05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 1: Line 1:
{{Adams
#REDIRECT [[05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground]]
| number = ML24263A236
| issue date = 09/19/2024
| title = Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground
| author name = Brown T
| author affiliation = Vistra Operations Company, LLC
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = L-24-221
| document report number = LER 2021-001-01
| document type = Letter, Licensee Event Report (LER)
| page count = 1
}}
{{LER
| Title = Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000346
| LER year = 2021
| LER number = 1
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:Davis-Besse          Nuclear                  Power                  Station Terry  J. Brown Site Vice            President 5501        N. State Route              2 Oak          Harbor,                      OH  43449 Office: 419  .321. 7676
 
L-24-221 September                19, 2024                                                                                    10CFR50.73
 
ATTN:  Document          Control        Desk U.S. Nuclear        Regulatory            Commission Washington,              DC 20555-0001
 
==Subject:==
Davis-Besse    Nuclear        Power    Station,      Unit  1 Docket  Number            50-346, License  Number              NPF-3 Licensee Event      Report      2021-001-01
 
Enclosed      is  Revision    01    to  Licensee    Event      Report        (LER) 2021-001, Emergency Diesel Generator Speed Switch Failure  due  to    Direct Current System Ground. This  event    was  initially        reported pursuant          to 10 CFR 50.73(a)(2)(i)(B). The  LER is being      revised        to update        the  cause    and corrective        actions  taken    since    the  initial      report      submittal.
 
There    are  no regulatory            commitments                      contained          in this  letter    or its  enclosure.                  The  actions described        represent        intended            or planned          actions    and  are  described          for  information                only.                If there    are  any    questions        or if additional              information            is required,            please    contact Mr. Robert  W. Oesterle,      Manager,          Site  Regulatory          Compliance,            at  (419) 321-7462.
 
GMW
 
==Enclosure:==
LER 2021-001-01
 
cc:                          NRC  Region  III Administrator NRC  Resident      Inspector NRR Project  Manager Utility      Radiological  Safety      Board NRC  FORM      366                                                                                                                                  U.S.              NUCLEAR                  REGULATORY                        COMMISSION                          APPROVED              BY    0MB:              NO. 3150-0104                                                                                                                    EXPIRES:            04/3012027 (04-02 -2024)                                                                                                                                                                                                                                                                                                                                          Estimated burden par response  to comply \\I.1th this mandatay                      collection request 80 hours  . Reported leS601lS LICENSEE        EVENT                  REPORT          (LER)                                                                                                                                                                                                  llllmed a-e    incaporalad nlD the icensing JroCeS& and fed bact kl ndustry. Send  (;Of11ffl8fl1s regring blrden estimate b          fie FOIA,  lbary        ,  IVld      Information  Serw:es  lnncl1  (T-6    A10M),  U    . S. NuciM      Regulatory (See  Page        2 for  required    number                          of    digits/characters      for each              block)                                                                                                                                              Cornniasion, Washington,              DC    20555-0001, or      by              e-mail to  lnftx:olBcis.Resource@nrc.gov, and  the  0MB 18\\'iewe,' at      0MB Office oflnformatiorl aid Regulab'y Affah, (3150-0104~ Attn: Desk Offloerforfle Nucea (See  NUREG-1022,                  R.3  for instruction and            guidance                for completing      this form                                                                                                                                                      Regulalory Commission, 7'1517lh Steel NW, Washington, OC  20503. The  NRC may              not    oonduct or sponsor, http://www. nrc    oov/readinq-rm/doc-collections/nuregs/staff/sr1022/r3D                                                                                                                                                                                                  and  a    per$Oll is  not      *ed t> respond      to,  a    collecllon of nmMion    unless  the  document reques!lng or reqliring the oolleclion <il;plays a amnlly            vaid otAl conlrol rurber    .
: 1. Faclllty Name                                                                                                                                                                                                                                                                                                                                      181                                                                                  050                                                                      2.      Docket          Number                                                                                                                  3.        Page Davis-Besse      Nuclear          Power              Station,      Unit        1                                                                                                                                                                                                                                                                                                                                          052                                                                                                                                                                                                                    346                                                                                                                                                                                    1                        OF                                              5 4.
 
