{{#Wiki_filter:V.C. Summer Nuclear Station ~ Dominion Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address: ~ Energy P. O. Box 88, Jenkinsville, SC 29065 Domin ionEnergy.com June 22, 2023 Document Control Desk Serial No. 23-168 U. S. Nuclear Regulatory Commission VCS LIC/JB Rev 0 Washington, DC 20555-0001 Docket No. 50-395 License No. NPF-12
{{#Wiki_filter:V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address:
 
P.O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com June 22, 2023 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 DOMINION ENERGY SOUTH CAROLINA (DESC)
DOMINION ENERGY SOUTH CAROLINA (DESC)
~
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2023-002 INOPERABLE LOOSE-PART MONITORING SYSTEM CHANNEL
Dominion
 
~
Dominion Energy South Carolina, Inc. (DESC) hereby submits Special Report 2023-002, pursuant to the requirements of Technical Specification (TS) 3.3.3.10 Action a and TS 6.9.2. Th is special report is required by VCSNS TS because Loose Part Monitoring System (LPMS) Channel 1 has been inoperable for greater than 30 days.
Energy Serial No. 23-168 VCS LIC/JB Rev 0 Docket No. 50-395 License No. NPF-12 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2023-002 INOPERABLE LOOSE-PART MONITORING SYSTEM CHANNEL Dominion Energy South Carolina, Inc. (DESC) hereby submits Special Report 2023-002, pursuant to the requirements of Technical Specification (TS) 3.3.3.10 Action a and TS 6.9.2. This special report is required by VCSNS TS because Loose-Part Monitoring System (LPMS) Channel 1 has been inoperable for greater than 30 days.
 
TS 3.3.3.10 requires the LPMS be operable in Modes 1 and 2 (and does not fall under the provisions of 3.0.4). LPMS Channel 1, monitoring the reactor vessel upper head, was inoperable when VCSNS entered Mode 2 on May 18, 2023. LPMS Channel 1 was declared inoperable due to indication of sensor failure in background trend data.
TS 3.3.3.10 requires the LPMS be operable in Modes 1 and 2 (and does not fall under the provisions of 3.0.4). LPMS Channel 1, monitoring the reactor vessel upper head, was inoperable when VCSNS entered Mode 2 on May 18, 2023. LPMS Channel 1 was declared inoperable due to indication of sensor failure in background trend data.
Reactor Vessel Upper Head LPMS Channel 10 continues to monitor the reactor vessel upper head for loose parts. Channel 1 has been disabled in LPMS. Loss of dual channel coincidence reduces one aspect of the false alarm filtering functionality. The failed transducer for Channel 1 (IAT00751) is planned for repair or replacement during Refuel 28 in Fall 2024.
Reactor Vessel Upper Head LPMS Channel 10 continues to monitor the reactor vessel upper head for loose parts. Channel 1 has been disabled in LPMS. Loss of dual channel coincidence reduces one aspect of the false alarm filtering functionality. The failed transducer for Channel 1 (IAT00751) is planned for repair or replacement during Refuel 28 in Fall 2024.
Should you have any questions, please call Michael S. Moore at (803) 345-4752.
Should you have any questions, please call Michael S. Moore at (803) 345-4752.
 
Sincerely, o
Sincerely,
L. Justice Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None cc:
 
G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G. Miller - NRC Project Manager NRC Resident Inspector}}
o L. Justice Site Vice President V.C. Summer Nuclear Station
 
Commitments contained in this letter: None
 
cc: G. J. Lindamood - Santee Cooper G. Miller - NRC Project Manager L. Dudes - NRC Region II NRC Resident Inspector}}

Latest revision as of 02:58, 27 November 2024

Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel
ML23173A105
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/22/2023
From: Ryan Justice
Dominion Energy South Carolina
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
23-168
Download: ML23173A105 (1)


Text

V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address:

P.O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com June 22, 2023 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 DOMINION ENERGY SOUTH CAROLINA (DESC)

~

Dominion

~

Energy Serial No.23-168 VCS LIC/JB Rev 0 Docket No. 50-395 License No. NPF-12 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2023-002 INOPERABLE LOOSE-PART MONITORING SYSTEM CHANNEL Dominion Energy South Carolina, Inc. (DESC) hereby submits Special Report 2023-002, pursuant to the requirements of Technical Specification (TS) 3.3.3.10 Action a and TS 6.9.2. This special report is required by VCSNS TS because Loose-Part Monitoring System (LPMS) Channel 1 has been inoperable for greater than 30 days.

TS 3.3.3.10 requires the LPMS be operable in Modes 1 and 2 (and does not fall under the provisions of 3.0.4). LPMS Channel 1, monitoring the reactor vessel upper head, was inoperable when VCSNS entered Mode 2 on May 18, 2023. LPMS Channel 1 was declared inoperable due to indication of sensor failure in background trend data.

Reactor Vessel Upper Head LPMS Channel 10 continues to monitor the reactor vessel upper head for loose parts. Channel 1 has been disabled in LPMS. Loss of dual channel coincidence reduces one aspect of the false alarm filtering functionality. The failed transducer for Channel 1 (IAT00751) is planned for repair or replacement during Refuel 28 in Fall 2024.

Should you have any questions, please call Michael S. Moore at (803) 345-4752.

Sincerely, o

L. Justice Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None cc:

G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G. Miller - NRC Project Manager NRC Resident Inspector