ML23157A072: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 6, 2023 Bob Coffey Executive Vice President, Nuclear | {{#Wiki_filter:June 6, 2023 | ||
Mail | |||
Bob Coffey Executive Vice President, Nuclear D ivision and C hief N uclear O fficer Florida Power & Li ght Company 700 Universe Blvd. | |||
Mail St op: EX/JB Juno Beach, FL 33408 | |||
==SUBJECT:== | ==SUBJECT:== | ||
SEABROO K STATION, UNI T 1 - NOTIFICATION OF CONDUCT O F A FIRE PROTECTION T EAM INSPECTION | |||
==Dear B ob Coffey:== | |||
The purpose of t his letter i s t o not ify yo u that U.S. Nuclear R egulatory C ommission (NRC) st aff will conduct a fire protection team inspection at your Seabrook S tation, U nit 1, starting in September 2023. The i nspection will be conducted in accordance with I nspection P rocedure 71111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), dated January 1, 2020. | |||
The inspection team will be led by Manan Patel, a Senior Reactor Inspector from the NRC Region I O ffice. | |||
The inspection will verify that plant st ructures, systems, and components, and/or administrative controls credited i n the approve d fire protection program ca n perform t heir l icensing basis function. | |||
The schedule for t he i nspection is as f ollows: | |||
* Information Gathering Visit : August 8 - 11, 2023 | |||
* Onsite I nspection: Weeks of September 18, 2023 and October 2, 2023 | |||
The purpose of the information gathering visit is to obtain information and documentation needed to support the inspection and to become familiar with the stations fire protection program, fire protection features, post -fire safe shutdown capabilities, and plant layout. During the information gathering visit, the team leader will select the specific samples to be reviewed during the onsite inspection weeks. | |||
The enclosure lists the types of documents that will be needed prior to the information gathering visit. Please provide the referenced information to the Region I office by July 28, 2023. | The enclosure lists the types of documents that will be needed prior to the information gathering visit. Please provide the referenced information to the Region I office by July 28, 2023. | ||
Following sample selection, additional documents will be requested specific to those samples. | Following sample selection, additional documents will be requested specific to those samples. | ||
Your cooperation and support during this inspection will be appreciated. | Your cooperation and support during this inspection will be appreciated. | ||
B. Coffey 2 | |||
If you have questions concerning this inspection, or the inspection team's information request or logistical needs, please contact Manan Patel, Team Leader at (610) 337-5304, or via e mail at manan.patel@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under Control Number 3150- 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | |||
Sincerely, | |||
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket No. 05000443 License No. NPF-86 | |||
==Enclosure:== | ==Enclosure:== | ||
Fire Protection Team Inspection Supporting Docu mentation | |||
cc: Distribution via LISTSERV | |||
Fire Protection Team Inspection Supporting Documentation | B. Coffey 3 | ||
==SUBJECT:== | |||
SEABROOK STATION, UNIT 1 - NOTIFICATION OF CONDUCT OF A FIRE PROTECTION TEAM INSPECTION, DATED JUNE 6, 2023 | |||
DISTRIBUTION: | |||
MPatel, DORS GDentel, DORS MYoung, DORS NWarnek, DORS JDeBoer, DORS JBresson, DORS TDaun, DORS, SRI SFlanagan, DORS, RI ACass, DORS, AA PZurawski, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource | |||
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Fire Protection/Fire Protection 90Day Letters/Seabrook/SB 2023 TFP 90- Day Letter.docx ADAMS ACCESSION NUMBER: ML23157A072 SUNSI Review n -Sensitive Publvlle | |||
Sensitive n -Publiclyvlable | |||
OFFICE / / | |||
ME MPat GDent TE 6/2/ 6 / | |||
OFFIAL RERD COPY | |||
Fire Protection Team Inspection Supporting Documentation | |||
If you have any questions regarding this information request, please contact Manan Patel at (610) 337-5304 or via email at manan.patel@nrc.gov. | |||