==Title:==
Emergency                                  Diesel Generator              Speed      Switch Failure due          to  Direct Current      System            Ground
: 5. Event      Date                                                                                                                                                                                                                                                6. LER    Number
* 7. Report    Date                                                                                                                                                                                                                                                    8. Other Facllltlea Involved Month                                                                        Day                                                                                          Year                                                                                              Year                                                                                        Sequential                                                                                Rev                                                                                        Month                                                                                            Day                                                                                                Year                                                          Faclllty Name                                                                                                                                                                                050                            Docket      Number Number                                                                                                                    No      .
Facility Name                                                                                                                                                                                                                                                                                                                                                                                                                                                                Docket      Number 02                                                      12                                                2021                                                            2021                                -                                001                      -                                                                  01                                                                                      09                                                                    19                                                  2024                                                                                                                                                                                                                                                                  052
: 9. Operating  Mode                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                10. Power        Level 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                100
: 11. This Report  is Submitted        Pursuant                    to the Requirements              of 10 CFR &sect;:        (Check    all that apply) 20.2203(a)(2)(vl)                                                                                                                                                                                                                                          60.73(a}(2)(ll)(A)                                                                                                        D        50.73(a)(2)(vlll)(A)                                          D          73.1200(a) 20.2201(b)                                                                                        20.2203(a)(3)(i)                                                                                                  0                60.36(c)(1)(i)(A)                                                                60.73(a)(2)(ii)(B)                                                                                                              D        60.73(a)(2)(viii)(B)                                          D          73.1200(b) 20.2201(d)                                                                                                                                    D    20.2203(a)(3)(ii)                                                                                                                                                                                                                                          50.73(a)(2)(iii)                                                                                                                              D        50.73(a)(2)(ix)(A)                                                                        D          73.1200(c) 20 .2203(8)(1)                                                                      20.2203(a)(4)                                                                                                                              D        50.36(c)(2)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              D          60.73(a)(2)(x)                                                                                                                  D          73.1200(d) -------------1.,..._-----------1                    50.73(a)(2)(lv)(A) 20.2203(8)(2)(1)                                                                                                                                                                                                                                                                                                                                                                                                                                  D        60.46(a)(3)(11)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      D        73.1200(e)                    60.73(a)(2)(v}(A) 20.2203(a)(2)(ii)                                                        0                21.Z(c)                                                                                                                                                                                                                    0                60.69(g)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          0                  73.1200(f) D      60.73(a){Z)(v)(B)                                                                                        73.n(a)(1) 20.2203(a)(Z)(iii)                                                                                                                                                                                                                                                                                                                                                                                                50.73(a){2)(v)(C)                                                                                            73. 77(a)(2)(1)                                                                                                            0                73.1200(g) 20.2203(a)(2)(Iv)                                                                                                                                                                                                                                                                                                                                                                                                          60.73(a)(2)(v)(D)                                                                                        73. 77(a)(2)(ii)                                                                                                0                73.1200(h) 20.2203(a)(2)(v)                                                                                                                                                                                                                                                                                                                                                                                            0                50.73(a)(2)(I)(C)                                                                    60.73(a)(2)(vll)
D        OTHER    (Specify  here, in abstract        , or    in NRC    Form          366A)  .
: 12. Licensee            Contact                  for this LER Licensee            Contact                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Phone              Number                (Include              area        code)
Gerald  M. Wolf,      Consulting              Engineer,          Regulatory                    Compliance                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                (419)      321-8001
: 13. Complete    One        Line  for Each            Component                                Failure Described      In      this Report
------------,-----------.------Cause                                                                                                                        System                                                                                        Component                                                                                              Manufacturer                                                                Reportable    to    IRIS                                                                                                                  Cause                                                                                                              System                                                                                                                Component                                                                                                          Manufacturer                                                      Reportable  to IRIS B                                                                                                                                                                EK                                                                                                  ST                                                                                                  D283                                                                                                                                                            y
: 14. Supplemental                  Report    Expected                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Month                                                                                                      Day                                                                                                      Year
: 15.        Expected            SubmlHlon                                Date l8I No                                                                                                                                                                      D      Yes    (If yes,        complete      15.        Expected      Submission                      Date)
: 16. Abstract                  (Limit to  1326 spaces,            i.e .. approximately                    13 single-spaced      typewritten lines)
 
