ML20076C271: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-601847, Reactor Containment Bldg Integrated Leak Rate Test. W/ ]]
| number = ML20076C271
| issue date = 02/28/1991
| title = Reactor Containment Bldg Integrated Leak Rate Test. W/ 910710 Ltr
| author name = Spangenberg F
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-601847, NUDOCS 9107170181
| document type = TECHNICAL SPECIFICATIONS & TEST REPORTS, TEST REPORT
| page count = 235
}}
 
=Text=
{{#Wiki_filter:\                                                                                            U 601847
    ~
ILLINDIS POWER C1.IWTON POWER STATION P.O. DOX (178. CLINTON. ILLINOIS 61727 0678. IELLPilONE (217) 935-8881 Eid"'''"
July 10, 1991 10CFR50.54(o) 10CFR50 Appendix J, V.B Docket No. 50 461 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
Clinton Power Station - Unit 1 Reactor Containment Buildine Intecrated Leak Rate Test
 
==Dear Sir:==
 
Please find enclosed the Reactor Containment Building Integrated Leak Rate Test (ILRT) report for the ILRT completed at Clinton Power Station (CPS) on February 16, 1991 during the last refueling outage. The ILRT was successful in confirming the leak tightness of the containment. However, as explained further below, the test must technically be regarded as a failure because the as-found leakage rates for two containment penetrations, which should
,                  have been considered in the total integrated leakage, were not determined prior to reworking the penetrations during the refueling outage. Please note also that, via this letter, since the ILRT is regarded as a failure, IP is requesting NRC approval of the schedule for performance of the next ILRT in accordance with Technical Specification and 10CFR50 Appendix J requirements.
During the last refueling outage (RF-2) it was determined that a number of penetrations had not been properly tested in accordance with the Type B and C testing requirements of 10CFR50 Appendix J.
                  .These penetrations involved either (1) piping which did not terminate deep enough in the suppression pool such that it would remain
                -submerged under accident conditions, or (2) piping containing flanged connections which also were not submerged or located deep enough in the suppression pool. These penetrations were not previously considered to be potential air leakage pathways. Since they were considered to be water sealed pathways, these penetrations had previously been tested only with water.              During the RF-2 outage, it was determined that these penetrations did constitute potential air leakage pathways.* This determination required that these penetrations receive a local leak rate test with air to determine These discrepancies were subsequently addressed in NRC Inspection Reports 90-025 and 91-002, and in Licensee Event                              !
Report 90-018.                                                                      .[
              ' n"      oto7170181 910220,
(' gk adV                ADON 05000401 kDR                                                                                  1
: p.                    FDR
 
N s                          .
their as-found (pre ILRT) leakages prior to any rework or modification. However, maintenance was performed on certain potential leakage pathways associated with two of the penetrations, MC 18 and MC 87, prior to determining that the penetrations constituted air leakage pathways, No as-found leakage test data was therefore available for these two penetrations.                        Based upon this indeterminate leakage, the ILRT completed on February 16, 1991 is considered to be a failure relative to the as found condition of the containment.
It should be noted that, notwithstanding the failure to obtain the as-found leakages described above, the RF-2 ILRT was generally regarded as successful as a relatively large margin was shown to exist between the as-found ILRT leakage and the allowable leakage limit (excluding the unknown as-found leakages).                        IP believes that if the above-noted, as found leakages had been determined, the total as-found leakage would still have been well within the allowable leakage lieft.      This conclusion is based on past test experience with valves and flanges similar to those associated with penetrations MC-18 and MC 87, no visible indications of gross leakage from the affected valves and flanges (based on their general condition), and acceptable local leak rate test results obtained for the remaining leakage pathways associated with these penetrations.
Regarding ILRT failures, CPS Technical Specification 4.6.1,2.b and 10CFR50 Ap, mdix J (Section III. A.6) require that the NRC approve the scheduling of the next ILRT after any failure and that the testing frequency be increased to at least once per 18 months after two consecutive failures, until two consecutive tests are completed with satisfactory results. With respect to the former, IP is heteby requesting NRC approval of the schedule for performance of the next 11RT. The next ILRT is scheduled to be performed during the fourth refueling outage (RF 4) which is currently scheduled to begin October 3, 1993. With respect to the latter, IP understands the potential impact of determining that the RF-2 ILRT was an unsatisfactory test.
If the RF-4 ILRT yields unsatisfactory results. IP will address the requirement to perform subsequent ILRTs at an increased frequency at that time.
Sincerely yours,
                                                                          ,                  t
                                                                            '. A. pwev]        '
F. A. Spqngenberg, III Manager,ILicen(.ngandSafety TBE/alh Enclosure cc:    NRC Clinton Licensing Project Manager NRC Resident Office NRC Region III, Regional Administrator                                            l Illinois Department of Nuclear Safety (2)
 
l Illinois Power Company Reactor Containment Building Clinton Power Station          Integrated Leak Rate Test Unit 1 Final Report February 1991 O
                  \
          @    )        NRC Decket No. 50-461
(    /
                                    - - - - ~ - ~ _ . _ _
 
l l                                                                                                    - .
l ILLINOIS POWER COMPANY CLINTON POWER STATION UNIT 1 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST                                                      .
9-t FINAL REPORT NRC Docket No.
50-461 l
 
TABLE OF CONTENTS                                          -
SECTION P1qE
 
==1.0  INTRODUCTION==
 
1 2.0    TEST SYNOPSIS 2
3.0    TEST DATA
 
==SUMMARY==
 
4 4.0    ANALYSIS AND INTERPRETATION 12
 
==5.0  REFERENCES==
 
15 APPENDICES A. ILRT Computer Program Summary A-1 B. ILRT Stabilization Summary Data Tempereture Stabilization Sumnary Report                            B-1 Weighted Average Temperature Plot D-2 C. ILRT Summary Data Summary Data Report C-1 Instrumentation Schematic Arrangements                            C-2 D. ILRT Calculations Summary Data Report Trend Report                                                      D-1 D-2 Mass Point Analysis Total Tire Analysis D-3 D-4 Simulation Studies (RTD-19 not used) - Summary, Trend            D-5 E. Verification Test Summary Data Trend Report                                                      E-1 E-2 Mass Point Analysis Total Time Analysis                                              E-3 E-4 F. Plots Plots Entire Test (Stabill:ation, ILRT, and Verification)
Air Mass Temperature                                                      F-1 Pressure                                                          F-2 Vapor Pressure                                                    F-3 F-4 11
 
TABLE OF CONTENTS (cont'd) l SECTION                                                                                                            f.hGE APPENDICES (cont'd)
Plots - ILRT Air Mast                                                  F-5 Mass Point Leakage Rate and UCL                          F-6 Total Time Leakage Rate and UCL                          F-7 Weighted Average Temperature                            F-8 Weighted Average Pressure                                F-9 Weighted Average Vapor Pressure                          F-10 Plots - Verification Air Mass                                                F-11 Mass Point Leakage Rate and UCL                        F-12 Total Time Leakage Rate and UCL                        F-13 Weighted Average Temperature                          F-14 Weighted Average Pressure                            F-15 Weighted Average Vapor Pressure                        F-16 Plots - Data Rejection Data Rejection Report                                F-17 Plots - Individual Sensors Pressure Sensor 1 and 2                              F-18 RTD 1 thru RTD 25                                    F-20 Humidity Sensor 1 thru Humidity Sensor 9            F-45 G.                  Instrument Selection Guide Calculations                                                            G-1 H.                Drywell Bypass Leakage Rate Test                                                                    H-1 I.                  Type B and C Leakage Rate Test Results                                                                I-1 LLL
 
ACRONYMS                                                                ---
l ANS                        American Nuclear Society ANSI                      American National Standard Institute BWR                        Boiling Water Reactor cu.ft.                    Cubic Foot (Feet)
F.S.                      Full Scale FC                        Fuel Pool Cooling System ILRT                      Integrated Leak Rate Test ISG                        Instrument Selection Guide La                        Containment Allowable Leakage Lean                      Containment Measured Leakage Ibm                        Pounds Mass LLRT                      Local Leak Rate Test LOCA                      Loss of Coolant Accident LPCS                      Low Pressure Core Spray MOVATS                    Motor Operated Valve Analysis and Testing System MSIV                      Main Steam Isolation Valve MWR                        Maintenance Work Request Ops                        Operations P& ids                    Reference Drawings PCC                        Post Calibration Check PMT                        Post Maintenance Test psia                      Pounds per Square Inch Absolute poig-                      Pounds per Square Inch Gauge RF                        Refueling Outage RHR                        Residual Heat Removal System RTD                        Temperature Element sccm                      St'andard Cubic Centimeters per Minute scfm                      Standard cubic Feet per Minute TPD                      Temporary Procedure Deviation UCL                        Upper Confidence Limit USAR                      Updated Safety Analysis Report
  *F                        Dogrees Fahrenheit iv
 
3.0 TEST SYNOPSIS Prior to performing the integrated leakage rate tests, all pressure, temperature, humidity, and flow sensors were calibrated, and all temperature and humidit3 sensors were installed in the drywell and containment at the locations tabulatec in Table 1 of Section 3.0. An in-situ check was performed on all sensors per the requirements of ANSI /ANS 56.8 - 1981.          Per the requirements of 10CFR50, Appendi' J,
the containment was isolated by aligning systems in their specified post-accident modes, with the exceptions listed in Section 3.C.12 of this report, or February 7 and 8, 1991, a pre-ILRT Containment and Drywell structural inspectior was conducted.          No abnormal degradation or change in appearance was noted.
Pressurization for the Containment ILRT began at 0145 hours on February 15, 1991.
ILRT test pressure of 9 poig was reached at 0715 hours, Febru ary 15,                                1991.
Temperature stabilization commenced at.0715, February 15, 1991 and was completed 4.25 hours later.          Temperature stabilization data is presented in Appendix B.
Subsequent to the temperature stabilization period,                  an 8.00 hour ILRT was conducted from 1130 hours on February 15, 1991, to 1930 hours on February 15, 1991.      The Mass Point calculated leakage rate was 0.14001/ day with an upper confidence limit of 0.1447%/ day.            The Total Time calculated leakage rate was 0.1339%/ day with an upper confidence limit of 0.1865%/ day. Both upper confidence limits were less than the allowable leakage rate of 0.4875t/ day (75% of La). The Total Time calculations satisfied all short duration test requirements of BN-TOP-1, and the Mass Point calculations satisfied all short duration test requirements of ANSI /ANS 56.8-1981.
During the pressurization, the penetration 1MC-52 (FC supply) vent path filled with water thus eliminating the drained vent path required by 10CFR50, Appendix J. The penetration was left in the test lineup and a local leakage rate test (LLRT) was performed following completion of the ILRT.              The results of this LLRT are included in Section 4.0.
The verification test was initiated at 2000 hours on Feb ruary                                15,  1991 by continuously venting 13.10 acfm (97% of La) of air from the containment through a flowmeter and allowing test conditions to stabilize for one hour.                                A 4-hour verification test was conducted from 2100 hours on February 15,                              1991 to 0100 hours on February 16, 1991.          The Mass Point calculated and Total Time calculated verification leakage rates of 0.7390%/ day and 0.7275%/ day respectively, were within the required ranges of 0.6095 to 0.9345 and 0.6034 to 0.9284 g/ day respectively, to verify the performance of the ILRT instrumentation.
Following the verification test, the drywell was depressurized to 3 psig and the containment was depressurized to O pelg. The Drywell Dypass Leakage Rate Test was performed between 1545 and 2045 hours on February 16, 1991 at a test pressure of 3 pelg.          A drywell bypass leakage rate of 21.86 scfm was calculated from the pressure decay test. The calculated leakage satisfied the acceptance criteria of being  less than 4,312          scfm. The data and pressure decay leakage rata calculations are presented in Appendix H.            Following the      Drywell Bypass Leakage Rate Test, the drywell was depressurized.
i Page 2
 
==1.0 INTRODUCTION==
                                                                                                                        ~
Successful Integrated Leakage Rate (ILRT) and Drywell Bypass Leakage Rate (Bypass) tests were conducted on the Clinton Power Station Unit i reactor containment building between February 15 and 16, 1991, with restoration completed by March 2, 1991. These tests were performed to demonstrate that the containment leakage and drywell bypass leakage rates do not exceed the allowable values specified in the Clinton Power Station (CPS) Unit 1 Updated Safety Analysis Report (USAR) (Reference 1) and Technical Specifications (Reference 2).
The ILRT and Bypass tests were conducted in accordance with the requirements of the ILRT procedure (Reference 3), Appendix J to 10CFR50 (Reference 4), ANSI /ANS 56.8 (Reference 5), BN-TOP-1 (Reference 6), and ANSI N45.4 (Reference 7). Test pressures for the ILRT and Bypass tests were 9 psig and 3 psig, respectively.
Test results, which satisfied all acceptance criteria, are summarized below. The Total Time calculated Upper Confidence Limit                                                      (UCL)  provides the highest calculated leakage rate.        As a result, the leakage rates calculated using the Total Time method have been chosen to represent the ILRT results.
Test Results                                Allowable ILRT Mass Point Leakage Rate
* 0.1826%/ day                          0.4875%/ day ILRT Mass Point UCL'                                                O.1873%/ day                          0.4875%/ day ILRT Total Time Le gaae Rate
* 0.1765%/ day                          0.4875%/ day ILRT Total Time UCL*                                                0.2291%/ day                          0.4875%/ day Verification Mass Point Rate                                        0.7390%/ day                          0.6095 to 0.9345%/ day Verification Tetal Time Rate                                        0.7275%/ day                          0.6034 to 0.9284%/ day Drywell Bypass Leakage Rate                                        21.86 scfm                            4312 scfm Note: UCL is 95% Upper Confidence Limit Includes penalties for non-standard system alignment and water level changes. (See Section 4.0.)
A summary of the tesc events and test chronology is presented in Section                                                      2.0, Test Synopsis. Plant information, technical data, test results, and measurement system information are presented in Section 3.0, Test Data Summary. Test results are    compared to the acceptance                              criteria                      in  Section    4.0,  Analysis  and Interpretation. Referenced documents are listed in Section 5.0, References, i
Page 1
 
Following completion of the above testing, calibration checks were performed on the test equipment.          Temperature sensor RTD-19 was found to be outside of its tolerance by -0.289'T to -0.316*F.
The following actions were taken to determine the ;mpact of RTD-19 on the test results.
: 1)    A review of the test data was perforn ' which indicated that no shift in temperature for RTD-19 occurred during the test.
: 2)    Since RTD-19 censures temperature in an area similar to the area monitored by RTD-20, the test data from RTD-19 was compared with the test data from RT3-20. RTD-20 and RTD-19 produced similar temperature changes during the test.
: 3)    Assuming a complete failure of RTD-19, a trend report was run deleting RTD-19 data from the test results and adding the volume fraction assigned to RTD-19 to RTD-20.
Based on the results of the above actions, no significant test results shifts wera observed and as such, no adjustment uas made to the reported leak rate in respc.tse to RTD-19 f ailing the Post Test Calibration Check.
Page 3
 
3.0                          TEST DATA
 
==SUMMARY==
 
A. Plant Information Owner                                                                                                    Illinois Power Company Docket No.:                                                                                              50-461 Planta                                                                                                  Clinton Power Station, Unit 1 Location:                                                                                                Clinton, IL containment Type                                                                                        Mark III NSSS Supplier, Typos                                                                                    General Electric, BWR Date Test Completed:                                                                                    February 16, 1991 Restoration Completed:                                                                                  March 2, 1991 s
B. Technical Data
: 1.                            Containment Free Air Volume
: a.                                            Drywell Free Air Volume                        246,500 cu. ft.
(Normal weir wall water level, el.
731'-5")
: b.                                              Containment Less Drywell Volume            1,550,800 cu. ft.
(Suppression Pool water level, el.                            3 731'-5")
: c.                                              Total Volume (Suppression Pool              1,797,300 cu. ft.
level, el. 731'-5")
: d.                                              Drywell Free Air Volume (Start                245,413 cu. ft.
of test weir wall water level, el.
731'-8")
: e.                                              Total volume (Start of test                1,795,400 cu. ft.
Suppression Pool level, el.
731'-8")
: 2.                            Containment Design Pressure                                                                15 psig Containment Design Temperature                                                              185'F
: 3.                              Peak Accident Pressure, Pa                                                                  9 psig
: 4.                              Containment ILRT Average                                                                  40 - 120'F Temperature Limits C. Test Results - Type A Test
: 1.                          Test Method                                                                                Absolute
: 2.                          Data Analysis Techniques                                                                  Mass Point Leakage Rate per ANSI /ANS 56.8-1981; Total Time Leakace Rage per BN-TOP-1 Page 4                                        l 1
: 3. Test Pressure                                                      9 psig
: 4. Maximum Allowable Leakage Rate,                      L,          0.65%/ day 5,  75% of L,                                                          0.4875%/ day
: 6. Measured Integrated Leakage                              Leakace Rate                      EqLa Rate Test Resul s (Not including corrections, see Section 4.0)
Mass Point Analysis                                      0.1400%/ day                      0.1447%/ day Total Time Analysis                                      0.1339%/ day                      0.1965%/ day
* 95% Upper Confidence Limit
: 7. Imposed Verification Leakage                            0.632%/ day (13.10 scfm)
Rate (Pressure and temperature compensated value during verification test.)
: 8. Veriff;:ation Test Results                              Leakaoe Rate, %/ day Mass Point Analysis                                              0.7390 (pg. 2)
Total Time Analysis                                              0.7275
: 9. Verification Test Limits:                                Test Limi*s, %/ day Mass Point Analysis Upper Limit (La +L  am + 0.25 L,)                            0.9345 Lower Limit (L a  +L am - 0.25 L,)                            0.6095 Total Time Analysis Upper Limit (La +L  am + 0.25 L,)                            0.9284 Lower Limit (La +  L,, - 0.25 L,)                            0.6034
: 10. Report Printouts:
The report printouts and data plots for the ILRT and verification test calculations are provided in Appendices B through F.
i.
Page 5
 
l f            11. Containment Water Volume Changes during the ILRT l
Level changes which occurred during the time between reaching test pressure and completing the verification test.
Level Volume              EhaG92 Drywell Floor Drain Sump                                                    +435.77 cu.ft.        (+9.33')
containment Floor Drain Sump                                                  +18.67 cu.ft.        (+1.16')
Containment Equipment Drain Sump                                              +2.78 cu.ft.        (+2.5")
Reactor Pressure Vessel                                                        -4.6 cu.ft.        (-2.5")
: 12. Penetrations not in Post-LOCA Alignment during ILRT.
: a.      The folAowing penetrations were utilized during the ILRT Penetration                          System                                          Leakaoe Rate IMC-67                      Containment Pressurization                                    O scem*
1hC-152(1)                  ILRT Instrumentation                                          5 seem 1MC-152(2)                  ILRT Instrumentation                                        30 seem 1MC-152(3)                  ILRT Instrumentation                                        20 seem Leakage Rate as a result of post-ILRT Local Leak Rate Test
: b.      The following penetrations were in an operational line-up during the ILRT.                                                                          ,
Leakage Rate Penetration                      System                                              (Minimum Path)
IMC-9                  Feedwater "A"                                                380 seem 1MC-10                  Feedwater "B"                                                  35 seem IMC-15                  RHR A                                                        137.2 scem IMC-16                  RHR B                                                        3035.5 seem 1MC-36                  LPCS Injection                                                20 seem 1MC-42                  Valve 1E12-F023 only                                          140 seem 1MC-52**                FC Supply to Containment                                      370 seem IMC-56                  Fire Protection                                                95 scem 1MC-81                  Fire Protection                                                92.5 seem 1MC-82                  Fire Protection                                              350 scem
                  ** Vent path not drained Page 6
 
l
: c. The following penetrations were modified during the second refueling outaca and no longer represent containment leakage pathways (reference CPS Licensee Event Report 90-018 for further details)
As-Found Ponetration                                    Svetem                      Leakace Rate 1MC-89                                        RHR A                                5 seem 1MC-172                                      RHR B                                0 seem 1MC-18                                        RHR A                                    **
1MC-20                                        RER B                              410 scem 1MC-24                                        RHR A                                  ***
1MC-26                                        RHR B                                  ***
1MC-87                                        RHR A                                    **
          **    Not tested, below normal suppression pool water level IMC-44 (1E51-F078) represents the minimum pathway leakage for these penetrations D. Test Results - Drywell Bypass Leakage Rate Test
: 1. Test Method                                            Absolute
: 2. Data Analysis Technique                                Pressure Decay per Procedure CPS 9861.01D005
: 3. Test Pressure D rywell                                      3.0 psig containment                                    0.0 psig
: 4. Maximum Allowable Bypass                              4,312 scfm Leakage Rate
: 5. Calculated Bypass Leakage                            21.86 scfm Rate
: 6. Report Printouts The report printouts for the Drywell Bypass Leakage Rate Test                                            are provided in Appendix H.
E. Test Results - Type B and C A summary of local leakage rate test results is provided in Appendix I.
l l
Page 7
 
F.                      Integrated Leakage Ratu Measurement System Instrument
(# of Sensors)    Description      Data
: 1. Absolute        volumstric        Range:            0-30 psia Pressure        PPM 1000        Accuracy:        0.005% F.S.
(2)                              Sensitivity:      0.001% F.S.
Repeatabilitys**  0.001 psia Calibration Date  12/7/90
: 2. Drybulb          Volumetric      Range            60-100*F Temperature    100 ohm          Accuracy:*        0.20*F (25)            Platinum RTD    Sensitivity:      0.01*F Type A Model    Repeatabilityt**  0.01*F 385              calibraticn Date:  12/5/90
: 3. Relative        Phys, chem.      Range:            10-100% R.H.
Humidity        Research        Accuracy:          2*F dew point (9)    .
Sensitivity:      0.5*F dew point Repeatability **  0.01% R.H. dew point calibration Date:  12/6/90
: 4. Flow Meter      Brooks          Range:            0-17 sefm (2)            Rotameter        Accuracy:          1% Reading Modal No. 316    Sensitivity:      1% F.S.
Repeatability:    1% F.S.
Calibration Date:  11/19/90 Accuracy is for the measurement system including the Fluke 2280B Data Logger used in the 3-wire accurate mode, provided that the data logger has been calibrated within the previous 90 days. The 2280B calibration date was 12/4/90.
Repeatability (resolution) of Fluke 22808 Data Logger display.
Drybulb and dew point temperature sensor locations and volume fractions are provided in Table 1.
The calculated ISC for the test is 0.04005 %/ day, as shown in Appendix G.
Page 8
: l.                                                                                      TABLE 1                                                                          -
I l
;                        Drybulb and Relative Humidity Sensor Location and Volume Fraction DRYBtTLD TEMPERM RTD            Elevation                                                      Azimuth          Distance From                                            Volume Egnggg            Feet
* Decree
* ggnigr, Feet
* Fractign 1              900                                                            0                                                                  25  0.070 2              900                                                          180                                                                  25  0.070 3              872                                                            90                                                                  30  0.070 4              872                                                          270                                                                  30  0.070 5              854                                                            0                                                                  30  0.046 6              854                                                          180                                                                  30  0.046 7              845                                                            0                                                                    0  0.046 8              837                                                            90                                                                  40  0.046 9              837                                                          270                                                                  40  0.046 10                816                                                            6                                                                  45  0.010 11                816                                                          310                                                                  45  0.046 12                816                                                          120                                                                  45  0.046 13                791                                                            60                                                                  50  0.038 14                791                                                          225                                                                  50  0.038 15                767                                                          135                                                                  50  0.038 16                767                                                          315                                                                  50  0.039 17                743                                                            45                                                                  50  0.042 18              743                                                          225                                                                  50  0.042 19
* 787                                                            0                                                                  25  0.033 20                769                                                          123                                                                  25  0.033 21                751                                                          180                                                                  25  0.033 22                732                                                          270                                                                  25  0.033 23                729                                                            0                                                                    4  0.004 24                818                                                            0                                                                  9  0.003 25                770                                                            0                                                                  50  0.012
 
