ML20072M395: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20072M395
| number = ML20072M395
| issue date = 11/08/1982
| issue date = 11/08/1982
| title = Responds to 821019 Ltr Re Emergency Appraisal Audit Items 82-01-39 & 72.Corrective Actions:Design Mod to Add HEPA & Charcoal Filters to Suction Side of Air Breathing Compressor Currently Being Completed
| title = Responds to Re Emergency Appraisal Audit Items 82-01-39 & 72.Corrective Actions:Design Mod to Add HEPA & Charcoal Filters to Suction Side of Air Breathing Compressor Currently Being Completed
| author name = Warembourg D
| author name = Warembourg D
| author affiliation = PUBLIC SERVICE CO. OF COLORADO
| author affiliation = PUBLIC SERVICE CO. OF COLORADO
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = P-82508, NUDOCS 8304010262
| document report number = P-82508, NUDOCS 8304010262
| title reference date = 10-19-1982
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 36: Line 37:
==Dear Mr. Madsen:==
==Dear Mr. Madsen:==


With reference to your letter dated October 19, 1982 (Reference 2),
With reference to your {{letter dated|date=October 19, 1982|text=letter dated October 19, 1982}} (Reference 2),
PSC offers the following response:
PSC offers the following response:
: 1. Appendix "A" Item 82-01-72 The design modification to add HEPA and charcoal filters to the suction side of the air breathing compressor is currently being completed by the Nuclear Engineering Division. Nuclear Engineering has not received a firm delivery date from the vendor for the charcoal and HEPA filter units as of this date but a reasonable delivery
: 1. Appendix "A" Item 82-01-72 The design modification to add HEPA and charcoal filters to the suction side of the air breathing compressor is currently being completed by the Nuclear Engineering Division. Nuclear Engineering has not received a firm delivery date from the vendor for the charcoal and HEPA filter units as of this date but a reasonable delivery
Line 48: Line 49:
: 2. Appendix "A" Item 82-01-39 At the time of the NRC Appraisal Audit, the area radiation and continuous air monitors had not been installed because the required material to complete the task had not arrived on site. To quote the NRC auditors, they have no choice but to take a " snapshot-in-time" and, therefore, wrote Item 82-01-39. The    air  monitor material      arrived subsequent to the Appraisal Audit and the area radiation and continuous air monitors were installed.          in PSC's response to the Appendix "A"        Items, Item 82-01-39 was, therefore, closed out.
: 2. Appendix "A" Item 82-01-39 At the time of the NRC Appraisal Audit, the area radiation and continuous air monitors had not been installed because the required material to complete the task had not arrived on site. To quote the NRC auditors, they have no choice but to take a " snapshot-in-time" and, therefore, wrote Item 82-01-39. The    air  monitor material      arrived subsequent to the Appraisal Audit and the area radiation and continuous air monitors were installed.          in PSC's response to the Appendix "A"        Items, Item 82-01-39 was, therefore, closed out.
During FOSAVEX 82,    it was discovered that the installed air monitors hindered telephone conversations due to a high noise level created by the air monitor compressor.
During FOSAVEX 82,    it was discovered that the installed air monitors hindered telephone conversations due to a high noise level created by the air monitor compressor.
The noise level was noted by NRC RERP Inspector and was written up in his report as Open Item 82-14-03.1.          PSC responded to the FOSAVEX 82 open items in a letter dated September 8, 1982 (G-82375) wherein it was stated that the instrument would be moved out of the TSC by January 1,1983. The Change Notice to move the air monitors has been completed by the Nuclear Engineering Division and is currently in the approval cycle. The January completion date looks to be on schedule.          This item is being not.itored via Item No. 759, Article 1, in the NRC Commitment Log.
The noise level was noted by NRC RERP Inspector and was written up in his report as Open Item 82-14-03.1.          PSC responded to the FOSAVEX 82 open items in a {{letter dated|date=September 8, 1982|text=letter dated September 8, 1982}} (G-82375) wherein it was stated that the instrument would be moved out of the TSC by January 1,1983. The Change Notice to move the air monitors has been completed by the Nuclear Engineering Division and is currently in the approval cycle. The January completion date looks to be on schedule.          This item is being not.itored via Item No. 759, Article 1, in the NRC Commitment Log.
Should you have any further questions regarding these Appraisal Audit findings, please give Mr. Milt McBride a call at (303) 785-2223.
Should you have any further questions regarding these Appraisal Audit findings, please give Mr. Milt McBride a call at (303) 785-2223.
Very truly yours,
Very truly yours,
                                                   ,10- }Y fYu ted Don W. Warembourg Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station DW/skr Attachment}}
                                                   ,10- }Y fYu ted Don W. Warembourg Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station DW/skr Attachment}}