On          September              4  , 2020,    with the Davis-Besse      Nuclear            Power              Station      operating        at  approximately                              100  percent      power, Emergency                                    Diesel Generator              (EDG)      2  failed to  start during        scheduled          monthly                    surveillance      testing. A    failed speed switch was                  identified and                    replaced,      restoring the EDG  to Operable          status  on                  September              7,  2020.              Based          on                  a        vendor analysis                                in  conjunction                                      with a            review of applicable          plant  data,                it was                determined    on                  February                              12,  2021    that the speed switch was                failed on                  September                  1,  2020,      due        to  a          shorted  component                                            within the switch in conjunction                                    with a        ground                              on the station      125  VDC                system          .
 
Since        the EOG  was                determined  to  be        failed prior to  discovery              during        routine      monthly                    testing and                  the necessary Technical                  Specification actions              for an                  inoperable                    EOG  were      not          performed        based                    on                the time of failure, this event      is being            reported pursuant                      to    10 CFR    50.73(a)(2)(i)(B)              as        operation                of the plant    in  a          condition                  prohibited by                the Technical Specifications. The  cause                      of this event    was                less than            adequate                        use        of operating        experience              for the station    DC distribution system,            resulting in  installation of EOG  speed    switches with components                                            not          rated for the maximum possible    voltage.      A  new                design  of switch capable                          of withstanding    the full voltage    of the DC  system          was                installed in January                                          2022.
NRC    FORM    366A                                                U.S.            NUCLEAR                REGULATORY                        COMMISSION                  APPROVED                BY    0MB:            NO. 3150-0104                                                                                                                                    EXPIRES:            04/30/2027 (04--02-2024)                                                                                                                                                            Estimated b    urden        per response  to  comp              ly with this mandatory                  c ollection request 80 hours    . Reported lessons      learned    a    re ilcorporate  d into the lice  n    sing        process a    nd      fed b    ack        to    industry. Send      com              ments
        ,w.\\                                            LICENSEE      EVE            NT R  E PO RT  (L  ER  )                                                        regarding          bur      den    estimate to  the FOIA, Library,  an          d In    fo    rmation      Services  Branch            (T-6  A 10M). U      . S.
        ;                                                                                                            i CO NTIN  UATI                O N S HEET          Nucl  ear                          Reg u  la  tory                              Com            mission,                              wash        lngto    n,                              DC                        20555--0001,                      o    r                by                      e-mai  l          to
        \\;.                                                I                                                                                                            lnfocollects.Reso    ur ce@nrc.gov,            and            the 0 MB reviewer a    t 0MB Office    o  f Info    rmation      111d Regu    latory
              ......                                                                                                                                                    Affairs, (315~0104), Attn:    Desk Officer fo    r the Nuclea    Reg~alD!y Commiss  io  n  , 7251 7th Street NW  ,
(See  NUREG              -  1022  , R.3  fo r instruction                and              gu      idance                    for comp                    leting this form Wash        ingto  n,            DC    20503.        The  NRC    may                    not        conduc1                      or    sponsor      , and            a      person      is no        t required to http:/lwww.nrc            .gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3D                                                                        respond          to, a      collection      of  Information          unless  the    document                    requesting          o  r requiring          the collection displays a    currently valid 0MB control  number              .
: 1.        FACILITY          NAME                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          l8'J                                                        050 2. DOCKET      NUMBER 3. LER    NUMBER YEAR                SEQUENTIAL                              REV NUMBER                              NO.
Dav          is-Besse Nuclea                r Powe                  r Station  Unit      1                                                                                            346                                                                                                                                                                              2021 00 1 01 052
 
NARRATIVE
 
Energy                Industry                Identification System          (EIIS)  codes              are      identified in the text as          [XX].
 