TABLE 1 (cont'd)
RELATIVE fiUMIDITY**
Humidity                  Assigned    Elevation    Azimuth      Distance From                          Volume ggnigt                    RTD***      F9et*      Decree
* Center. Teet*                          Fraction 1                      1,2,3,4        895            3                                            25  0.140 2                      1,2,3,4        867          95                                            31  0.140 3                      5,6,7,8,9      852          180                                            31  0.116 4                      5,6,7,8,9      838          272                                            44  0.116 5                      11,12          814          91                                            45  0.094 6                      13,14,15,16    789          225                                            55  0.128 7                      17,18          744          50                                            54  0.128 8                      19,20,21,22    785            0                                            26  0.069 9                      19,20,21,22    749          180                                            23  0.069 Elevations and distances to nearest foot; azimuths to nearest degree.                                    Sensor location tolerances:              radius and elevation 23'-0", Azimuth 25', except radium and-elevation are 25'0" in the containment dome.
Vapor Pressura = (%R.H.) (Saturation pressure at drybulb temperature)
Tg = RTD Temperature DrybulbTemperature=[c<tt              T    /ht Cw;g = RTD Volume Fraction f
Page 10
 
l F. Information Retained at Plant                                                -
The following information is available for review at the facility:
: 1. Access control procedures that were established to limit ingress to containment during testing.
: 2. A listing of all containment penetrations, including penetration size and function.
: 3. A listing of normal operating instrumentation used during the leakage rate test.
: 4. A system line-up (at time of test), showing required valve positions and status of piping systems.
S. A continuous, sequential log of events from !.nitial survey of containment to restoration of all tested systems.
: 6. Documentation of instrumentation cslibration and standards.
: 7. The working copies of test procedures that include signature sign-off of procedural steps.
: 8. The procodure and all data that will verify completion of local leakage testing (Type B&C tests).
: 9. Computer printouts of Integrated Leakage Rate Test Data.
: 10. The Quality Assurance Audit plan or checklist that was used to monitor ILRT with proper sign-off.
: 11. A listing of all test exceptions.
: 12. Description of sensor malfunctions.
: 13. Description of method of leak rate verification of instrument measuring system (superimposed leakage), with calibration information on flowmeters.
: 14. The PGIDs of pertinent systems penetrating the containment or affected by ILRT.
: 15. Drawings showing location of all temperature and humidity sensors.
Page 11
 
l 4.0                                          ANALYSIS AND INTEBPRETATION 4.1                                          ILRT Test During the                                                                                              ILRT,      the  following penetrations were not                in their post-LOC alignment.                                                                                            The penetrations and their Type C mininium path leakage rates ar given below:
Penetration                                                                                                                      System                                Leakace Pate 1MC-9                                                                                                                Feedwater    "A"                                380    seem IMC-10                                                                                                                Feedwater    "B"                                  35    seem
                                                    ."'C- 15                                                                                                              RHR A                                            137.2 seem IMC-16                                                                                                                RHR B                                          3035.5 seem IMC-36                                                                                                                LPCS Injection                                    20    seem 1MC-42                                                                                                              1E12-F023 (only)                                140    seem 1MC-52*                                                                                                              FC Fuel Pool Cooling                            370    seem IMC-56                                                                                                              Fire Protection                                  95    seem 1MC-67                                                                                                              Containment Pressurization                          O  seem 1MC-81                                                                                                              Fire Protection                                  92.5 secm 1MC-82                                                                                                              Fire Protection                                  350    seem 1MC-152(1)                                                                                                          ILRT Instrumentation                                5  seem 1MC-152(2)                                                                                                          ILRT Instrumentation                              30    seem 1MC-152(3)                                                                                                          ILRT Instrumentation                              20    seem NA**                                                                                                                  MSIV Dash Pots                                    26.6 seem Total 4736.8 seem (0.1672 sefm)
Penetration 1MC-52's vent path filled with water during the test. Since the outboard vent path could not be drained during the test, a local leak rate test was performed following completion of the ILRT.
MSIV Dash Pots were not vented prior to the test; therefore, the volume of the dash pots was converted to seem leakage and added as potential containment inleakage.
ILRT Correction =                                                                                                (.1672)(2400)f60)(14.7)
                                                                                                                                                                                                  %/ day (1,795,400)(24.02)
                                                                                                                                                                = .0082%/ day Page 12
 
The following containment water volume increases were measured during the ILRT.                                    ~I Dryvell Floor Drain Sump                              435.77                          cu. ft.
Containment Floor Drain Sump                                    18.67                cu. ft.
Containment Equipment Drain Sump                                          2.79      cu. ft.
Total        457.22                          cu. ft.
ILRT Correction =      f457.22)f2400)
(1,795,400)(17.75)
                    = .0344%/ day Based on the assumption that the entire water volume change occurred uniformly during the 17.75 hour period beginning with reaching test pressure and ending with ccmpletion of the verification test.
4.2 The total leakage rate for penetrations not in post-LoCA alignment and water volume changes is 0.0426%/ day.
The calculated leakage rates during the ILRT were 0.1400%/ day (mass point) and 0.1339%/dav (total time).        The calculated 95% upper confidence limits were 0.1447%/ day (mass point) and 0.1865%/dav ftetal time).                                      Adding the total leakage rate correction for penetratione not in post-LOCA alignmenc and containment water volume changes yields the corrected leakage rates as follows:
Leakace Rates. %/dav M3es Point                                                  Total Time MahiS2 Pate          M.QL      Makace Pate                                          ILql Calculated        0.1400          0.1447                          0.1339                          0.1965 Corrections        0.0426          0.0426                        0.0426                            0.0426 Corrected          0.1826          0.1873                        0.1765                            0.2291 Since the corrected 95% upper confidence limits for both mass point and total time are less than 0.75 L, (0.4875%/ day), the test results demonstrate that the leakage through the primary containment and systems and components penetrating primary containment does not exceed the allowable leakage rate specified in the Clinton Power Station, Unit 1, USAR and Technical Specifications,                                                    j As-Found-Additions The "As-Found" Type B&C addition is 75687 seem (2.67 scfm).
As-Found Addition =      (2.67)(2400)f60)(14.7)
(1,795,400)(24.02)
                          = .1311%/ day Page 13
 
This Type B & C addition consists of the difference between the as-found and as-left '.eakages for those penetrations for which repairs or adjustments were performed during the refueling outage prior to the ILRT. In addition, this Ty      4 & C addition included the as-found leakage of the penetrati,      hich were modified during the refueling outage. Excluded frs    he Type B & C addition were the as-found leakages for two penetrations, IMC 18 and IMC-87 which were reworked and subsequently modified during the outage. Specifically, one leakage barrier in each of.these penetrations was reworked prior to obtaining as found test leakage values. (Reference Licensee Event Report 90 018). Failure to obtain the as-found leakages prior to rework, however, constitutes a non-compliance with requirements of 10CFR50 Appendix J, section III as further amplified by Information Notice 85-71.
l l'
Page 14
 
5.0 BEf]SE.tigf1 i
: 1. Clinton Power Station, Updated Safety Analysis Report (USAR).
: 2. Clinton Power Station, Technical Specifications.
: 3. Clinton Power Station Surveillance Test Procedure CPS 9861.01, " INTEGRATED LEAK RATE TEST", Revision 21.
: 4. Code of Federal Regulations, Title 10, Part 50, Appendix J, " Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors".
: 5. ANSI /ANS 56.8-1981, " Containment System Leakage Testing Requirements".
: 6. Bechtel Topical Report BN-TOP-1, " Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants",
Revision 1, 1972.
: 7. ANSI /N45.4-1972, " Leakage-Rate Testing of Containment Structures for Nuclear Reactors".
Page 15
 
APPENDIX A ILRT Computer Program Summary i
i
 
BCP TECIINICAL SERVICES,1NC.
USER'S-PROGRAMMER'SMANUAL FOR ILLINOIS POWER COMPANY'S CLINTON POWER STATION ILRT PROGRAM Prepared By: Mdeh      M I/3du.p_
Reviewed By;a',.,.f-  E.            7 Approved By:    .c e g / [& h      A
                                      ,e                    ,/
I 1
4 h
    -e-n---
 
BCP Technical Services, Inc.
User's and Programmer's Manuni Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1      910315 TABLE OF CONTENTS Section                        Tih.-                                        EAga.
1.0                  Puqx)se                                                3 2.0                  References                                            3 3.0                  Definitions                                            3 4.0                  Program Data                                          3 4,1                          User Information                              3 4.1.1                                Preliminary                          '3 4.1.2                                Starting                                4 4.1.3                                Data Input and Deletion                8 4.1.4                                Reports                                8 4.1.5                                Corrections                            10 4.1.6                                ' Utilities                            11 4.1.7                                Plots                                  12 4.1.8                                Air' Mass                            13 4.1.9                                Leakage Rates                          14 4.1.10                        Temperature                                    14 4.1.11                        Pressure                                      14 4.1.12                      Dew Point / Vapor Pressure                    14 4.1.13                        Overlay                                      15
                                                                  ~
4.1.14                        Plot Utilities                                16 4.2                          Programmer Infonnation                        16    j 4.2.1                                Programming Language                  16 4.2.2                                Mass Point Leakage Rate                16 4.2.3                                Total Time Leakage Rate                17 4.2.4                                Air Mass                              18 4.2.5                                Data Rejection                        19 4.2.6                                Verification, Upper and Lower Limits  20 4.2.7                                Temperature Stabilization              21 4,2.8                                Global Variables                      22 4.2.9                                Passed Variables                      24 4.2.10                        Data Storage Stmeture                        24 4.2.11                        Compiling and Linking                        26 5.0                  Attachments                                          27 Attachment 5.1      Program Verifications Attachment 5.2      Progmn Listing 2
                  ,W                                                                  #
 
BCP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated leakage Rare Testing Computer Program
-Revision 1        910315 1.0    PURPOSE
          'Ihe purpose of this manual is to prcrvide the users and programmers of the BCP Integrated Iealoge ihte Testing program with an understanding of the program structu e and coding raethods. The level of detai's provided is adequate for all required progr:an modification and maintenance.
 
==2.0      REFERENCES==
 
a)      BCP Quality Assurance Manual b)      Microson QuickBASIC, Version 4.5 c)      10 CFR 50, Appendix J d)      ANSI /ANS-56.8-1981 c)      BN ','OP-1, Revision 1 3.0      DEFRnTIONS None.                                                                                                  .
4.0      PROGRAM DATA 4.1      Ur.cr Information 4.1.1 Preliminary Time is always entered as hhmm, or hmm for hour < 10, where hh = hours ( 00 23 )
mm = minutes (00-59 )
Date is always entered as mmdd, or mdd for month < 10, where mm = month (01-12) ad = day ( 1 - number of days in month )
3
 
BCP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1                  910315 4.1.2 Starting the Program The program is started by entering the command "ilrt".The program first displays a screen showing infonnation about the program, including version number.
Note: In order to enable graphics output to the printer, \ dos \ graphics.com (or equivalerit) must be executed before executing the ILRT program.
After pressing any key, the program displays this message:
Reload an existing data file ?
Press the [y] key if the data file for this test has already been created during a previous run and user wants to use or append to the existing data. Otherwise press the [n] key.
The pr6 gram will now prompt. the user for the data file name.                          ,
If user pressed [y]above, the program will ask:
Enter data file name'?
Or, if user pressed (n) above, the program will ask:
Enter new data file name ?
Enter the aata file name in the format 'ilename. extension, where, filename is I to 8 characters , and extension is 1 to 3 characters.
4
 
3CP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated I.cakage Rate Testing Computer Program Revision 1      910315 If the user is reloading an existing data file, the program wil! load the data from the file and then display the main menu.
If the user is starting a new data file the program will prompt the user for the following pre-data:
enter ' title (40 characters max.)- up to 40 characters whlen will be printed as a heading on reports and plots      .
leap year (y/n; default = n) - press (y] for yes, (n) for no number of temperatures (1 - 40) - enter the number of temperature sensors l
number of humidities (1 - 10) - enter the number of relative humidity sensors number of pressures (1 - 2) enter the number of pressure wasors free air volume, cu.ft.- enter the containment free air volume to be used          .
as the default value in all data sets.
12, %/ day - enter the allowable leakage rate'.                                      !
The program will then prompt the user to enter the temperature, relative humidity, and pressure sensor volume fractions.
After prompting the user through a correction routine (see "cp" option), the pre-dtta is saved and the program prompts the user to enter the number of pressure calibration points and the pressure calibration table-(see "pt" option).
The user is then prompted to enter the humidity sensor-rtd 'able. (See "th" option).
The PROGRAM OPTIONS are then displayed:
5
                                                                                              --.-_---_a
 
BCP Technical Sevices, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Prognm Revision 1                910315 P Pb O G R> A M 6;P T I O N S~
DATUINPUT/DELETIONi                                            '
                                                                                                                  ~ REPORTS 4
a                .      ..
  .              da =' enter $lats set t ,                                      "~                                                                                    ~
                                                                                                                                    ~11 = list all data sets (reduced) ds '=' delete aidataisht -                                                                                          dr = one' data set (raw & reduced) un = undelete a data set                                                                                            mp = mass point 'eak rate                    '
er = erase a ' deleted data set!                                                                                    tt = total time leak rate tr = trend (mp & tt)'
CORRECTIONS:                                                                                                        . dr = data rejection                          .
st = temperature stabilization.
              > cd~ = correct a data set-cp(=/ correct; pre-datsD                                                                                PLOTS-ecy = correct: verification pre-datal
                  ' V-              -
                                                                                  .. W                                          . p1 = Plot Options UTILITIES                                          ,J tid =' change stSt/cr d tid [                                                                                        ex = exit; program                    ._  _
bu = thekup datalfilel                                                                                                bn = BNTOPl> =24hr(toggle on/off)
                'd6.:= branchito DOSn. _ . . .                                                                                                                    .
ve; =1. verification L(toggle on/offi or enter perificati6n~ prenta)
: pt ;= review / print or edit.' pressure 1calibmtion1 table
                                                                      ~
Jrh = review, print or edit humidity sensor rtd~                                                                                        a        table Enter OptionT                                                          ,
The desired option is selected by entering the two-letter code. If the "pl" option is selected, the PLOT OPTIONS are displayed. An explanation of each option follows.
6
 
                                                                                                        ~
BCP Technical Services, Inc.                                                                              -
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1      910315 Note :        Reports and plots are generated in the range specified by the current start and end times. (See "ti" option).
4.1.3 Data Input and Deletion The following commands are used to enter and delete information:
da -  Enter a data set from the keyboard (i.e., time, date, free air volume, and sensor readings). After prompting the user though a correction routine (see "cd" option), a data set report is generated.
Note:          The data set is automatically sorted into its correct chronological order.
de -    The data set corresponding to the user input time and date is deleted from all leakage rate calculations. All reports will show that the data set has been deleted and the data point will not be plotted.
                                                                                                            ~
un -  The data set corresponding to the user input time and date is restored (un-deleted).
er -  Removes (erases) a deleted data. A removed data set does not show up on any reports or plots. Also, a removed data set cannot be recovered, except by editing the data file. (See lord %( ) variable in programmers manual.)
4.1.4 Reports Generate reports using the following commands:
11 -    DATA SUhDdARY REPORT. Displays data set number sme, date, temperature, pressure, vapor pressure and dry air mass fa. dl data sets.
7                                                          ;
l
 
BCP Technical Services, Inc.
User's and Psogrammer's Manual Blinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1    910315 dr -  DATA SIT REPORT, for the data set with user input time and date.
Displays cata set number, time, date, sensor data (raw data and calibrated values), weighted average tempenture, pressure and vapor pressure, and volume and dry air mass.
mp - MASS PCWI' LEAKAGE RATE REPORT (ANSI /ANS 56.8- 1981).
Displays data set mtmber, time, date, elapsed time, dry air mass, mass point leakage rate and UCL for all data sets. Also displays allowable and 75% of allowable leakage rate ( or upper and lower limits in verification mode),
tt -  TOTAL TIME LEAKAGE RATE REPORT (BN-TOP-1, rev 1.).
Displays data set number, time, date, elapsed time, dry air mass, total time measured leakage rate, leakage rate (calculated) and UCL for all data sets.
Also displays allowable and 75% of allowable ( or upper and lower limits in veification mode),
tr -  TREND REPORT. Displays data set number, time, date, clapsed time, total time measured ~1eakage rate, leakage rate (calculated) and UCL , and mass point leakage rate and UCL for all data sets.
rj -  DATA REIECTION REPORT (ANSI /ANS* 56.8- 1981). Displays data set number, time, air mass, linear least square fit (air mass), residual from least :quare fit, standard error of residual and standardized residual for all l                                                                                                  data sets. Data sets rejectable at the 1% and/or 5% rejection levels are marked by asterick (*). Also displayed are the 1% and 5% rejection level values.
l l                                                                                            st -  TEMPERATURE STABILIZATION REPORT (ANSI /ANS 56.8- 1981 l                                                                                                  and BN-TOP-1, rev 1.). Displays start time and data, data set number, l
clapsed time, tempen.ture, I hour and 4 hour average rates of temperature change and difference (ANSI criteria), and 2 hour average rate of temperature change and 2 hour average change in rate of temperature change, i.e.,second derivative, (BN-TOP-1 criteria) for all data sets. Data l
points which satisfy temperature stabilization criteria are marked with an asterick (*).
8
 
BCP Technical Services, Inc.                                                                      .
T User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1                                910315 4.1.5- Data Corrections Use the following commands to correct the data set:
cd -            Correct the data set with user entered time and date. Time, date, volume, sensor temperatures, and relative humidity and/or pressures can be changed for a data set. If time and/or date is changed, the data set will be re-sorted into its correct chronological order. Responses to the correction                                                                                                                      l menu line are:                                                                                                                                  -
time - to change the time -
date - to change date volume - to change free air volume                                                                                                                                                              -
t <to change a' sensor temperature h - to change a sensor relative humidity p - to change a sensor pressure After entering "t',"h",or "p",the                                          "
user is prompted for the sensor number and sensor value. ~                                            .                                                                                                                                          .
                                                - cp -            Correct pre-data. The following pre-data can be corrected: title, free air volume, allowable leakage rate (L), leap year (toggled on\off) and the sensor volume fractions. If the free air volume is changed, the user is asked if the volume should be changed for all existing data sets. The responses to the menu line are:                                                                                                                                                                  i title _- to change title volume - to change free air volurne.
la - to change allowable leakage rate.                                                                                                                                                            .
leap - to toggle leap year yes/no vf- to change a volume fmetion; responses to next menu line are:
t - to change a temperature volume fraction h - to change a relative humidity volume fraction p - to change a pressure volume fraction 9
g  emmi,.mpe.g-mpgw. g+me+.6ww.--,4megy-mm-.w.,,-,v.g.pg.gy.                  ,ag,-sy--W    Pde'WBur 's9:'T  ''*w'M'-**-    ==9eT  h- -=m-we wg 'y -=vg-'Tfi'eg'-myMrW9"''C-T1re-t w-wg-e wyc e
* as w p' F*W'yse-1''s, @- 9rMM' dol'WF* f ''9''T''f'''iP'"
 
BCP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1                              910315 After entenng "t",*h',or "p*the user is prompted for the sensor number and sensor volume fraction.
Note :                                                                      'Ite number of sensors cannot be changed. To delete a sensor, set its volume fraction to zero, cv -                            Correct verification pre-data. The imposed leakage rate, the ILRT calculated mass point leakage rate and total time leakage rate can be changed. The responses to the menu line are:                                                          -
lo - to change imposed leakage rate Imp - to change mass point leakage rate lit - to change total time leakage rate After entering 'lo",*1mp",or "Itt",the user is prompted te enter tne leakage rate.
4.1.6 Utilities The fol'.owing are the progr'am's utility commands:
ti -                              Change the current start and end time. The start and end time defines the time interval for all reports and plots.                                      -
vc -                              Toggle the verification mode on/off. When toggled on, the user has the option to change the verification pre-data.
bu -                                Backs up the data file to a floppy disk in drive A: and to the default drive subdirectory, \ BACKUP. '
i 10
 
                                                                                                    ~
BCP Technical Services, Inc.                                                                          -
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1      910315 do -  Dmnches (shells) to DOS. The program is re-entered after the user types
                " exit"on the DOS command line. '
pt -    Review, print or edit the pressure calibration table. The user is first asked to enter or verify the number of pressure calibration points (2-25) in the table. The pressure calibration table is then displayed. The displayed pressure calibration table is fixed at 2 sensors. If the number of pressure sensors is 1,only enter values for pressure sensor 1.
To edit the table, press "c"; values can then be changed in the displajed cells.
Note: The edit mode is automatically turned on for the initial entry of the table.
To print the table, press "p". To exit the option, press "x". The curser is moved around the table by using the direction keys. The table scrolls on the screen if the number of calibration points is greater than 19.
rh -    Review, print or edit the relative humidity sensor-rtd table. The rtd numbers for a I;iven humidity sensor are used to calculate the dry bu!b                .
temperature used in the vapor pressure calculation.
To edit the table, press "e"; values can then be changed in the display cells.
Note: The edit mode is automatically turned on for the initial entry of the table.
To print the table, press "p". To exit the option, press "x". The curser is moved around the table by using the direction keys.
bn -    Toggle on/off DNTOP195% UCL calculation for elapsed times greater than or equal to 24 hours.
          ' Warning -Data tmnsmitted from the data acquisition system via the RS 232 interface cannot be read by the program and will be lost when the "bu" and "do" options are invoked.
11
 
BCP Technical Services, Inc.
User's and Programmer's Manual                                            -
Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1                910315                      .
OFF - Total time 95% UCL for elapsed tim'es greater than or equal to 24
* hours uses the formulation given in the Programmers Manual Total-Time I.makage Rate. That is, t!.e more conservative UCL calculation is turned off at 24 hours. ( Afsult = OFF) 4 ON - Total time 95% UCL for elapsed times greater than or equal to 24                                                                                                      i hours uses the formulation given in the Programmers Manual Total Time Leakage Rate for elapsed times less than 24 hours. That is,                                                                                              _;
                                                      - the more conservative calculation is not turned on at 24 hours,                                                                                                ;
ex -            Exit the program 4.1.7 Plots The following are general guidelines for performing a plot:
pl -            Displays the PLOT OPTIONS menu:
a f-F 12
.anaW  ***-w-7    m  *m- m  ---=7-^w-w--    -Ag.-.-    --_a--d-        vi--ee----rea;'v    an ==rw m www tiremewa gse--s--w+-tw  rrn r we +w v-- ep t-en - w- e + w-e +dF's- e-D-v7*-  #E4 6m--+r+"+*W +e r=*r
 
                                                                                                                                ~
BCP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1        910315 P L O .T' O P T 1 O N S
        ' AIR MASS                                                    -
LEAK RATES '
am = air mass;                                                      imp ~ = mais point tt = total time TEMPERATURE                                                        '.._              .
OVERLAY
          - te = one temperature or average                      '
                                                                                                                              ~
at = all temperatures- + one highlighted                            oy = overlay ofleak rates, mass, temperature, PRESSURE                                                                    pressure, and/or vapor pressure pr = one pressure or average -
ap = all pressures + one highligised                                  UTIIJTIES HUMIDITY / VAPOR                                        PRESSURE        .tl = changej start /end - time-ex = Progtum Options hu = lone humidity or avegge vapor pressure
          . ah = all humidities. + one highlighted                                                                                -
Ender Option 7                                            -
The desired option is selected by entering the 2 letter code. An explanation of each option follows, a)      Air Mass am - Plots the air mass (solid line), regression line (dotted line), and 75% La line (dashed line). In the verincation mode the 75% La line is replaced by the upper and lower verincation leakage rate limit lines.
i 13
 
BCP Technical Nervices, Inc.
User's and Programmer's Manual 1111nois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1          910315 i
b)    I.cakage Rate mp - Plots the mass point leakage rate, UCL and 75% La ( dashed line ). In the verification mode the UCL is not plotted and the 75% La line is replaced by the upp e and lower verification leakage rate limit lines.
It -    Plots the total time leakage rate, UCL and 75% La ( dashed line ). In the verification mode the UCL is not plotted and the 75% 1.a line is replaced by the upper and lower verification leakage rate limit lines.        -
c)      Temperature te -    Plots the weighted average tempera:ure or the temperature for one sensor, at -    Plots the tempemture for all sensors and the weighted average (dotted lines) and one highlighted tempemture (solid line). The sensor temperature which is highlighted can be selected by number or by using the up/down direction keys to cycle through the sensors, d)        Pressure pr -      Plots the weighted average pressure or the pressure for one sensor.
ap -      Plots the pressure for all sensors and the weighted average (dotted lines) and one highlighted preature (solid line). The sensor pressure which is highlighted can be selected by number or by using the up/down direction keys to cycle through the sensors.                                        <
c)          Humidity / Vapor Pressure hu -        Plots the weighted average vapor pressure or the relative humidity for one sensor.
14
 
BCP Technical Sbtvices, Inc.                                                                  '-~
User's and Programmer's Manual Ulinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1    910315 ah -    Plots the relative humidity for all sensors and the weighted average (dotted lines) and one highlighted relative humidity (solid line). The sensor relative humidity which is highlighted can be selected by number or by using the up/down direction keys to cycle through the sensors.
f)    Overlay ov -  The air mass, and/or mass point leakage rate and UCL, and/or total time leakage rate and UCL, and/or weighted average temperature, and/or weighted average pressure and/or weighted average vapor pressure can be plotted on the same frame.
The responses to the menu line are:
mp - to plot mass point leakage rate tt - to plot total time leakage rue                                          '
m - to plot air mass t - to plot temperature p - to plot pressure                                                              ,
vp - to plot vapor pressure c - to display title on menu line x - to return to main plot menu                  -
Note: The user can change the plot scale (i.e., minimum and maximum values) on all plots except the overlay plot. The overlay plot scales are fixed at the minimum and maximum values for air mass, temperature, and pressure.
The vapor pressure scale is adjusted to conform to the pressure scale.
I.eakage rate plot scales for mass point and total time are the same and are determined by the minimum leakage and maximum UCL of the first leakage rate type plotted.
15
 
BCP Technical 5ervices, Inc.
User's and Progmmmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1              910315 L
4.1.8 Plot Utilities The following commands are used for peripheral plotting functions:                                        --
a)      ti - Change start and end times, b)      ex - Retum to the PROGRAM OPTION menu.
4.2              Programmer Information 4.2.1 Programming Language The ILRT program is written in Microsoft QuickBASIC, Version 4.5,for IBM Personal Computers and Compatibles.
4.2.2 Mass Point Leakage Rate Mass point leakage rate is calculated in accordance with ANSI /ANS 56.81981 as follows:
L. = -2400a/b 2 2 a = in 2it-21D)/(n D ,3                        t) b = (31 a D)/n n = number of data sets t = elapsed time, hr M = air mass, Ibm E = suic.mation over all data sets Mass point 95% UCL is calculated as follows:
16
 
                                                                                                                                        ~
BCP Technical Nervices, Inc.                                                                                                        -
User's and Programmer's hianual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program                                                                                        l Revision 1              910315 l
UCL = L., + 2400t,,Sa/b t,s = student t funcbon
                                                            = (1.6449df+3.5283 +.85602/dO/(df+ 1.2209-1.5163/d0 df = n-2 S. = vtK'n]
3                  3      2 K = S /(n D'-E t)
S' = (af' baf a nit)/df                                                                                            l l
1 4.2.3 Total Time Leakage Rate                                          .
Total time leakage rate, L. %/ day, is calculated per BN-TOP-1, Revision 1 as follows:                                                                                                                    , ,
L. = at .+b a = (m D.t ILD)/(m D2 .gi)g b = (IL-aD)/m L = -2400(hi-hiJ/t/h! i m = number of L's calculated
                                                = n-1 Total time 95% UCL is calculated as follows for t < 24 hr:
UCL = L.+t,5VIS'fl t,3 = 1.95996+2.57226/df+2.8225/df 2 17
 
