah Nuclear Plant

Enclosure:

Sequoyah Unit 1 Cycle 25 Core Operating Limits Report, Revision 0 cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - SQN

Marshall, Thomas B.

Digitally signed by Marshall, Thomas B.

Date: 2021.05.18 07:57:46 -04'00'

ENCLOSURE SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0

QA RECORD L36 210325 800 SEQUOYAH UNIT 1 Page 1 of 16 Revision 0 SEQUOYAH UNIT 1 CYCLE 25 CORE OPERATING LIMITS REPORT REVISION 0 April 2021 Prepared by:

__________________________________________________________/_________________________

W. Kayla Verner-Dingle/Mark D. Porter, PWR Fuel Engineering and NSA Date Verified by:

__________________________________________________________/_________________________

Jamel C. Bell, PWR Fuel Engineering Date Reviewed by:

__________________________________________________________/_________________________

John A. Ritchie, PWR Fuel Engineering Manager Date

__________________________________________________________/_________________________

Eric L. Phillips, Reactor Engineering Manager Date Approved by:

_________________________________________________________/_________________________

PORC Chairman Date

__________________________________________________________/_________________________

Plant Manager Date Revision Date of PORC Approval Affected Pages Reason for Revision 0

See above All Initial issue.

Verner-Dingle, Whitney Kayla Digitally signed by Verner-Dingle, Whitney Kayla Date: 2021.03.26 17:29:46 -04'00' Porter, Mark Donald Digitally signed by Porter, Mark Donald DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Porter, Mark Donald, email=mdporter@tva.gov Reason: I am the author of this document Date: 2021.03.26 17:37:19 -04'00' Digitally signed by Bell, Jamel C DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Bell, Jamel C, email=jcbell3@tva.gov Reason: I have reviewed this document Location: TVA COC - WFH Date: 2021.03.26 18:05:04 -04'00' Ritchie, John A Digitally signed by Ritchie, John A DN: dc=gov, dc=tva, dc=main, ou=Main, ou=Corporate, ou=Users, cn=Ritchie, John A, email=jaritchie0@tva.gov Reason: I have reviewed this document Date: 2021.03.27 07:33:33 -04'00' Phillips, Eric Lewis Digitally signed by Phillips, Eric Lewis Date: 2021.03.28 11:32:55 -04'00' Hodge, James M.

Digitally signed by Hodge, James M.

Date: 2021.04.01 16:40:51 -04'00' Reneau, William Christopher Digitally signed by Reneau, William Christopher Date: 2021.04.05 12:34:23 -04'00'

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 2 of 16 Revision 0 1.0 Core Operating Limits Report This CORE OPERATING LIMITS REPORT (COLR) for Sequoyah Unit 1 Cycle 25 has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.3.

The TSs affected by this Report are listed below.

TS Section Technical Specification COLR Parameter COLR

Section, Table and/or Figure COLR Page (s) 3.1.1 SHUTDOWN MARGIN (SDM)

SDM 2.1 3

3.1.3 Moderator Temperature Coefficient (MTC)

BOL MTC Limit EOL MTC Limit 300 ppm Surveillance Limit 60 ppm Surveillance Limit 2.2.1 2.2.2 2.2.3 2.2.4 4

4 4

4 3.1.4 Rod Group Alignment Limits SDM 2.1.3 3

3.1.5 Shutdown Bank Insertion Limits Shutdown Bank Insertion Limits SDM 2.3 4

2.1.4 3

3.1.6 Control Bank Insertion Limits Control Bank Insertion Limits 2.4, Figure 1 5, 14 SDM 2.1.5 3

3.1.8 PHYSICS TESTS Exceptions -

MODE 2 SDM 2.1.6 3

3.2.1 Heat Flux Hot Channel Factor (FQ(X,Y,Z))

FQ RTP 2.5.1 6

K(Z) 2.5.2, Figure 2 6, 15 NSLOPEAFD 2.5.3 6

PSLOPEAFD 2.5.4 6

NSLOPEf2(I) 2.5.5 6

PSLOPEf2(I) 2.5.6 6

FQ(X,Y,Z) Appropriate Factor 2.5.7 6

TS LCO 3.2.1 Required Action A.3 2.5.8 6

3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FH(X,Y))

MAP(X,Y,Z) 2.6.1, Table 2 6, 11 RRH 2.6.2 6

TRH 2.6.3 6

FH(X,Y) Appropriate Factor 2.6.4 7

TS 3.2.2 Required Action A.4 2.6.5 7

TS 3.2.2 Required Action B.1 2.6.6 7

3.2.3 AXIAL FLUX DIFFERENCE (AFD)

AFD Limits 2.7, Figure 3 7, 16 3.3.1 Reactor Trip System (RTS)

QTNL, QTPL, QTNS, and QTPS QPNL, QPPL, QPNS, and QPPS 2.8.1 8

Instrumentation 2.8.2 9

3.9.1 Boron Concentration Refueling Boron Concentration 2.9 9

5.6.3 CORE OPERATING LIMITS REPORT (COLR)

Analytical Methods Table 1 10

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 3 of 16 Revision 0 2.0 Operating Limits The cycle-specific parameter limits for the TS listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in TS 5.6.3. The versions of the topical reports, which describe the methodologies used for this cycle, are listed in Table 1.

