Inspection Manual Change Notice 24-004,: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC INSPECTION MANUAL | {{#Wiki_filter:NRC INSPECTION MANUAL IRIB | ||
CHANGE NOTICE 24-00 | CHANGE NOTICE 24-00 4 | ||
DELETED: | DELETED: TRANSMITTED: | ||
Number | Number Date Number Date | ||
: 1. | : 1. IMC 0308 Att 3 App J 07/06/11 IMC 0308 Att 3 App J 02/02/24 | ||
TRAINING: | TRAINING: No special training is required for any documents issued with this Change Notice. | ||
REMARKS: | REMARKS: IMC 0308, Attachment 3, Appendix J, "Technical Basis for Steam Generator Tube Integrity Findings." Revised to reflect completion of the Steam Generator Action Plan, addition of new and updated industry references, and revisions to other NRC Inspection Manual Chapters. Additional formatting changes to meet guidance in IMC 0040. | ||
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required): | EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required): | ||
| Line 33: | Line 33: | ||
DISTRIBUTION: | DISTRIBUTION: | ||
Standard Official Use Only (OUO)-Security Related Information. | Standard Official Use Only (OUO)-Security Related Information. | ||
Please contact: | Please contact: _____________ Phone: __________ | ||
END | END | ||
Issue Date: 02/02/24 | Issue Date: 02/02/24 1 24-004}} | ||
Revision as of 19:20, 5 October 2024
| ML24033A286 | |
| Person / Time | |
|---|---|
| Issue date: | 02/02/2024 |
| From: | Madeleine Arel NRC/NRR/DRO/IRIB |
| To: | |
| References | |
| CN 24-004 | |
| Download: ML24033A286 (1) | |
Text
NRC INSPECTION MANUAL IRIB
CHANGE NOTICE 24-00 4
DELETED: TRANSMITTED:
Number Date Number Date
TRAINING: No special training is required for any documents issued with this Change Notice.
REMARKS: IMC 0308, Attachment 3, Appendix J, "Technical Basis for Steam Generator Tube Integrity Findings." Revised to reflect completion of the Steam Generator Action Plan, addition of new and updated industry references, and revisions to other NRC Inspection Manual Chapters. Additional formatting changes to meet guidance in IMC 0040.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _____________ Phone: __________
END
Issue Date: 02/02/24 1 24-004