ML20055D392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PY-CEI-NRR-1193, Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues]]
| number = ML20055D392
| issue date = 06/29/1990
| title = Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues
| author name = Lyster M
| author affiliation = CENTERIOR ENERGY
| addressee name =
| addressee affiliation = NRC
| docket = 05000440
| license number =
| contact person =
| case reference number = TASK-***, TASK-OR
| document report number = GL-90-04, GL-90-4, PY-CEI-NRR-1193, NUDOCS 9007060263
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 6
}}
 
=Text=
{{#Wiki_filter:r,                                                                                                            %
J.
l GM I
6200 Dok1ree Boulevoro          Mail Acaress                                                  I Independence Cil                PO Box 94661                                                  )
216 4473100                    Clevelond,0H 441004661 L
June 29, 1990 PY-CEI/NRR-1193 L                          :
F U.S. Nuclear Pegulatory Commission Document Control Desk
      - Washington, D.C. 20555.
Perry Nuclear Power Plant (PNPP)
Docket No. 50-440 Generic Safety Issue Implementation Status Generic Letter 90-04 Gentlemen l        The subject Generic Letter requests PNPP implementation status of Generic Safety Issues according to format and content guidelines provided. This l'
letter's attachment shows that status with supporting references.
We conclude that no new commitments are required.                          Please feel free to call if you have further questions.
Sincere y,            .,
s!    +
Michael D. Lyster Vice President, Nuclear - Perry l-MDL: nj c-'
Attachment ec: NRC Region III T. Colburn l              P. Hiland
                                                                                                                  )
9007060263 900629 40 DR      ADOCK 0500 i
O A1 ('dperating    Companies.
eveiana tiectnc murninoring Toledo Edison                                                                          '>
i
 
a Perry Nuclear Power Plant tatit 1 FT-<EI/IES-            -*
Docket No. 50-C40                                                                                                                                            Atta w The Cleveland Moctric Illuminating Co.                                                                                                                        Page 1 of 5-              .
G8243 TIC SAFETT ISSUE IPEUPENDtTICK                                                        ,
                                                                                                                                                                                              =
GSI/(N A No.)          TITIE                                                                        APPLICABILITY    ST3trt3S  CDr8ENFS/ REFERENCES 40 (9065)            Safety Concerns Associated with                                              All Bugts (sic *) N/A          GL 86-01 states N/A to Pterk III's.
Pipe Brooks in the met Scram ?ysten 41 (8058)              seat Scram Discharge volume Systems                                          All BIEts        C            !stter Devidson to Schwencer, 10/25/82 43 (B107)              Reliability of Air Systems                                                  All Plants        C            FT-CEI/IEEN)971b 2/22/89 FT-GI/lWWl-1080b 20/23/89 51 (L913)              Improving the soliability of                                              All Plants          I-(1)        FT-GI;. Jut-1121b 1/26/90 W ie Service unter Systems 67.3.3 (A017)          Improved Accident Monitoring                                              All Plants          I, E-( 2 )    tatter Youngblood to Edelman, 12/11/84 i
PT-CEI/IES-0179b 2/6/95 PT-CEI/IWWHP9694 3/3/89
                                                                                                                                      !atter Colburn to Esplan, 7/14/89 Letter Miraglia to Westos,1/29/90 75** (9076)          Item 1.1 - Post-Trip Review                                                All Plants          C            FT-GI/1551-0100L 4/6/94 (Prograar Description and                                                                                    FT-CEI/Igut-03094 8/28/85 Procedtare)                                                                                                  FT 6 3544 9/23/85 75 (8085)              Item 1.2 - Post-Trip Deview -                                              All Plants          C            FT-GI/155t-01004 4/6/84 Data and Information capability                                                                              FT-GI/14st-0397L,11/15/85 75 (8077)              Item 2.1 - Equipment Classification                                      All Plants            C            FT-GI/IWWt-01004 4/6/84 and vendor Interface (Boector Trip                                                                            FT-GI/IES-43094 8/28/85 System Congenents) l l (1) Implement water treatment - 8/90, performance testing / inspection of boet on " , e 0/90, resolve SSFI findings - 6/91, final confirmation of performece test / inspection schednales - 12/93.
(2) (t35AR Appendix 15 License comunitsamt too. 7) Define a schedale for neutran monitoring system asdification by 7/90, subject to ERWIDG/Inc resolution of licensing basis. (License htment Iso.16) Pesesure post-accident sample line loss pending inc direction.
As identified in Generic Letter 90-04.
 