Latest revision as of 20:54, 30 May 2023

Responds to Re Emergency Appraisal Audit Items 82-01-39 & 72.Corrective Actions:Design Mod to Add HEPA & Charcoal Filters to Suction Side of Air Breathing Compressor Currently Being Completed
ML20072M395
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/08/1982
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-82508, NUDOCS 8304010262
Download: ML20072M395 (2)


Text

-

',4',.

Ptibile service company oIP C dleta do

. 16805 WCR 19 1/2, Platteville, Colorado 80651

F W@LMl\VATT [  ;

November 8, 1982 Fort St. Vrain Pi > W I 5 llE a unit n

[_ j P-82508 am GW li---(& a :l[!:'j

_@  ;=!!_N' ",

Mr. Glenn L. Madsen, Chief !c Reactor Project Branch 1 Li U. S. Nuclear Regulatory Commission 611 Ryan Plaza Dr., Suite 1000 L

h :' E I5122 ui /j lp Arlington, TX 76012

SUBJECT:

NRC Emergency Appraisal Audit Items 82-01-39 and 82-01-72

REFERENCES:

1. PSC Letter, dated August 19, 1982, Warembourg to Collins (P-82238)
2. NRC Letter, dated October 19, 1982 Madsen to 0. R. Lee (G-82333)

Dear Mr. Madsen:

With reference to your letter dated October 19, 1982 (Reference 2),

PSC offers the following response:

1. Appendix "A" Item 82-01-72 The design modification to add HEPA and charcoal filters to the suction side of the air breathing compressor is currently being completed by the Nuclear Engineering Division. Nuclear Engineering has not received a firm delivery date from the vendor for the charcoal and HEPA filter units as of this date but a reasonable delivery

! time, dependent upon the purchase order specification, is usually 90 to 120 days. PSC's commitment to the NRC states that the HEPA and charcoal filters will be installed 60 days after the delivery of material which would make the expected installation date approximately March to April of 1983. This item is being monitored via Item No. 726, Article 1 in the NRC Commitment Log.

/

/

8304010262 821108 PDR ADOCK 05000267 G PDR

/[/

x', .

2. Appendix "A" Item 82-01-39 At the time of the NRC Appraisal Audit, the area radiation and continuous air monitors had not been installed because the required material to complete the task had not arrived on site. To quote the NRC auditors, they have no choice but to take a " snapshot-in-time" and, therefore, wrote Item 82-01-39. The air monitor material arrived subsequent to the Appraisal Audit and the area radiation and continuous air monitors were installed. in PSC's response to the Appendix "A" Items, Item 82-01-39 was, therefore, closed out.

During FOSAVEX 82, it was discovered that the installed air monitors hindered telephone conversations due to a high noise level created by the air monitor compressor.

The noise level was noted by NRC RERP Inspector and was written up in his report as Open Item 82-14-03.1. PSC responded to the FOSAVEX 82 open items in a letter dated September 8, 1982 (G-82375) wherein it was stated that the instrument would be moved out of the TSC by January 1,1983. The Change Notice to move the air monitors has been completed by the Nuclear Engineering Division and is currently in the approval cycle. The January completion date looks to be on schedule. This item is being not.itored via Item No. 759, Article 1, in the NRC Commitment Log.

Should you have any further questions regarding these Appraisal Audit findings, please give Mr. Milt McBride a call at (303) 785-2223.

Very truly yours,

,10- }Y fYu ted Don W. Warembourg Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station DW/skr Attachment