ML20134D514: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PY-CEI-NRR-0313, Forwards Proposed Revs to FSAR Re Fracture Toughness of RCPB Matls to Resolve SER Confirmatory Issue 17,per NRC Request.Changes Will Be Incorporated in Future FSAR Amend]]
| number = ML20134D514
| issue date = 08/09/1985
| title = Forwards Proposed Revs to FSAR Re Fracture Toughness of RCPB Matls to Resolve SER Confirmatory Issue 17,per NRC Request.Changes Will Be Incorporated in Future FSAR Amend
| author name = Edelman M
| author affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
| addressee name = Youngblood B
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000440, 05000441
| license number =
| contact person =
| document report number = PY-CEI-NRR-0313, PY-CEI-NRR-313, NUDOCS 8508190257
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 11
}}
 
=Text=
{{#Wiki_filter:7 0      D 1 :
                  !1 [  r  (  ?Y II
                                      .  ' (it
                                                ~ j _ . i
: c. _ v s y
t ,
i I I
: t. I ?k
_ coS  2t.!t!'E f -I 4. {f
[' f j f ~* NT um 4
                                                                                                                      ,s 4 n f'[
                                                                                                                        - 2 P.O. box 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 t  - ILLUMINATING BLoG. - 55 PUBLICSQUARE Serving The Best Location m the Nation -
RRAY R. EDELMAN TflCE PRESIDENT                                                                                                                  i NUCLEAR                                                                                                                          l August 9, 1985                                                          )
PY-CEI/NRR-0313 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.      20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fracture Toughness RCPU Materials SER Confirmatory Issue 17
 
==Dear Mr. Youngblood:==
 
Attached are proposed revisions to the FSAR associated with fracture toughness of the Reactor Coolant Pressure Boundary (RCPB) materials as requeated by your stuff. These will be incorporated in a future FSAR amendment. A Technical Specification bases page associated with this revision is also attached.
We believe this information is sufficient to resolve SER Confirmatory Issue Number 17 in the next SER Supplement.
Very truly yours, Murray R. Edelman f~
Vice President Nuclear Group MRE:njc Attachment ec: Jay Silberg, Esq.
John Stefano (2)
J. Grobe 8508190257 05080'?
PDR    ADOCK 05000440 E                    PDR Booi i ,t
 
5.3.2.1.2      Temperature Limits for Preoperational System Hydrostatic Tests and ISI Hydrostatic or Leak Pressure Tests
{
s f      Based on 10 CFR 50 Appendix C, if there is no fuel in the reactor during system hydrostatic pressure tests or leak tests, the minimum permissible test temperature is 1000 F at 1563 psig for Perry Units 1 and 2.
The fracture toughness analysis for system pressure tests resulted in the curves labeled A shown in Figures 5.3-2 (Perry 1) and 5.3-3 (Perry 2). The curves labeled " core beltline" are based on an initial RTNDT of 10'F for the plate                      l material for Perry 1, and an initial RTNDT of -200F for the plate material for Perry 2.
The predicted shift in the RTNDT from Figure 5.3-5 (based on neutron fluence at 1/4 T of the vessel wall) must be added to the beltline curve to account for the effect of fast neutrons.
5.3.2.1.3      Operating Limits During Heatup, Cooldown and Core Operation The fracture toughness analysis was done for the normal heatup or cooldown rate of 1000F/ hour. The temperature gradients and thermal stress effects corresponding to this rate were included. The results of the analyses are a set of operating limits for non-nuclear heatup or cooldown shown as curves labeled B on Figures 5.3-2 and 3. Curves labeled C on Figures 5.3-2 and 5.3-3 apply whenever the core is critical.
5.3.2.1.4      Reactor Vessel Annealing In place annealing of the reactor vessel because of radiation embrittlement is unnecessary because the predicted value in transition of adjusted reference temperature does not exceed 2000F.
5.3-14
 
