| NRC officer = Ernest West
| NRC officer = Ernest West
| event date = 04/24/2022 00:00 EDT
| event date = 04/24/2022 00:00 EDT
| last update date = 08/26/2022
| last update date = 12/16/2022
| title = Part 21 Report - Potential Defect in Quick Disconnect Connector Cable Assemblies
| title = Part 21 Report - Potential Defect in Quick Disconnect Connector Cable Assemblies
| event text = The following is a synopsis of information received via facsimile:
| event text = The following is a synopsis of information received via facsimile:
Line 33: Line 33:
To prevent this from reoccurring, Curtiss-Wright will implement an inspection activity to verify the absence of burrs and/or sharp edges of all fittings that could potentially cause damage which could prevent the items from performing its intended safety function.
To prevent this from reoccurring, Curtiss-Wright will implement an inspection activity to verify the absence of burrs and/or sharp edges of all fittings that could potentially cause damage which could prevent the items from performing its intended safety function.
For additional information, please contact Jim Tumlinson, Director of Operations (256-425-8037), Christopher Covan, Quality Assurance Manager (256-624-7301), or Tim Franchuk Director of Quality (513-201-2176).
For additional information, please contact Jim Tumlinson, Director of Operations (256-425-8037), Christopher Covan, Quality Assurance Manager (256-624-7301), or Tim Franchuk Director of Quality (513-201-2176).
Notified R3DO (Pelke), R2DO (Miller), and Part 21 Group (by email).
Notified R3DO (Pelke), R2DO (Miller), and Part 21 Group (by email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220829en.html#en55960
* * * UPDATE ON12/16/22 AT 0932 EST FROM CHRIS COVAN TO THOMAS HERRITY  * * *
The following is an update received via facsimile:
In pursuance of compliance to Federal Regulation 10CFR21, this letter is issued to provide an amendment for notification issued on June 24, 2022 of the potential defect in a configuration of the 11/2 Inch Quick Disconnect Connector cable assemblies supplied to Duke Energy for a total of 460 of connectors only supplied to Oconee, McGuire and Catawba Nuclear Power Stations. This increase of scope is due to new evidence provided by Duke Energy, where this potential defect was found in other lots of material other than the ones previously bound to this condition.
The nature of the defect is a sharp edge located inside of the supplied reducing bushing which could cause damage to the cables when being installed or removed. These cable assemblies and bushing need to be evaluated to determine if this potential defect has occurred or if there is a potential for damage to occur at the earliest convenience. To the best knowledge of the application, we believe that there is a very low risk of damage to the cable assemblies after installation but this needs to be evaluated at the plants. We have been working with Duke Energy and will continue to support them until this issue is resolved.
To prevent this from reoccurring, Curtiss-Wright will implement inspection activities to verify the absence of burrs and/or sharp edges of all fittings that could potentially cause damage and prevent the items from performing its intended safety function.
For additional information, please contact Jim Tumlinson, Director of Operation (256-425-8037) or Christopher Covan, Quality Assurance Manager (256-624-7301), or Tim Franchuk, Director of Quality (513-201-2176).
Notified R3DO (Ruiz), R2DO (Miller), and Part 21 Group (by email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221219en.html#en55960
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 07:30, 19 December 2022

ENS 55960 +/-
Where
Curtiss Wright Flow Control Co.
Middleburg Heights, Ohio (NRC Region 3)
Organization: Curtiss Wright Flow Control Co.
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+1473.55 h61.398 days <br />8.771 weeks <br />2.018 months <br />)
Opened: Christopher Covan
13:33 Jun 24, 2022
NRC Officer: Ernest West
Last Updated: Dec 16, 2022
55960 - NRC Website