Perry maclear Power Plant tktit 1 PT-CEIMWWD-
* Docket sio. 50-440                                                                                                                                                                                    Atta W The Cleveland Electric Illumnating Co.                                                                                                                                                                Page 2 of 5          o awmTC SAFETT ISSUE IEW12MirtkTIGE                                                                                                                        .
GSI/(PFA ND.)        TITIE                                            APPLICABII.ITY    ST3STIS G5WENTSMIEPERIEWGK 75 (8086)            Item 2.2.1 - Equipment Classification          All P1 mets        C              PT-CEI/lWEE-01SO4 4/6/84 for Safety-Related Compoesnts 75 (IA03)            Item 2.2.2 - Tendor Interface for              All Plants          E              PT-CEIAEWi-01004 4/6/84 Safety-melated Components                                                          GL 90-03 Under Revice 75 (9078)            Items 3.1.1 s 3.1.2 - Post-+tmintentanew        All Plants          C              PT-CEIAest-01004 4/6/98 Testing (Reactor Trip System ''WM) 75 (9079)            Item 3.1.3 - Post-Nmintenance Testing-          All Plants          C              PT-CEI/3rst-4775b 2/23/98 Onanges to Test moquirements (Reactor Trip System couponents) 75 (8087)            Items 3.2.1 s 3.2.2 - Post-Maintenanaco        All Plants          C              PT-CEI/IWet-01004 4/6/84 Testing (All Other Safety-melated Components)
, 75 (Boe8)            Item 3.2.3 - Post-Maintenance Testing-        All Plants          C              PT-CEIAula-0775b 2/23/98 Ganges to Test moqutirements (All Other safety-melated Components) 75 (5080)            Item 4.1 - meector Trip System                All Plants (sic)    M/A          All Ptet's per GL 83-28 Reliability (vendor-melated Modifications) 75 (8031)            Items 4.2.1 s 4.2.2 - meector Trip            All Fests            N/A System me11 ability - Penintenance and Testing (Preventative Maintenance and Surveillance Program for moector Trip Brookerst 75 (s082)            Item 4.3 - noector Trip System                All w and aser      tyA i
Reliability - Design fbdifications            Plants (Automatic Actistion of Shunt Trip Attactment for IAes* E , __ and BsAr Plants) 75 (8090)            Item 4.3 - meector Trip System                All w and asAr        w/A me11 ability - Tech Spec diseges              Plap*.s (Automatic Accustion of Shurt Trip Attachuset for inestinghouse and Batt Plants) i l
l l
1
                --      ~ , . _ . _.      .-. ,-        -    .  . - - _ ,          -.    . _ _ _ _ ~ . _ _ . , _ . _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ . _ _ . _ ._ ._ __..____ . _ . _ _ _ _ _ ,
_                                                                            __._1
 
                                                                                                                                                                                                                                                                                                                            ~
g .
Perry 9meloor Power Plant trait 1 PE-GIMER-                                    4 Dodet 33. 50-440                                                                                                                                                                                                                                          Jtttadmuset 7he Cleveland Electr',c Illuminating Co.                                                                                                                                                                                                                  Page 3 of 9                                  .
GDERIC SAFETT IS$tFE IPEP{g gyJgyIG[                                                                                                                                      ,
GSI/(MPA 150.)          TIT 12                                                                                                                APPLI N LITY        STJtTt!S  CtNW4NFS/IEFE5WpCES 75 (8091)              Item 4.4 - poector Trip system                                                                                      All Bser Plants      IVA me11 ability (Improvements in femintenance and Test Procedures for sser Plants) 75 (8092)                Item 4.5.1 - moector Trip system                                                                                    All Fleets            C                FT 6 100L, 4/6/94 meliability-Dinese Trip Features (system Functional Test 2ng) 75 (8093)              Items 4.5.2 s 4.5.3 - meector Trip                                                                                  All Plants            C                FT-GI/15tn-3100L, 4/6/f 4 system meliability - Test Alternati w s                                                                                                                    (3) and Intervals (System Ftunctional Testing) 86 (8084)              long Range Flan for Dealing with                                                                                    All stets              C                PuPP SER (stWEG 0857) S 2.4, SSER 5/5.2.5.2, Stress Carrosien Crock 2ng in                                                                                                                              SSER 7/5.2.5.2 Beatt Piping                                                                                                                                              PT-CEI/155t-09944 7/29/88 FT-GI/15m-1027L, 6/15/99 FT-GI/15 tit-1944b 7/31/89 93 (8098)              Steen Sinding of Auxiliary Feeduster                                                                                All PIERS              N/A Pumpe 4
99 (L817)              RCS/RItt Suction Line valve                                                                                        All Posts              N/A Interlock on Poets 124                    Anaxiliary Foodwater Sy1 stem                                                                                      ABIO-1&2, mancho      IVA Beliability                                                                                                        Seco, Prairie Island 1s2, Crystal River-1 Ft. Calhoen A-13 (8017)            Sud ber operability Assurance -                                                                                    All Plants              C                PT- G IAWWi-6449L, 4/15/96 Hydraulic Sudbers                                                                                                                                          Techstical Specifications 3/4.7.4 1
(3) IEEDC 30844, "BIEt Ouner's Grg hosponse to Geooric Estter 83-28, Item 4.5.3, January 1985.
  , ,                    ,, ,                      . _ _ . . . . - . , . . . .                                        ...,s    .. . . . , . .            . . . . - - -_      _ . _ _ _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ . _                                -u
 