BCP Technical 5ervices, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station 2
Integrated Leakage Rate Testing Computer Program Revision 1                      910315 3        8 S = (1 -bE a Et)/df df=m2 f = 1+1/m+(t D/m) '/(m D'-E't)/m Total time 95% UCL will be calculated as follows for t. > = 24 hr:
UCL = Ltt+tnytS'f]                                                         -
t n = (1,6449df+ 3.5283 + . 85602/d f)/(d f+ 1.2209 1.5163/d f) 3 S = (ErbE-a Et)/df 2
f = 1/m+(tm D/m) '/(m D -E2)/m          t 4.2.4 Air Mass For both mass point and total time, air mass, M lbm, is calculated as follows:
M = 144(P-P)V/(RT)                                                      -
P = weighted average pressure, psia P, = weighted average vapor pressure, psia Note: sensor vapor pressures is obtained from the sensor dew point temperatures using the K-Function per ASME Steam Tables, 3rd edition with k8 and k9 term neglected (see below)
V = containment free air volume, cu ft, T = weighted average temperature, deg, R 18 l
l I .... _ . , _ - - , . _ , _                _.          . .-      . . . _ . - - . _ . _ . . . . . . - . _ _  ._  ,
 
                          .                                                                    I BCP Technical Services, Inc.                                                              - .
User's and Programmer's Manual Illinois Power Company's Clinton Power Station                                                  l Integrated Leakage Rate Testing Computer Program Revision 1          910315 R = 53.35 ft lbf/lbm/deg. R                                                l Vapor pressure, P, psia at dew point temperature, T,deg. F is calculated as      ,
follows:                                                                            ,
P , a p,ie '
z = Ik(1-q)'/q/(1+k /1-q)+kf t-q)2 E = summation over i= 1 to 5 q = (5/9(T g32)+273.15)/t poi = (2212)(1.45038) to = 647.3                                            .
k i= -7.691235
                                                                                          ~
k = -26.0802'4 k 3= -168.1707                                                  .
: k. = 64.23286 k 3'= -118.9646
: k. = 4.167117 k, = 20.97507 19
 
BCP Technical 5ervices, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated I.eakage Rate Testing Computer Program Revision 1      910315 Dewpoint' temperature, T,deg. F, at relative humidity, % RH, is calculated as follows:
T. = (LT,vf)/( D/f) where Els over the RTD's assigned to the humidity sensor via the humiditry sensor - rtd table, T iand vf iare the temperature and volume fraction of the RTD.
P    = vapor pressure at dewpoint ter..perature T, T, = (To RH)(P .)
4.2.5 Data Rejection Data rejection critena are calculated in accordance with ANSI /ANS 56.81981 as follows:
The standardized residual, r, for the i data i    set is calculated as follows:
ri = (M r at rb)/s i M i= calculated air mass for i* data set        -
a,b = reEres: ion constants for mass point leakage rate (see MASSPOINT LEAKAGE RATE) t i= elapsed time for i* data set si = Svtl-1/n-(t r(D)/n)/((n D'-D)/n))
n = number of data sets S = D[M-at-b) 2 /(n-2)
The critical values for the standardized residuals at the 1% and 5% rejection levels are given in Table D2 of ANSI /ANS 56.8-1981.
20
 
l BCP Technical $ervices, Inc.                                                                  -
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leaktge Rate Testing Computer Progmm Revision 1          910315 4.2.6 Verification Upper and Lower Limits                                    ,
Upper and lower limits on the calculated mass point and total time leakage rates dudng the ILRT vedfication test (imposed leakage method) are calculated per ANSI /ANS 56.8-1981 as follows:
I.ower Limit = L+La .25L, Upper Limit = L+Lo+.25I,                                                                  l i
L = ILRT calculated leakage rate (total time or m.us point)            -
j La = imposed leakage rate, %/ day L. = allowable leakage rate, %/ day 4.2.7 Temperature Stabilization ANSI /ANS 56.8- 1981 criteria dT4 - dT1' < .5 deg. 'F                                                        .
dT4 = (T - TJ/4 dT1 = (T - T i)                                      -
T = current temperature T 4= temperature 4 hours ago; interpolated between 2 adjacent points if necessary T i= temperature 1 hour ago; interpolated between 2 adjacent points if necessary BN-TOP 1, rev.1 (first criteria)
!'                                                  (T - T 2)/2 < 1 deg. F T = tempemture 2 hours ago; interpolated between 2 adjacent points if necessary 21
 
DCP Technical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1                  910315 i
BN TOP-1, rev.1 (second criteria)
(dT - dT 2)/2 < .5 deg. F dT    = first derivative of T at current time = ( T - T. ) /.01 dT: = first derivation of T two hours ago = ( Ti .n- T 2) / .01 T m = temperature .01 hours ago; interpolited between 2 adjacent points T i.w = temperature 1.99 hours ago; interpolated between 2 adjacent points T2    = temperature 2 hours ago; interpolated between 2 adjacent points if necessary 4.2.8 Global Variables The following is a list of the program's global variables:
nt% - number of temperature sensors, 40 max ndp% - number of dew-point sensors,10 max nd% - number of pressure sensors,2 max            .
voll - containment free air volume, default value for vl,cu. ft.
vft!(i) - temperature sensor i volume fraction vfdp!(i) - humidity sensor i volume fraction vfp!(i) - pressure sensor i volume fraction titles - title printed on reports and plots ,40 characters max leaps - y(es)/n(o) switch for leap year Lal allowable leakage rate, %/ day Lo! - verification imposed leakage rate, %/ day Lmp! - mass point leakage rate calculated during ILRT, %/ day Ltt! - total time leakage rate calculated during ILRT, %/ day verify % - verification mode switch, = -1 if true lord %(n)      = r for data sets not deleted or crased
                                                                                            = -r for deleted data sets
                                                                                            = 0 for erased data sets n = internal data set number (chronologically sorted) 22
 
l IlCP Technical Services, Inc.                                                            -
l User's and Programm t's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1    910315 r = external data set number (not sorted) time %(n) - time for data set n, hhmm cate%(n) - date for data set n, mmdd temp!(i.n) - calibrated temperature of sensor i for data set n , deg. F dewpt!(i.n) - calibrated relative humidity of sensor i for data set n, deg. F press!(1,n) - calibrated pressure of sensor i for data set n rawt!(i) raw data for temperature sensor i rawdp!(i) - raw data for humidity sensor i rawp!(i) - raw data for pressure sensor i rs awt!(i) - raw data for temperature sensor 1 (data input via RS232) rsrawdp!(i) - mw data for humidity sensor 1(data input via RS232) rsrawp!(i) - raw data for pressure sensor i (data input via RS232) h!(n) - elapsed time for data set n, hours note : hl = 0 at 0000 hours on date%(1) h#(n) - double precision value of h!(n) t!(n) weighted everage temperature for data set n, deg. F vp!(n) - weighted average vapor pressure for data set n, psia dp!(n) - weighted average relative humidity for data set n, deg. F p!(n) - weighted average total pressure for data set n, psia m!(n) - air mass for data set n, Ibm                                      ,
m#(n) - double precision value of m!(n) v!(n) - free air volume for data set n, cu. ft.
Ir!(n) - mass point leakage rate calculated at < lata set n, %/ day ucl!(n) - mass point upper confidence level at data set n, %/ day 1rttm!(n) - total time measured leakage rate at data set n, %/ day 1rtt!(n) - total time calculated leakage rate at data set n, %/ day ucitt!(n) - total time upper confidence level at data set n, %/ day rsdata!0 - data set values read from RS232 y!0,x!0 - end point coordinates used to plot a straight ifne pt!(,i) - pressure calibration table array for pressure sensor i npaints% - number of pressure calibration points per sensor tswait% - = -1 if a data set is waiting in the RS232 port buffer rs232ok% - = 1 if program is ready to accept RS232 data maxpts% - maximum number of data sets (=400) pause % - = -1 to pause program while a message is being displayed scrnmode$ - = " text"in screen text mode
                              = 'gnphics"in screen graphics mode intable% - = -1 if pressure calibration table routine is executing 23
 
J BCP Tochnical Services, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station                                              l Integrated Leakage Rate Testing Computer Program Revision 1      910315 j
1 rort%      = -1 if data sets need to be r9 sorted bntopl% - = 1 if DNTOP1 > = 24 ar calculation is turned ON fore %, back%, border % - foreground, background and border color in text mode traps $ = used to indicate which key was trapped 4.2.9 Passed Variables The following variables have the same name throughout the program:
datafile$ data file narre                                                  :
n% - data set currently being processed nmax% - number of internal data sets rmax% number of data sets on data file nfirst% - first data set used in calculations, reports and plots nlast% -last data set used in calculations , reports and plots al - slope of regression.line bl -intercept of regression line option $ - user selected option 4.2.10 Data Storage Structure                                      -
The data is stored in the random access file, datafile$. Each record having a fixed length of 102 bytes. The data items in each record are of variable length and separated by ","s.The record layouts are follows:
Record 1 nmax%, title $, rmax%, leap $, npoints%
nmax% = number of unerased data sets titles = title (40 characters max.)
rmax% = number of data sets (erased and unerased) leaps = "y"for leap year, "n"for non leap year npoints% = number of pressure calibration points 24
 
BCP Technical $ervices, Inc.                                                                                                                                                -
User's and Progmmmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Progmm Revision 1                                        910315 Record 2, voll, nt%, ndp%, np%, La!, Lo!, Lmp!, Ltt!
vol! = default volume nt% = number of tempenture sensors ndp% = number of humidity sensors np% = numbew of pressure sensors La! = allowable leakage rate I.o! = imposed leakage rate (verification test)
Emp! u ILRT calculated mass point leakage rate Ltt! = ILRT calculated total time leakage rate Record 3 through (nt%+ndp%+np% 1)\10              +3 vft!(1), ...,vft!(nt%), vfdp!(1), ...,vfdp!(ndp%), vfp!(1), ...,vfp!(np%)
10 values per record vft!(i) = temperature sensor i volume fraction vfdp!(i) = humidity sensor i volume fraction vtp!(1) = pressure sehsor i volume fraction                                                                                  ,
Records (nt%+dp%+np%-1)\10 + 4 through (nt%+dp%+np%-1)\10 + 13 pt!(1,1), pt!(1,2), pt!(1,3), pt!(1,4), pt!(2,1), ...,pt!(25,4) pt!( ) = pressure sensor calibration table pt!(i,1) = pressure sensor 1 reading, counts, i = 1 to 25 pt!(i,2) = pressure sensor 1 true pressure, psia pt!(i,3) = pressure sensor 2 reading, counts pt!(1,4) = pressure sensor 2 true pressure, psia
                                                                                    -Note: pt!0 = 0 for i > npoints%
10 values per record 25
____y  _. -----                          ,_ ~ .-= .-    -  - - - ,
 
BCP Technical $ervices, Inc.
User's and Programmer's Manual .
Illinois Power Company's Clinton Power Station Integmted ienbge Rate Testing Computer Program Revision 1              910315 4
Records (nt%+ndp% =np%-1)/10+13 thru (nt%+ndp%+np% 1)/10+13+nc:p%
rtd%(1,1)        ....rtd%(1,5) = rtds assigned to humidity sensor 1 rtd%(2,1)        ....rtd%(2,5) = rtds assigned to humidity sensor 2 rtd %(ndp %,1)......rtd %(ndp % ,5)      = rtds assigned to humidity sensor dp%
Data Set Records (one set for each data set,1 through rmax%)
First record lord %(n), time %(n), date%(n), v!(n) lord %(n) = n for undeleted, unemsed data set n
                                      = -n for deleted data set
                                      = 0 for crasdd data set; note: erased data sets are not read by the program time %(n) = time date%(n) = date                                                                                -
v!(n) = volume Next (nt%+ndp%+np%)\10 records rawt!(1), ...,rawt!(nt%), mwdp!(1), ...,rawdp!(ndp%), ...,
rawp!(1), ....rawp!(np%)
10 values per record rawt!(i) = raw temperature data rawdp!(i) = raw relative humidity data rawp!(i) = raw pressure data 26
 
i l
BCP Technical $ervices, Inc.                                                                    -I User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1        910315 4.2.11 Compiling and Linking                                          ,
The program is composed of the main module, ILRT.DAS, and 8 sub modules MOD 1.DAS through MOD 8.DAS. With quickBASIC in directory \qb45\ and the program in the default directory, and wmpile command for each module is:
copy \qb45\qb.bl qb.bl
                    \qb45\bc/e/x/v/w/o/t/c:1024        11rt;
                    \qb45\bc/v/w/o/t/c:1024        modl;
                .  \qb45\bc/v/w/o/t/c:1024        mod 2;
                    \qb45\bc/v/w/o/t/c:1024        mod 3;
                    \qb45\bc/v/w/o/t/c:1024        mod 4;
                    \qb45\bc/v/w/o/t/c:1024        mod 5;
                    \qb45\bc/v/w/o/t/c:1024        mod 6;
                    \qb45\bc/v/w/o/t/c:1024        mod 7;
                    \qb45\bc/v/w/o/t/c:1024        mod 8; The link command is:
          \qb45\ link      iltt + mod 1 + mod 2 + mod 3 + mod 4 + mod 5 + mod 6 + mod 7 + mod 8,,,
                            \qb45\bcom45'. lib +\q b45\qb. lib                                      ,
5.0      Attachments 5.1    Program Verification Problems-Problem 1 - Air Mass hand calculation using data set 15 from data file CHECK 24.
Problem 2 - 1 Hour Mass Point and Total Time leakage rates using data file CHECK 24 Problem 3 - -8 Hour Mass Point and Total Time leakage rates using data file CHECK 24.
Problem 4 - 24 Hour Mass Point and Total Time leakage rates using data file CHECK 24.
27
 
BCP Technical $ervices, Inc.
User's and Programmer's Manual Illinois Power Company's Clinton Power Station Integrated Leakage Rate Testing Computer Program Revision 1    910315 Problem 5 - Data Rejection Report uning data file REJECT.
Problem 6 - Tempenture Stt;ilization Report using data file STABCHK.
Problem 7 - Air Mass hand calculation using data set 19 from data file ILRT. SAT.
Problem 8 - 24 Hour Mass Point and Total Time leakage rates using data file CHECK 24, with BNTOP1 ON.
5.2    Program Listing 28                                      i
 
p,
    ., o c
3 1
s-1 APPENDIX B ILRT Stabilization Summary Data
                        - Temperature Stabliization Summary Report
                        - Weighted Average Temperature Plot
 
__  __    , . . _ _ _ . . _ . _ _ . . . _ . ~ . . . . _ . _ . _ . . _ _ . .                  _ _ . ~ . _ _ _ _ _ . _ . ~ . . - .              . . _ .
CLINTON NWEft STATION RF-2 ZLRT
                                                            . TEMPERATURE STABILIZATION REPORT Start Timo = 715 215
                                                    * = stabilization criterion satisfied
                                                                                                                        - ANSI -        --- BN-TOP-1 ---
  %s-    elapsed                    temperaturo                                      dT1        dT4                        dT1-dT4        dT  or d(dT)          !
bt      time, hr                          T, dog F                                ovg dT      avg dT                                      avg          avg        l (1 hr)      (4 hr)                                    (2 hr)    (2 hr)        ;
i 1          0.00-                            71.510
: 3.        0.25                            76.446 3          0.50                            75.827 4          0.75                            75.576 5          1.00                            75.432                              -2.078 6          1.25                            75.327                              -1.119
  -7          1.50                            75.139                              -0.508 8          1.75-                            75.148                              -0.428 9        -2.00                            75.093                              -0.339                                              ~1.208    2.019 B0          2.25                            75.023                              -0.304                                              -0.712*    1.097 B1          2.50                            74.982                    .        -0a256                                              -0.422*    0.420*
B2-        2.75                            74.919                              -0.229                                              -0.329*    0 161*
3          3.00                            74.880                              -0.213                                              -0.276*    0.133*          I 4          3.25                            74.848                              -0.175                                              -0.240*    0.112*
e5          3.50                            74.796                              -0.186                                              -0.221*    0.078*
6          3.75                            74.750                              -0.169                                              -0.199*    0.017*
s7          4.00                            74.720                              -0.160      -0.697                            0.537  -0.186*    0.083*
e8          4.25                            74.685                              -0.163      -0.440                          .0.277*  -0.169*    0.009*
,                                                                                          B-1
                                                                                                                - . - . . . , - . - -                . - - _ = _ ~
 
J.& #---- s,Jr..se      J. 4.A- 4. 4--n-=e4 4---4d. 2,_a-ee-_  _a a--  =  #qs 4  --e-=hwia a4aJ      _m..a_.e
* 4    m- _ ~a/f A.,_h.aa#Aa.4    -.4a.a. a._m J  ...-.m>_.a__.a m
                    *                                                                                                                                                                          )
l l
O Il                "
                                                                                                                                                                    ~        g 5
N                                                                                                                                            -
I E
                      =
                      "                                                                                                                                                !E!
                                                                                                                                                                        =
E
                      ~
                      !is
:3 La l'l
                                                                                                                    /
                                                                                                              /
                                                                                                            /                                                    -
                                                                                                    /
l N
                                                                                                                                                                        ~
tr's I            I            l            1                i              g            g E _                                                ~ . .              ,_
co WNEANMcWmmN B-2
 
APPENDIX C ILRT Summary Data
                      - Summary Data Report
                      -Instrumentation Schematic Arrangements
 
CLINTON POWER STATION RF-2 ILRT                                                                                _,
DATA
 
==SUMMARY==
REPORT data  time date  temperature    pressure                                                        vapor                    dry air set                    dog F          psia                          pressure                                              mass psia            lbm 1  715  215      77.5100      24.1990                                              0.3618                          215042.25 2  730  215      76.4458      24.1340                                              0.3541                          214951.61 3  745  215      75.8267      24.1130                                              0.3510                          215037.99 4  800  215      75.5764      24.1030                                              0.3501                          215056.27 5  815  215      75.4322      24.0970                                              0.3499                          215061.94 6  830  215      75.3270      24.0920                                              0.3500                          215058.08 7  845  215      75.2387      24.0800                                              0.3496                          215060.53 8  900  215      75.1481      24.0840                                              0.1495                          215061.56 9  915  215      75.0932      24.0800                                              0.3495                          215047.55 10  930  215      75.0226      24.0770                                                0.3495                        215048.71 11  945  215      74.9823      24.0750                                                0.3496                        215045.79 12  1000  215      74.9188      24.0715                                                0.3495                        215040.94 13 1015  215      74.8803      24.0690                                                0.3498                        215030.80 14  1030  215      74.8478      24.0670                                                0.3498                        215025.71 15 1045  215    74.7960      24 CC45                                                0.3498                        215024.33 16 1100  215      74.7497      24.0625                                                0.3498                        215024.72 17 1115  215    74.7204      24.0605                                                0.3499                        215017.06 18 1130  215      74.6848      24.0585                                                0.3499                        215013.19 I
i C-1
 
l ILRT RTD AND HUMIDITY SENSOR DIAGRAM is. ,,=
                                    ~
                  ,                      tJSMM
                  ..                                  l
                                    --                          L 1J&n4K eeer
    , , , .                                        fJS115K      -
E.vPt64 6" *m TE4Psee                                  ,,g n y a *'er                                                TE4P212 E#G                                                  uE4Pf73 sa o,e
                                                          *28-TitK TE4P214 se *m                                    _
TE. veer                    __
TE4Ps10                                  tjsr;cg TE,vP213 DRnVELL      '
uc4Psso msinuuExis tuslCE CONTAmMENT h          nen am                        1;&rnK
: e. , .. -
FUEL BLDG 736'ELEV.
sPL041                                  g
                                                                                                                        =
                                                                                                                                ~ Ink]
c _.-;
n  I J
1  , Je. , ,
fJS 7f M                                                            j een N 9172 m e,n                      IJ&h8K g                  fdOI2CK  -
C-2
 
s-
                                            ! _a ,s
                                            >o-                          :x :g \                                    '
                                                                                                                      ,k 1_              ,  -                                          i g
C)<3-J                    :                                              g cm g"
3
                            -      s-8-ll __
:><a-g n
3 m              i' m
i na 8x 1                              !
                              *u ,            -
k
                                    !      bN                              _
IvA vA vs    p8
                                      ,! g_ '.....................
a                                                                            i 3    _                                                              !-
e              e Us        U                              -
i              e.                                    XI o.
lX
                                                                                                  ! E!
i                        i 8
ei I u
C-3
 
APPENDIX D                                  .
ILRT Calculations
                  - Summary Data Report
                  -Trend Report
                  - Mass Point Analysis
                  - Total Time Analysis
                  - RTC 19 Volume Fraction Reassignments
                  - RTD-19 Trend Report
 
CLINTON POWER STATION RF-2 ILRT                            ,,,
DATA
 
==SUMMARY==
REPORT data  time date  temperature    pressure          vapor    dry air cat                    deg F        psia pressure          mass psia        lbm la 1130  215    74.6848    24.0585      0.3499    215013.19 19 1145  215      74.6492    24.0565      0.3500    215008.49 20 1200  215      74.6206    24.0545      0.3499    215002.85 21 1215  215      74.5972    24.0530      0.3500    214998.15 22 1230  215      74.5437    24.0515      0.3501    215004.79 23  1245  215      74.5309    24.0495      0.3502    214990.66 24  1300  215      74.5082    24.0475      0.3502    214981.56 25  1315  216      74.4724    24.0465      0.3504    214985.62 26  1330  215      74.4374    24.0450      0.3504    214985.86 27  1345  215      74.4271    24.0435    0.3505    214975.74 28  1400  215      74.3853    24.0420    0.3J04    214979.66 29  1415  215      74.3627    24.0405    0.35L5    214974.05 30  1430  215      74.3424    24.0395    0.3507    214971.37 31  1445  215'    74.3243    24.0380    0.3509    214963.60 32  1500  215      74.2977    24.0365    .0.3507    214962.59 33  1515  215      74.2759    24.0355    0.3507    214961.61 34  1530  215      74.2642    24.0345    0.3509    214956.06 35  1545  215      74.2324    24.0330    0.3508    214955.71 36 -1600  215      74.2158    24.0316    0.3509    214948.31 37  1615  215      74.1870    24.0300    0.3509    214945.97 38  1630  215      74.1668    24.0290    0.3508    214945.73 39 1645  215      74.1505    24.0280    0.3510    214941.97 40 1700  215      74.1249    24.0265    0.3509    214938.90 41 1715  215      74.1034    24.0255    0.3510    214937.90 42 1730  215      74.0850    24.0245    0.3510    214936.57 43  1745  215      74.0687    24.0235    0.3510    214933.85 44  1800  215      74.0499    24.0220    0.3510    214928,19 45 1815  215      74.0299    24.0205    0.3509    214923.11 46- 1830  215      74.0141    24.0200    0.3510    214923.65 47 1845  215      73.9977    24.0185    0.3511    214916.35 48  1900  215      73.9829    24'.0175    0.3513    214911.35 49 1915  215      73.9661    24.0165    0.3512    214909.79 50 1930  215      73.9541    24.0165    0.3513    214913.84 D-1
 
l CLINTON POWER STATION RF-2 ILRT TREND REPORT leakage rates total time                                                      mass point data  time  date  elapsed  measured      leakage                                          ucl  leakage        uc cet                time        rate        rate                                rate              rate      ratt (hrs)    (%/ day)    (%/ day)      (%/ day)                                (%/ day)  (%/ day 18  1130  215    0.00    0.0000      0.0000              0.0000                            0.0000    0.000-19  1145  215    0.25    0.2096      0.2096              0.2096                            0.2096    0.209 20  1200  215    0.50    0.2308      0.2308              0.2308                            0.2308    0.335 21  1215  215    0.75    0.2238      0.2285              0.3397                            0.2266    0.244 22  1230  215    1.00    0.0937      0.1363              0.4152                            0.1211    0.264 23  1245  215    1.25    0.2012      0.1610              0.3871                            0.1639    0.263 24  1300  215    1.50    0.2353      0.1926              0.3922                            0.2051    0.287 25  1315  215    1.75    0.1758      0.1835              0.3474                            0.1901    0.251 26  1330  215    2.00    0.1525      0.1682              0.3109                            0.1697    0.221-27  1345  215    2.25    0.1858      0.1709                0.2986                          0.1747    0.215 28  1400  215    2.50    0.1497      0.1605  .
0.2764                          0.1615    0.197 29  1415  215    2.75    0.1589      0.1561              0.2623                            0.1573    0.186 30  1430  215    3.00    0.1556      0.1521                0.2506                          0.1536    0.178 31  1445  215    3.25    0.1703      0.1533                0.2466                          0.1567    0.178 32  1500  215    3.50    0.1614      0.1520                0.2402                          0.1560    0.174 33  1515  215    3.75    0.1535      0.1493                0.2328                          0.1530    0.169 34  1530  215    4.00    0.1594      0.1485                0.2283                          0.1528      0.167 35 1545  215    4.25    0.1510      0.1461                0.2225                          0.1503      0.163 36  1600  215      4.50    0.1609      0.1463                0.2202                          0.1513      0.163-37 1615  215    4.75    0.1580      0.1460                0.2174                          0.1514      0.161 38 1630  215      5.00    0.1506      0.1444                0.2133                          0.1497      0.159 39  1645  215      5.25    0.1514      0.1433                0.2100                          0.1485      0.157-40  1700  215    5.50    0.1508      0.*1422                0.2071                          0.1476      0.155 41  1715  215    5.75    0.1461      0.1407                0.2036                          0.1458      0.153 42  1730  215    6.00    0.1425      0.1388                0.2000                          0.1436      0.150 43  1745  215    6.25    0.1417      0.1371                  0.1967                        0.1417      0.148 44  1800  215    6.50    0.1460      0.1363                  0.1945                        0.1411      0.147 45  1815  215    6.75    0.1490      0.1360                0.1932                        0.1412      0.147 46  1830  215    7.00    0.1428      0.1350                0.1909                        0.1402      0.145 47  1845  215    7.25    0.1491      0.1349                0.1900                          0.1405    0.145 48  1900  215    7.50    0.1516      0.1352                0.1896                        0.1413      0.146 49  1915  215    7.75    0.1489      0.1352                0.1887                        0.1416      0.146 50  1930  215    8.00    0.1386      0.1339                  0.1865                        0.1400      0.144 D-2                                                                            ,
1
 
