ML23143A228: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)
{{#Wiki_filter:ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)
The Lead Reviewer in concert with other reviewer(s) assigned to an ITAAC closure review will complete this form for the ITAAC under review.
The Lead Reviewer in concert with other reviewer(s) assigned to an ITAAC closure review will complete this form for the ITAAC under review.
Docket No:          5200026                            Plant Name:        Vogtle Unit 4 Combined License Licensee Name:      Southern Nuclear Operating          Combined            NPF-92 Company, Inc                        License No:
ITAAC ID No:        3.2.00.07                          ITAAC Type:        Non-Targeted ITAAC Family Designation or      16A enter N/A:
ITAAC Closure Notification (ICN) ADAMS ML No:                                ML23140A003 Name of Lead Reviewer:                                                      Cayetano Santos Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.
: a. Yes      The ICN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number, and (4) plants docket number.
: b. Yes      The ITAAC as stated in the ICN matches the ITAAC as stated in the combined license.
: c. Yes      NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Determination Basis (IDB) of the ICN contains sufficient information including a summary of the methodology for performing the ITAAC, to demonstrate that the licensee has successfully performed the inspection, test, and/or analysis stated in the ITAAC. The methodology described in the IDB of the ICN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.
: d. Yes      NRC personnel with the requisite technical and engineering knowledge has/have determined that the IDB of the ICN contains sufficient information to demonstrate that the licensee has fully met the entire acceptance criterion stated in the ITAAC.
: e.      N/A      For ITAAC specified as being performed on as-built structures, systems, or components (SSCs): If the licensee performed the inspections, tests, and/or analyses of the ITAAC at location(s) other than the final installed Page 1 of 3


ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN) location, the licensee has based on the guidance in NEI 08-01 either summarized a technical justification or provided a reference to a generic technical justification in the IDB of the ICN that establishes why it was acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC was not performed at a remote location or if the ITAAC is not specified as as-built.]
Docket No: 5200026 Plant Name: Vogtle Unit 4 Combined License Licensee Name: Southern Nuclear Operating Combined NPF-92 Company, Inc License No:
: f. N/A     If ITAAC is a Reference ITAAC, all the ITAAC it references have been verified as successfully completed. (Enter N/A if ITAAC is not a reference ITAAC.)
ITAAC ID No: 3.2.00.07 ITAAC Type: Non-Targeted
: g. Yes       All planned inspections for this ITAAC (if any) have been completed as indicated in the Construction Inspection Program Management System (CIPIMS). Either NRC inspectors found no ITAAC findings for this ITAAC or any ITAAC findings are closed as indicated in CIPIMS and the ICN for this ITAAC.
 
: h. Yes       The ICN indicates that the licensee completed the ITAAC as affirmed by the signature of a licensee representative.
ITAAC Family Designation or 16A enter N/A:
: i. No       During concurrence review, a potential problem was identified which prevents verifying the completion of the ITAAC
ITAAC Closure Notification (ICN) ADAMS ML No: ML23140A003
: j. No       An additional reviewer was assigned to the ITAAC closure review with his or her name entered into the blank at the top of this page based on his or her expertise being required.
 
Name of Lead Reviewer: Cayetano Santos
 
Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.
: a. Yes The ICN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number, and (4) plants docket number.
: b. Yes The ITAAC as stated in the ICN matches the ITAAC as stated in the combined license.
: c. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Determination Basis (IDB) of the ICN contains sufficient information including a summary of the methodology for performing the ITAAC, to demonstrate that the licensee has successfully performed the inspection, test, and/or analysis stated in the ITAAC. The methodology described in the IDB of the ICN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.
: d. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the IDB of the ICN contains sufficient information to demonstrate that the licensee has fully met the entire acceptance criterion stated in the ITAAC.
: e. N/A For ITAAC specified as being performed on as-built structures, systems, or components (SSCs): If the licensee performed the inspections, tests, and/or analyses of the ITAAC at location(s) other than the final installed
 
Page 1 of 3 ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)
 
location, the licensee has based on the guidance in NEI 08-01 either summarized a technical justification or provided a reference to a generic technical justification in the IDB of the ICN that establishes why it was acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC was not performed at a remote location or if the ITAAC is not specified as as-built.]
: f. N/A If ITAAC is a Reference ITAAC, all the ITAAC it references have been verified as successfully completed. (Enter N/A if ITAAC is not a reference ITAAC.)
: g. Yes All planned inspections for this ITAAC (if any) have been completed as indicated in the Construction Inspection Program Management System (CIPIMS). Either NRC inspectors found no ITAAC findings for this ITAAC or any ITAAC findings are closed as indicated in CIPIMS and the ICN for this ITAAC.
: h. Yes The ICN indicates that the licensee completed the ITAAC as affirmed by the signature of a licensee representative.
: i. No During concurrence review, a potential problem was identified which prevents verifying the completion of the ITAAC
: j. No An additional reviewer was assigned to the ITAAC closure review with his or her name entered into the blank at the top of this page based on his or her expertise being required.
 