The following abbreviations are used in this section:

BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER 2.1 SHUTDOWN MARGIN - SDM (TS 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8) 2.1.1 For TS 3.1.1, SDM shall be 1.6 %k/k in MODE 2 with keff < 1.0, MODE 3 and MODE 4.

2.1.2 For TS 3.1.1, SDM shall be 1.0 %k/k in MODE 5.

2.1.3 For TS 3.1.4, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.

2.1.4 For TS 3.1.5, SDM shall be 1.6 %k/k in MODE 1 and MODE 2.

2.1.5 For TS 3.1.6, SDM shall be 1.6 %k/k in MODE 1 and MODE 2 with keff 1.0.

2.1.6 For TS 3.1.8, SDM shall be 1.6 %k/k in MODE 2.

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 4 of 16 Revision 0 2.2 Moderator Temperature Coefficient - MTC (TS 3.1.3) 2.2.1 The BOL MTC limit is:

less positive than

-0.22 x 10-5 k/k/ºF.

2.2.2 The EOL MTC limit is:

less negative than or equal to

-4.50 x 10-4 k/k/ºF.

2.2.3 The 300 ppm Surveillance limit is:

less negative than or equal to

-3.80 x 10-4 k/k/ºF.

2.2.4 The 60 ppm Surveillance limit is:

less negative than or equal to

-4.20 x 10-4 k/k/ºF.

2.3 Shutdown Bank Insertion Limits (TS 3.1.5) 2.3.1 Each shutdown bank shall be withdrawn to a position as defined below:

Cycle Burnup (MWd/mtU)

Steps Withdrawn 0

225 to 231

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 5 of 16 Revision 0 2.4 Control Bank Insertion Limits (TS 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure 1.

2.4.2 Each control bank shall be considered fully withdrawn from the core at 225 steps.

2.4.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C, and Bank D. The control banks shall be sequenced in reverse order upon insertion.

2.4.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap as a function of full out position.

Full Out Position (steps)

Bank Overlap (steps)

Bank Difference (steps) 225 97 128 226 98 128 227 99 128 228 100 128 229 101 128 230 102 128 231 103 128

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 6 of 16 Revision 0 2.5 Heat Flux Hot Channel Factor - FQ(X,Y,Z) (TS 3.2.1) 2.5.1 FQ RTP

=

2.62 2.5.2 K(Z) is provided in Figure 2 2.5.3 NSLOPEAFD = 1.3 2.5.4 PSLOPEAFD = 1.6 2.5.5 NSLOPEf2(I) = 1.6 2.5.6 PSLOPEf2(I) = 2.3 2.5.7 The appropriate factor for increase in FQ M(X,Y,Z) for compliance with SR 3.2.1.2 and SR 3.2.1.3 is specified as follows:

For all cycle burnups, use 2.0%.

2.5.8 TS LCO 3.2.1 Required Action A.3 reduces the Overpower Delta-T Trip setpoints (value of K4) at least 1% (in T span) for each 1% that FQ C(X,Y,Z) exceeds its limit.

2.6 Nuclear Enthalpy Rise Hot Channel Factor - FH(X,Y) (TS 3.2.2) 2.6.1 MAP(X,Y,Z) is provided in Table 2.

2.6.2 RRH = 3.34 when 0.8 < P 1.0 RRH = 1.67 when P 0.8 Where RRH = Thermal power reduction required to compensate for each 1% that FH(X,Y) exceeds its limit.

P = THERMAL POWER / RATED THERMAL POWER 2.6.3 TRH = 0.0334 when 0.8 < P 1.0 TRH = 0.0167 when P 0.8 Where TRH = Reduction in Overtemperature Delta-T K1 setpoint required to compensate for each 1% that FH(X,Y) exceeds its limit.

P = THERMAL POWER / RATED THERMAL POWER

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 7 of 16 Revision 0 2.6.4 The appropriate factor for increase in FH M (X,Y) for compliance with SR 3.2.2.1 and SR 3.2.2.2 is specified as follows:

For all cycle burnups, use 2.0%.

2.6.5 TS LCO 3.2.2 Required Action A.4 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the FH minimum margin.

2.6.6 TS LCO 3.2.2 Required Action B.1 reduces the Overtemperature Delta-T setpoint (K1 term in Table 3.3.1-1) by TRH multiplied by the f1(I) minimum margin.