:ca        na a _ cc  n-s:st CLINTON POWER STATION RF-2 ILRT TREND REPORT                                  ,
laexege rates total' time    ..
mass point data    time      data    alapsed    measured    leakage            uc1      leakage                uc1 cct                        -
time        rate        rate          rate            rate              rate (hrs)    (%/ day)    (%/ day)      (4/ day)        (t/ day)        (4/ day) 18    1130        215        0.00    0.0000      0.0000        0.0000          0.0000          0.0000 19    1145        215        0.25    0.2096      0.2096        0.2096          0.2096          0.2096 20      1200      215        0.50    0.2308      0.2308,      0.2308          0.2308          0.3353 21      1215      215        0.75    0.2230      0.2285        0.3397          0.2266          0.2442 22      1230      215          1.00    0.0937      0.1363        0.4152          0.1211          0.2648 23      1245      215          1.25    0.2012      0.1610        0.3871          0.1639          0.2639 24    '1300      215          1.50    0.2353      0.1926        0.3922          0.2051          0.2074 25      1315      215          1.75    0.1758      0.1835        0.3474          0.1901          0.2516 26      1330      215          2.00    0.1525      0.1682        0.3109          0.1697          0.2212 27      1345      215          2.25    0.1858      0.1709        0.2986          0.1747          0.2154 28      1400      215          2.50    0.1497      0.1605  .
0.2764          0.1615          0.1971 29      1415      215          2.75    0.1589      0.1561        0.2623          0.1573          0.1869 30    1430      215          3.00    0.1556      0.1521        0.2506          0.1536          0.1787 31    1445      215          3.25    0.1703      0.1533        0.2466          0.1567          0.1783 32    1500      215          3.50    0.1614      0.1520        0.2402          0.1560          0.1746 33    1515      215          3.75    0.1535      0.1493        0.2328          0.1530          0.1695 34    1530      215          4.00    0.1594      0.1485        0.2283          0.1528          0 1673 35 1545          215          4.25    0.1510      0.1461        0.2225          0.1503          0.1633 36 1600          215          4.50    0.1609      0.1463        0.2202          0.1513          0.1630 37 1615            215        4.75    0.1580        0.1460        0.2174          0.1514          0.1619 38 1630          215          5.00    0.1506      0.1444        0.2133          0.1497          0.1592 39 1645            215        5.25    0.1514      0.1433        0.2100          0.1485          0.1573 40 1700            215        5.50    0.1508      0:1422        0.2071          0.1476          0.1556 41 1715            215        5.75    0.1461      0.1407        0.2036          0.1458          0.1534 42 1730            215          6.00    0.1425      0.1388        0.2000          0.1436          0.1509 43, 1745          215          6.25    0.1417      0.1371        0.1967          0.1417          0.1487 44      1800      215          6.50    0.1460      0.1363        0.1945          0.1411          0.1475 45 1815            215          6.75    0.1490      0.1360        0.1932          0.1412          0.1472 46 1830            215          7.00    0.1428      0.1350        0.1909          0.1402          0.1458 47 1845            215          7.25    0.1491      0.1349        0.1900          0.1405          0.1458 46      1900      215          7.50    0.1516      0.1352        0.1896          0.1413          0.1463 49      1915      215          7.75    0.1489      0.1352        0.1887          0.1416          0.1463 50 1930            215          8.00    0.1386      0.1339        0.1865          0.1400          0.1447 4
l D-2 e o .,
M dl    C Et__t__1L_ n______ 1_rs_ e
 
                  --      .-            _        _  _ _      ~    -- --
CLINTON POWER STATION RF-2 ILRT                            _ ,,
MASS POINT LEAKAGE RATE REPORT data  time  date    elapsed    dry air    leakage              ucl set                      time      mass        rate          rate (hrs)      (1bm)    (%/ day)      (%/ day) 18  1130    215        0.00  215013.19    0.0000        0.0000 19 1145    215        0.25 215008.49      0.2096        0.2096              l 20 1200    215        0.50 215002.85      0.2308        0.3353 21 1215    215        0.75 214998.15      0.2266        0.2442 22 1230    215        1.00 215004.79      0.1211        0.2648 23 1245    215        1.25 214990.66      0.1639        0.2639              l 24 1300    215        1.50 214981.56      0.2051        0.2874              l 25  1315    215        1.75 214985.62      0.1901        0.2516              '
26  1330    215        2.00 214985.86      0.1697        0.2212 27  1345    215        2.25 214975.74      0.1747        0.2154 28  1400    215        2.50 214979.66      0.1615        0.1971 29  1415    215        2.75 214974.05      0.1573        0.1869 i
i 30  1430    215        3.00 214971.37      0.1536        0.1787              '
31  1445    215        3.25 214963.60      0.1567        0.1783 32  1500    215        3.50 214962.59      0.1560        0.1746 33  1515    215        3.75 214961.61      0.1530        0.1695 34  1530    215        4.00 214956.06      0.1528        0.1673 35  1545    215        4.25 214955.71      0.1503        0.1633 36  1600    215        4.50 214948.31      0.1513        0.1630 37  1615    215        4.75 214945.97      0.1514        0.1619 38  1630    215        5.00 214945.73      0.1497        0.1592 39  1645    215      '5.25  214941.97      0.1485        0.1573 40  1700    215        5.50 214938.90      0.1476        0.1556 41  1715    215        5.75 214937.90      0.1458        0.1534 42  1730    215        6.00 214936.57      0.1436        0.1509 43  1745    215        6.25 214933.85      0.1417        0.1487 44  1800    215        6.50 214928.19      0.1411        0.1475 45  1815    215        6.75 214923.11      0.1412        0.1472 46  1830    215        7.00  214923.65      0.1402        0.1458 47  1845    215        7.25  214916.35      0.1405        0.1458 48  1900    215        7.50  214911.35      0.1413      0.1463 49  1915    215        7.75  214909.79    0.1416        0.1463 50  1930    215        8.00  214913.84    0.1400        0.1447 Allowable leakage rate, La =          0.6500 %/ day 75% La                        =        0.4875 %/ day Mass point leakage rate      =
0.1400 %/ day Mass point UCL                =        0.1447 %/ day D-3
 
CLINTON POWER STATION RF-2 ILRT TOTAL TIME LEAKAGE RATE REPORT data  time                              date  olapsed    dry air  measured      leakage                            ucl set                                              time        mass      rate                          rate        rate (hrs)      (lbm)  (%/ day)        (%/ day)                  (%/ day) 18  1130                                215    0.00  215013.19    0.0000                    0.0000          0.0000 19  1145                                215    0.25  215008.49    0.2096                    0.2096          0.2096 20  1200                                215    0.50  215002.85    0.2308                    0.2308          0.2308 21  1215                                215    0.75  214998.15    0.2238                    0.2285          0.3397 22  1230                                215    1.00  215004.79    0.0937                    0.1363          0.4152 23  1245                                215    1.25  214990.66    0.2012                    0.1610          0.3871 24  1300                                215    1.50  214981.56    0.2353                    0.1926          0.3922
]l[  25 26 1315 1330 215 215 1.75 2.00 214985.62 214985.86 0.1758 0.1525 0.1835 0.1682 0.3474 0.3109 27  1345                                215-    2.25  214975.74    0.1858                    0.1709          0.2986 28  1400                                215    2.50  214979.66    0.1497                    0.1605          0.2764 29  1415                                215    2.75  214974.05    0.1589                    0.1561          0.2623 30  1430                                215    3.00  214971.37    0.1556                    0.1521          0.2506 31  1445                                215    3.25  214963.60    0.1703                      0.1533          0.2466 32  1500                                215    3.50  214962.59    0.1614                      0.1520          0.2402 33  1515                                215    3.75  214961.61    0.1535                      0.1493          0.2328 34  1530                                215    4.00  214956.06    0.1594                      0.1485          0.2283 35  1545                                215    4.25  214955.71    0.1510                      0.1461          0,2225 36  1600                                215    4.50  214948.31    0.1609                      0.1463        0.2202 37  1615                                215    4.75  214945.97    0.1580                      0.1460        0.2174 38  1630                                215    5.00  214945.73    0.1506                      0.1444        0.2133 39  1645                                215    5.25  214941.97    0.1514                      0.1433        0.2100 40  1700                                215    5.50  214938.90    0.1508                      0.1422        0.2071 41  1715                                215      5.75  214937.90    0.1461                      0.1407        0.2036 42 1730                                215      6.00  214936.57    0.1425                      0.1388        0.2000 43 1745                                215      6.25  214933.85    0.1417                      0.1371        0.1967 44 1800                                215      6.50  214928.19    0.1460                      0.1363        0.1945 45 1815                                215      6.75  214923.11    0.1490                      0.1360        0.1932 46 1830                                215    7.00  214923.65    0.1428                      0.1350        0.1909 47 1845                                215    7.25  214916.35    0.1491                      0.1349        0.1900 48  1900                                215    7.50  214911.35    0.1516                      0.1352        0.1896  -
49  1915                                215    7.75  214909.79    0.1489                      0.1352        0.1887 50  1930                                215    8.00  214913.84    0.1386                      0.1339        0.1865 Allowable leakage rate, La =                          0.6500 %/ day 75% La                            =                  0.4875 %/ day Total time leakage rate            =                  0.1339 %/ day Total time UCL                    =                  0.1865 %/ day D-4
 
l Gitle = CPS HF-2 ILRT ( HTD 19 not used )                                          volume = 1795400 La = 0.6500 leap year : no temperature volume fractions t( 1)=0.0700 t( 2)=0.0?00  t( 3)=0.0700 t( 4)=0.0700 t( 5)=0.0460 t( 6)=0.0460 t( ?)=0.0460  t( 8)=0.0460 t( 9)=0.0460 t(10)=0.0100 t(11)=0.0460 t(12)=0.0460  t(13)=0.0380 t(14)=0.0380 t(15)=0.0380 t(16)=0.0390 t(17)=0.0420  t(18)=0.0420 t(19)=0.0000 t(20)=0.0660 t(21)=0.0330 t(22)=0.0330  t(23)=0.0040 t(24)=0.0030 t(25)=0.0120 i
  'ewpoint    volume frections ip( 1)=0.1400 dp( 2)=0.1400 dp( 3)=0.1160 dp( 4)=0.1160 dp( 5)=0.0940 ip( 6)=0.1280 dp( ?)=0.1280 dp( 8)=0.0690 dp( 5)=0.0690 iressure volume fractions p( 1)=0,5000 p( 2)=0.5000 is pre-data correct (g/n: default = n) 7 _
D-5
 
CPS RF-2-ILRT ( RTD 19 not used  ).-
TREND REPORT total time                mass point data            time- date  elapsed  measured    leakage      uc1  leakage cet                                                                                            us time      rate        rate    rate      rate                raQ (hrs)  (%/ day)    (%/ day) (%/ day)  (%/ day)        (%/ day 18        1130'    215    0.00  0.0000      0.0000'  O.0000    0.0000 19        1145-    215                                                          'O.00@
0.25  0.2176      0.2176  0.2176    0.2176          0.217.
20-        1200    215    0.50  0.2307      0.2307  0.2307    0.2307          0.29@
z21          1215    215    0.75    0.2215      0.2252  0.3132    0.2237          0.239 22' 1230            215  ~ 1.00  0.0936      0.1337  0.3954    0.1196-          0.261
    -23 1245-            215    1.25    0.1995      0.1579  0.3790 24        1300    215 0.1617          0.26@
1.50    0.2342      0.1896  0.3884    0.2031          0.284 25 1315            215-    1.75    0.1733      0.1799  0.3431    0.1875 26 1330                                                                            0.248 215    2.00    0.1493      0.1641  0.3059    0.1664          0.218 27 1345            215    2.25    0.1840      0.1670  0.2944    0.1718 28 1400                                                                            0.212 215    2.50    0.1480      0.1568  0.2722    0.1589          0.194 29 1415            215    2.75    0.1559      0.1522  0.2580    0.1544 1430    215                                                            0.184'
    - 3 10                      3.00    0.1536      0.1484  0.2465    0.1508          0.176 31        1445    215    3.25    0.1684      0.1497  0,2429    0.1542 32'-      1500                                                                    0.175 215    3.50    0.1584      0.1483  0.2364    0.1532          0.171 33        1515    215    3.75    0.1513      0.1456  0.2291 34                                                                0.1503          0.166 1530  '215    4.00    0.1563      0.1447  0.2246    0.1499
    '35                                                                                0.164' 1545    215    4.25    0.1476      0.1422  0.2187    0.1471          0.160 36          1600    215    4.50    0.1573      0.1422  0.2162    0.1479 37          1615    215                                                            0.159 4.75-  0.1549      0.1418  0.2134    0.1480          0.158 38          1630    215    5.00    0.1481      0.1403 39' 1645            215 0.2095    0.1464          0.156l 5.25    0.1487      0.1392  0.2063    0.1453          0.154
    -40          1700    215    5.50    0.1482      0.1383  0.2035    0.1444          0.152 41          1715    215    5.75    0.1436      0.1367  0.2001    0.1427 142 -1730                                                                            0.150 215    6.00    0.1392      0.1348  0.1964    0.1404          0.147 43- 1745            215    6.25    0.1394      0.1332  0.1932    0.1386          0.145 44- 1800            215    6.50    0.1426      0.1323  0.1910    0.1379        -0.144 14 5          1815    215    6.75    0.1462      0.1321  0.1897    0.1381          0.144 46 1830            215    7.00    0.1402
  - 4 7-        1845    215 0.1311  0.1875    0.1371          0.142 7.25    0.1463      0.1310  0.1867    0.1374          0.142
:48 1900              215    7.50    0.1488      0.1314  0.1863    0.1383 49 - 1915                                                                          0.143 215    7.75    0.1458      0.1313  U.1855    0.1385          0.143 50- 1930            215    8.00    0.1355      0.1301  0.1832    0.1369          0.141 D-6
 
m        ru as m n - y w------ -- -- - -
i
              ,              CPS RF-2 ILRT ( RTD 19 not used )
        .                                TREND REPORT leakage rates total time  ,
                                                                      .          . mass point data    time    date  elapsed    measured      laakage          uc1    leakage            uc1 sot                      time          rate        rate        rate        rate          rate (hrs)    (%/ day)      (%/ day)  (%/ day)      (%/ day)      (%/ day) 18    1130    215      0.00        0.0000      0.0000*    0.0000        0.0000        0.0000 19    1145    215      0.25        0.2176      0.2176    0.2176        0.2176        0.2176 20    1200    215      0.50        0.2307      0.2307    0.2307        0.2307        0.2953 21    1215    215      0.75        0.2215      0.2252    0.3132        0.2237        0.2391 22    1230    215      1.00        0.0936      0.1337    0.3954        0.1196        0.2613 23    1245    215      1.25        0.1995      0.1579      0.3790      0.1617        0.2605 24    1300    215      1.50        0.2342      0.1896      0.3884      0.2031        0.2848 25    1315    215      1.75        0.1733      1.1799      0.3431      0.1875        0.2488 26      1330    215      2.00        0.1493      3.1641      0.3059      0.1664        0.2181 27      1345    215      2.25        0.1840      0.1670      0.2944      0.1718        0.2127 28      1400    215      2.50      0.1480      0.1568      0.2722      0.1599        0.1946 29      1415    215      2.75      0.1559      0.1522      0.2580      0.1544        0.1841 30      1430    215      3.00      0.1536      0.1484      0.2465      0.1508        0.1760 31      1445    215      3.25      0.1684      0.1497      0.2429      0.1542        0.1758 32      1500    215      3.50      0.1584      0.1483      0.2364      0.1532        0.1718 33      1515    215      3.75      0.1513      0.1456      0.2291        0.1503      0.1668 34      1530    215      4.00      0.1563      0.1447      0.2246        0.1499      0.1644 35    154C    215      4.25      0.1476      0.1422      0.2187        0.1471      0.1602 36      1600    215      4.50      0.1573      0.1422      0.2162        0.1479      0.1596 37    1615    215      4.75      0.1549      0.1418      0.21.34      0.1480      0.1585 38    1630    215      5.00      0.1481      0.1403      0.2095        0.1464      0.1560 39    1645    215      5.25      0.1487      0.1392      0.2063      0.1453        0.1541 40    1700    215      5.50      0.1482      0.1383      0.2035      0.1444        0.1524 41    1715    215      5.75      0.1436      0.1367      0.2001      0.1427        0.1502 42    1730    215      6.00      0.1392      0.1348      0.1964      0.1404        0.1477 43    1745    215      6.25      0.1394      0.1332      0.1932      0.1386        0.1456 44    1800    215      6.50        0.1426      0.1323      0.1910      0.1379        0.1443 45    1815    215      6.75        0.1462      0.1321      0.1897      0.1381        0.1440 46    1830    215      7.00        0.1402      0.1311      0.1875      0.1371        0.1427 47    1845    215      7.25        0.1463      0.1310      0.1867      0.1374        0.1427 48    1900    215      7.50        0.1488      0.1314      0.1863      0.1383        0.1433 49    1915    215      7.75        0.1458      0.1313      0.1855      0.1385        0.1431 50    1930    215      8.00        0.1355      0.1301      0.1832      0.1369        0.1416 I
l D-6 ena                                                w at --. cc sa : - I a - __ __1 a__ Am
 
APPENDIX E Verification Test
        - Summary Data
        -Trend Report
        - Mass Point Analysis
        -TotalTime Analysis
 
        -          - - .      ~_ . _ - _ -          ___            _    .        .-
CLINTON POWER STATION RF-2 ILRT DATA
 
==SUMMARY==
REPCRT data time  date temperature            pressure        vapor    dry air cot                        deg F              psia pressure          mass psia        lbm 51 1945    215        73.9205            24.0145      0.3511 214911.05 53 2000    215        73.9046            24.0135      0.3511 214908.31 53 2015    215        73.8767            24.0105      0.3510 214892.92 S4 2030    215        73.8674            24.0085      0.3512 214876.61 55 2045    21S        */3.8533          24.0065      0.3514 214862.61 56 2100    215        73.8304            24.0035      0.3512 214846.38 57 2115    215        73.8212            24.0010      0.3713 214826.61 58 2130    215        73.7951            23.9985      0.3513 214814.38 59 2145    215        73.7849            23.9955      0.3514 214790.07 60 2200    215        73.7712            23.9935      0.3515 214776.83 61 2215    215        73.7505            23.9905      0.3513 214759.58 62 2230    215        73.7363            23.9885      0.3514 214746.42 63 2245    215        73.7211            23.9855      0.3513 214725.98 64 2300    215        73.7076            23.9835      0.3514 214711.87 65 2315    215        73.7028            23.9815      0.3515 214694.88 66 2330    215        73.6691            23.9785      0.3514 214682.72 67 2345    215        73.6581            23.9765      0.3515 214667.96 68      0  216        73.6526            23.9740      0.3516 214645.89 69  15    216        73.6397          23.9715      0.3516 214628,74 70  30    216        73.6254          23.9685      0.3515 214608.05 71  45    216        73.6085          23.9665      0.3515 214596.47 72  100    216        73.5948          23.9640      0.3515 214579.44 E-1
 
CLINTON POWER STATION RF-2 ILRT TREND REPORT total time                    mass point data  time                date        elapsed  measured                                              leakage        ucl    leakage        uc sot                                      time              rate                                          rate    rate        rate        rat:
(hrs).    (%/ day)                                            (%/ day) (%/ day)    (%/ day)  (%/ day
    .56 2100                        215    0.00      0.0000                                              0.0000  0.0000      0.0000    0.0006 57 2115                        215    0.25      0.8830                                              0.8830  0.8830      0.8830    0.883t 58 2130                        215    0.50      0.7149                                              0.7149  0.7140      0.7149    1.545-59 2145                        215    0.75      0.8386                                              0.7900  1.9443      0.8095    1.014
?
60 2200                        215    1.00      0.7769                                              0.7742  1.1977      0.7848    0.885e 61 2215                        215    1.25      0.7756                                              0.7673  1.0358      0.7758    0.836 62 2230                        215    1.50      0.7444                                              0.7480  0.9503      0.7524    0.801" 63 2245                        215    1.75      0.7685                                              0.7488  0.9185      0.7561    0.7914 64 2300                        215    2.00      0.7513                                              0.7426  0.8888      0.7494    0.777:
65 2315                        215    ?.25      0.7521                                              0.7392  0.8696      0.7466    0.768<
66 2330                        215    2.50      0.7313                                              0.7301  0.8477      0.7353    0.756:
67 2345                        215    2.75      0.7248                                              0.7218  0.8296      0.7266    0.746-68    0                        216    3.00      0.7465                                              0.7224  0.8249      0.7297    0.746!
69  15                        216    3.25      0.7480                                              0.7235  0.8217      0.7326    0.747:
70  30                        216    3.50      0.7606                                              0.7278  0.8241      0.7393    0.753e 71  45                        216    3.75      0.7444                                              0.7274  0.8195      0.7389    0.751-72  100                        216    4.00      0.7455                                              0.7275  0.8161      0.7390    0.750(
E-2                                          j l
 
_ _ _          _ .        ..                _          _ _ _ _ .          _ _ . . _ - - - . -                  __  m.___
CLINTON POWER STATION RF-2 ILRT TREND REPORT leakage rates dnta    time
                                            . . .                total 1 time                                        mass point data elapsed        measured          leakage          '
uc1            . leakage              uci Oct                                  time            ' rate              rate            rate                    rate            rate (hrs)        (4/ day)          (4/ day)          (4/ day)                (%/ day)      (8/ day)
.56    2100            215        0.00          0.0000            0.0000            0.0000 57    2115-            215        0.35                                                                      0.0000        0.0000' 0.8830            0.8830            0.8830                  0.8830        0.8830 58    2130            215        0.50          0.7149            0.7149            0 7149 59    2145              215        0.75          0.8386 0.7149        1.5454 60 0.7900            1.9443                  0.8095        1.0147 2200              215        1.00          0.7769            0.7742 61    2215              215 1.1977                  0.7848        0.8854 1.25          0.7756            0.7673            1.0358                  0.7758        0.8364 62  2230              215        1.50          0.7444            0.7480            0.9503 63  2245              215                                                                                    0.7524        0.8012 1.75          0.7685            0.7488            0.9185                  0.7561        0.7914 64- 2300                215        2.00          0.7513            0.7426 65 2315                215 0.8888                  0.7494        0.7771 2.25          0.7521            0.7392            0.8696                  0.7466        0.7684 66  2330              215        2.50          0.7313            0.7301 67' 2345              ,215                                                            0.8477                  0.7358        0.7568 2.75          0.7248            0.7218        -0.8296                    0.7266        0.7464 68        0            216        3.00          0.7465 69        15 0.7224            0.8249                  0.7297        0.7465 216        3.25          0.7480            0.7235            0.8217                    0.7326        0.7472 70        30            216        3.50          0.7606            0.7278 71        45            216        3.75 0.8241                    0.7393      0.7536 0.7444            0.7274            0.8195                  0.7389        0.7514 72      -100            216        4.00          0.7455            0.7275            0.8161                  0.7390        0.7500
                                                    \
* E-2 toa                                                                          na      es: Io                  te  *e a    *L o
 
l CLINTON POWER STATION RF-2 ILRT                                !
MASS POINT LEAKAGE RATE REPORT                              11 VERIFICATION                                          ;
data      time    date  elapsed      dry air        leakage set                        time          mass        . rate (hrs)          (lbm)    -(%/ day) 56-    2100    215      0.00 214846.38          0.0000 57      2115    215      0.25 214826.61          0.8830 58      2130    215      0.50 214814.38          0.7149 59      2145    215      0.75 214790.07          0.8095 60      2200    215      1.00 214776.83          0.7848 61      2215    215      1.25 214759.58          0.7758 62      2230    215      1.50 214746.42-          0.7524 63      2245    215    1.75  214725.98          0.7563 64      2300    215    2.00  214711.87          0.7494 65      2315    215    2.25  214694.88          0.7466 66      2330    215    2.50  214682.72          0.7358 67      2345    215    2.75  214667.96          0.7266 68          0    216    3.00  214645.89          0.7297      .
69        15    216    3.25  214628.74          0.7326 70        30    216    3.50  214608.05          0.7393 71        45    216    3.75  214596.47          0.7389 72        100    216    4.00  214579.44          0.7390 Upper limit on leakage rate =              0.9345 %/ day Mass point leakage rate            =-      0.7390 %/ day Lower limit on leakage rate =              0.6095 %/ day E-3
 