I TABLE 5.3-1 CHARPY TEST RESULTS AND CHEMICAL COMPOSITION A.            PERRY UNIT I I. VESSEL BELTLINE MATERIAL IDENTIFICATION A. Number 2 Shell Ring Plates - Pc. 22-1-1, Heat C2557, Slab 1 Pc. 22-1-2, Heat B6270, Slab I Pc. 22-1-3, Heat A1155, Slab 1 B. Welds in No. 2 Shell Ring Vertical Seams Seam BD - Type E8018NM, Heat 627260, Lot B322A27AE Type E8018NM, Heat 626677, Lot C301A27AF Type RACO-1NMM, Heat SP6214B, Lot 0331 Seam BE - Type E8018NM, Heat 624063, Lot C228A27A Type E8018NM, Heat 626677, Lot C301A27AF Type E8018NM, Heat 627069, Lot C312A27A Type RACO-1NMM, Heat SP6214B, Lot 0331 Seam BF - Type E8018NM, Heat 627260, Lot B322A27AE Type E8018NM, Heat 626677, Lot C301A27AF Type RACO-1NMM, Heat SP6214B, Lot 0331 II. CHEMICAL ANALYSES FOR BELTLINE MATERIAL A. Plates          C    Mn      P    S  Cu  Si  Ni  Mo    V    Al Pc. 22-1-1, HL C2557    .23  1.32 .010 .025    .06 .27  .61  .54  .001  .039 Pc. 22-1-2, HL B6270    .20  1.28 .012 .015    .06 .23  .63  .53    0 .039 Pc. 22-1-3, Ht A1155    .20  1.33 .010 .013    .06 .28  .63  .54  .002 .031 B. Welds                C      Mn  Ni  Si  Mo    Cu    P    S      V Ht. 627260 Lot B322A27AE      .04    1.25 1.08  .56 .64  .06  .020  .022 .02 Ht. 626677 Lot C301A27AF      .048  1.10    .85 .56 .45  .010  .015  .022 .009 Ht. SP6214B Lot 0331          .051    1.39  .82 .53 .52  .02  .013  .017 .004 Ht. 624063 Lot D228A27A      .041  1.12 1.00  .41 .54  .03  .009  .018 .01 HL. 627069 Tot C312A27A      .037  1.07    .94 .60 .52  .010  .013  .019 .012 l i      (
l                                                                5.3-27
                  ,-n,-,~.-,        .,
 
y.
TABLE 5.3-2 UNIRRADIATED FRACTURE TOUGHNESS PROPERITES 9
A.      PERRY UNIT 1 Plates          Drop Wt.          Transverse CVN        Reference    Upper Ht.No.          NDT(*F)    Ft-lbs        MLE    Temp. Temp.('F) Shelf (Ft-lb)
C2557-1 Top                -20      52,50,52    42,46,42  +70F    10          84 Bottom.                                                                          l
                              -20      54,64,76    63,53,46  +60F B6270-1 Top                -40      53,78,56    43,58,44  +20F Bottom            -30      63,63,64    51,51,52  +30F    -30          94 A1155-1 Top                -20      65,63,67    54,60,52  +50F    -10        114      l Bottom            -20      54,66,85    68,55,44  +40F Weld            Drop Wt.                CVN              Reference    Upper Metal          NDT(*F)    Ft-lbs        MLE    Temp. Temp.(*F) Shelf (Ft-lb)
Ht. 627260            -40      52,56,51    36,37,35  +30F      -30        104      l Lot B322A27AE Ht. 626677            -40      53,51,54    36,37,35  +40      -20          90 Lot C301A27AF Ht. SP6214B            -50      56,50,54    45,41,46  +10      -50          88 Lot 0331              -40      50,61,64    46,50,52  +10      -40          96 Ht. 624063            -60      57,59,68    37,38,46  +10      -50        105 Lot 228A27A Ht. 627069            -60      72,64,78    52,48,56    0      -60        112 Lot C312A27A                                                                          l f
1 5.3-29 i
 