Electronic format is preferred. If electronic media is made available via an internet-based document management system, then document access must allow inspectors to download, save, and print the documents in the NRC's Regional office. Paper records (hard copy) are acceptable. At the end of the inspection, the documents in the teams possession will not be retained. | Electronic format is preferred. If electronic media is made available via an internet-based document management system, then document access must allow inspectors to download, save, and print the documents in the NRC's Regional office. Paper records (hard copy) are acceptable. At the end of the inspection, the documents in the teams possession will not be retained. | ||
This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary. | This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary. | ||
Note that following sample selection, additional documents will be requested specific to those samples. | Note that following sample selection, additional documents will be requested specific to those samples. | ||
Please provide these documents to the inspection team leader in the Region I Office by July 28, 2023: | Please provide these documents to the inspection team leader in the Region I Office by July 28, 2023: | ||
: 1. Post-fire safe shutdown or Alternative Shutdown Analysis. | : 1. Post-fire safe shutdown or Alternative Shutdown Analysis. | ||
| Line 51: | Line 90: | ||
: 3. Fire Hazards Analysis Report. | : 3. Fire Hazards Analysis Report. | ||
: 4. Fire Probabilistic Risk Assessment (PRA) Summary Document. If a Fire PRA is not available, please provide the Individual Plant Examination for External Events (Fire Chapter Only). | : 4. Fire Probabilistic Risk Assessment (PRA) Summary Document. If a Fire PRA is not available, please provide the Individual Plant Examination for External Events (Fire Chapter Only). | ||
: 5. Fire Protection Program and/or Fire Protection Plan Document(s). | : 5. Fire Protection Program and/or Fire Protection Plan Document (s). | ||
: 6. Fire Protection Program implementing procedures, if not already included in item (5). This could include procedures for programs such as transient combustible controls, hot work, etc. | : 6. Fire Protection Program implementing procedures, if not already included in item (5). This could include procedures for programs such as transient combustible controls, hot work, etc. | ||
: 7. Fire Protection Design Basis Document(s), if available. | : 7. Fire Protection Design Basis Document(s), if available. | ||
| Line 57: | Line 96: | ||
Include a short description and/or title of each evaluation. | Include a short description and/or title of each evaluation. | ||
: 9. List of all 10 CFR 50.59 applicability determinations and screens (date, number, title) performed since July 2020. Include a short description and/or title of each document. | : 9. List of all 10 CFR 50.59 applicability determinations and screens (date, number, title) performed since July 2020. Include a short description and/or title of each document. | ||
Enclosure | Enclosure | ||
: 10. List of all fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since July 2020 (e.g., a Generic Letter 86-10 review, LS-AA-128 review, etc.). Include a short description and/or title of each review. | : 10. List of all fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since July 2020 (e.g., a Generic Letter 86-10 review, LS-AA-128 review, etc.). Include a short description and/or title of each review. | ||
: 11. List of fire protection system, post-fire safe shutdown, or alternative shutdown design changes completed since July 2020. Include a short description and/or title of each change. | : 11. List of fire protection system, post-fire safe shutdown, or alternative shutdown design changes completed since July 2020. Include a short description and/or title of each change. | ||
: 12. List of the top 25 highest fire core damage frequency scenarios, if available. | : 12. List of the top 25 highest fire core damage frequency scenarios, if available. | ||
: 13. List of the top 25 highest fire | : 13. List of the top 25 highest fire l arge early release frequency scenarios, if available. | ||
: 14. From your most recent site-specific PRA, including external events and fires (if available): | : 14. From your most recent site-specific PRA, including external events and fires (if available): | ||
* Two risk rankings of components: one sorted by Risk Achievement Worth and the other sorted by Birnbaum Importance | * Two risk rankings of components: one sorted by Risk Achievement Worth and the other sorted by Birnbaum Importance | ||