2.7 Axial Flux Difference - AFD (TS 3.2.3) 2.7.1 The AFD limits are specified in Figure 3.

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 8 of 16 Revision 0 2.8 Reactor Trip System Instrumentation (TS 3.3.1) 2.8.1 Trip Reset Term [f1(I)] for Overtemperature Delta-T Trip The following parameters are required to specify the power level-dependent f1(I) trip reset term limits for Table 3.3.1-1 (function 6), Overtemperature Delta-T trip function:

2.8.1.1 QTNL = -20%

where QTNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.2 QTPL = +5%

where QTPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.1.3 QTNS = 2.50%

where QTNS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QTNL).

2.8.1.4 QTPS = 1.40%

where QTPS = the percent reduction in Overtemperature Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QTPL).

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 9 of 16 Revision 0 2.8.2 Trip Reset Term [f2(I)] for Overpower Delta-T Trip The following parameters are required to specify the power level-dependent f2(I) trip reset term limits for Table 3.3.1-1 (function 7), Overpower Delta-T trip function:

2.8.2.1 QPNL = -25%

where QPNL = the maximum negative I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.2 QPPL = +25%

where QPPL = the maximum positive I setpoint at RATED THERMAL POWER at which the trip setpoint is not reduced by the axial power distribution.

2.8.2.3 QPNS = 1.70%

where QPNS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its negative limit at RATED THERMAL POWER (QPNL).

2.8.2.4 QPPS = 1.70%

where QPPS = the percent reduction in Overpower Delta-T trip setpoint for each percent that the magnitude of I exceeds its positive limit at RATED THERMAL POWER (QPPL).

2.9 Boron Concentration (TS 3.9.1) 2.9.1 The refueling boron concentration shall be 2052 ppm.

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 10 of 16 Revision 0 Table 1 COLR Methodology Topical Reports

1.

BAW-10180-A, Revision 1, NEMO-Nodal Expansion Method Optimized, March 1993.

(Methodology for TS 3.1.1-SHUTDOWN MARGIN, 3.1.3-Moderator Temperature Coefficient, 3.9.1-Boron Concentration)

2.

BAW-10169P-A, Revision 0, RSG Plant Safety Analysis - B&W Safety Analysis Methodology for Recirculating Steam Generator Plants, October 1989.

(Methodology for TS 3.1.3-Moderator Temperature Coefficient)

3.

BAW-10163P-A, Revision 0, Core Operating Limit Methodology for Westinghouse-Designed PWRs, June 1989.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f1(I), f2(I) limits],

3.1.5-Shutdown Bank Insertion Limits, 3.1.6-Control Bank Insertion Limits, 3.2.1-Heat Flux Hot Channel Factor, 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.2.3-AXIAL FLUX DIFFERENCE)

4.

EMF-2328(P)(A), Revision 0 PWR Small Break LOCA Evaluation Model, March 2001.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

5.

BAW-10227P-A, Revision 1, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

6.

BAW-10186P-A, Revision 2, Extended Burnup Evaluation, June 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

7.

EMF-2103P-A, Revision 0, Realistic Large Break LOCA Methodology for Pressurized Water Reactors, April 2003.

(Methodology for TS 3.2.1-Heat Flux Hot Channel Factor)

8.

BAW-10241P-A, Revision 1, BHTP DNB Correlation Applied with LYNXT, July 2005.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])

9.

BAW-10199P-A, Revision 0, The BWU Critical Heat Flux Correlations, August 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])

10.

BAW-10189P-A, CHF Testing and Analysis of the Mark-BW Fuel Assembly Design, January 1996.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])

11.

BAW-10159P-A, BWCMV Correlation of Critical Heat Flux in Mixing Vane Grid Fuel Assemblies, August 1990.

(Methodology for TS 3.2.2-Nuclear Enthalpy Rise Hot Channel Factor, 3.3.1-Reactor Trip System Instrumentation [f1(I) limits])

12.

BAW-10231P-A, Revision 1, COPERNIC Fuel Rod Design Computer Code, January 2004.