j 1
4 TABLE 5.3-2 (Continued)
B.                PERRY UNIT 2 Plates                          Drop Wt.          Transverse CVN          Reference            Upper Ht.No.                          NDT(*F)      Ft-lbs        NLE    Temp. Temp.(*F)          Shelf (Ft-lb C3474-1 Top                                  -30      54 .54,53    44,44,44      +40F            -20            95 Bottom                              -40      51',63,69    41,45,51      +20F C3560-1                                                                                                                  !
Top                                  -30      92,86,68    71,56,62      +30F Bottom                              -30      54,74,64    58,62,46      +40F            -20          125 C3560-2 Top                                  -30      70,52,61    44,54,49      +30F                                  I Bottom                              -30      60,66,76    62,52,48      +40F            -20          107 Weld                            Drop Wt.          Transverse CVN          Reference            Upper Metal                          NDT(*F)      Ft-lbs        MLE    Temp. Temp.(*F)          Shelf (Ft-lb Ht. 422K8511                                -80      65,74,127 44,48,76        -20F            -80        143 Lot G313A27AD Ht. 492L4871                                -90      50,51,57    36,38,40        0F            -60        151 Lot A421B27AE Ht. 04T931                                  -90      65,69,72    52,48,50        0F            -60        148 Lot A423B27AG Ht. SP6756                                  -60      55,66,63    54,51,57        0F          -60              89 Lot 0342 (Single Wire)
Ht. SP6756                                  -50      64,79,77    35,72,55      +10F          -50            95 Lot 0342                                              80,72        69,60 (Tandem Wire) l i
i r
l 5.3-30
 
                                                                                                                                    ,                                                  a-e-,
TA512 5.3-3 EOL BELTLIIE FIATE RTgyy & WELDS
,                                        UNIT I A. Beltline Plates Reg. Cuide Asm NB-2300              1.99 Extrap.                    Eatinated meat                            WT ICu          W ZF                    Start RTNDT              ARTNDT (OF)                  EOL RTgDT (OF) i C2557.!(2)                            .06            .010                        10                      34                  +44 (Limitins Plate) 36270-1                                .06            .012                        -30                      40                  +10                      .
l All55-1                                .06            .010                        -20                      34                  +14 B. Beltline Welds i
Reg. Guide ASE NS-2300        1.99 Extrap. Estimated      Weld Wire                Flux y Weld Seam                        Beat /Imt      WT ICu    WT IF      Start RTNOT        ARTamT (OF)  EOL RTNDT (OF)      Type                  Type
!                                        BD, SF                    627260/5322A27AEI3)    .06        .02            -30                67            +37      E8018MM                      --
}                                        BD, BE, BF                626677/C301A27AF(3)    .01      .015            -20                50            +30      E80180et                    --
l l
BE                        624063/D228A27A        .03      .009            -50                30            -20      E80181st                    --
BE                        627069/C312Aj7A        .01      .013            -60                43            -17      E8018MM                      -
BD, BE, BF                SP6214B/03Yr(3)      .02      .013            -40                43              +3      mA00 llem              Linde 124 (Single Wire)                      l C. Test Plate Weld Material 2
Reg. Cuide ASE M5-2300                                              Estimated 1.99 Extrap.
Heat / Lot                        WT ICu          UT IF                  Start RTNDT              ARTN DT ( F)                EOL RTNDT ( F) l 624039/D205A27A(3)                    .028            .015                      -90                      50                      -40 1                                        07R458/S403827AC(3)                    .04            .02                      -60                      67                      +7
;                                        40lF2871/H430827AF(3)                  .03            .013                      -50                      43                      -7 i
 
