ML20205D193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-4953, Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs]]
| number = ML20205D193
| issue date = 08/11/1986
| title = Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs
| author name = Beck J, Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = Noonan V
| addressee affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = CPRT-597, TXX-4953, NUDOCS 8608150296
| package number = ML20205D198
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:__
CPRT-597                                                                            Log # TXX-4953
              .                                                                                  File # 10068 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER . 400 NOR'TH OLIVE STREET. L.B. SI . DALLAS. TEXAS 75301 August 11, 1986 0N'A*E?E2?.7&'Er Director of Nuclear Reactor Regulation Attn: Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nue. lear Regulatory Commission Washington, D.C. 20555
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORTS
 
==Dear Mr. Noonan:==
 
We transmit herewith the SRT approved Results Reports listed below. The files which contain supporting documentation for the Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/979-8242).
I.a.4    Agreement Between Drawings and Field Terminations, Revision 2 I.a.5    NCR's on Vendor Installed Amp Terminal Lugs, Revision 1 VII.a.5    Periodic Review of QA Program, Revision 1 We shall issue future Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours, i
i                                                                      W. G. Counsil By: h d. b >_
J. S. Beck Vice President WGC/arh Enclosures 0
,            8608150296 860011 l
PDR    ADOCK 00000445                                                                      I    I l A                  PDR A titvssuos or rexAs ursuries essernac coursur
 
CPRT-596                                                                                      Log # TUS-4903 File # 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER
* 400,comTIE OBJVE WrmBET. L.B. 81
* DA11AS. TEXAS 7890 8 August 11, 1986
'L"EJ.,US*
MEMORANDUM T0: Mr. W. G. Counsil
 
==SUBJECT:==
CPRT RESULTS REPORTS We transmit herewith the SRT approved Results Reports listed below. The files which contain supporting documentation for the Results Reports have been reproduced and are available in the Dallas file room for public inspection.
I.a.4        Agreement Between Drawings and Field Terminations, Revision 2 I.a.5        NCR's on Vendor Installed Amp Terminal Lugs, Revision 1 VII.a.5        Periodic Review of QA Program, Revision 1 John W. Beck Chairman, CPRT Senior Review Team JWB:arh Enclosures cc: CPRT File A DEVEREON OF TEXAB (TETLETIES ELECTERC COMPANY
_ _ _ _ _ _ .}}

Latest revision as of 11:11, 10 July 2023