      , , - ___ _                _ . . _ . _ _ _ - . . _ _ . .          .        _.  ._          . _ . _ . . . _ . _ _ _ _ . - _ . ~ . . - _
                                          .CLINTON POWER STATION RF-2 ILRT                                                                      >
TOTAL TIME. LEAKAGE RATE REPORT VERIFICATION-data    time          date . elapsed                    dry air          measured                    leakage set                                        time                mass                  rate                rate              t (hrs)                (1bm)      (%/ day)                  (%/ day) 56  2100            215                0.00    214846.38                0.0000                    0.0000                +
57  2115            215                0.25    214826.61                0.8830                    0.8830 58  2130-            215                0.50    214814.38                0.7149                    0.7149 59  2145'            215                0.75    214790.07                0.8386                    0.7900 60  2200            215                1.00    214776.83                0.7769                    0.7742 61  2215            215                1.25    214759.58                0.7756                    0.7673 62  2230            215                1.50    214746.42                0.7444                    0.7483                :;
63  2245--          215                1.75-  214725.98'              O.7685                    0.7488                '
64  2300            215.                2.00    214711.87                0.7513                    0.742G                ;
65  2315            215                2.25    214694.88              -0.7521                    0.7392 66 -2330              215                2.50    214682.72-              0.7313                    0.7301 67 ~2345              215                2.75    214667.96              0.7248                    0.7218
                    -68          0-        215                3.00    214645.89              0.7465'                    O.7224 69        15          216                3.25    214628.74              0.7480                    0.7235 70        30          216                3.50    214608.05              0.7606                    0.7278 71        45-        216                3.75. 214596.47              0.7444                    0.7274 72    100            216                4.00    214579.44              0.7455                    0.7275 Upper limit on leakage rate =                                          0.9284 %/ day.
Total time leakage rate                                =              0.7275 %/ day-Lower limit on leakage rate =                                          0.6034 %/ day J
L l
  =
E-4
 
6 APPENDIX F PLOTS
 
PLOTS ENTIRE TEST (Stabilization, ILRT, Verification)
          - AIR MASS
          -TEMPERATURE
          -PRESSURE
          - VAPOR PRESSURE
 
t CLINTONPMERSIAIIONRF-2ILRT 215113
                                                            .                                _ verification 5                stabilization        !
N
                                                                \
verification f                                                  .
g,    _
;      L        stabilization              ILRT I
MB                                                                                                              l AN                                                                                                              ,
c    S      _
S i
L
: i.                                                                                                                    .
;                                                                                                                    i a
214400    i    i    i    i i  i  i  i    i  i  ,      , ,                          ,    ,    ,    ,        1 715  215                        IINE                                                      100  216    i
 
CLINTONPSERSTATIONRF-2ILRT 78.000 I      _  stabilization E
                                                            ~
,      M    .
: p. d
    , Ee                                                              verification a  Rg      -
t-stabilization A-TF    -
ll R      _                              ILRT I      E verification g        I  !    !    ! k  l  l    l    l  l l l    l    l  l    l    l l              715  215                        IINE                          100 216
 
I CLNIONPMERSTATIONRF-2ILRT
              '24,299 Ium -
stabilization Y
P
:                R-
                .E P                                                '
      ,          SS a          SI    -
r ve ?ification UA                                                            -
stabilization R      _                              iggy l                      _
N        verification l
_                                                                                  t 1
23.950      i  i      i ,    ,  ,      ,    '  '    '    '  '    '  '
715  215                          y;NE                            100 21      .
            ~~
                                            -        --                          -  __              __id
 
CLINTONPOWERSIAfl0HRF-2..ILRT 0.370 U
A P        _
0 R
P
                                                                    .y-verification
  , PS          stabilization                                            stabilization a RI-        .
EA S        -
S i  ll      _
ILRT                          verification l  B                                                          -    ^"        ~
E
                        ~
l 0.345      i    i  i  i  i  i  i  i    i  i  i    i    i    i  i-  i    '
715  215                      IINE                              100  216
 
4 i
Plots - ILRT Air Mass Mass Point Leakage Rate and UCL.
1 TotalTime Leakage Rate and UCL Weighted Average Temperature Weighted Average Pressure Weighted AverageVapor Pressure
 
l                                                                                                                                                                            --,=
tr'3 l(                                                                                                                /          -4
                                                                                                                                                                        ~
1                                                                                                              /
                                                                                                                                                                  ~
                                                                                                                                                          /            cs cm E              D 1
f
                                                                                                                                                    /              _
r
                                                                                                                                                /
t                                                                                                    /
N                                                                                                                                        E e                                  t
                                                                                                                                  /                                -
cu a.
M                                                                                                            f b                            ;
I s--.
M                                                                                        /                                                                            W css                                                                              j                                                                                    X as                                se                                                                                                                    W OC          c                                    :a                        /
LaJ        .-
              "-''                              tr3                  /
A            c                                C/
l2          .3                                          f
  <=>          u.
3 t., 3 e
rza                              ,
0
                                            /
                                          /
                                      /                                                                                                                              ~
                                  )
                              /
                            /                                                                                                                                          g
(                                                                                                                                            N f                                                                                                                                            _
CD
                      /                                                                                                                                                  cn
                                                                                                                                                                          --4 1      , ,1            l            g                          3                                  g                          g          g      ,        --4 CD                                                                                                                                                        O C33 AME                                                                                                      $
w Y.
N                            C ''""* M                          E C C/3C/3 F-5
 
                    +w.    . m.Js -      Aw<-e --e.A    h    M                .w. a  m      ,
e i                                                                                    C'%3 1                                                                                -
l-                                                                                    cvs e
i                                                                                    W I
1 I
1 I
l
  .=.      i                                                                                  -
I ea t      I h                                                              I gas      l                                                    l 5        '
i                                                                                  _
o-.
e        I E=a Cm9      l-                                                                                    E g        3-                                                                                    U E
A        I E                                                                      2 g
g      1-
          '                                                            x Bi
  <-.a    I <e                                                            re w
la  -
CJ
          !"'  C                  :llll2 1
l' 1
I l-                                                                                      u">
l I                                                                                      W I                                                                                      @
L                                                                                                m t
I      !      I  I    I        I              l        l          l      I W.
!      @                                                                                            e l      @                                                                                  @
o      ""'
N N ac::n a::>.                                          Q E6MM    A  <">a-.* Z 6 e                            g.ma G
sl2c:.c:x:a
!                                        F l l
l
                                                        ~ -
 
                                                                                                                                                                                                                                                      -----m-------  - - , . - - - - - - . - . - - - - - - - - - - - - - - - . - - - - , - . - - - - - - - . - - .
a f
I                                                                                                                                                              l W
w
                              ,                                            1 N
I                                                                                                                                                                                                                                                  ,
i                                                                                                                                                                                                                                                  "
e i
I I
i                                                                                                                                                                                                                                                                                                  l 1
I                                                                                                                                                                                                                                                                                                  i E
l                                                                                                                                                                                                                              _
I ca 8      i N        I E
                                                                -        i p                                                                                                                                                                                                                                                          EmJ                                              ;
M        i                                                                                                                                                                                                                                                                                                  {
l                                                                                                                                                                                                                                                  M l                                                                                                                                                                                                                              _
l-                                                                                                                                                                        e m
                                                                -lii!  ''                                                                                                                                                                          g 25                                                                                                                                                                                -
                                                                                                                                                                                                                                                  ~
v      i                                                                                                                                                      a                                                                      -
U tra                                                                                                                                                                                                                                                                                            ,
I&-*
I I
                                                                                                                                                                                                                                                                                                      ~
i f
I                                                                                                      %
N                                                                                                      O W
i I                                                                                                                                                                                                                              _
1 N
m I          I                                                                                I                                                          I  I    I l    l      l            l 3
m                                                                                                                                                            xsa.>                                                                                                                                      .
Howa4                                                                                W-Ew      masw F~7
 
  ,4yw h,_a        wha-A-4-*-      1 --e"--  '''O  "                          '
Y
                                                                                                                                                                                  == 4 N
m                    h A
                                                                                                                                                                                  ==4 i
                                                                                                                                                                        ===
h
                                                                                                                                                                      =
N I
E M
6
                                >                                                                                                                                                Em3 saw                                                                                                                                            2:
_m                                                                                                                                                                    t U                                                      #                                                                          m N
                                                                                                                                                                              ==-4 N
m l        i                  I                I            i        i        i                  I                          W C,3                                                                                                              I                                ,,t W                                                                                                                        tTn W.                                                        ""t$ sta tllF1        Eme tra W
W Ea3 Xll ElLe CaJ AC a 6 = :llllll2 GC Es3                                    &
F-8 9
n ew  w'                    r* wye-          -,e-  T--geyeT---M-t        -w  ---e-a-ur*'im+  ^ - ' ' - -    **t---  H - w--'=M-----=    - - = - - - = - - - ' ^ ' - - - " - " ' - ' '
 
i l
6 j
                                                                                                                                                                                                                                                      ~  l tras A
N
                                                                                                                                                                                            ~
                                                                                                                                                                                  /              @
e*w l
I W                                                        l l
1
                                      =                                                                                            /
a N
a g
See8
                                  . <lu:                                                                                                                                                        EmJ l
o-                                                                                                                                                                                                                  l vs                                                                                                                                                        :le::
                                                                                                                                                                                                ==*                                                      \
                                                                                                                                                                                                ***                                                      l e
E
                                    -                                                                                                                                                                                                                    i A
C3                                                                                                                                                    _
                                                                                                                                                                                                                                                        -i i
l l
tra
                                                              /.                                                                                                                                .- e m.
CD M
                                                                                                                                                                                                ==4 3
I    I      I_            t                    I                f  f                  I                            f                e 4                                                                                                                                          Gb CB                                                                                                                                          m                                                              \
A b 4 *==8 6                                                                                      CEB                                                            !
N                            A DCEm3 Vsto *:"l35:hCEn.3                                                                                    N                                                              ,
F-9
_. - .~. ..._, ~ _, ~ . . . . . . _ . . . ~ . _                    _ _ .      _ . - . _ _ _ . _ . . _ . . _ . . . . _ . _        _    _ . . _ _ ~ . _                                _          . _ _ . . . ~ . - _ . . . . , . . - - _ . . _ . -
 
                                                                                                , sa e o ae &A~A**8 -
p 9
D W
4                                                                                    N m
8Pt W
5 N
I
    !!E.
W 6                                                                                  E*J D -e E,5                                                                                E
                                                                                        *==
t==.
A                                                                                                                <
lii!
E
    %)                                                                            _
k W
t i
g.,.s .
I'  l      l        l-        i        I          f    I~ I sc3 I
Lt3                                                                    u>
i M                                                                      *tf" l
A c#5 m 4                                  CSS csb                                                                    @
:::> <: : A O sac      A paq Em:I c.,n c,o ,::::3sacEm3 l'
l                                            F-10
 
t Piots - Verification                                er.n Air Mass Mass Point Leakage Rate and UCL Total Time Leakage Rata and'UCL Weighted Average Temperature Weighted Average Pressure Weighted Average Vapor Pressure e
                                      ,m..-      e,,,,      ,mw,----n,.. v,-,,w,,--,e,-,.e-,,,      .m ,w ..,-n,--  - ,v-  ,e -n+,- - .n--  ,,,.,5
 
l l                                      l      M      ,
                                                                                                    )                                                ~
                                                                                                                                          )
1 n                                                                                                                                        /          g E                                                                                            /                                      /            --4
'n                                                                                            i                                    /
e
                                                                                          /
                                                                                                                                  /
w l                          l
'{
y                                                                                )                        J
* 1                        /e*
                                                                                /                        /
_                                                                              /        o                / b *E:
m                                                                            1          ),            t      - s.
d                                                                          (                        /            I*
m i                      i                                                          1 g
~
                                                                      )                      /
W                                                                  /                    s
$                                                                /                  /                                                              w an                                                            -p                  ;                                                            _    E g                                                            /                  /      k                                                                  l b
: a.                                                      .i                i E
E                                          A          J              /              g=                                                                  l o                                          .
o g                                            at:      (          /                .                                                                    ,
3                                          O
                                                    /          /                      N
<>                                          s.    )        /
N1 s            /
t
:= <      c.                                                                                    _
                                              /    }                                                                                                    ^
Je /
f /                                                                                                          ,
                                          / /
                                            /                                                                                                      m
                                        - f                                                                                                        m      ;
l  I        I          1              l          l              t                            -g            y
        %                                                          a==                                                                      3 m
g                                                                                                                                  T N                                        M *-=* M              E a t.n tA F-11
~ ' " ' ' ~ ~ ~ ~ - - . , , _ _ _ __                                "
                                                                                                                #h'M'N''gw--ew9.,g
 
f
[
l                                                                                  l                              O i                                                                                  I
                  =
o                      l                                                                                  1 E
                .-                      1                                                                                  I ew                    I o                                                                                                        I
                *w e
I                                                                                  I
                **                      I                                                                                  I                                                  '
                -=
ee                    i                                                                                  I                                                  r w                                                                                                                                      _
1 i
5 l
l n                                                                                                          I 8                    I                                                                                  l E*.    .
Its                    I                                                                                  i g -.
i                                                                                  1 1
e- .                                                                                                      I                                                  .
6                      I                                                                                  I
                +          .**
EaJ
                          .          1 I          .                  :st.:
                          . .at.
                              .        i.                                                                                              s
                          -                                                                                              .          . _t:
i                                                                                  i s                                                                                                          L 2E k
m        i.                                                                                              I all5        :s                                                                                          l            o g                      i                                                                                  1 3
ca I
l                                                                                  i I                                                                                  I I                                                                                  i                          -
1 I
I                                                                                  i 1
I I                                                                                  I
!                                    1
!                                                                                                                        I                                tes i
t 4
l I                                ew l                                                                                  1
!-                                  -l
                                                                                                                        .i                                e G
L                                ii        i L
I  1      i                        t-                      t      it                    i    .
N                  -
L                    E--.                                x s .:= = ~                                                                                3-n
:ac a c , e , m o - :a= .-.                                        oc a .--. s.a F-12
  - - . - _ _ _  . = . . . . . . _ . - - .            -    .. - _. _.-_-                                                                --                    . .    . - _
 
                  ;\,iil a
6
_                                            -                1 2
_                                              -                0
    )                                                                            0 a        _                                              -                1 c
i          _                                              -
t a        _                                              -
i f
c i          _                                              -
r e        _                                              -
v                                                                    i
(          _                                              -
T          _                                              -
R L          _                                              -
I 2
F-                                                          -
N R
O I
T N                    -
A          _                                              -                E T      t                                                      t              H S      i
                                                                -  i
[
R n                                                      n            7
                                        ~
i E      l
                                                                -  i W
O        '
l P
r
_    e N        ?_                                                    w
_    o O
I M
l I          _                                              _
L C          _                                              _
_                                              _                5 1
_                                              _                  2
                ,                                                                  0
_                  0 1
B'                                                  .                      2 0                                                                  0 0                        z/ day                                  0
          .                                                                5 1                                                                  0 T0IAL      IIME        RAIE a"
:    '    ,t  ll!l!                    iiI
 
1 L                                    g p ggg s u 110M RF-2 ILRT (verification) 73.900 I
i                      -
\
}
I      -
E 1            M
              ?A      ~
I Ee
    "        R9      -
A
                  '  ~
t R      -
E i
                    ~
13.50%            '
\
W 215              TlNE
 
1 i
em
(
                                                                                                                                                                                                                                                                                                                                                  ===4
("%3 1
e s==.
C                                                                                                                                                                                                                          """4 El2 eem M
EJ ee M
                                                                                                  -eme b
e D                                                                                                                                                                                                          -
v a
N
* s                                                                                                                            '
w                                                                                                                                                                                                                                                  .
                                                                                                                                                                                                                                                                                                                                                            \
Inc                                                                                                                                                                                                                                                I i
N q                                                                                                                                                                                                                                      W            !
W                                                                                                                                                                                                                                      E Es9                                                                                                                                                                                                                    -
D==
                                                                                                                                                                                                                                                                                                                                                            =
f s
                                                                                          . !is M
t.)
t
                                                                                                                                                                                                                                                                                                                                            ==4 N
C55 CED I I                              I                  I    I                                                                                                  .-4 I    I    I                          I                                                      N u3 kr"3 AE4m6                                                                              m O
N                                                                  . A CaC Emq c.ps t o :lll: 3 sllac Em3                                                                    N F-15
 
I w
                                                                                                            .--.e N
CD m                                                                                                        G c=                                                                                                    '*"4
  . o.
    .s.*
res
  . o.
h.
L ue w
s- s Clac:
A m
en I
La.
Eac; Z
    <=>
me 6- e
    <I:
6-W t.n                                                                                                .-  M se 6-*
53r:
LaJ tis
    . :3 v
us
                                                                                                              = =4 44 CD C53 I    I        I                  3            g          g            g        g      ,      w u>                                                                                                  C"4 Lr"3 CD M
N t.n e- e 4:2l:                                          $
CD
:ll> *:C C3
* 1ll> N                  A C"k:". EmJ t.in C,a ::::::3 5:3d:Ea3 F-16
 
4 Plots - bata Rejection      m Data Rejection Report                                      ,
i l
1 l
l e-- -e-g ---veew e g - ' y
* CLINTON POWER STATION RF-2 ILRT l
DATA REJECTION REPokT
                      ** data pointo rejectable at 1% rejection level
                            ,i.e., standardized residual >= 3.32
* data pointo rejectable at 5% rejection lovel
                            ,i.e., standardized ronidual >= 3.00 ta timo dato          air mans        linear        residual  standand  standardized at                                      least      from least  error of      residual square      squaro fit  residual fit 1 1130    215    215013.19      215000.58              4.61    3.16        1.46 1 2 1145    215    215008.50      215005.44              3.06    3.18        0.96 3  1200    215    215002.84      215002.31              0.53    3.19        0.17 4  1215    215    214998.16      214999.17            -1.02      3.21      -0.32 5  1230    215    215004.80      214996.03              8.77    3.22        2.72 6  1245    215    214990.66      214992.89            -2.23      3.24      -0.69 7  1300    215    214981.56      214989.77            -8.20      3.25      -2.52 8  1315    215    214985.63      214986.63            -1.00      3.26      -0.31 9  1330    215    214985.86      214983.48              2.38    3.27        0.73 10  1345    215    214975.75      214980.34            -4.59      3.28      -1.40 11  1400    215    214379.66      214977.22              2.44    3.29        0.74 12  1415    215    214974.05      214974.08            -0.03      3.29      -0.01 13  1430    215    214971.38      214970.94              0.44    3,30        0.13 14 1445    215    214963.61      214967.80            -4.19      3.30      -3.27 15 1500    215    214962.59      214964.67            -2.08      3.30      -0.63 1.6 1515    215    214961.61      214961.53              0.08    3.31        0.02
    .7 1530    215    114956.06      214958.39            -2.33      3.31      -0.70 8 1545    215    214955.72      214955.25              0.47    3.31        v.14 9 1600    215    214948.31      214952.13            -3.81      3.30      -1.15 0 1615    215    214945.97      214948.98            -3.02      3.30      -0.91 1 1630, 215      214945.73      214945.84            -0.11      3.30      -0.03 2 1645    215    214941.97    214942.70            -0.73    3.29      -0.22 3 1700    215    214938.91    214939.58            -0.67    3.29      -0.20 4 1715    215    214937.91    214936.44              1.47      3.28        0.45 5 1730    215    214936.56    114933.30              3.27    3.27        1.00 6 1745    215    214933.86    214930.16              3.70    3.26        1.14 7 1800    215    214928,19    214927.03              1.16      3,25        0.36 8 1815    215    214923.11    214923.09            -0.78    3.24        -0.24 9 1830    215    214923.64    214920.75              2.89      3.22        0.90 0 1845    215    214916.36    214917.61            -1,25      3.21      -0.39 1 1900    215    214911.34    214914.48            ~3.14      3.19      -0.98 2 1915    215    214909.80    214911.34            -1.55      3.18      -0.49 3 1930    215    214913.84    214908.20              5.64      3.16        1.79 NOTE:  No data points were rejected during the ILRT.
F-17
 
i l
l 1
1 Plots - Individual Sensors nn                                                            \
Smte Test (tu6 statkg lutt &#d Verreatwg
      - Pressure Sensors 1 & 2
      - RTD 1 through RTD 25
      - Humidity 1 through Humidity 9 l
I 1
 
CLINT')NPOWERSTATIONRF-2ILRT 24.200 I-jstabilization P        ~
R E
SP      -
S  S,
  -                  s g$
R E      _
h  N          !!.RI verification e-stabilization 1
                                                  'x N    verification kW 23.950,      i  i  iiiiiiiiiiiiiii 715 215                        TIME                    100        216 d
 
3 Cf,1NTM PMER STAIIM RF-2 ILRT 24.24 I
              \~
stabilization
!.            I
!    P                              !
R E
SP      ~
'  7 S  S.
HI      -
t RA                                                                            verification E                                                                          e-stabilization ILRT 2
N      verification
                                                                                          \,
g                !  !    !    !    !    !          !  !  !      !  !  !    !  !    I 715    215                                  IINE                              IM 216
 
CLINIM PMER STATIM RF-2 ILRT 76.5 W f
stabilization
!    I      --
l-  E-N      -
P l
E Rd-
  ? Ae i
a Ty-11 verification RF_                                                        ,  stabilization
:    E l          -
1
_                    m        ILRT verification 4
w      u
                                                                            ~
70.5N      i  i        i  i  i  i  i    i  i i  i    i  i    i    +  i m
i-715  215                        IINE                            IN  216 i
 
l
[
t i
CLINIM PMER STATIM RF-2 ILRt
;        76.M l              ,_
I                  stabilization                                                                                !
i' i    ..
E                                                                                                        ;
;        M                                                                                                        !
              ~
L        P i        E l        Rd    -
!    ?  Ae
: l.      Ig    -
:,      g verification              i
!        Rf  ^
p    stabilization            j l        E l
2                          m            ILRT i
              -                          s                        ~
N                                              . .
_                                            %                        b vestftcat. ion 8                        !      !  l    l  l  l    l      l    g          g 715    215                            IIE                                      IW 216 I'
i
 
t k                                                                                        b GINTON P014ER STATION RF-2 ILRT                        !
l'    76.500                                                                              !
l i
              ! stabilization 1
I      ,_
i    E                                                                                  t N      '  '
P E
Rd      -
t t  7 Ae Ig      -
ll RF    -
E
            ~
                                                                    ' verification c  stabilization
:    3 i                                        ILRT 4
verification a5a          ,  ,  ,  , ,  ,  ,  ,    ,  ,  ,  ,    ,  ', N,    ,    ,
:              715  215                      IINE                            IM 216 1
i i
l'                                                                                        !
i l                                                                                          l l
i
 
L, i
i GIM PMER STATIM RF-2 IIAT l                            77,ggg                                                                                          '
i t
:                                                    stabilization
~
I        .                -
i E
i                            H              J p        i                                                                                          !
1 E                                                                                                  !
Rd -(
    ,                      Ae                                                                                                  .
t
    "                      Ig      -
11                                                                                                  l RF 4
_                                                                                          i
;                            E                                                                                verification
                                                                                                        ,/ stabilization i
4
                                    -                                  %        ILRT i
N_                  ,_
verification      t 71.000                      i  i  i    i i  i i    i    i  i  i  i    i    i  i    i    i      i
:                                        715              215                      IINE                              199 216  !
 
CLINIONPOWERSTATIONRF-2ILRI 76.500 fstabilization I      .l.
E N
p E
Rd    -
  ,  Ae i  Ig    -
U RF    -                                                          . .    .
                                                              # ' verification E
stabilization i                                      ILRT 5
l            _
                                                    ~
                                                          ~      verification m
i i  i  i    i  i    i  i  i  i  i  i    '      i    i 70.500      i  i
                            ~
715  215                      IIME                            100  216 il
 
4 s
CLINIM PMER SIAfl0N RF-2 ILRT l                  77,ggg 3
1 I        -
E          stabilization M      "
.                  P E.
Rd      -
        ?      Ae -{
e      Iy II
,                RF      -
E                                                                      verification C- stabilization 6                                      ILRI
                                                                    '                  verification m
3                71.000          i  i    i i  i  ,  ,      ,  ,    ,  , ,  ,  ,        , ,    ,.
715    215                          IINE                              100  216 l
e.-        a                _  -- _            --. _m w
 
f N $I$I[@ E-2 l @
76,$@                                                                              .
i                                                                                        s l            ; stabilization
    .I      F 1
E                                                                                  -
          ~
M
\            .,
P
\                                                                                        1 E
RA ~\
i'
>  T  Ae                                                                                .\
Ig    -
i    11 gy_\                                                                                :
E verification t stabilization ILRI                                              ;
7 N                  --
                                                          ~      verification i
m j    2h,hh        1  l    i  I I I I  i    !  I I  I    I    I  I    I    I
!.            715-215                    IIME                            IN    216
                                                                                        ~
1 I                                                                                        .
I                                                                                        !
I i
d.
 
J i
CLINIM PMER STATIM RF-2 ILRT 76.500 stabilization l
I
!                E N                      .  .
p E
R.d l' y            Ae r
Iy                    -
!:              il
:              RF                    -
l E                                                                                            verification
                                      ~
                                                                                                        %-stabilization I
0                                                              ILRT
                                                                                              %            venfication N
m%              "
70,50a                      i  i  i        i ,    ,      ,  ,    ,    ,  I I  I  I    f    ,    ;
i                                        715  215                                    IINE                            100 2.!6 l
                                                                                                                          - ' ' - ,~p .- .
 