m
                                /
                                                      .            TABLE 5.3-3 (Cont'd)
Unt? 2 A. Beltline Plates Rag. Cuide ASE 115-2300              1.99 Extrap.                  . Estimated Beat                    W ICu                UT IF                  Start RTNDT              ARTN DT (DF)                EOL RTugyr (OF)
C3474-1(2)                    .09                .031                        20                      44                +24 (Limiting Plate)
C3560-1                        .07                .010                      -20                      34                +14 C3560-2                        .07                .010                      -20                      34                +14
: 3. Belttime Welde Reg. Cuide ASE NS-2300      1.99 Extrap. Estimated    Weld Wire              Flux
?  Weld Sese              Beat /Imt          WT ICu      WT IF    Start RTEDT      ARTET (OF)    EOL RTMDT (DF)      Type                Type Y
50, BE, BF        422E8511/C313A27AD(2)      .01        .016          -80              54              -26    E8018eet                  -
BD, BE, BF        492L4871/A421527AE(3).      .04          018          -60              60              0      E8018tDI                  -
BD, BF            04T931/A423527AC(3)        .03        .020          -60              67              +7    E80181st                  -
BD, BE, SF        SF6756/0342(1)e(3)          .08        .010          -60              34              -26    RACO 18998            Linde 124 (Single Wire)
BD, BE, BF        SP6756/0342(Ile(3)          09        .010          -50              40              -10    RACO Imet            Linde 124  l (Tanden Wire)                  l C. Test Plate Weld Material Reg. Cuide ASE NB-2300              1.99 Extrap.                    Estimated West / Lot                WT ICu                WT IF                  Start RTNDT              ARTNDT ( F)                  EOL RTMDT (OF) 05T776/L314A27AR(3)            .06                .015                      -70                      50                          -20 All materials in (B.) were also used in the surveillance test plate fabrication.
NOTES:
1    Submerged ARC welding
: 2. Serveillance Test Plate 3    Surveillance Weld Material
 
i i
AA'        BB'            CC' im                                                  -g- -g- -;                        '
f            J                    BOTTOM HEAD
* F PENETRATION
                                                                                      -J                        l I            I              I                                                                                  i
                              ,200                                            .
I          L.l I                                                                                                    \
                                                                                  /            /                l CORE BELTLINE                                                                      ,
AFTER SHIFT                                                                j
                                                                          -h--                                                                                                                      i 3                                                  t a
                                                                      -l-i              I j
I 3 1000                                                          f-y                                              [              f l              FEEDWATER NOZ2LE g                                            [                                                  LIMITS w
                                                                    /                /
a
                          $ B00
                                                                    /              /
e f-f
                                                                              -                        NOTE: CURVES A, B, AND C ARE PREDICTED O
[                                      TO APPLY AS THE LIMITS FOR 6 YEARS 15 EFPY) OF OPERATION h
W
                                                                              /
1 E                                                              }
l f
E t-                                              l            l                    A -INITIAL SYSTEM HYDROTEST LIMIT
                                                                  -                                                                                                            ~
                          $ 600                                            l            l--                  B -INITIAL NON-NUCLEAR HEATING E                                                l              l                    C - INITI AL NUCLE AR (COR E CRITICAL) 3
                                                                  -        j-              -~
LIMIT BASED ON GE BWR LICENSING TOPICAL REPORT NEDO=21778-A h
E                                  .      .                    l                    A', B', C', - A,B,C LIMITS AFTER AN I      E l            h                                                ASSUMED 340 F CORE BELTLINE 400                            -
TEMP. SHIFT FROM AN INITIAL                -
0 SHELL PLATE RTNDT OF 10 F I
                                                                                          ! 312 psie 1b            g 200 BOLTUP LIMIT l 700F  j 0
0                    100                                200                                300              400                          600 MINIMUM REACTOR VESSEL METAL TEMPER ATURE ( F)
Figure 5.3-2 85 303-01
 