System         
 
== Description:==
 
The  Davis-Besse  Nuclear        Power            Station                  (DBNPS)      Class 1 E Alternating Current  (AC)  Electrical Power            Distribution System          sources                    consist  of the offsite power            sources                (preferred power            sources,                  normal                      and                    alternate) and                  the two onsite standby                            Emergency                                Diesel Generators          (EDGs)  .        An            EOG  [EK-DG] starts automatically                          on                    a          Safety  Features Actuation                System              (SFAS)  [JE] actuation                    or    on                      an                  essential bus                degraded        voltage or    loss of voltage  signal. After an EDG    has        started, it will automatically                    tie to    its respective bus                after offsite power              is tripped.
 
The    DBNPS    Direct Current (DC)  system        [EJ] consists  of two        250/125    Volt    DC  (VDC)              motor              control          centers, four batteries, six battery        chargers,      four    essential distribution panels,        four    480V            AC/125V                  DC  rectifiers, and                four nonessential                  distribution panels      . The  system          is arranged                    to  form      two        completely      independent              load        groups            .        The    DC system            is des igned            as          an                    ungrounded                                            system,          so        a          single ground                        will not          have          an                  adverse      impact      on                  the DC system        or    individual components                                            receiving power            from      the DC  System          .          Each                    DC  motor              control          center  has        a positive, a          negative,    and                    a          neutral      bus                  arranged                    to form        a        250/125  VDC                system;        each                  bus                    is equipped with ground detection instrumentation              that allows  for identification and                    removal            of a          ground                      to  prevent more              significant issues.
 
Technical            Specifications:
 
Technica                      l Specification (TS)  Limiting Condition        for Operation        (LCO)    3 .8 .1.b          requires two          EDGs be          Operable      in Modes          1 through          4.            With one                      EOG  inoperable              LCO  3.8  .1.b          requires the following:
: 1.                      Surveillance    Requirement        3.8.1.1  must        be          performed  within one                  hour              and                    at  least once                        per 8  hours          thereafter to verify correct      breaker        alignment        and                    indicated power            availability for each                offsite circuit,
: 2.                      Any                    required feature(s) supported      by                the inoperable            EDG    must          be          declared  inoperable            when                      its redundant required feature(s) is inoperable          within 4  hours            from      discovery,
: 3.                      The  Operable          EDG  must        be          determined to  be          not          inoperable            due        to common                                                  mode                  cause                        failure o        r perform Surveillance    Requirement        3.8.1.2 to verify the Operable        EDG  starts from      standby                            conditions              and                    achieves steady          state voltage  and                  frequency                      within 24  hours,              and
: 4.                      Two                  EDGs  must          be          restored to  Operable      status within 7  days                or  the plant must        be            in Hot  Standby                              (Mode            3) within the next          6  hours            and                        in Cold Shutdown                            (Mode              5) within the following 30  hours.
 
DESCRIPTION          OF  EVENT              :
 
On          September          4  , 2020,    EDG  2 was              declared  inoperable              and                    unavailable                      at  1112  hours            for routine    monthly                testing to  satisfy TS  Surveillance Requirement          3.8.1  .2  .          During    the first idle start at  1134 hours,                EDG  2 locked  out          on                    a failure to  start. Due          to work            having          been                    performed    on                  the air start side that was                  being            used        to  start the EOG, a second                        start attempt was                performed on                  the opposite air start side, which    also        resulted in an                    EDG  lock  out            on                  failure to start.          Based          on                  the observed              indications from      the second                          start attempt, the likely cause                    of the failure to  start was suspected      to  be          either the EDG  speed switch [EK-ST] or  magnetic                  pickup.              Subsequent                              inspection  of the EOG 2 speed  switch identified internal overheating    damage                              .        The  failed speed switch was                  replaced with the same                  model switch and                  the EDG  tested satisfactorily, allowing    the EOG to  be          declared  Operable      on                    September        7,    2020,  at  1800 hours            .
 