* A list of the top | * A list of the top 1 00 cut sets | ||
: 15. Risk ranking of operator actions and/or recovery actions from your site-specific PRA sorted by Risk Achievement Worth. | : 15. Risk ranking of operator actions and/or recovery actions from your site-specific PRA sorted by Risk Achievement Worth. | ||
: 16. List of current fire protection system impairments, including description. | : 16. List of current fire protection system impairments, including description. | ||
| Line 76: | Line 116: | ||
: 24. List of open and closed condition reports for post-fire safe shutdown or alternative shutdown issues since July 2020 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description. | : 24. List of open and closed condition reports for post-fire safe shutdown or alternative shutdown issues since July 2020 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description. | ||
: 25. List of open and closed condition reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since July 2020. Include the issue report number and a brief description. | : 25. List of open and closed condition reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since July 2020. Include the issue report number and a brief description. | ||
2 | 2 | ||
: 26. List of open and closed condition reports related to the fire brigade or fire drills since July 2017. Include the issue report number and a brief description. | : 26. List of open and closed condition reports related to the fire brigade or fire drills since July 2017. Include the issue report number and a brief description. | ||
: 27. Copies of the following condition reports: | : 27. Copies of the following condition reports: | ||
02363880 | |||
02363880 02364481 02365206 02363938 02364484 02365234 02364079 02364558 02365235 02364099 02365147 | |||
: 28. Copies of any self-assessments performed, and corrective action documents generated, in preparation for this fire protection team inspection. | : 28. Copies of any self-assessments performed, and corrective action documents generated, in preparation for this fire protection team inspection. | ||
3}} | 3}} | ||
Revision as of 21:59, 13 November 2024
| ML23157A072 | |
| Person / Time | |
|---|---|
| Site: | Seabrook (NPF-086) |
| Issue date: | 06/06/2023 |
| From: | Glenn Dentel Division of Operating Reactors |
| To: | Coffey B Florida Power & Light Co |
| References | |
| Download: ML23157A072 (1) | |
Text
June 6, 2023
Bob Coffey Executive Vice President, Nuclear D ivision and C hief N uclear O fficer Florida Power & Li ght Company 700 Universe Blvd.
Mail St op: EX/JB Juno Beach, FL 33408
SUBJECT:
SEABROO K STATION, UNI T 1 - NOTIFICATION OF CONDUCT O F A FIRE PROTECTION T EAM INSPECTION
Dear B ob Coffey:
The purpose of t his letter i s t o not ify yo u that U.S. Nuclear R egulatory C ommission (NRC) st aff will conduct a fire protection team inspection at your Seabrook S tation, U nit 1, starting in September 2023. The i nspection will be conducted in accordance with I nspection P rocedure 71111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), dated January 1, 2020.
The inspection team will be led by Manan Patel, a Senior Reactor Inspector from the NRC Region I O ffice.
The inspection will verify that plant st ructures, systems, and components, and/or administrative controls credited i n the approve d fire protection program ca n perform t heir l icensing basis function.
The schedule for t he i nspection is as f ollows:
- Information Gathering Visit : August 8 - 11, 2023
- Onsite I nspection: Weeks of September 18, 2023 and October 2, 2023
The purpose of the information gathering visit is to obtain information and documentation needed to support the inspection and to become familiar with the stations fire protection program, fire protection features, post -fire safe shutdown capabilities, and plant layout. During the information gathering visit, the team leader will select the specific samples to be reviewed during the onsite inspection weeks.
The enclosure lists the types of documents that will be needed prior to the information gathering visit. Please provide the referenced information to the Region I office by July 28, 2023.
Following sample selection, additional documents will be requested specific to those samples.
Your cooperation and support during this inspection will be appreciated.