l l l                  l                l l I I I_
A*A- B              B '_.__.C
__-C                                                                                            '
[,              1400 8    I            l-~~~I                                      _
r g If                I                  I
                                                                                              ,            l                  l                COR ELTLINE j      j~ ~j                            y                  AFT          44*F SHIFT
                                                                                          -J l                    I                  #+            _ (NOT LlMITING)
                                                                                                              ~~-
I E          I          Ef                    EJ'" /
                                                                                  ,        D ''T                            f f 1200                                                            "                  8              '8 J
f_y .('I I            I        d._            __j I            E._1    y E
I                                N
          -                                                            J.            I                              i                          VESSEL l
                                                                        '              3    .}__._.I                                              DISCONTINUITY f
6    1000 f
                                                                          -f-f        -- I----
f
                                                                                                                            ,,, /[
y        LIMITS l
O                                                    -
l--l"--    Is '''
                                                                                                      -z  -.
J'
                                                                                                                                ///
H                                                    I ._f ' '                                            '        f J                                                t' r                        r                A      :    /
y                                                  J                    J:      ,.gJ                    /
            >                                                {.[l_f 4
__.J f.
g                                                        I-- H                                ,-
O      B00
                                  -                          A        --'
                                                                                            -j g                                                y_____      _
4                                                j                    _                  _
m 1
__.l 2                      --
: f.          __-I        l F                            NEW 10 CFR 50 --
5                            APPENDIX G                  :-I --~)
            -J                          LIMITS                  ___                  ___-
w      600              -
1            --          -      ----
D5[
NOTE: CURVES A, B, AND C ARE APPLICABLE
      '    N                                              k- % -~[A                      -                                                              FOR SERVICE PERIODS UP TO 40 YEARS
{                                              % '-k-                                                                                        (32 EFPY)
__,_..                                            t i! t f I I if I ! I f f ff ff i _t I _ll ! t f ! !
A - SYSTEM HYDROTEST LIMIT WITH FUEL IN VESSEL
                                                                  ~~
400                -
B - NON-NUCLEAR HEATING LIMIT
                                                                                                                                                                                                            ~
                                                                  ~2                5[                      222                C - NUCLEAR (CORE CRITICALI LIMIT                                      _'_2
                                                                  ---              g---                      ---
BASED ON G.E. CO. BWR LICENSING                                ---
IJ                        j      ri                                        TOPICAL REPORT NEDO 21778-A A y_L__L312 poig                                                      A', B', C* -CORE BELTLINE LIMITS AFTER AN
                                      '' BkTUP [  -    -
B                  j                                                                    ASSUMED 44*F TEMPERATURE SHIFT FROM tiggy AN INITIAL PLATE RT NDT OF -20*F CURVES        ;-:
200 70'F g
2 h --
[ C------
ARE NOT LIMITING (SHOWN FOR INFORMATION
                                                                                                                                                                                                        -~~
T                                                                                                    ONLY) 22 J
                                                          .__q.
0                            100                                                      200                                  300            400              600 MINIMUM RE ACTOR VESSEL METAL TEMPERATURE (*fi Am. 15 (12-31-84)
PERRY HUCLEAR POWER PLANT                +
THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY Minimum Temperatures Required vs.
C.-                                                                                                                                                                  Reactor Pressure, Perry Unit 2 Figure 5.3-3
 
FIGURE 5.3-4 IIAS BEEN DELE 7 FED
 
i h                                                    BASES TABLE B 3/4.4.6-1 Q                                                    -
REACTOR VESSEL TOUGHNESS E
HIGHEST I. BELTLINE                                                          ^                                END 0                        !fE HELF                                          s COMPONENT      MATERIAL      HEATf/ LOT #      CU(%)  P(%)
T NOT  )
ENERGY (Ft-Lb) p NOT
                                                                                                                      ,p)
Plate          SA533 GrB      C2557-1            .06 -  .010    +10                75              + 44                          l.
Class 1 Weld            BD,BF    627260/8322A2/AE        .06    .020    -30                75              +37                            l.
. II. NON-BELTLINE                                                                  HIGHEST STARTING COMPONENT                            MATERIAL                                RTNOT( F)
* Shell Ring                      SA 533 Gr.B. C1.1                              +10
"          Botton Head                  ' SA 533 Gr.B. C1.1                                +10 Top Head SA 533 Gr.B. C1.1                              +10 Top Head Flange                  SA 508, C1.2                                    +10                        ts 7.J Vessel Flange                    SA 508, C1.2                                  +10                      Ov1 Feedwater Nozzle                SA 508, C1.2                                  -20                      go Veld                            Low alloy steel per                                                      :*3 GE purchase specification                      -20                      Q m
45 ft-lb & 25 mils lat. exp G Closure Studs                    SA 540 Gr.823 requirement met at +10(*F)    @
  -                                        ,                                                                          'i!
                                                                                                -    .  -              - - - - - - - - - -}}

Latest revision as of 22:49, 23 July 2023