NRC  FORM  366A        (04-02-2024)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Page            1 of&sect; NRC    FORM      366A                                            U.S.            NUCLEAR                  REGULA          TORY      COMMISSION                    APPROVED                  BY  0MB:                  NO. 3160--0104                                                                                                                                          EXPIRES:          04/30/2027 (04-02 -2024)                                                                                                                                                      Estimated    bur      den        per response          to  comply            wilh this mandatory                      collection request: 80 hours    . Reported
        ,w.,                                          LI  C EN  SE  E EVENT                RE  POR  T ( L  ER)                                                  lesso  ns      lea    rned  a    re incor          por ated  Into  the licensing process      a    n  d fed bac              k to    industJy. Send        com              me      nts regar  ding        bu          rden      estim  ate  to  the FOIA, Libray,        and  Info    rmation      Service  s Branc        h {T  -6  A 10M),  U      . S.
C                                                                                                                        t
        ~                                                                                                            . CO NTI  N U          AT  IO N SHEE  T      Nucl  ea    r                Reg wtory                          Comm                ission          ,                  W  ashingto    n  ,                  DC                    20555-0001,                    o    r                  by                                  e-ma        il        to
        ~                                    ~                                                                                                                      lnfoco              llects.Resour      ce@    nr c  .go    v, an          d the 0 MB reviewer a    t: 0MB Off'1ee o    f In    form a    tion and Reg u  latory
            .....                                                                                                                                                  Affairs, (3150-0104), Attn:    Desk Officer for the Nuclea-          Reg  ulatory      Co    mmission,    725  17th Street NW, (See NUREG                    -1    022  , R.3  fo r instruction    and                  gu      ida        n      ce        for co            m      pleting        this form W    ashing      ton    , DC  20503.              Th e NRC    m  ay              not        cond            uct    o    r spo    nso          r,  and              a      pe rso    n      is not        required to http://www                    .nrc.gov/reading-rm/doc                                  -collections/nuregs/staff/sr1022/r3D                        respond        to, a      co        llection              o  f information        u    nless the    do      cu        ment      requ      esting          o    r requimg  the    co      llection displays    a  cu        rrently valid 0 MB contr    ol numbe                  r.
: 1.        FACIL  ITY    NA  ME                                                                                                                                  2. DOCKE  T  NUMBER                                                        3. LER    NUMBER
                                                                                                                      ~                                                                050                              YEAR                SEQUENTIAL                            REV Davis-Besse  Nuclear            Power          Station  Un                            it 1                                                                                                                                              NUMBER                            NO.
346                                                                                                                                                                            2021 001 01 052
 
NARRATIVE
 
CAUSE                  OF  EVENT:
 
The failed speed    switch was                installed in October            2019    as          a        ten-year                  preventive maintenance                                        act      ivity.      The  switch installed was                  a          different part from      a          different manufacturer                                        as        the previous  sw      itch was                obsolete        and                        no                  longer available          .          Due          to the short period of time between                    installation and                  failure, the failed speed switch was                shipped to an                  external        vendor,                  whose                inspection    revealed excessive      damage                              at the input power              section    of the speed  switch.
Based          on                  the vendor's                conclusion                                  that the failure may                            have            been                    related to the power            supplied to the speed switch, a          review of the DBNPS    125 VDC              system        history was                performed    .        This review, completed        on                    February                                12, 2021, identified a          hard        ground                          had          been                    received on                    Direct Current  Motor      Control    Center (DCMCC)  2  [EJ-MCC] on August            25,  2020.              Troubleshooting                  of this ground                      commenced                                                    later that day.                              On          September          1,  2020,  the breaker
[BQ-BKR] for the High Pressure Injection    Pump                    2  DC  oil pump                  motor              was                opened                      at  approximately                        1500  hours            as part of these troubleshooting              efforts, resulting in the ground                        switching from      a          hard      ground                        to  an                  oscillating ground.
This oscillating ground                        condition            cleared when                  the EOG  2  speed  switch was                  removed                  on                  September          5,    2020    ,
following the failure during    testing.
 