't CLINIM PMER SIATIM RF-2 ILRT
        ,6.599 1
:                                                                                      i T        -.
E          stabilization                                                            l N      "
:      P i                                                                                          i RA
                ~
i-k' t    i    g    -
s 3
1 i
RV      -
E                                                              geeitication m stemu."
N 9                                    igt verittcahon i
use                                                  -
                                                                      ~          ~-
;      79.500      i  i    iiiii,,,,,,,,,,
715  215                        IINE                          100 216 t
l                                                                                        -
I
 
GINTON POWER STATION RF-2 ILRT 71.000 I        -
E verification E                                                            e-stabilization Rd      ~
7 Ae
: Ig Il        stabilization                                          verification RF          .
ILRT      -    ~      --
g 1
0 I l l  l  l    I    I    ! !    ! I    I  l    l    l g  l      l  !
715  215                        IINE                            100  216
 
CLINTONPOWERSTATIONRF-2ILRT 76.500 I        -
l E          stabilization N
P                                                            i E
1  Rd      -
l , Ae s Ig      -
il RF      -                                                        verification E
6 stabilization LRT 1
N        .
verification
                                                              ~    ~
                                                                  ;      ~%
1 70,500!      i  i    i  i i  i  i  i    i  i i    i  i    i    i    i    i 715 215                      IINE                              100 216 il
 
                                    ,                                      li!;ll 6
1 n                                                  2 no                n oi                o                              i it                .i                                    0 t a              t                                      0 az                a                                    1 ci il c                            i
                                                    .i fi ib                .fi ra                r                              i et                e vs                v
                                        -                                  8      i T
R L
I m                          i i
2 F-R                                                                            i i
i 0
I                                                                            i T
A T                                            x                                    E M
S                                                                            i    I T
R E                                    I W                                    E                                      i O                                    L P                                    I N
N"w O                                                                            i T
N I
G i
i
                          ,                      .                              I      -
i n
o i                                                              i t
a z                                                                  5 i                                                              i    1 l
i 2
b a                                                            i    5 t                                                                    1 s,k.s                                                              7 r
0;
_            '        _ i        ,_  i}
                                                                                  , 0 0                                                                      0 0                      de            I                                0
            ?                                                                      1
            ?      IE      PERs              1 l.
1 i2                      7
      .                                                          llll!1\l\
 
                                                  ~CLINTON PNE!! STATION RF-2 Itur W
T.      -
E M  .
stabilization P
E R' d
    ?          A' e                                                                  verification e        .T ll g  -
N                  li,RT-e-stabilization t
RF    -
E verification 1-                                                                                  -
3 71,000          i  i iiiiiiiiiiiiiii 715    215                            IINE                        100  216
 
                                                                                                ?
4 i
_                      CLINTM PMER STATIM RF-2 iLRT-77.00W 3
I          -                                                                      1 E
N            stabilization P
:            E
            .R d                                                                                '
7          Ae                                                                                i e          Ig        -
11
'                                                                            verification    I RF      -
qv                              e  stabilization l            E
_                            ILRT                                        1
,          1                                              %                verification
                      ~                                        %
4
!                                                                            %s 71.000        i  i    i    i i  i  -i  i    i  i i  i    i  i  i    i    i 715  215                        IINE-                          100 216 4
 
CLINION Pol!ER STAil0N RF-2 ILRT                  -
          ??.000 I      -
E                                                                                            -
N      -
P.
E        stabilization Rd y      A' e
* I  fl
                -                                                          verification e_ stabilization
          'f  r N
E                                  ruf
                -                  N-              ~
vertftcation i                                              -
5 f
71,000      !  i    iiiiiiiiiiiiiii 715  215                        IINE                            100  216 t
1
 
CLINTON POER STATION RF-2 ILRT I    -
E N      ~
P E
Rd      stabilization                                    verification c
  ?  Ae                                                    o -stabilization e  Ig    -
Il                    %        ILRT RF    -
E                                                          verification
                                                          ~%
1 6
h 715 215                    IINE                          100 216  .
T
 
CLINTONPOWERSTAf!0NRF-2ILRT' 77.999                                                                                            i                                -
l I        -
:  E N      -
P.                                                                                                                                  .
1 E                                                                                                !
Rd      -
7 Ae a Ig                                                                                                                                j 11        stabilization R .F.                                                                                                verification E
                                                                                                  +- stabilization ILRT 1                            %                                                                                                      '
7
                                                                                      -                verification i                                                                  m~                  _
71,000      i  i  i    i    i  i  i  i    i    i  i                    i            i    i    i      i          i 715 215                            IINE                                                                100        216-i t
 
77,ggg                    CLINTONPMERSI!Il0NRF-2ILRT I-      _
E li      ~
F
:                                    E                                                                              ,
Rd 7                                  ^e [ stabilization lI
                                    .R  F
                                              ~
e verification stabilization E              'N                  ILRT vertftcat. ion 1                                                    %      %
g      _
71.000      i-  i  e i  i  i  i      i  i  , , ,  ,  ,    ,    '
715  215-                      IINE                          100 216
 
CLINIM MER STATIM RF-2 ILRT 94,ggg                                                            ,
[
i      -
E N      -
    .p E          : stabilization                                          verification Rd                                                            ,-stabilization 7  Ae                                                                                      ..,
u  1g      -
11                                                                                        !
ILRT
<  ~Ri-                                -
verificatic        1 E                                                      m m      _
                                                                                    ~
1 9
l 88.000      i  i    i    i  i  i  i  i    i  i i  i  i    i    i    i    i 715  215                          IIME                            100  216
 
CLINTON POWER STATION RF-2 ILRT M 000 4
I      -
E N      ~
P E
Rd    -
            ~ Ae      stabilization                                      verification s Ig                                                    ##-stabilization U
RF    -
                                %            ILR7 E                                                                .  .
                                                      ~                  verificattaa
                                                                -~
2 0
E g
715  215                    IINE                          100  216
_ _ _ _ _                                                            M
 
CLINIONPOWERSTATIONRF-2ILRT 94.000 I      -
E N      _
P E
Rd    -
  , Ae k I  (J D
Rf    -                                                              verification E          stabilization                                        e-stabilization
          ~
N            ' -~
[LRT 2                                                                          ,    .
1
                                                      ~    _
verification
                                                                              ~~-        -
I          _
i    i      i  i    i  i i  i  i    i  i    i    i 88.000      i  i  i            i 715  215                            IIME                              100 216 il
                                        .                                                      1
 
b CLINTON POWER STAil0N RF-2 ILHI 89,000 I      -
E N        ~
P E          stabilization Rd                                                                    verification Ae                                                              e    stabilization s Ig      -
[]                                    .
1 RF      -
ILRT E                                                                      verification
_                                                  s w
1  2 2                                                                                      ,
i
                !  !    !    !  !  !  !    I    l' l l  '    I    !
s                                                                    I    I    l 715  215                            IIME                              100 216
 
CLINTONPOWERSTATIONRF-2ILRT 87.000 T
E H        _
P E        l stabilization Rd      -
verification
  , Ae                                                            224tabilization h Ig      -
ll RF      _
                                %          ILRT                          ..      .
E
                                            ~                        vertftcation 2                                      -
3 i
81,000      i    i    i  i    i  i  i    ;    i    i i i i    i  i    i    i 715  215                            i!, 9E                        100 216 il
 
m CLINfM PMER STAf!M RF-2 ILRT-86.000 I        _
E
                              -H        -
p                                                                .                  .
g Rd      -
y                  Qe hI'
                                        ~
verification W-stabilization l                              RF      -
E j                                      (stabilization
_        _                          ILRT l
                                                                                      -                    verification L
2 4
80.000        i  i    i    i  i    i-  i      i  i  i -i  i  i  n      ,    ,    ,        l l
715 215                                  ilNE'                            100  216    ,I
 
CLINTONPOWERSTATIONRF-2ILRT 77.000 I      -
E H      _
P E                                                                                  verification Rd    -
A-stabilization
          ,,  Ae istabilization i    Iy                                                                        -
0                                            ILRI RF    _
s    _
verification E                        F x-%                              _s                    %~
l                                                                        v 5
i l                    L I
f              n.m        , 1    ,  m,        ,        ,  ,        ,  ,  ,    ,    ,    ,  ,    ,    ,
1                        715 215                                    IINE                                  100  216 l
t i
_ _ _ _      -              m.;          ..    ..
                                                                                          ... .                      r x
 
www                            ' --- - ''- ~'' ' ' ' - '-
k '
e I
_ ,                      .  ..-                                Ma
* g
                                                                                                                                                                                        **=4 t**                                                                                                      N C                    $l"* C
  ,                                                o                    C+=*                                                                                                    ,,
                                                  .e                  . e w.*                                                                                                          CD
                                                  .dm.D              eM                                                                                                                @
                                                    *1l5 e.;s                rti N, o.e  e                                                                                                  **
                                                                                                                                                                                        -4
                                                  .e                  .e ei.ana              teme*een ea                  . es.ee&%
                                                    &                    $8 tb
* 4Le                  ese 2D                  ## M I                -                    -
2
                                                                        - S b 88 cc                                                                                                                                          -..
wJ
                                .e WY
    "                          s 8.m.
    ;                        s"4                                                                                                                                                  -
                                                                                                                                                                                      \
i                          .r D                          o w                                                                                                                                                    -
a''e                                                                                                                                                        E.m.3 3- e '                                                                                                                                                      2C vs                                                                                                                                                    -        .e CM                                                                                                                                                          be EmJ                            4- e
                            ""IC
                            .                              GC                                                                                                                    -
C                              A EE.                            -
M                        e
  =                          .-.
                                                            \.
4 x.
O                                                                                                                                                    _
4.)
u M
                                      - M M M.M      .H.      M  {M              --- H-MM MM 9% MMS.                                                                MM
_s                                                                                                                c o
E                                                                                                            .e M                                                                  m e                                                                                                              M N
n                                                                                                                .-                                                                      its e                                                                    M
  =
^
                                                                                                                ..a.                                                                    N A
        "                                                                                                        tu
                                                                                              ,N"              e                                                                    . t.s 3 3                                                                                                              m                                                                      ==4 C33 1        1            9          I              I          I Ds              1      1.,
I C53 C9                                                                                                                                          CD
          ,                        C33                                          N            C2C 2.c                                                                          CA g
-                                  Cr**                          Z *ll*:3 E * * (".4 a.==e E=== .-l>e                =-4                                                        CO m
  -a F- t+ 5 9
 
CLINTONP011ERSTATIONRF-2ILRT 97.000                                                                          e H
            ~
j' verification H
IX      -
ILRT
  - D                                                            verification i IR    -
u-stabilization IH
* y      _
l 2
1 stabilization l
i      i i  i  i  i    i  i  i    i    i  i    i    i 85.000      i        i 715    215                    IINE                          100  216 I
il TM
 
I CLINTONPOWERSTAil0NRF-2ILRT 97.000 H          ~
                                                                ~~'
g              verification
, ,    D s    IR      -
                                /                                q  verification iH                                                            Stabilization
      .y      _
3 stabilization e
m g      _
715 215                      IINE                        100  216 4
                                  ,            ~                    -
 
CLINTONPMERSIAfl0N.RF-2ILRT 97,000 l
y      s      's                          !
H      _
verification U
M                                  ILRI Ix    -
D verification i  iR    -
M-stabilization                  -
IH
!    Y      -
    -4 stabilization 3
i                                                                                              k 85,000      i  r  i    i i  i  i  i    i  i  i  i  i  i  i      i      i
;            715  215                        IIME                            100    216        i i                                                                                              :
i l                                                                                              -
                                                                                          .h    t
 
CLINTONPOWERSIATIONRF-2ILRT
                                                                                            ~_
                                                                              '      verification-H        ~
U                                        ILRT                          verification N                                                                  e
                  ,    _                ,                                            stabilization
          ~  D s  !R      -
IH V        _
5
)
stabilization 78.000_ i        i  i  i  i. i  i      i    i  i i    i i  i    i    i    i    ,
715 215                                IINE                            100  216 e
6
 
l i
6 1
n                              2 n            no o            oi                            i i            it                                    0 t            t a                                  0 a            az                                1 c            ci                            i i            il f            fi i            ib r            ra                            i e            et v
vn        .
i s                      a i
I R      -
L I
i
                /
2 F
R                                                      i N
O I                                                        i T
A                                                            E I                                                            M S                                                        i    i R                                                            I E                      I W                      R O
i L
P                      I N
O                                                      i I
N I
L                                                      i C
i i
n o
i t        i z
i                5
-                                              l        i 1
.                                              i                2 b
-                                                a t        i      5 s              1 7
_ -        ~      ~ l
                                      - _  -  f      _
0 0
                            %        RH                0 0
1HIDIIy 1                      6          8 7:
 
CLINTONFWERSTATIONRF-2ILRT                          -
92.000                                              ._          ,~--
                                                  -                    vertitcation g                                                        .
ILRT verification H      _                                                C stabilization il N
Ix      -
    ,  D s  IR-      -
IH
      .y      ..
7                                                              .
stabilization                            .
i 80,000      i    i  i  i    1  1          i i  i      i  i  i    i    i 715  215                      IINE                            100 216 l
 
CLINTONPMERSTAfl0NRF-2'ILRT 52,000
            -                                                                                  1 a
j 1
N U
                                                              /            .
verification N
I. x D
I
  ~~
IR    -
[LRT                      verification              .
fH                                                          *-stabilization Y      -
l
;                      /
8                                                                                          !
stabilization                                                                1 40,000      i  i    i  i  i  i  i  ,    i  i i  i  i  i  i    i    i 715  215                          IIME                          100 216' I      f
 
CLINI M f MER STATION RF-2 ILRT 52.000 verification H                        _
U q  verification y
ILRT                      stabilization          .
[  .x
            ,                  3 e                -[    g                    _
fH Y                        _
_ stabilization 9
40.006                            ,        , , ,  '    '    '    '  '  '  '  '  '  i    i      i 715 215                          IINE                            100      216
 
APPENDIX G                                      '
instrument Selection Guide Calculations 1
                    +--we- e- , - -
n  ,. ,--
 
i
                                                                                                          --am ISG CALCULATION                                            -
(ANSI /ANS 56.8 - 1981)
CALIBRATION DATA
                                # OF SENSORS                    SENSITIVITYfE)          REPEATABILITYfr)
TEMPERATURE (T)                            25                0.0100 deg. F            0.0100 deg. F PRESSURE (P)                                2                0.0003 psia            0.0010 psia VAPOR PRESS (Pv)                            9                0.5000 deg. F          0.1000 deg. F Length of Test (t)                        8.00 hre          ,
T0ct Pressure (P)                        9.70 poig -- 24.0165 paia Test Temperature (T)                      533 deg. R From Steam Table                          .01259 pai/deg. F (at 70 deg. F dp) 0.3415 deg. F/% R.H.      (at 85% R.H., 75'F dp)
Lg                                        0.6500 wt%/ day INSTRUMENT MEASUREMENT ERRORS OT a ((ET)2 + (rP)2 )1/2 /(# of sensors)1/2 GT =          0.002828 deg. R GP = ((ET)2 + (rP)2 jl/2 /(# of sensors]1/2 cP =          0.000738 psia sPv = ((EPv)2 + (rPv)2 )1/2 /[# of sensors]I/2 OPv = 0.002139 psia INSTRUKENT SELECTION GUIDE ISG = 2400/t( 2geP/P)2 + 2(ePv/P)2 + 2(eT/T)2 )1/2 ISG =          0.04005 wt%/ day 25% of L,    0.1625 wt%/ day G-1
 
_I l
APPENDIX H Drywell Bypass Leakage Rate Test Fs
: g.                                                                          /
g+$',$A t?$9 t                                                                          $0 q
IMAGE EVALUATION                                                      k
      /o %\ , W- [.. q +$      TEST p%h' TARGET (MT-3)
                                                                                          /
j[,4[.&,* 4 y,,          &                                                      ffs V
          +                                                                                +
i 1.0    Em M                                                                      l usu p"u                                                                  \
t tu                                                                      l l,l C          bb U1
!                                  l.25      1.4                    1.6 4                        150mm                                              >
4                          6"      -
i 4k*%                                                                        /f4%
->,p(>>,,,g-oy
                                                                                    <gg y                                                              <tyw b;;                                                  a
  .,..-~.___~..._____.._3%-c-_
_      . _ . _ , , , - . _ - . . . . . -,!MI, _
:Y ,
 
s-  0-b I
v_.4,Np    9,
                                                                                                            $'fa g Y;.q, rQ,V                          IMAGE EVAL.UATION                                              g/'f KsNg [,..$
9$'g, f                    TEST TARGET (MT-3)                                              4                    49 sg%p,'1'~'                                                                                              ,4      't 4              g                                                                            ,
gh
                                                                                                                  ~f J}W
      #                                                                                                          4 p #;ht
    %(ii>$>gp                                                                                              4;g g
1k      . j 2
_ _ . _        ?_,,,M n.m L. tnt m
l,l
                                                                  %  s -4 w i, y-m l                  :
                                                    =====                        1.8 i                            l11 n an l  1.25 91.4  I 1.6 I=        -
Ib sm        eeee 4                                                  150mm                                            >
4                                                    6"  -
A A ,%j        ,p/>%      yy - -                                                                    < &+ s*
Qv ;u/h.
  %)v oy
          %g ,            .
gy qe h1  fYh.
o  A                                              ,g '
                                                                                        ) , , , '  J' %            y            _u -
 
l DRYWELL BYPASS LEAKAGE RATE TEST                                                                              MARCH 13, 1991 -33 START:      16:45                                                          END:  20:40                        t (HRS) : 4.00 T.      WEIGHTFD AVEP*.GE DRYWELL T7PEPATURE INITIAL TEMPERATpRE RTD                      Ti                                        _ V_QL FRAC                fTI+460) X VFL T19 =                    89.417                                        0.033                  2.9507 T20 =                    88.957                                        0.033                  2.9355 T21 =                    88.336                                        0.033                  2.9150 T'a 2 a                    85.696                                      0.033                  2.8279 T23 =                      83.788                                      0.004                  0.3351 T24 =                      80.263                                      0.003                  0.2410 SUMS    =o                VFL =                                          0.139                  Ti, IVFL = 12.2056 WT AVG                    T1 =                                          547.81 DEG R OR        37.81 DFG F FINAL TEMPERATURE RTD                        Tl                                            VOL FFAC              (Ti+460) X VFL T19                        89.301                                      0.033                  2.9469 T20 a                      88.852                                      0.033                  2.9321 T21 =                      88.292                                      0.033                  2.9136 T22 =                      85.728                                      0.033                  2.8290 T23 =                      83.788                                      0.004                  0.3351 T24 =                      80.244                                      0.003                  0.2407 SUMS ==                  VFL =                                        0.139                  Ti. 2 VFL = 12.1975
    )'T AVG                    T2 =                                        547.75 DEC R OR        87.75 DEG F II.      ABSOLUTE DRYWELL PRESSURES (PPM - 1000                                  GP W.941_
INITIAL                                                                              FTKJ          ,
P1 =            17.3290 pria                                                          P2 =        17.2280 psia PO =            .4.2350 psia                                                          PO =        14.2770 V=              245413.85 III. DRYWELL LEAKAGE RATE CALCULATION (COMPENSATED.FOR WEIR LEVEL) g , P1fV J.?l-PO) x 2.31 x 473)1                                ,    P2fv+fIP2-PO) x 2.31 x 47311 x        Ts T1                            T2                      60tPs t    ,  17. 5 2 9 f 24 5,41_1._8 5+ f f 17. 5 2 90-14. 2 3 50 ) x 1092.63)1 _
547.81035 17.228f245.411x11+f(17.2280-14.2770) x 1092.63)1                                              529 547.75247                                      882(4) g  ,  21.86,sefm i
H-1
 
APPENDIX I Type B and C Leakage Rate Test Results 4
4
 
                                                              -2 APPENDIX I LOCAL _ LEAK RATE
 
==SUMMARY==
ANALYSIS This appendix includes a summary of the local leak rate test results as of March 2, 1991. This appendix also contains a summary of all local leak rate Type B and C tests completed since the last Type A test (November 1986), including those that failed to meet the acceptance criteria.      This surmary contains the valves tested, leakage rate, tolerance of test equipment, date tested and remarks concerning maintenance activities associated with the valves. The analysis of the        ,
as-found and as-left leakage rate results for the Type A test are contained in Section 4.0 of the ILRT report.
Local Leakane Rate Test Results Summarv (as of 3/2/91)
Leakage              Tolerance Rate seem                sccm          q Type C                    63,169.39                1037.9 Type B                        551.01                  24.5 Total B & C (excluding-    63,720.40                1062.4 MSIV and water tests)
Total MSIV                13,205.1                  713.4 Total Water Test          1.890 gpm                0.080 gpm I-1
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                  SCCM TOLER DATE                COMMENTS:
NUMBER                                            ANCE
                  **  1MC001 1MC001 1CM099                                  0.0  0.0 01/23/87 1MC001 HATCH                                  0.0  0.0 02/03/87 1MC001 1CM099                                  0.0  0.0 10/18/87 1MC001 HATCH                                  0.0  0.0 11/13/87 1MC001 HATCH                                  0.0  0.0 04/19/88 1MC001 1CM099                    20.0              10.0 04/07/89
,                  1MC001 HATCH                                  0.0 10.0 04/27/89 E
1MC001 HATCH                                  0.0 10.0 06/18/89 1MC001 1CM099                                  0.0  2.0 03/13/90 1MC001 FATCH                                  0.0  2.0 03/13/90 1MC001 HATCH                                  0.0  2.0 03/13/90 PMT FOR MWR D07065 HATCH REMOVAL.
1MC001 HATCH                                  0.0  2.0 03/26/90 PMT FOR MWR D14174 HATCH REMOVAL.
IMC001 HATCH                                  0.0 10.0 07/25/90 PMT FOR MWR D07011 HATCH REMOVAL.
1MC001 HATCH                                  1.9  2.0 10/15/90 PRETEST FOR ILRT PRIOR TO HATCH REMOVAL l                  1MC001 1CM099                    20.0              10.0 01/31/91 1MC001 HATCH                                  0.0 10.0 02/10/91 PMT FOR MWR D07569 HATCH REMOVAL l
l l
l l
{
l I-2
 
                                                                                          ~_.
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN              SCCM TOLER DATE            COMMENTS:
NUMBER                                ANCE
**  1MC002 1MC002 LOWER              8000.0        0.0 01/23/87 MWR C27927 EQUALIZING VALVE BARREL                                            LINKAGE SHEARED IMC002 LOWER                280.0    10.3 02/03/87 PMT FOR MWR C27927 EQUALIZING BARREL                                          VALVE LINKAGE SHEARED 1MC002 LOWER                510.0    10.3 07/31/87 BARREL 1MC002 LOWER                640.0    27.6 09/05/87 PMT FOR MWR C51084 SEAL BARREL                                          SEPARATED FROM OUTER DOOR.
1MC002 LOWER                  40.0    10.3 03/01/88 BARREL 1MC002 LOWER                3000.0    22.5 05/04/88 MWR C54021 WRITTEN TO REPAIR BARREL                                          SHAFT SEAL.
1MC002 LOWER                  420.0    10.3 05/04/88 PMT FOR MWR C54021 BARREL 1MC002 LOWER                4000.0 200.0 05/18/88 BEGAN TESTING A:RLOCKS ON AN BARREL                                          INCREASED FREQU';NCY TO DETERMINE CAUSE OF RECURRENT FAILURES. MWR C28179 ADJUSTED SHAFT SEALS 1MC002 LOWER                1720.0    27.6 05/24/88 PMT FOR MWR C28179 BARREL 1MC002 LOWER                  40.0    10.3 06/08/88 BARREL 1MC002 LOWER                  40.0    10.3 06/22/88 AIRLOCK 1MC002 LOWER              5000.0        0.0 09/14/88 MWR C57309 WRITTEN TO REPAIR BARREL                                          SHAFT SEAL.
1MC002 LOWER                320.0    10.0 09/14/88 PMT FOR MWR C57309.        TEST BARREL                                          INTERVAL REDUCED TO 3 MONTHS.
1MC002 LOWER _                40.0    20.0 12/15/88 BARREL 1MC002 LOWER                    40.0    20.0 04/10/89 BARREL 1MC002 LOWER              1000000        0.0 09/11/89 MWR D14064 TO REPAIR BARREL                                          EQUALIZING VALVE 1MC002 LOWER                  420.0    S5.0 09/12/89 PMT FOR MWR D14064 BARREL 1MC002 LOWER                  620.0    65.0 02/14/90 BARREL 1MC002 LOWER                4500.0 400.0 07/19/90 MWR D07847 WRITTEN TC REPATR BARREL                                          THE EQUALIZATION VALVE THAT WAS IDENTIFIED TO BE LEAKING.
1MC002 LOWER                  40.0    20.0 07/20/90 PMT FOR MWR D07847 BARREL 1MC002 LOWER                  20.0    10.0 11/04/90 AS FOUND FOR ILRT BARREL 1MC002 LOWER                1620.0    14.1 02/09/91 AS LEFT FOR ILRT I-3
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                                                                                                    SCCM TOLER DATE                                          COM!4ENTS :
NUMBER                                                                                                                                                                        ANCE BARREL
          **  1MC003 1MC003 UPPER                                                                                                1220.0                                                          27.6 01/27/87 BARREL 1MC003 UPPER                                                                                                1420.0                                                          27.6 07/15/87 BARREL 1MC003 UPPER                                                                                                1220.0                                                          27.6 01/05/88 BARREL 1MC003 UPPER                                                                                    18000.0 210.0 05/02/88 MWR C46275 TO REPAIR BARREL                                                                                                                                                                                EQUALIZING VALVE                        o 1MC003 UPPER                                                                                                1970.0                                                          27.6 05/03/88 PMT FOR MWR C46275 BARREL 1MC003 UPP2R                                                                                                              520.0                                              27.6 05/11/88 BARREL 1MC003 UPPER                                                                                                              820.0                                              22.5 06/01/88 BARREL 1MC003 UPPER                                                                                                              360.0                                              10.3 06/15/88 BARREL 1MC003 UPPEA                                                                                                              100.0                                              10.0 09/21/88 BARREL 1MC003 UPPER                                                                                                                          40.0                                  20.0 11/23/88 BARREL 1MC003 UPPER                                                                                                                          40.0                                  20.0 04/13/89 BARREL 1MC003 UPPER                                                                                                              900.0                                              55.0 09/18/89 BARREL 1MC003 UPPER                                                                                                  1620.0                                                        20.0 02/20/90 BARREL 1MC003 UPPER                                                                                                                          30.0                                  15.0 07/16/90 BARREL 1MC003 UPPER                                                                                                              400.0                                              10.0 11/01/90 AS FOUND FOR ILRT BARREL 1MC003 UPPER                                                                                                                330.0                                            14.1 02/07/91 AS LEFT FOR ILRT.              NO WORK BARREL                                                                                                                                                                              PERFORMED 1
I-4
                                                                                  - - - _ - _ - _ _ - - - - - _ - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                                      --J
 