If the reviewers have verified that the licensee successfully completed the inspections, tests, and analyses prescribed for this ITAAC, and that the acceptance criteria have been met then this determination is based on information available at the time and is subject to the licensees ability to maintain the condition that the acceptance criteria are met. If the staff receives new information suggesting that the staffs determination on this ITAAC is incorrect, then the staff will determine whether this ITAAC should be reopened by the licensee. An affirmative NRC staff determination on this ITAAC will be used to support a subsequent finding, pursuant to 10 CFR 52.103(g), at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure verification process is not finalized for this ITAAC until the NRC makes an affirmative finding under 10 CFR 52.103(g).
If the reviewers have verified that the licensee successfully completed the inspections, tests, and analyses prescribed for this ITAAC, and that the acceptance criteria have been met then this determination is based on information available at the time and is subject to the licensees ability to maintain the condition that the acceptance criteria are met. If the staff receives new information suggesting that the staffs determination on this ITAAC is incorrect, then the staff will determine whether this ITAAC should be reopened by the licensee. An affirmative NRC staff determination on this ITAAC will be used to support a subsequent finding, pursuant to 10 CFR 52.103(g), at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure verification process is not finalized for this ITAAC until the NRC makes an affirmative finding under 10 CFR 52.103(g).
Lead Reviewer: Cayetano Santos                                                    Date: 5/23/2023 Lead Approver: Christopher Welch                                                  Date: 5/23/2023 Licensing PM: Patel, Chandu Page 2 of 3


ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)
Lead Reviewer: Cayetano Santos Date: 5/23/2023
 
Lead Approver: Christopher Welch Date: 5/23/2023
 
Licensing PM: Patel, Chandu
 
Page 2 of 3 ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)
 
Page 3 of 3}}
Page 3 of 3}}

Latest revision as of 13:14, 14 November 2024

ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 3.2.00.07 (Index No. 756) for Vogtle Unit 4 Combined License (VOG4)
ML23143A228
Person / Time
Site: 05000026
Issue date: 05/23/2023
From: Cayetano Santos
NRC/NRR/VPOB
To:
References
ITAAC Number 3.2.00.07
Download: ML23143A228 (1)


Text

ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)

The Lead Reviewer in concert with other reviewer(s) assigned to an ITAAC closure review will complete this form for the ITAAC under review.

Docket No: 5200026 Plant Name: Vogtle Unit 4 Combined License Licensee Name: Southern Nuclear Operating Combined NPF-92 Company, Inc License No:

ITAAC ID No: 3.2.00.07 ITAAC Type: Non-Targeted

ITAAC Family Designation or 16A enter N/A:

ITAAC Closure Notification (ICN) ADAMS ML No: ML23140A003

Name of Lead Reviewer: Cayetano Santos

Enter Yes in the blank at the beginning of a statement below if the whole statement is true, No if the whole or part of the statement is not true, and N/A if the statement is not applicable.

a. Yes The ICN identifies all of the following: (1) licensee, (2) plant site name, (3) unit number, and (4) plants docket number.
b. Yes The ITAAC as stated in the ICN matches the ITAAC as stated in the combined license.
c. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Determination Basis (IDB) of the ICN contains sufficient information including a summary of the methodology for performing the ITAAC, to demonstrate that the licensee has successfully performed the inspection, test, and/or analysis stated in the ITAAC. The methodology described in the IDB of the ICN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result.
d. Yes NRC personnel with the requisite technical and engineering knowledge has/have determined that the IDB of the ICN contains sufficient information to demonstrate that the licensee has fully met the entire acceptance criterion stated in the ITAAC.
e. N/A For ITAAC specified as being performed on as-built structures, systems, or components (SSCs): If the licensee performed the inspections, tests, and/or analyses of the ITAAC at location(s) other than the final installed

Page 1 of 3 ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)

location, the licensee has based on the guidance in NEI 08-01 either summarized a technical justification or provided a reference to a generic technical justification in the IDB of the ICN that establishes why it was acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC was not performed at a remote location or if the ITAAC is not specified as as-built.]

f. N/A If ITAAC is a Reference ITAAC, all the ITAAC it references have been verified as successfully completed. (Enter N/A if ITAAC is not a reference ITAAC.)
g. Yes All planned inspections for this ITAAC (if any) have been completed as indicated in the Construction Inspection Program Management System (CIPIMS). Either NRC inspectors found no ITAAC findings for this ITAAC or any ITAAC findings are closed as indicated in CIPIMS and the ICN for this ITAAC.
h. Yes The ICN indicates that the licensee completed the ITAAC as affirmed by the signature of a licensee representative.
i. No During concurrence review, a potential problem was identified which prevents verifying the completion of the ITAAC
j. No An additional reviewer was assigned to the ITAAC closure review with his or her name entered into the blank at the top of this page based on his or her expertise being required.

If the reviewers have verified that the licensee successfully completed the inspections, tests, and analyses prescribed for this ITAAC, and that the acceptance criteria have been met then this determination is based on information available at the time and is subject to the licensees ability to maintain the condition that the acceptance criteria are met. If the staff receives new information suggesting that the staffs determination on this ITAAC is incorrect, then the staff will determine whether this ITAAC should be reopened by the licensee. An affirmative NRC staff determination on this ITAAC will be used to support a subsequent finding, pursuant to 10 CFR 52.103(g), at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure verification process is not finalized for this ITAAC until the NRC makes an affirmative finding under 10 CFR 52.103(g).

Lead Reviewer: Cayetano Santos Date: 5/23/2023

Lead Approver: Christopher Welch Date: 5/23/2023

Licensing PM: Patel, Chandu

Page 2 of 3 ITAAC CLOSURE VERIFICATION EVALUATION FORM (VEF-ICN)

Page 3 of 3