ML20153F230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-4699, Interim Deficiency Rept CP-85-39 Re Installation of Conduit to Equipment Which May Not Be Specified Per Design Documents.Initially Reported on 850918.Issue Expanded to Review Flexibility Problems.Next Rept by 860523]]
| number = ML20153F230
| issue date = 02/12/1986
| title = Interim Deficiency Rept CP-85-39 Re Installation of Conduit to Equipment Which May Not Be Specified Per Design Documents.Initially Reported on 850918.Issue Expanded to Review Flexibility Problems.Next Rept by 860523
| author name = Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = Johnson E
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000446
| license number =
| contact person =
| document report number = CP-85-39, TXX-4699, NUDOCS 8602250343
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 1
}}
 
=Text=
{{#Wiki_filter:r                                                                                                                ,
Log i TXX-4699 File # 10110 903.10 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 400 NORTH OtJVE STREET. L.B. at
* DALLAS. TEEAR 78201 February 12, 1986 EIe"21L*2?."&%
            # EEric HC M nsonZ A'c ting Director Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan P1aza Drive, Suite 1000                                      l e" g g g p 7g p= gi j Arlington, TX 76012                                                ,
l FEB i 91966      h
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION                  ;,                      ~!!
DOCKET N0. 50-446                                    Lj ti                  &
EQUIPMENT CONDUIT INTERFACE SDAR: CP-85--39                                                                  -
 
==Dear Mr. Johnson:==
 
On September 18, 1985, we verbally notified your Mr. T. Westerman of a deficiency involving the installation of conduit to equipment which may not be as specified'per design documents. This is an interim report of a poten-tially reportable item under the provisions of 10CFR50.55(e). We have sub-mitted interim reports logged TXX-4589 and TXX-4615, dated October 10, 1985, and November 7, 1985, respectively. This issue has been expanded in scope to review flexibility problems associated with the equipment and raceway interface.
We are continuing our evaluation and anticipate completion of our final report by May 23, 1986.
Very truly yours, W
W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555
                                                                                                              \9
                                                                                                          ~
y _.jt.)y                      a ouvussou or rexas urzurzes zu.ecrmsc couraur 8602250343 860212
                                                                                                        /. 6'M PDR    ADOCK 05000446 S.                    PDR}}

Latest revision as of 17:26, 11 July 2023