#REDIRECT [[TXX-6425, Forwards Rev 1 to Issue Specific Action Plan I.a.2, Insp Repts on Butt-Splices, Rev 1 to Issue Specific Action Plan III.a.5, Preoperational Test Review & Approval of Results & Rev 1 to Issue Specific Action Plan Vi.A, Gap..]]
| number = ML20209F515
| issue date = 04/27/1987
| title = Forwards Rev 1 to Issue Specific Action Plan I.a.2, Insp Repts on Butt-Splices, Rev 1 to Issue Specific Action Plan III.a.5, Preoperational Test Review & Approval of Results & Rev 1 to Issue Specific Action Plan Vi.A, Gap..
| author name = Beck J, Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = CPRT-885, TXX-6425, NUDOCS 8704300305
| package number = ML20209F518
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
}}
 
=Text=
{{#Wiki_filter:M
                                                      &9 Log # TXX-6425 CPRT-885 n        .--                        File # 10068
                                                      =        =
RIELECTRIC April 27, 1987 wnunn c. coun.a Esecuene Vnw Presuknt U. S. Nuclear Regulatory Commission ATTN:      Document Control Desk Washington, DC 20555
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORTS Gentlemen:
We transmit herewith the following SRT Results Reports:
I.a.2          Inspection Reports on Butt-Splices, Revision 1 III.a.5 Preoperational Test Review and Approval of Results, Revision 1 VI.a            Gap Between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 These reports should be placed in sequence behind the tabs " Electrical" for I.a.2,                          (
    " Testing" for III.a.5 and " Mechanical" for VI.a in the results reports binders previously transmitted. Also, enclosed is a revised Table of Contents reflecting the issuance of these reports.
The files which contain supporting documentation for these Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/979-8242).
We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours,
: u. c. M W. G. Counsil
    %#$b A                                                                    By:d66n b ".W4.).
Beck Ma Vice President, 9 o[, \g Nuclear Engineering TLS/mlh Enclosures 400 North Olwe Suret LB 88 Dallas, Teus 73.'01
 
j      ..
TABLE OF CONTENTS n
U              COLLECTIVE SIGNIFICANCE REPORT f                - Later -
COLLECTIVE EVALUATION REPORTS
                    - Later -
RESULTS REPORTS Electrical I a.1      Heat-Shrinkable Cable Insulation Sleeves -
Revision 1 I.a.2      Inspection Reports on Butt-Splices, Revision 1 I.a.3      Butt-Splice Qualification - Revision 1 1
I.a.4      Agreement Between Drawings and Field Terminations
                                    - Revision 2 I.a.5      NCR's on Vendor Installed Amp Terminal Lugs
                                    - Revision 1
!(        )            I b.1      Flexible Conduit to Flexible Conduit Separation              !
!                                  - Revision l' I.b.2      Flexible Conduit to Cable Separation - Revision 1 I.b.3      Conduit to Cable Tray Separation - Revision 1
,1 l                      I.b.4        Barrier Removal - Revision 1 f,
!                    Civil / Structural j                    II.b          Concrete Compression Strength - Revision 1 l                    II.c          Maintenance of Air Gap Between Concrete Structures          t j                                  - Revision 1                                                '
l l
l lO 1
l r
 
    \~/          Testina III.a.2                      JTG Approval of Test Data - Revision 0 III.a.3                      Technical Specification for Deferred Tests
                                              - Revision 0 III.a.4                      Traceability of Test Equipment - Revision 0 III.a.5                      Preoperational Test Review and Approval of Results, Revision 1
        ,      III.b                        Conduct of the CILRT - Revision 0 III.d                        Preoperational Testing - Revision 1 Mechanical V.a                          Inspection for Certain Types of Skewed Welds in NF Supports - Revision 1 V.c                          Design Consideration for Piping Systems Between Seismic Cateoory I and Non-Seismic Category I Buildings - Revision 1 V.d                          Plug Welds - Revision 1 V.e                          Installation of Main Steam Pipes - Revision 1 VI.a                          Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 O
 
i l
?
I.d.2            Guidelines for Administration of QC Inspector Test
                              - Revision 1 a
I.d.3            Craft Personnel Training - Revision 1                      ;
i          VII.a.3          Document Control - Revision 1 i
i          VII.a.4          Audit Program and Auditor Qualification -
,                            Revision 1 l          VII.a.5          Periodic Review of QA Program - Revision 1 i          VII.a.6          Exit Interviews - Revision 1
;          VII.a.7          Housekeeping and System Cleanliness - Revision 1
:          VII.a.8          Fuel Pool Liner Documentation - Revision 1 1
{          VII.b.1          Onsite Fabrication - Revision 1 i
j          VII,b.2          Valve Disassembly - Revision 1 4
i i          DSAPs
{          - Later -
l l
I l                                                                                        -
i l
i l
l i
i l
O
_}}

Latest revision as of 22:08, 9 July 2023