(Methodology for TS 3.3.1-Reactor Trip System Instrumentation [f2(I) limits])

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 11 of 16 Revision 0 Table 2 Maximum Allowable Peaking Limits MAP(X,Y,Z) for Operation AXIAL(X,Y)

ELEVATION (FT)

MAP(X,Y,Z)

AXIAL(X,Y)

ELEVATION (FT)

MAP(X,Y,Z) 1.03 1

2 3

4 5

6 7

8 9

10 11 1.7084 1.7084 1.7083 1.7082 1.7081 1.7079 1.7078 1.7073 1.7072 1.7072 1.7066 1.3 1

2 3

4 5

6 7

8 9

10 11 2.4093 2.4077 2.4068 2.4063 2.4050 2.4043 2.4034 2.3923 2.3053 2.1479 2.0305 1.1 1

2 3

4 5

6 7

8 9

10 11 1.8764 1.8761 1.8758 1.8755 1.8750 1.8746 1.8732 1.8731 1.8729 1.8733 1.8320 1.4 1

2 3

4 5

6 7

8 9

10 11 2.7078 2.6846 2.6349 2.5983 2.5933 2.6505 2.6394 2.5563 2.4572 2.2668 2.1190 1.2 1

2 3

4 5

6 7

8 9

10 11 2.1327 2.1321 2.1315 2.1306 2.1295 2.1290 2.1286 2.1274 2.1254 2.0247 1.9355 1.5 1

2 3

4 5

6 7

8 9

10 11 2.8223 2.7591 2.6985 2.6542 2.6482 2.7162 2.7495 2.6507 2.5578 2.3791 2.2011

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 12 of 16 Revision 0 Table 2 (continued)

AXIAL(X,Y)

ELEVATION (FT)

MAP(X,Y,Z)

AXIAL(X,Y)

ELEVATION (FT)

MAP(X,Y,Z) 1.6 1

2 3

4 5

6 7

8 9

10 11 2.8935 2.8252 2.7571 2.7055 2.6985 2.7776 2.8428 2.7401 2.6471 2.4862 2.2766 1.9 1

2 3

4 5

6 7

8 9

10 11 3.0267 2.9676 2.8960 2.8345 2.8256 2.9291 3.0655 2.9714 2.8741 2.7780 2.4797 1.7 1

2 3

4 5

6 7

8 9

10 11 2.9545 2.8786 2.8103 2.7522 2.7457 2.8308 2.9230 2.8209 2.7287 2.5873 2.3478

>1.9 1

2 3

4 5

6 7

8 9

10 11 2.6005 2.5794 2.5536 2.5118 2.4500 2.4520 2.6494 2.5446 2.4371 2.2595 2.0819 1.8 1

2 3

4 5

6 7

8 9

10 11 2.9942 2.9271 2.8570 2.7942 2.7875 2.8823 2.9967 2.8980 2.8027 2.6853 2.4156 2.1 1

2 3

4 5

6 7

8 9

10 11 2.7049 2.6623 2.6375 2.5288 2.5460 2.5252 2.7990 2.6963 2.5830 2.4527 2.1796

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 13 of 16 Revision 0 Table 2 (continued)

AXIAL(X,Y)

ELEVATION (FT)

MAP(X,Y,Z)

AXIAL(X,Y) ELEVATION (FT)

MAP(X,Y,Z) 2.3 1

2 3

4 5

6 7

8 9

10 11 2.7475 2.7275 2.6457 2.6125 2.5774 2.5707 2.9015 2.7773 2.6757 2.4740 2.2722 2.5 1

2 3

4 5

6 7

8 9

10 11 2.8372 2.7099 2.7081 2.6340 2.6483 2.6284 3.0303 2.8965 2.8111 2.7019 2.3542

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 14 of 16 Revision 0 Fraction of RATED THERMAL POWER FIGURE 1 Rod Bank Insertion Limits Versus THERMAL POWER, Four Loop Operation (TS 3.1.6)

  • Fully withdrawn region shall be the condition where shutdown and control banks are at a position within the interval of 225 and 231steps withdrawn.

Fully withdrawn shall be the position as defined below, Cycle Burnup (MWd/mtU)

Steps Withdrawn 0

225 to 231 This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the rod insertion limit lines must be increased by 3 steps withdrawn until the LEFM is returned to operation.

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 15 of 16 Revision 0 FIGURE 2 K(Z) - Normalized FQ(X,Y,Z) as a Function of Core Height (TS 3.2.1) 0.0 0.2 0.4 0.6 0.8 1.0 1.2 0

2 4

6 8

10 12 Core Height (Feet)

K(Z)

Elevation K(z)

(ft) 0.000 1.0000 6.285 1.0000 7.995 1.0000 9.705 1.0000 12.000 1.0000

COLR FOR SEQUOYAH UNIT 1 CYCLE 25 SEQUOYAH UNIT 1 Page 16 of 16 Revision 0 FIGURE 3 AXIAL FLUX DIFFERENCE Limits As A Function of RATED THERMAL POWER For Burnup Range 0 EFPD to EOL (TS 3.2.3)

This figure is valid for operation at a RATED THERMAL POWER of 3455 MWth when the LEFM is in operation.

If the LEFM becomes inoperable, then prior to the next NIS calibration, the maximum allowable power level must be reduced by 1.3% in power, and the AFD limit lines must be made more restrictive by 1% in AFD until the LEFM is returned to operation.