1
                      -RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIri  SCCM TOLER DATE        COMMENTS:
  -NUMBER                    ANCE
  **  1MC004 1MC004 IFTS      100.0  25.7 10/31/87 1MC004 IFTS        12.0  10.0 03/15/89 PMT FOR MWR C56310 ROTATE SPECTACLE FLANGE 1MC004 IFTS        0.0  50.0 03/09/90 PMT FOR MWR D07174 1MC004 IFTS        0.0 100.0 10/10/90 AS FOUND FOR ILRT 1MC004 IFTS        26.8  10.0 12/22/90 AS LEFT FOR ILRT I-5
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM-TOLER DATE        COMMENTS:
NUMBER                      ANCE
  **  1MC005 1MC005 MSIV C        20.0    5.1 01/10/87 TESTED 1E32F330A ONLY. PMT 1E32F330A                          FOR IS-7 MODIFICATION 1MC005 MSIV-C        20.0    5.1 03/24/87 PMT FOR MWR C32331 1E32F330A iMC005 MSIV C      750.0  22.6 11/10/87 PMT FOR MWR CS2618 AND MWRC38147. REPAIREC SEAT FO F022C AND MWR C38147 REPAIR F028C.
1MC005 liSIV C    1000000    0.0 01/05/89 MWR C52137 LAPPED F022C.
C52141 LAPPED F028C.
1MC005 MSIV C      900.0    0.0 02/22/89 1B21F028C 1B21F022C 1MC005 1B21F026C    20.0    0.0 02/22/89 MSIV C iMC005 1B21F022C    900.0    0.0 02/22/89 1B21F028C MSIV C 1MC005 1B21F026C    20.0    0.0 02/22/89 MSIV C 1MC005 MSIV C      920.0  55.0 02/23/89 1MC005 1B21F022C    361.0  20.0 10/21/90 1B21FC28C
,          MSIV C t
i I-6
 
_\
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE        COMMENTS:
l NUMBER                      ANCE-
**  1MC006 1MC006 MSIV A        45.0    5.1 01/10/87 TESTED 1E32F329A ONLY 1E32F329A                            RETEST FOR IS-7 MODIFICATION-1MC006 MSIV A        20.0    5.1 03/24/87 PMT FOR-MWR C32331 1E32F329A iMC006 MSIV A      3020.0 206.1 11/07/87 PMT FOR MWR C48983 AND C38144 REPAIRED SEAT FOR F022A AND F028A iMC006 MSIV A    1000000    0.0 01/05/89 MWR C52139 LAPPED 28A iMC006 MSIV A      2070.0 410.0 02/19/89 PMT FOR MWR C52135 INSPECT ACTUATOR SPRINGS (CHANGED),
AND MWR C52139 LAPPED SEATS ON 1B21F028.
1MC006 1B21F022A  12750.0 400.0 10/25/90 THIS IS A TEST OF THE INBOARD MSIV A                                MSIV. THE OUT6OARD VALVE WOULD NOT HOLD press 0RE.      MWR D09910 PERFORMED MODIFIC/. TION MSF012 AND REPAIRED SEAT OF 1821F028C.
1MC006 MSIV A      51'0.0 420.0 11/16/90 THIS IS THE POST MAINTENANCE TEST (PMT) FOR MWR D0'3910 (MSF012 MODIFICATION'.
I-7
 
  ^
RF-2_ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                SCCM TOLER DATE        COMMENTS:
NUMBER                                ANCE
**  1MC007 1MC007 MSIV D                  20.0    5.1 01/10/87 TESTED 1E32F330C ONLY 1E32F330C                                    RETEST FOR IS-7 MODIFICATION 1MC007 MSIV D                  20.0    5.1 03/24/87 PMT FOR MWR C32331 1E32F330C 1MC007 MSIV D          12270.0 206.1 10/22/87 1MC007 MSIV D          1000000          0.0 03/19/88 1MC007 MSIV D          1000000          0.0 01/03/89 MWRS C52138 AND CS2142 WRITT TO REPAIR SEATS.
1MC007 MSIV D            2070.0 1MC007 MSIV D                          20.0 02/19/89 PMT FOR MWR C52138 & CS2142.i 6060.0-420.0 10/21/90 I-8
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                                                                                    SCCM TOLER DATE                                  COMMENTS:
NUMBER                                                                                                                                                ANCE
                      *o                                  ~1MC008 1MC008 MSIV B                                                                                                      20.0                            5.1 01/10/87 TESTED 1E32F330C ONLY 1E32F329C                                                                                      RETEST FOR IS-7 MODIFICATION 1MC008 MSIV B                                                                                                      20.0                            5.1 03/24/87 PMT FOR MWR C32331 1E32F329C 1MC008 MSIV B                                                                                                  420.0                              27.6 11/07/87 PMT FOR MWR C48983 AND C48984 REPAIRED SEAT 1MC008 MSIV B                                                                                                  3020.0 410.0 01/03/89 TOTAL LEAKAGE INCLUDING TEST CONNECTION 1MC008 MSIV B                                                                                                  1975.0                              65.0 10/21/90 I-9
 
RF-2 ILRT/LLRT LEAKAGE REPORT-PENETR VALVE EIN          SCCM TOLER DATE            COMMENTS:
NUMBER                              ANCE
**    1MC009 1MC009 1B21F010A- 1000000            0.0 04/06/88 1MC003 1B21F032A        350.0        5.1 04/06/88 1MC009 1B21F063A        -20.0        5.1 04/06/88 1MC009 1E12F053A        20.0        5.1 04/06/88 1B21F065A 1E12F058A 1E12F349A-1MC009 1B21F030A        20.0        5.1 04/06/88 1MC009 1B21F010A    7000.0 400.0 03/07/89 1MC009 1B21F010A    7000.0 400.0 03/07/89 LMC009 1B21F063A        20.0 -10.0 03/08/89 1MC009 1B21F063A        20.0 10.0 03/08/89 1MC009 1B21F010A    7000.0 400.0 03/19/89 FAILED NON TECH SPEC ACCEPTANCE CRITERIA. RETEST)
ON 3-28-89 1MC009 1B21F063A          20.0      10.0 03/19/89 1MC009 1821F010A        750.0        45.0 03/27/89 1MC009 1B21F010A        750.0        45.0 03/27/89
-1MC009 1B21F010A          75.0      45.0 03/28/89 PMT FOR MWR CO2067 1MC009 1B21F032A-          0.0      0.0 03/29/89 TROUBLE SHOOTING F032A NO DA9 TAKEN.
1MC009 1B21F032A 1000000 0.0 03/31/89 1MC009 1B21F065A    3000.0        400.0 03/31/89 1E12F053A 1E12F058A 1E12F349A 1B21F030A 1MC009.1B21F030A            0.0      0.0 03/31/89
-1MC009 1B21F032A . 1000000            0.0 10/20/90 D06674 WRITTEN FO REPAIR THE' EXCESSIVE LEAKAGE IDENTIFIEDi IN THE PRE-LLRT. MWRs D1515k and D07911 WERE WORKED IN THT OUTAGE ALSO.
1MC009 1B21F010A        360.0        10.0 10/20/90 1MC009 1821F063A          20.0      10.0 10/20/90 1MC009 1B21F065A        950.0        45.0 11/20/90 1E12F053A 1E12F349A 1E12F058A 1MC009 1B21F030A          0.0      10.0 11/20/90 1MC009 1B21F032A    1000000          0.0 12/16/90 PMT FOR MWR D06674 TO REPAIR-SEAT LEAKAGE. EXEMPTION APPROVED TO EXCLUDE THIS VAL 3 FROM THE LEAKAGE-TOTALS UNTI8 REFUELING OUTAGE N 'MBER 3.
I-10
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN          SCCM TOLER DATE          COMMENTS:                      ,
NUMBER                            ANCE
  **  1MC010 1MC010 1B21F030B          20.0    10.0 03/31/88 1MC010 1G33F057          20.0    10.0 03/31/88 1MC010 1E31N077A          20.0    10.0 03/31/88                                    ,
1E31N077B 1MC010 IB21F010B      20000.0      0.0 03/31/88 FAILED NO RETEST AS 1821F032B      >
PASSED.
1MC010 1821F032B        450.0    22.5 03/31/88 1MC010 1B21F063B          45.0    5.1 03/31/88 1MC010 1B21F065B          20.0    5.1 03/31/88 1E12F053B 1E12F058B 1E12F349B 1MC010 1B21F010B          20.0  10.0 03/06/89 1MC010 1B21F063B          30.0  10.0 03/06/89 1MC010 1B21F030B          20.0  10.0 03/06/89 1MC010 1E31N077A          20.0  10.0 03/06/89
          -1E31N077B 1MC010 1G33F057            20.0  10.0 03/06/89 1MC010 1B21F032B      1000000      0.0 03/15/89 NO WORK PERFORMED F010B PASSED.
1MC010 1E12F053B        1000.0    45.0 03/16/89 1E12F058B 1E12F349B 1B21F065B 1MC010 IB21F063B          20.0    10.0 10/17/90 1MC010 1B21F032B      1000000      0.0 10/17/90 T. S. EXEMPTION TO EXCLUDE THIS VALVE FROM THE LEAKAGE TOTALS UNTIL REFUELING OUTAGE NUMBER 3 1MC010 1B21F010B      10500.0 400.0 10/18/90 MWR D15624 TO REPAIR SEAT.
1MC010 1B21F065B            5.0  10.0 12/15/90 1E12F053B 1E12F058B 1E12F349B 1MC010 1B21F030B          10.0    10.0 12/15/90 1MC010 1G33F057              0.0  10.0 12/15/90 1MC010.1E31N077A            5.0  10.0 12/15/90 1E31N077B 1MC010 1B21F010B          15.0-  10.0 12/16/90 PMT FOR MWR D15624.
1MC010 1B21F032B      1000000      0.0 12/16/90 PMT FOR MWR D07813 LAPPED SEAT. EXEMPT FROM LEAKAGE TOTALS.
L I-ll L
 
RF-2 ILRT/7,LRT LEAKAGE REPORT PEFETR VALVE EIN SCCM TOLER DATE        COMMENTS:
NUMBER                    ANCE
  **  1MC011 1MC011 1E12F335A    0.1    0.0 08/02/90 1MC011 1E12F334A    0.1    0.0 08/02/90 1-12 l
 
a RF-2 ILRT/LLRT LEAKACE REPORT PENETR VALVE EIN                                                                                        SCCM TOLER DATE      COMMENTS:
NUMBER                                                                                                          ANCE
                                                  **                                              1MC012 1MC012 1E12F335B                                                                                      0.1    0.0 07/31/90 1MC012 1E12F334B                                                                                      0.1    0.0 07/31/90 I-13
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE            COMMENTS:
NUMBER                  ANCE
    **  1MC013 1MC013 1E12F335C  0.1          0.0 07/31/90 1MC013 1E12F334C  0.1        0.0 07/31/90 9
d 4
4 I-14
 
i RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE        COMMENTS:
NUMBER                    ANCE co 1MC014 1MC014 1E12F009  190.0    5.1 04/12/88 1E12F475 LMC014 1E12F001  650.0  22.5 04/12/88 1E12F008 LMC014 1E12F009  370.0  10.0 02/21/89                                  '
1E12F475 1MC014 1E12F008  172.0  10.0 02/23/89 1E12F001 1MC014 1E12F475  2050.0  45.0 12/21/90 TEST PERFORMED AT 1800 HRS 1E12FOO9                          AFTER CYCLING FOR THE F008 AND F001 TEST.
1MC014 1E12F008    90.0  45.0 12/21/90 1E12F001 1MC014 1E12F475  3000.0 450.0 12/21/90 PRETEST FOR MWR D19177 1E12F009                          (REPACKED 1E12F009 AND PERFORM MOVATS). TEST PERFORMED AT 12:45.
1MC014 1E12F009  1150.0  45.0 12/27/90 PMT FOR MWR D19177 (CHESTERTON 1E12F475                          PACKING AND MOVATS).
'1MC014 1E12F008    100.0  10.0 12/27/90 1E12F001 1-15
 
A RF-2 ILRT/    RT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE        COMMENTS:
NUMBER                    ANCE
  **  1MC015 1MC015 1E12F027A    20.0  5.1 04/10/88 1E12F042A 1E12F037A 1E12F04AA 1E12F329A 1E12F025A 1E12F028A 1E12F107A iMC015 1E12F331A  20.0    5.1 04/10/88 1MC015 1E12F331A    20.0  10.0 01/21/89 1MC015 1E12F027A  20.0  10.0 01/21/89 1E12F025A 1E12F042A 1E12F107A 1E12F044A 1E12F329A 1E12F037A 1E12F028A iMC015 1E12F027A  330.0  10.0 10/27/90 PRETEST FOR MISC. PM'S TO BE 1E12F025A                          PERFORMED ON ALL VALVES (MOTC IE12F042A                          REPLACEMENT, SHAFT KEYS, CLEI 1E12F107A                          INSPECT, ETC.)
1E12F329A 1E12F044A 1E12F037A 1E12F028A iMC015 1E12F027A  254.4  10.0 11/24/90 PMT FOR BENCH TEST OF 1E12F025A                          1E12F025A & REASSEMBLY OF 1E12F042A                          1F12F028A AFTER REMOVAL FROM 1E12F107A                          SYSTEM FOR THE CONTAINMENT 1E12F329A                          SPRAY TEST.
1E12F044A 1E12F037A 1E12F028A 1MC015 1E12F331A    20.0  10.0 11/24/90 l-I-16
 
Q RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN-      SCCM i7LER DATE      COMMENTS:
NUMBER                        ANCE
    **- 1MC016-IMC016 1E12F027B    1600.0    22.5 03/29/88 1E12F042B 1E12F329B 1E12F028B 1E12F044B 1E12F037B 1E12F025B 1E12F107B 1MC016 1E12F331B      20.0    5.1 03/29/88 1MC016 1E12F027B    8000.0 400.0 03/04/89 1E12F042B 1E12F329B 1E12F037B 1E12F025B 1E12F107B 1E12F044B 1E12F028B 1MC016 1E12F331B      20.0    10.0 03/04/89 1MC016 1E12F027B  10237.6 400.0 12/05/90 PRETEST FOR MISC. PM'S TO BE 1E12F042B                          PERFORMED (SHAFT KEY 1E12F329B                          REPLACEMENT, MOTOR 1E12F037B                          REPLACEMENT, CLEAN AND INSPECT 1E12F025B                          ETC.)
1E12F107B 1E12F044B 1E12F028B 1MC016 1E12F331B      20.0    10.0 12/05/90 1MC016 1E12F027B    6071.0 400.0 12/30/90 PMT FOR BENCM TEST OF 1E12F042B                            1E12F025B & REASSEMBLY OF 1E12F329B                            1E12F028B AFTER CONTAINMENT 1E12F037B                            SPRAY, AND MISC. PM'S.
1E12F025B 1E12F107B 1E12F044B IE12F028B I-17
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE                                      COMMENTS:                        '
NUMBER                      ANCE
**  1MC017 1MC017 1E12F042C    20.0    5.1 03/27/88                                                .
1E12F058C 1E12F047C 1MC017 1E12F056C    20.0    5.1 03/27/88 1MC017 1E12F057C    20.0    5.1 03/27/88 1MC017 1E12F042C    20.0  10.0 02/18/89 1E12F456B 1E12F351 1E12F056C 1E12N058C 1E12N047C 1MC017 1E12F041C  1000000    0.0 02/19/89 FAILED.                                    MWR C18395 PERFORME' 1E12F301C                                                          REWORK (REPLACED OUTER AND INNER ACTUATOR SHAFT AND INN SEAL SHAFT).
1MC017 1E12F042C    20.0  10.0 02/19/89 1E12F351 1E12F056C 1E12N058 1E12F456B 1E12N047C 1MC017 1E12F041C  9000.0 400.0 02/23/89 1E12F301C 1MC017 1E12F041C  9000.0 400.0 02/23/89 1E12F301C 1MC017 1E12F057C    20.0    10.0 03/27/90 THIS TESTrD 1E12F057C ONLY.
THIS VALVE WILL NOT REQUIRE TESTING AFTER THE REVISION TQ THE TECH SPEC IS APPROVED DELETING THIS VALVE AS A CIVi 1MC017 1E12F042C  100.0    10.0 12/15/90 THIS WAS A PRETEST FOR MWR 1E12F456B                                                            D03825 (REPACK INSTALL 1E12F351                                                            CHESTERON AND MOVATS OF 1E12F056C                                                            1E12F042C).
1E12N058C 1E12N047C 1MC017 1E12F041C 1000000    0.0 12/15/90 MWR D07907 WAS WRITTEN TO 1E12F301C                                                            REPAIR THE EXCESSIVE LEAKAGE THROUGH 1E12F041C.
1MCG17 1E12F042C    15.0    10.0 01/01/91 PMT FOR MWR D03825 REPACK ANE 1E12F456B                                                            MOVATS OF 1E12F042C.
1E12F351 1E12F056C 1MC017 1E12F041C 14500.0 450.0 01/01/91 PMT FOR MWR D07907 (LAPPED 1E12F301C                                                            SEAT AND DISC, INSTALLED CHESTERTON PACKING, ADJUSTED HINGE PINS).
1-18 l
 
T RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN              SCCM TOLER DATE            COKMENTS NUMBER                                ANCE
**  1MC018' 1MC018 1E12F420              20.0        5.1 10/19/87 1MC018 1E12F421              20.0        5.1 10/19/87 1MC018 1E12F418              20.0        5.1 10/19/87 1MC018 1E12F419              20.0          5.1 10/19/87 1MC018 1E12F415              20.0        5.1 10/19/87 1MC018 1E12F414              20.0        5.1 10/19/87 1MC018 1E12F347              20.0        5.1 10/19/87 1MC018 1E12F346              20.0        5.1 10/19/87 1MC018 1E12F366A            20.0        5.1 10/19/87 1MC018 1E12F365A            20.0        5.1 10/19/87 1MC018 1E12F421              20.0    10.0 01/20/89 1MC018 1E12F420              20.0    10.0 01/20/89 1MC018 1E12F419              20.0    10.0 01/20/89 1MC018 1E12F418              20.0    10.0 01/20/89 1MC018 1E12F415              20.0    10.0 01/20/89 1MC018 1E12F414              20.0    10.0 01/20/89 1MC018 1E12F347              20.0    10.0 01/20/89 1MC018 1E12F346              20.0    10.0 01/20/89 1MC018 1E12F366A              20.0    10.0 01/20/89 1MC018 1E12F365A              20.0    10.0 01/20/89 1MC018 1E12F421              10.3    10.0 11/23/90 1MC018 1E12F420              41.2    10.0 11/23/90 1MC018 1E12F419              10.3    10.0 11/23/90 1MC018 1E12F418              41.2    10.0 11/23/90 1MC018 1E12F414              41.2    10.0 11/23/90 1MC018 1E21F347              41.2    10.0 11/23/90
'1MC018 1E12F415              41.2    10.0 11/23/90 1MC018 1E21F346              41.2    10.0 11/23/90 1MC018 1E12F366A                0.0  10.0 11/23/90
'1MC018.1E12F365A                0.0  10.0 11/23/90 I-19
 
RF-2 ILRT/LLRT-LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE              COMMENTS:
NUMBER                    ANCE
**      1MC019 1MC019-1E12F354    20.0      5.1 09/29/87 1MC019 1E12F353    20.0      5.1 09/29/87 1MC019 1E12F428    20.0      5.1 09/29/87 1MC019 1E12F429    20.0      5.1 09/29/87 1MC019 1E12F354    20.0  10.0 09/08/89 1MC019 1E12F353    20.0  10.0-09/08/89 1MC019 1E12F428    20.0  10.0 09/08/89 1MC019 1E12F429    20.0  10.0 09/08/89 1MC019 1E12F354    10.0  10.0 02/19/91 1MC019 1E12F353    150.0  10.0 02/19/91 1MC019 1E12F428      0.0  10.0 02/20/91 1MC019 1E12F429      0.0  10.0 02/20/91 1-20
 
l                                                                                        RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                    SCCM TOLER DATE      COMMENTS:
NUMBER-                                    ANCE 0*                                    1MCO20 1MC020 1E12F426                    20.0    5.1 09/29/87 1MCO20 1E12F427                    20.0    5.1 09/29/87 1MC020 1E12F366B                  20.0    5.1 09/29/87 1MC020 1E12F365B                  20.0    5.1 09/29/87 1MC020 1E12F366B                  20.0    4.0 09/12/89 1MC020 1E12F365B                  20.0    4.0 09/12/89 1MCO20 1E12F427                    20.0    4.0 09/12/89 1MC020 1E12F426                    20.0    4.0 09/12/89 1MCO20 1E12F365B                    0.0  10.0 02/20/91 IMCO20 1E12F366B                    0.0  10.0 02/20/91 1MCO20 1E12F427                    10.0  10.0 02/20/91 1MC020 1E12F426                    10.0  10.0 02/20/91 1-21              '
 
RF-2 ILRT/LLRT LEAKAGE REPCRT PENETR VALVE EIN            SCCM TOLER DATE                                CC.aENTS:
NUMBER                                        ANCE                                                          ;
          **  1MCO24 1MCO24 1E12F432A            20.0              5.1 09/24/87 1MCO24 1E12F433A            20.0              5.1 09/24/87 1MCO24 1E12F433A            20.0              4.0 09/12/89                                                  l 1MCO24 1E12F432A            20.0              4.0 09/12/89 I-22
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE      COMMENTS:
NUNBER                  ANCE
**  1MCO26 1MCO26 1E12F433B 20.0    4.0-09/12/89 1MCO26 1E12F432B 20.0    4.0 09/12/89 1MCO26 1E12F433B  0.0  10.0 03/27/91 1MCO26 1E12F432B  0.0  10.0 03/27/91 I-23
 
  .. - . -    --  . . . . . _ . _ . -  .    , .    .    .. . . .- . .      .- ... - . . .. ..-.-... _~-_ ..
1
                                            ~
RF-2 ILRT/LLRT LEAKAGE REPORT i
;            PENETR VALVE EIN          SCCM TOLER DATE                  COMMENTS:
NUMBER                              ANCE
            ** -1MCO31
:            1MC031 1E12F436          20.0        5.1 11/08/87 CHANGED TO WATER TEST
;            .1MCO31 1E12F437          20.0        5.1 11/08/87 CHANGED TO WATER TEST t
s f
h I-24
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR-VALVE EIN                SCCM TOLER DATE                                                      COMMENTS:
NUMBER                                                                ANCE
                                            **                1MC033 1MC033 1E22F376              20.0                                            5.1 10/12/87 1MC033 1E22F376                20.0                                    10.0 06/13/89 CHANGED TO WATER TEST 1MCO33 1E22F376                0.1                                              0.0 07/18/90 WATER TEST 1MCO33 1E22F376              20.0                                    10.0 07/18/90 I-25
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE        COMMENTS:
NUMBER                  ANCE
      **  IMCO34 1MCO34 ISF004    120.0 5.1 11/08/87 USAR TEST REQUIREMENTS CHANG {
DUE TO LINE BEING SEALED BY SUPPRESSION POOL.
1MC034 1SF034    20.0 5.1 11/08/87 USAR TEST REQUIREMENTS CHANG [
DUE TO THE LINE BEING SEALED.
BY SUPPRESSION POOL.
9 I
l l
l l
[
I-26
 
i
                                                                                                                                                                          -11 RF-2 ILRT/LLRT LEAKAGE REPORT PEllETR VALV2 EIN                                      SCCM TOLER DATE                                                                COMMENTS:
NUMBER                                                        ANCE
  **  1MC035 1MC035 1E22F004                                        20.0          5.1 03/20/88 1MC035 1E22F022                                        20.0          5.1 03/20/88 1MC035 1E22F021                                        20.0          5.1 03/20/88 1MC035 1E22F004                                        300.0  10.0 01/14/89 1E22F021 1E22F366B 1MC035 1E22F005                                      1000000          0.0 01/14/89 FAILED MWR C52754 (WRITTEN TO 1E22F304                                                                                                                        LAP SEAT AllD DISC ON F005) .
  *MCO3e 1322F004                                        300.0  10.0 01/14/89 1E22F021 1E22F366B iMC035 1E22F005                                      4500.0 400.0 01/22/89 THIS TEST IS PMT FOR MWR 1E22F304                                                                                                                        C52754 (LAPPED SEAT ON FOO5).
CRIGI!!AL TEST Oli 1-14-89.
1MC035 1E22F005                                      4500.0 400.0 01/24/89 1E22F304 3MC035 1E22F022                                        20.0    10.0 03/09/90 THIS IS A TEST OF 1E22F022 ONLY TO ALLOW TECH SPEC COMPLIANCE UllTIL THE TECH SPEC REVISION IS APPROVED.
1MC035 1E22F004                                      130.0    10.0 10/30/90 1E22F366B 1E22F021 1MC035 1E22F005                                    1000000            0.0 10/30/90 WC D07886 WAS WRITTEN TO 1E22F304                                                                                                                        REFAIR 1E22F005 (LAPPED SEAT AND DISC).
1MC035 1E22F005                                      414.4    10.0 11/18/90 PMT FOR MWR D07886. PCC 1E22F304                                                                                                                        PERFORMED ON 12/6/90.
INDICATED THAT ACTUAL LEAKAGE OF 414.4 SCCM FOR THE RECORDED LEAKAGE OF 400 SCCM FOR FM10 3 "i . THE RECORDED LEAK RATE FOR THiS PENETRATION WAS CORRECTED TO THE ACTUAL LEAK RATE.
1-27
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                      SCCM TOLER DATE                              COMMENTS NUMBER                                        ANCE
        **  1MCO36 1MC036 1E21F013                      50.2    2.0 03/07/86 PACKING LEAK ON 1E21F013 1E21k006 1E21F005 1E21N050 1E21N049 1MC036 1E21F013                        20.0    2.0 03/07/86 PMT FOR REPAIRING PACKING L@
ON 1E21F013
'        1MC036 1E21F005                      20.0      5.1.10/19/87 1E21F356A 1E21F013 1E21F358 MCO36 1E21F014                      20.0      5.1 10/19/87
          ;.dCO36 1E21F006                  1000000 1E21F3s0 0.0 01/14/89 MWR C18392 WRITTEN TO REPAIR 1E21F006 1MC036 1E21F005                      160.0    10.0.01/14/89 1E21F013 1E21F358 1E 1MC036 1E12F006                    .3000.0 400.0 02/09/89 PMT FOR MWR C18392 REPLACED 1E12F340                                                        SHAFT ON 1E21F006 1MC036 1E7.1F014                        0.0  10.0 04/10/89 1MCO36 1E21F005                      20.0    10.0 10/28/90 1E21F356A 1E21F358 1E21F013 1E21N049 1E21N050 1MCO36 1E21F006                    1000000 1E21F340                      10.0 10/28/90 MWR D07885 WRITTEN TO REPAIR 1E21F006. LAP SEAT / DISC.
1MCO36 1E21F006                      500.0    45.0 11/16/90 PMT FOR MWR D07885 1E21F340 1-28
 