The  cause                      of the failed EOG 2  speed switch was                initially determined to  be          a          shorted component                                            within the speed switch concurrent                                  with a        ground                            on                    the 125 VDC              power              supply      to the speed switch, resulting in failure of the switch.
With two        competing                    grounds                        it was                postulated there was                sufficient direct current      flow to cause                    the damage identified in the speed  switch. Neither of the grounds                          on                  the 125 VDC                system        led plant personnel          to conclude                              that any                          plant  equipment                had          failed as        a        result of the grounds                          , and                  the speed  switch was                  not          known                                to be          failed until regularly scheduled        testing was                performed.
 
In          July          2021      it was                  identified that the EOG  speed  switch design installed in October          2019  utilized an                    auxiliary        circuit board                      that contains                          electromagnetic      and                    radio  frequency                        interference (EMI/RFI)    filtering and                  surge    suppression devices at  the DC  input.        This circuit contained                          a            metal  oxide        varistor (MOV)            that connected                                to  the 125 VDC              positive inlet terminal and                    station ground.                                  This MOV              had          a          maximum                                            continuous                                            rating of 170 VOC.                      Since    the DC    System includes    a          continuous                                              ground                      monitor          that connects                            the neutral    and                    negative rails to  station ground                        through resistors and                    an                    ammeter              , the arrangement                          of the ground                        detector resulted in the positive 125 VDC                terminal of the speed  switch to  see +200 VDC              to ground                        .        This overvoltage        condition                likely resulted in a        decreased              life of the MOV.
 
The  Root            Cause                  of this event was                less than          adequate                        incorporation,                        internalization, and                  anchoring                        of operating      and in-house                experiences            as        it pertains to the unique                  design vulnerabilities in the DBNPS    DC  distribution system.                A similar issue occurred                          in 2010  when                  a        component                                        was                  installed onto                    the DC  system        but          was                not            rated for the conditions              present within the system.                Because                        learnings  from      the previous    incident were    not        anchored                              into any design documents                                    or    specifications, when                  replacing the EOG  speed  switches the station failed to  select equipment that was                suitable to function                  in the DC  system        .
 
ANALYSIS          OF  EVENT:
 
A  qualitative risk assessment            was                performed for the approximately                      six days                    EOG 2 was                  unavailable,                        starting with the initiation of the oscillating ground                            on                  September            1,  2020  , at approximately                          1500  hours,            and                  ending        with EOG 2 becoming                                available          following completion            of testing on                  September          7  at approximately                        1600 hours.              During  this time period, all redundant                          train 1 equipment            remained              Operable,        and                    no                    risk-significant equipment          in train 2 was unavailable                        or      inoperable            .        The  plant risk associated              with the extended              unavailability  of EOG 2 for less than          the 7-day                    Completion            Time of TS    LCO  3.8 . 1 Required Action        B .4  is considered          to  be        of very      low      safety significance.
 