B. Coffey 2
If you have questions concerning this inspection, or the inspection team's information request or logistical needs, please contact Manan Patel, Team Leader at (610) 337-5304, or via e mail at manan.patel@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under Control Number 3150- 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 05000443 License No. NPF-86
Enclosure:
Fire Protection Team Inspection Supporting Docu mentation
cc: Distribution via LISTSERV
B. Coffey 3
SUBJECT:
SEABROOK STATION, UNIT 1 - NOTIFICATION OF CONDUCT OF A FIRE PROTECTION TEAM INSPECTION, DATED JUNE 6, 2023
DISTRIBUTION:
MPatel, DORS GDentel, DORS MYoung, DORS NWarnek, DORS JDeBoer, DORS JBresson, DORS TDaun, DORS, SRI SFlanagan, DORS, RI ACass, DORS, AA PZurawski, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Fire Protection/Fire Protection 90Day Letters/Seabrook/SB 2023 TFP 90- Day Letter.docx ADAMS ACCESSION NUMBER: ML23157A072 SUNSI Review n -Sensitive Publvlle
Sensitive n -Publiclyvlable
OFFICE / /
ME MPat GDent TE 6/2/ 6 /
OFFIAL RERD COPY
Fire Protection Team Inspection Supporting Documentation
If you have any questions regarding this information request, please contact Manan Patel at (610) 337-5304 or via email at manan.patel@nrc.gov.
Electronic format is preferred. If electronic media is made available via an internet-based document management system, then document access must allow inspectors to download, save, and print the documents in the NRC's Regional office. Paper records (hard copy) are acceptable. At the end of the inspection, the documents in the teams possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary.
Note that following sample selection, additional documents will be requested specific to those samples.
Please provide these documents to the inspection team leader in the Region I Office by July 28, 2023:
- 1. Post-fire safe shutdown or Alternative Shutdown Analysis.
- 2. List of post-fire safe shutdown components (i.e., safe shutdown equipment list), if not already included in item (1) above.
- 3. Fire Hazards Analysis Report.
- 4. Fire Probabilistic Risk Assessment (PRA) Summary Document. If a Fire PRA is not available, please provide the Individual Plant Examination for External Events (Fire Chapter Only).
- 5. Fire Protection Program and/or Fire Protection Plan Document (s).
- 6. Fire Protection Program implementing procedures, if not already included in item (5). This could include procedures for programs such as transient combustible controls, hot work, etc.
- 7. Fire Protection Design Basis Document(s), if available.
- 8. List of all safety evaluations performed to support any plant modifications since July 2020.
Include a short description and/or title of each evaluation.
- 9. List of all 10 CFR 50.59 applicability determinations and screens (date, number, title) performed since July 2020. Include a short description and/or title of each document.
Enclosure
- 10. List of all fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since July 2020 (e.g., a Generic Letter 86-10 review, LS-AA-128 review, etc.). Include a short description and/or title of each review.
- 11. List of fire protection system, post-fire safe shutdown, or alternative shutdown design changes completed since July 2020. Include a short description and/or title of each change.
- 12. List of the top 25 highest fire core damage frequency scenarios, if available.
- 13. List of the top 25 highest fire l arge early release frequency scenarios, if available.
- 14. From your most recent site-specific PRA, including external events and fires (if available):
- Two risk rankings of components: one sorted by Risk Achievement Worth and the other sorted by Birnbaum Importance
- A list of the top 1 00 cut sets
- 15. Risk ranking of operator actions and/or recovery actions from your site-specific PRA sorted by Risk Achievement Worth.
- 16. List of current fire protection system impairments, including description.
- 17. List of time critical operator actions and associated program procedure.
- 18. One-line diagram of the electrical distribution system.
- 19. Copy of the Updated Final Safety Analysis Report.
- 20. Copy of the Technical Requirements Manual.
- 21. Copy of the Quality Assurance Program Manual (including specific fire protection Quality Assurance Manual, if applicable).
- 22. Copy of the Corrective Action Program Procedure(s).
- 23. List of station procedures used to respond to fire (i.e., Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures). Include the procedure number, title, and current revision.
- 24. List of open and closed condition reports for post-fire safe shutdown or alternative shutdown issues since July 2020 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description.
- 25. List of open and closed condition reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since July 2020. Include the issue report number and a brief description.
2
- 26. List of open and closed condition reports related to the fire brigade or fire drills since July 2017. Include the issue report number and a brief description.
- 27. Copies of the following condition reports:
02363880 02364481 02365206 02363938 02364484 02365234 02364079 02364558 02365235 02364099 02365147
- 28. Copies of any self-assessments performed, and corrective action documents generated, in preparation for this fire protection team inspection.
3