Ferry sanclear Power Plant trait 1                                                                                                                                                          FT-GI/15m-                                i~
Docket Wo. 50-440                                                                                                                                                                          Jtt* ==*===t
* S o Cleveland Electric Ill e anting Co.                                                                                                                                                      Page 4 of 5                              ,
conee'C SAFETT ISSUE I!W'tJPE3FEREIst                                                                                  .
GSI/ W A No.)            TITTE                                                                                          AFFLICtBILTFT              STRTUS  N/REFEBENCES
;    A-13 (8022)              me operability Jhssurance -                                                                  All Plants                  C            FT4 xr/imm-0449L 4/15/96 Mechaniemi 9mdibers Todutical Specifications 3/4.7.4 A-16 (D012)              Steen Effects on wet Core                                                                    oyster Crook                R/A Spray Distribution                                                                            & ISEP-1 A-35 (3023)              Adequecy of offsite Feuer                                                                    All Flants                                Intter Davidu n to Schoencer, 8/26/92 systems                                                                                                                                USAR 3.3.1.1.2.9 responds to Branch Tod Positica FSB-1 SSER 2/S.2.4 5-10                    Behavior of DEt Mark III                                                                      All EBE Mark III            C            (4)
Containments                                                                                  Flaets j    B-36                    Develop Design, Testing and                                                                  All Plants with              C            (5)
Maintestance Criteria for Atmosphere                                                        oL M 11 cations Cleanup System Air Filtration and                                                            After 4/1/90 Adsorption tknits for magineered Safety Features Systems (Regulatory l                            Guide 1.52) and for storumi l                            Ventilation Systems (megulatory Guide 1.140)
!    IMi3 (9045)              Isolation of Ice Pressure Systems                                                            All Plants (sict              Er/A Connected to the Beector Coolant System Pressure Soundary i
I (4) Jgspendia R to SSER S provides the references supportinT the MIS Staff conclusicus in SSER 4/6.2 that the 66 Busyhrey contai===et system desi1pt concerns beve been addressed and resolved for FMFF. FNIPP sumApittals material to that resolutice include letters dated Septeudper 9,1982 j          (D.R. Davidson to A. Schuomrer; FY422/IEEb-007L Jemanary 26,1983 (M.R. Edelman to B.J. Yoemsgblood); FT-GI/IEE-OSSL Jesumery 5, FT-GI/teist-0123L July 11, and FT-GI/15m-4151L 1Bovendsor 1,1964 (M.R. Edelsen to S.J. Youngblood); FT-GI/imm-0235L sesy 16 FT-GI/15tp-0281L Jemte 24, FT-GI/1EE-0336L September 13, FT-GI/IEst-4351L September 23, FT-GI/15m-8363L SeptemAper 24, FT-GI/ Ism-4371L i
Octoty,c 8, FT-GI/WW-4399L Bovember 12, FY6392L Bovember 11,1985 (M.R. Edelsman to 3.J. Youungblood).
(S) The PUFF licensing basis for sidsject hogulatory Omido compliance ses established in the original FSAR dated 9/12/90 in Table 1.0-1. Se
,          apptopriate revision uns deterudmod by reforeseeing the sec mogulatory Boquirement Devies httee (ERAC) categorizatica. Segulatory Guide 1.52 was Category 2 - evaluated for beckfitting mood sund mogulatory Guide 1.140 uns Catagory 1 - forumed fit enly. SER 6.5.1.4 accepts as 1.52 -
movision J conforumece, and SER 9.4.1 & 9.4.3 accept 3G 1.140 - Devision 6 confotwunce.
i 4
i
    %        .,s  y v % ,  we- . . * ,  , - - , .                                                            4    .          . , .                ..,      ,.  .,---e,          ,,,e.....-..  ,s        w, .__ _ . . . . , . _
 
1 o...,q..
* I PY-CEI/NRR-        )
            '                                                              Attachment        i
      ,                                                                    Page 5 of 5 l
i GL 90-04 Guidance For Completing States Column                  l J
(1) Provide a separate entry for each licensed reactor unit.        If the l
information is identical for multiple units, so state.
(2) If a GSI is not applicable to a unit (s), enter "NA".
(3) If a GSI is applicable but no changes were necessary to implement the        ,
resolution, enter "NC". If the GSI implementation was completed prior to issuance of the operating license, enter "NC", .s no post-licensing        '
changes were necessary.
(4) If a GSI is applicable, submittal of inform tfon and/or changes were necessary and such submittals were made or changes are complete, enter l-                "C". Aleo identify the licensee's document (s) to the NRC which certified completion, and the document date(s).
(5) If a GSI is applicable and changes are necessary but such changes are not    ;
yet fully implemented, enter "I" and the projected month and year of completion. Provide a brief explanation of the outstanding work in the
                  " Comments" column.
(6) If implementition guidance for a resolved GSI was issued recently and the
                'lleensee is still evaluating the appropriate response, enter "E" and the projected response date.
(7) The "Craments" column may be used to explain any entry in the " Status" column.
1' l
l l
l 1
l h}}

Latest revision as of 19:27, 13 November 2023