NRC    FORM  366A        (04-02-2024}                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Page              1 of~
NRC    FORM    366A                                            U.S.            NUCLEAR                REGULATORY                      COMMISSION                APPROVED              BY    0MB:                NO. 3150-0104                                                                                                                                                EXPIRES:        04/30/2027 (04-02-2024)                                                                                                                                                        Estimated burden            per respoose    to  comply            with this mandato!y                        collection request: 80  hours    . Reported
 
lessons learned are  incorporated  ilto the licenslng process and            fed back              to  industry. Send      comments LICENSEE        EVENT              REPORT        (LER)                                                        regarding burden              estimate to  the FOIA, U>rary        , and              Information        Services Branch          (T-6 A tOM), U    . S.
CONTINUATION                        SHEET                                                        Nuclear                        Regu    latory                            Commission      ,                    Washington          ,                    DC                        20555-0001,                or                            by                                  e-mal  l          to lnfocollects.Resovrce@nrc    .gov    , and              the 0MB reviewer at: 0MB Office of Information      and            Regulatory Affairs, (3150-0104), Attn:    Desk Officer for the Nuclear Regulatory  Commission      , 7'25  17th Street NW    ,
(See  NUREG-1022,                    R.3  for instruction                and              guidance                    for completing      this form      Washington          , DC    20503.          The    NRC      may                    not      conduct                  or        sponsor      ,  and              a      person        is    not        required to http://www.nrc.gov/readinq-rm/doc-collections/nuregs/staff/sr1022/r3D                                                                                  respond        to,  a        collection of information    unless  the document                    requesting or      requiring the collection displays a    currently valid 0MB control  number.
: 1.        FACILITY          NAME                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                181                                                                050 2. DOCKET    NUMBER 3. LER    NUMBER YEAR                SEQUENTIAL                            REV Davis-Besse Nuclear          Power            Station  Unit      1                                                                                                                                                                          NUMBER                            NO.
346                                2021                          001                            01 052
 
NARRATIVE
 
Reportability Discussion          :
 
When                      the EOG  2  speed switch was                  initially discovered  failed following the unsuccessful                        test start on                  September          4, 2020,    there was                  no                      firm    evidence      at that time that the switch had          failed prior to  the test, so      the failure was                assumed to  be        at the time of discovery            in accordance                                                    with NRC    reporting guidance                      contained                              in  NUREG-1022,                    Event Reporting Guidelines for 10 CFR    50.72  and                    50.73,    Revision  3.              Following      receipt of the vendor's              evaluation                  of the failed switch and                    further review of the DBNPS    125 VDC                System            history, it was                determined EOG 2 was                inoperable prior to  the start of the September      4,  2020,    monthly                  test. EOG 2 was                determined to  be          inoperable          for approximately three days                  with the plant operating        in  Mode            1 prior to    it being        declared    inoperable            and                    unavailable                          on                  September          4, 2020,    at  1112 hours            for monthly                  testing. Because                      Technical              Specification 3.8.1    requires actions            to  be          taken          within 1 hour            for an                    inoperable              EOG, this issue represents operation              of the plant in a          condition              prohibited by                the plant's Technical              Specifications, which      is reportable in accordance                                                  with 10  CFR    50.73(a)(2)(i)(B).              Revision 00  of this Licensee      Event    Report was                submitted 60 days                  from      the discovery        of the reportable issue on                    February                              12, 2021,    in accordance                                                  with 10 CFR    50.73(a)(1).                      Because                        all redundant                        train 1 equipment            remained              Operable    during    the time EOG  2 was                inoperable,              no                    loss of Safety  Function                      per 10 CFR      50  .73(a)(2)(v)            occurred                    .
 
When                        Surveillance Requirement        3.8.1. 1 was                performed    within one                    hour          of declaring EDG  2 inoperable            on September        4,    no                  issues were    identified with the offsite circuit breaker        alignments        and                    power            availability. EDG    1 was                successfully          idle started on                    September        5 at  0900    hours                in accordance                                                with Surveillance Requirement        3.8.1.2  to satisfy LCD    3.8.1  Action        8.3.1    to verify it was                not          inoperable              due          to  a          potential common                                                    cause                        failure. EOG 2 was subsequently                              restored to  Operable    status within the seven          days                  allowed        by                      LCO  3.8.1  Action        B.4.
 
CORRECTIVE                      ACTIONS:
 
Completed  Actions:
 
The  ground                        on                    the High Pressure Injection    Pump                    2  DC  oil pump                    motor              was                repaired on                    September      3,    2020,    by repairing the damaged                            wire to the motor                .
 
A    replacement              speed switch of the same                  model        was                  installed and                  post maintenance                                          testing was                completed satisfactorily at  1600  hours            on                  September        7,    2020,    allowing        EOG 2  to  be          declared  Operable    at  1800 hours.
 
Upon                                identification of the vulnerability of the installed speed  switches to  a          higher than            design voltage, a          Standing Order was                issued to the operators        with guidance                      to  more                readily identify grounds                      that could              affect the EDG  speed switches.
 
The  EOG  speed  switches were      replaced  in January                                        2022  with a          model          using        an                  external      power            supply        and                    capable of withstanding full voltage within the DBNPS    DC  Ground                          Detection System.
 
The  DC  System            voltage to  ground                        configuration                was                added            to  the DC  electrical distribution system      of the station Design Criteria Manual                              as          well as        appropriate  DC  system          specifications and                        DC  system        descriptions.
 
NRC    FORM    366A        (04-02-2024)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page          ~of.&sect; NRC    FORM    366A                                                            U.S.            NUCLEAR                    REGULA          TORY      COMMISSION                                          APPROVED                  BY    0MB:              NO. 3150-0104                                                                                                                                              EXPIRES:          04/30/2027 (04-02-2024)                                                                                                                                                                                            Estimated burden              per response  to comply            with this mandatory                      collection request: 80  hours    . Reported
            ~-    ..... ~                                      LICENSEE        EVENT                REPORT    (LER)                                                                                  lessons learned ere incorporated  into the licensing process and            fed back            to industry. Send      comments l~~                                                                                                                                                                                            regarding burden              estinate to  the FOIA, Library,  and            Information      Sel\\lices Branch            (T-6 A10M), U      . s.
          ~~!                                                                  CONTINUATION                        SHEET                                                                                Nuclear                        Regulatory                        Commission      ,                    Washington        ,                      DC                          20555-0001,                      or                          by                                    e-mai  l          to
          \\;~                                ~                                                                                                                                                          lnfocollecis.Resource@nrc.gov, and            the 0MB reviewer at 0MB Office of Information      c11d    Regulatory
                ......                                                                                                                                                                                  Affars, (3150-0104), Attn:    Desk Officer for the Nuclear Reg~atory    Commission      , 725 17th Street NW, (See  NUREG            -  1022,  R.3  for instruction    and                guidance                      for completing    this form                                                    Washington,                DC    20503.            The    NRC    may                    not        conduct                  or    sponsor      , 111d  a      person        is not        required to http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/QO                                                                                                                    respond        to,    a      collection of  information  unless  the document                    requesting or      requiring the collection displays a    currently valid 0MB control number.
: 1.        FACILITY            NAME                                                                                                                                                                    2. DOCKET      NUMBER                                                                        3. LER    NUMBER 050                                                                                                    YEAR                    SEQUENTIAL                                    REV Davis-Besse Nuclear          Power              Station      Unit      1                                                                                                                                                                                                                        NUMBER                                    NO.
346                                        2021                                  001                                  01 052
 
NARRATIVE
 
Scheduled        Actions:
 
No        further actions              are      planned.
 
PREVIOUS                                      SIMILAR  EVENTS:
 
LER    2010-003      dated    October                15,  2010,    documents                                      an                  event    where        a          train of Auxiliary    Feedwater    was                inoperable for longer    than            allowed          by                  the TS  LCO  due        to  a        ground                              in the DC  system          that was                not          adequately                      prioritized for identification and                      repair. The  Auxiliary      Feedwater        Pump                  discharge    control              solenoid        valve  position controller board was                designed for up          to  140  voe              .
 
NRC    FORM    366A        (04-02-2024)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Page.&sect;            of.&sect;
}}
 