4 RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                            SCCM TOLER DATE                                COMMENTS:
NUMBER                                                ANCE
  **    1MC041 1MC041 1E51F077                            210.0        5.1 05/26/88 1MC041 1E51F041                              20.0        5.1 05/26/88 1MC041 1E51F040                              0.1        4.0 04/15/89 PMT FOR MWR D04150 NEW SHAFT KEY IMC041 1E51F077                              60.0    10.0 03/19/90 1MC041 1E51F041                              20.0    10.0 03/19/90 1MC041 1E51F077                            280.0    10.0 01/26/91 1HC041 1E51F041                              10.0        5.0 01/26/91 1MCrt41 1E51F068                          12000.0 400.0 02/04/91 PMT FOR PM MWR PMMRIM010 1E51F040                                                                  (REMOVED BON!iET, INSPECTED HINGE PINS, REASSEMBLED). AS LEFT TEST RESUL'I FOR ILRT.
AS FOUND TEST RE!. TL'IS WERE DETERMINED BY TEf4 NG THE FLANGED CONNECTIOh INSIDE THE CONTAINMENT.            REFERENCE LER 90-018 FOR DETAILS.
I-29
 
RF-2 ILRT/LLRT LEAKAGE REPORT PEhMTR VALVE EIN        SCCM TOLER DATE                                                                                                COMMENTS:
NUhBER                            ANCE
                                                                                                      **  1MC042 1MC042 1E12F0?3          0.0      0 0 11/05/86 THE REQUIREMENTS OF TECHNICA 1E51F034                                                                                                                      SPECIFICATION J.6.1.2, PRIMA:
1E51F035                                                                                                                      CONTAINMENT LEAKAGE, FOR THE 1E51F390                                                                                                                      LISTED VALVES WAS NOT 1E51F391                                                                                                                      COMPLETED UNTIL PRIOR TO 1E12F061                                                                                                                      STARTUP FOLLOWING THE FIRST 1E12F062                                                                                                                    REFUELING OUTAGE. EXEMPTION 1E51F013                                                                                                                      ON FILE IN TECH SPEC.
1MC042 1E51F316          0.0      10.0 01/29/89 INFORMATION ONLY TEST NO CREDIT TAKEN. PMT FOR MWR D49652 1MC04 2 1E51F066      5500.0 400.0 02/02/89 PMT FOR MUR C49652 (REPLACED 1E51F316                                                                                                                      1E51F066).
1MC042 1E51F367          2.0      1.0 02/20/89 1MC042 1E51F013        600.0      45.0 03/12/89 1E12F023 1E51F391 1E12 F0 0 '.
1MC042 1E51F0;6        20.0      10.0 03/12/89 1MC042 1E12F062        20.0      10.0 04/11/89 1MC042 1E51F390        20.0      10.0 04/11/89 1MC042 1E51F035        20.0      10.0 04/11/89 1HC042 1L51F034        20.0      10.0 03/12/90 1MC042 1E51F013        600.0      45.0 10/25/90 PRETEST FOR ILRT ADJUSTMENTS 1E12F061 1E51F391 1E12F023 1MC042 1E51F316      1000000        0.0 11/02/90 D07889 WRITTEN TO REPAIR THE 1E51F066                                                                                                                    FAILURE.
LAPPED SEAT & DISC.
1MC042 1E51F316      1000000 450.0 12/11/90 1E51F066 1MC042 1E51F316      3750.0 400.0 12/27/90 PMT FOR MWR D07889 1E51F066 1MC042 1E51F367        20.0      10.0 12/27/90 1MC042 1E51F013        140.0      10.0 12/29/90 PMT FOR MWR D13652 [ REPACK 1251F391                                                                                                                    (CHESTERTOF    AND MOVATS OF 1E12F061                                                                                                                    1E51-F013).
1E12F023 IMC042 1E51F034          20.0      10.0 12/29/90 I-30
 
l l
I RF-2 I1RT/' 2 : // 'EW % i ' /NTyf PENETR VALVE EIN                                                      SCCM tot h. 0ATL          o M. 'TS:
NUMBER                                                                      AhCF
                                **                                    IMC043 1MC043 1E51F064                                                  7500.0 201.0 04/17/88 1E51F401 1E51F399 1E51F063 1E51F076 1MC043 1E51F072                                                    30< 0    5.1 04/17/88 1MC043 1E51F064                                                    400.0  20.0 02/04/89 1E51F401 1E51F399 1E51F063 1E51F076 1MC043 1E51F074                                                    20.0    4.0 02/0'4/89 1MC043 1E51F072                                                    10.0    5.0 03/14/90 1MC043 1E51F064                                                3500.0    45.0 03/14/90 1E51F063 1E51F076 1E51F399 1E51F401 1MC043 1E51F064                                                1350.0    45.0 05/13/90 PMT FOR REPACK AND MOVATS OF 1E51F063                                  1E51F064 PER MWR D13570.
1E51F076 1E51F399 1E51F401 1MC043 1E51F072                                                    10.0    5.0 05/13/90 1MC043 1E51F063                                                1800.0    45.0 10/26/90 THIS IS A PRETEST TO ADJUST 1E51F076                                  THE TYPE A TEST RFSULTS PRIOR 1E51F399                                  TO PERFORMING MAINTENANCE.
1E51F401                                  MRR D16985 REPAIRED A PACKING 1E51F064                                  LEAK ON 1E51F064. MWR D10598 REPLACED THE MOTOR ON 1E51F063. MWR D04210 REPAIRED A PACKING LEAK ON 1E51F063.
1MC043 1E51F072                                                  20.0  10.0 10/26/90 1MC043 1E51F063                                              1500.0    45.0 01/17/91 PMT FOR MAINTENANCE.
E51F064 1E51F076 1E51F401 1E51F399 1MC043 1E51F072                                                15.0  10.0 01/17/91 1MC043 1E51F003                                              1850.0    45.0 01/31/91 PMT FOR MAINTENANCE REPACK 1E51F064                                  (CHESTERTON) AND MOVATS.
1E51F076 1E51F401 1E51F399 1MC043 1E51F072                                                100.0  10.0 01/31/91 l
1-31
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE              COMMENTS:
NUMBER                    ANCE
**  1MC044 1MC044 1E51F078  470.0    5.1 04/28/88                                      ,
1MC044 1E51F375  20.0    5.1 04/28/88 1MC044 1E51F376  20.0    5.1 04/28/88 1MC044 1E51F082  470.0    5.1 04/28/88 1E51F080                                                              ,
1E51F083                                                              ~
1MC044 1E51F078  120.0    10.0 03/19/90 1MC044 1E51F080  130.0    10.0 03/19/90 1E51F082 1E51F083 1MC044 1E51F375  20.0    10.0 03/19/90 1MC044 1E51F376  20.0    10.0 03/19/90 1MC044 1E51F082  280.0    10.0 01/26/91 PMT FOR MWR D15221. THIS MWR 1E51F080                                REMOVED THE 1E12F102 VALVE 1E51F083                                FROM THE S*lSTEM AND REPLACED IT WITH A BLIND COUPLING. (R LER 90-018) 1MC044 1E51F375  10.0    5.0 01/26/91 1MC044 1E51F078  310.0    10.0 01/26/91 1MC044 1E51F376  10.0    5.0 01/26/91 I-32
                      .- ,    -      , ~ . -..._;-.-.-      .  .:.,--..-,-
 
_ _ _ _ _ _ _ _ .    ..                _ _ . _ _ _      _____      _ ~ __    _ _ - . - _ . _ . - _
RF-2 IL:iT/LLF? LEAKAGE REPORT PENETR VALVE EIN                SCCM TOLER DATE                  COMMENTS:
NUMBER                                  ANCE
**    1MC045 1MC045 IB21F013                240.0      5.1 10/20/87 1821F019 1MC045 1B21F016                  60.0      5.1 10/20/87                                                            ,
1MC045 1821F016                500.0    45.0 02/24/89 1MC045 1821F019                160.0    1^.0 02/24/89 1B21F017 1hC045 1B21F016                550.0    45.0 03/07/90 1MC045 1B21F019                22030    % .0 03/07/90 PMT FOR MWR D05158 (CHESTERTON 1B21F017                                                PACKING AND MOVATS).
1MC045 1B21F016                1300.0    45.0 10/18/90 PRETEST FOR MWR D10697 (INSTALL CHESTERTON PACKING AND MOVATS).      BOUNDARY VALVES LEAKING, NO ATTEMPT MADE TO QUANTIFY (ALARA CONCERN).
1MC045 1B21F019                1850.0    45.0 10/18/90 1B21F017 3 ''C04 5 4B21F016              240.0    10.0 01/15/91 PMT FOR MWR D10697 11C045 .B21F017                  10.0    10.0 01/15/91 1B21F019 k
I-33 l
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE                                          COMMENTS:
NUMBER                                  ANCE
**  1MC046 1MC046 1CC050      550.0                  22.5 04/03/88 1CC049 1CC164 1CC266 1MC046 1CC127      20.0                              5.1 04/03/88 1MC046 1CC050      550.0                  45.0 02/15/89 1CC049    .
ICC164 1CC266 1MC04G 1CC127      40.0                  10.0 02/15/89 1MC046 1CC050    2100.0                    45.0 11/28/90 PRETEST TOR PM'S TO REPLACE 1CC049                                                                MOTOR (EVERY 84-MONTHS),
1CC164                                                                TORQUE SWITCH, PACKING 1CC266                                                                (CllESTERTON) , AND INSPECT.
1MC046 1CC127      20.0                    10.0 11/28/90 1MC046 1CC050    1700.0                    45.0 12/04/90 PMT FOR MWR C43770 (REPACK 1CC049 1CC164                                                                (CHESTERTON) AND MOVATS).
1CC266 1MC046 1CC127      20.0                    10.0 12/04/90 I-34
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE      COMMENTS:
NUMBER                  ANCC
  **  1MC047 1MC047 1CC053    390.0    5.1 04/03/88 1CC054 1CC165 1MC047 1CC060    240.0    5.1 04/03/88 1MC047 1CC053    350.0  45.0 02/13/89 1CC054 y
1CC165 1MC047 1CC060    260.0  10.0 02/13/89 1MC047 1CC053    100.0  10.0 11/28/90 1CC054 1CC165 1MC047 1CC060    90.0  10.0 11/28/90 I-35
 
i RF-2 ILRT/LLRT LEAKAGE REPohT PENETR VALVE EIN                                                                  SCCM TOLER DATE                              COMMENTS:
NUMBER                                                                                            ANCE
                **                1MC048 1MC048 ISXO89A                                                                  20.0              5.1 02/10/88 1MC048 ISXO88A                                                              260.0                  5.1 02/10/88 1MC048 ISXO89A                                                                  20.0              10.0 02/14/89 1MC048 1SXO88A                                                                  20.0              10.0 02/14/89 1MC048 ISXO89A                                                                  20.0              10.0 10/09/90 1MC048 1SX088A                                                                  20.0              10.0 10/09/90 4
I-36
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN        SCCM TOLER DATE        COMMENTS NUMBER                          ANCE
                  **                    1MC049 1MC049 ORA 026        1000000    0.0 10/08/87 AS FOUND LEAKAGE FOR ORA 026 COULD NOT BE DETERMINED. MWR C44364 REPLACED ORA 045 AND MADE ADJUSTMENTS TO ORA 026.
1MC049 ORA 027            20.0    5.1 10/08/87 1MC049 ORA 026          160.0    5.1 11/12/87 PMT MWR C44364 ORA 027 1MC049 ORA 026          400.0  10.0 05/05/89 1MC049 ORA 027            400.0  10.0 05/05/89 1MC049 ORA 027            40.0  10.0 04/10/91 1MC049 ORA 026            30.0  10.0 04/10/91 1-37
 
i RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                        SCCM TOLER DATE                  COMMENTS:                                              <
HUMBER                                                  ANCE
            **        1MC050                                                                                                                  !
1M''J50 OMC009                      182.6                2.0 03/17/86 1MC011 IMC050 OMC009 20.0              5.1 12/18/86 PMT FOR MAINTENAllCE 1MC011                                                                                                    )
1MC050 OMC010                          20.0              5.1 12/18/86 PMT FOR MAINTENANCE                                        ,
1MC050 OMC010                          20.0              10.0 09/15/88 1MC050 1MC011                          20.0            10.0 09/15/88 OMC009 1MC050 OMC010                              0.0          10.0 08/21/90 1MC050 OMC009                              0.0          10.0 08/21/90 1MC011
* 1MC050 OMC010                              0.0          10.0 08/22/90 PMT FOR MWR 003615.                              REPAIRE PACKING LEAK O!! OMC010.
1MC050 OMC009                            0.0            10.0 08/22/90 1MC011 l
I-38
  ,-.    .---...------._..-.-...w..-.--
 
E
                                                                                                        ~.'.
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE                                      COMMENTS:
NUMBER                                                  ANCE
    **  1MC052 1MC052 1FC037    37.2                                    2.0 03/04/86 1MC052 1FC036    40.8                                    2.0 03/06/86 1FC092 1MC052 1FC037    40.0                                    5.1 08/02/88 1MC052 IFCO36    180.0                                    5.1 08/02/88 1FC092 1MC052 1FC037    20.0                                  10.0 03/10/90 1MC052 1FCO36    20.0                                  10.0 03/10/90 1FC092 1MC052 1FCO37    140.0                                  10.0 04/02/90 PMT FOR MWR D15033. CHANGED GEARS IN THE MOTOR.
1MC052 1FC036    20.0                                  10.0 04/02/90 1FC092 1MC052 IFC036  370.0                                  10.0 02/21/91 1MC052 1FCO37    390.0                                  10.0 02/21/91 1-39
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                              SCCM TOLER DATE                                        COMMENTS:
NUMBER                                                          ANCE
          **        1MC053 1MC053 1FC036                                  2.0                0.2 03/05/86 1FC092-                                                                                                                      1 1MC053 1FC007                                20.0                  5.1 08/23/88 1FC008 1MC053 1FC093                                20.0                  5.1 08/23/88 1MC053 1FC093                                20.0              10.0 03/15/90 1MC053 1FC007                                20.0              10.0 03/15/90 1FC008 1MC053 1FC007                                20.0              10.0 04/06/90 PMT FOR MWR D13056 (CHANGED-1FC008                                                                        GEAR RATIO AND MOVATS).
1MC053 1FC093                                11.5                  5.0 04/06/90 1MC053 1FC007                                10.0              10.0 02/21/91 1FC008 1MC053 1FC093                                  0.0              10.0 02/21/91 i-I' I-40 l
L
;.                      __                    .    . --      - - . .          -      --,        , - - - ~ - -          - , - -                - - - ~ =
* RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE      COMMENTS:
NUMBER                  ANCE
  **  1MC056 1MC056 1FP051    20.0    5.1 05/18/88 1FP052 1MC056'1FP127    20.0    5.1 05/18/88 1MC056 1FP127    20.0    5.1 04/06/90 1MC056 1FP052    20.0    5.1 04/06/90 1FP052 1MC056 1FP051    190.0  10.0 01/25/91 1FP052 1MC056 1FP127    10.0    8.0 01/25/91 9
I-41
 
k RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                SCCM TOLER DATE                        COMMENTS:
NUMBER                                          ANCE
**  1MC057 1MC057 lIA175                750.0              22.5 11/08/87 1MC057 IIA 005                180.0              5.1 11/08/87 lIA006 1MC057 lIA039                320.0              5.1 11/08/87 1MC057 IIA 005                350.0              10.0 02/15/89 lIA006 1MC057 lIA039                      0.0          10.0 02/15/89 1MC057 1IA175                500.0              45.0 02/15/89 1MC057 lIA005                138.0              10.0 12/19/90 lIA006 1MC057 lIA039                562.2              45.0 12/19/90 1MC057 IIA 175                725.0              45.0 12/19/90 1-42
                                                                  ~. _-  . - - - , , _    , - _ _ . . _ _ _ . . _ _ _ _ . . _ _ , , _ ,
 
. - _ .            - _ . _      - _ . . - - - .                                    -  . . - . -- -                                            ._-  -_ - ~ _~ ~.. - -.__                  - - .
i RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                  t'cCM TOLER DATE                                                                    COMMENTS:
NUMBER                                                                      ANCE
        **        1MC058 1MC058 LIA042D                                8000.0 201.0 04/11/88 AS TOUND LEAKAGE 8000 SCCM.
MWR C23731 WRITTEN TO REPLACE VALVE. AS LEFT 950 SCCM.
1MC058 lIA012D                                  20.0                        5.1 04/11/88 1MC058 IIA 012A                                  200.0                        5.1 04/11/88 PMT FOR MWR C48865 REPACKED 1 PSIA 084                                                                                                        AND PERFORMED MOVATS ON 1PTIA078                                                                                                          IIA 012A. WORK FINISHED 4/3/88, TEST PERFORMED 4/11/88.
1MC058 lIA042B                                  950.0                      22.5 04/20/88 PMT FOR MWR C28731 REPLACED VALVE AS LEFT 950 SCCM.
1MC058 IIA 042B                                  650.0                      45.0 02/02/89 1MC058 IIA 012B                                  20.0                      10.0 03/02/80                                                                                                      ;
iMC058 1TA012A                                  100.0                      10.0 03/02/89 1 PSIA 084 1PTIA078                                                                                                                                                                    '
1MC058 1IA042B                                  1625.0                    45.0 01/16/91 1MC058 IIA 012B                                  180.0                      10.0 01/16/91 1MC058 lIA012A                                  1050.0                    45.0 01/16/91 THIS WAS A PRETEST TO ADJUST TYPE A TEST-RESULTS PRIOR TO      _
WORF!NG MWR D10852 (REPACK 1HC058 IIA 012A IIAc12A).
1300.0                    45.0 01/29/91 1MC058 IIA 012A                                1000.0                    45.0 01/30/91 1MC058 lIA012A                                  110.0                    10.0 01/31/91 PMT FOR MWR D10852 (REPACK &
MOVATS).          THIS TEST WAS USED TO ADJUST TYPE A TEST RESULTS.
I-43
 
RF-2 ILRT/I.LRT LEAKAGE RFPORT PENETR VALVE EIN  SCCM TOLER DATE                                                  COMMENTS:
NUMBER                  ANCE
                                                                                        **    1MC359 1MC059 ISA030    820.0  22.5 09/21/87 1MC059 ISA029    540.0  22.5 0a/23/87 1SA046 1MC059 ISA030    275.0  10.0 08/24/89 1MC059 1SA029    346.0  10.0 08/24/89 ISA046 t
b T
l I-44
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                                    SCCM TOLER DATE                                          COMMEllTS:
liUMBER                                                                    AllCE o*  1MC060 1MC060 1G33F004                                                      20.0    5.1 04/06/38 PMT FOR MWR C52455. REPACKED 1G33F002                                                                                                              VALVE 1G33F004 3/14/88 1MC060 1G33F001 20.0    5.1 04/06/88 PHT FOR MWR C37272. REPACKED VALVE 1G33F001 4/3/88.
1MC060 1G33F001                                                      20.0  10.0 02/16/09 1HC060 1033F002                                                      20.0  10.0 02/16/89 1G33F004 1MC060 1G33F004                                                      20.0  10.0 11/26/90 1G33F002 1MC060 1G33F001                                                      20.0  10.0 11/26/90 1-45 m_                                                    ._ -                                                    _                                            .-, _.  -_                _
 
i RF-2 ILRT/LLRT LEAKAGE REPORT l
PEllETR VALVE EIli                      SCCM TOLER DATE                                  CO!CiE!1TS :
liUMBER                                        alice
          **    1MC061 1MC061 1G33F053                      190.0      5.1 04/05/88                                                                        1 1G33F054 1MC061 1G33F061                        20.0    5.1 04/05/88 1MC061 1G33F053                        20.0  10.0 02/17/89 1G33F054 iMC061 1G33F061                        20.0  10.0 02/17/89 1MC061 1G33F061                        20.0  10.0 11/27/90 1MC061 1G33F053                        70.0  10.0 11/27/90 1G33F054                                                                                                                    ,
8 1
l I 46
                                                                                                        ~      _ _ -
 
RP-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE      COMMENTS NUMBER                  ANCE
**  1MC062 1MC062 1HG008    50.1    2.0 03/05/86 1HG019 1MC062 1HG008    20.0    5.1 10/22/87 1HG019 1MC062 1HG008    20.0  10.0 08/03/89 1MC062 1HG019    20.0  10.0 08/03/89 I-47 i
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE        COMMENTS NUMBER                  ANCE
                                                                                      **  1MC063 1MC063 1C11F122  30.0    5.1 04/10/88 1MC063 1C11F083  20.0    5.1 04/10/88 1MC063 1C11F128  20.0    5.1 04/10/88 1MC063 1C11F122  20.0  10.0 02/23/89 1MC063 1C11F083  20.0  10.0 02/23/89 1MC063 1C11F128  20.0  10.0 02/23/89 1MC063 1C11F083  20.0  10.0 12/19/90 PRETEST FOR REPACK (CHESTERTON) AND MOVATS.
1MC063 1C11F128  20.0  10.0 12/19/90 1MC063 1011F122  750.0  45.0 12/20/90 1MC063 1C11F122  400.0  10.0 01/03/91 1MC063 1C11F083  10.0  10.0 01/04/91 PMT FOR MWR D14124 (R" PACK &
MOVATS).
1MC063 1C11F128    0.0  10.0 01/04/91 3
                                                                                                                            +
I-48
 
-                  . - _    _.  . _ . . . _ - = _        _ . . . _ .    . _ - - .-  --    - .
S RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN          SCOM TOLER DATE                          COMMENTS NUMBER                                  ANCE o*  1MC064 1MC064 1G33F055          20.0              5.1 04/05/88 1MC064 1G33F039          40.0              5.3 04/05/88 1G33F040 1MC06' 1G33F039          50.0          10.0 02/17/89 1G33F040 1MCO 4 1G33F055          20.0          10.0 02/17/89 1MC064 1G33F039          289.6          10.0 11/26/90 THE PCC PERFORMED ON 12/6/90 1G33F040                                                  INDICATED AN ACTUAL LEAKAGE RATE OF 289.6 SCCM FOR THE RECORDED L?K RATE OF 275. THE RECORDED LEAK RATE WAS CORRECTED TO kEFLECT THE ACTUAL LEAK RATE.
1MC064 1G33F055          40.9          10.0 11/27/90 THE PCC PERFORMED ON 12/6/90 INDICATED AN ACTUAL LEAKAGE RATE OF 40.9 SCCM FOR THE RECORDED LEAK RATE OF 30 SCCM.
l j
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE                                    COMMENTS:
NUMBER                  ANCE
        **  1MC065 1MC065 1WX019    20.0    5.1 07/25/87 1MC065 1WX020    20.0    5.1 07/25/87 1MC065 1WX019    20.0  10.0 02/09/89 1MC065 1WX020    20.0  10.0 02/09/89 1MC065 1WX019    20.0  10.0 11/26/90 1MC065 1WX020    20.0  10.0 11/26/90 I-50 1
4
 
I i
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE            COMMENTS NUMBER                      ANCE                                                          '
**  1MC067 1MC067 1SA129        70.0    2.0 10/30/85 1MC067 FLANGE        60.0    5.1 12/09/86 1MC067 FLANGE        20.0    S.1 06/03/87 1MC067 ISA129        34.7    5.1 10/19/87 FLOW RATE CORRECTED DUE TO POST CALIBRATION CHECK.
1MC067 FLANGE        34.7    5.1 10/19/87 CORRECTED FLOW RATE DUE TO POST CALIBRATION CHECK IMC067 ISA129        20.0    10.0 04/03/89 1MC067 FLANGE        20.0    10.0 04/04/89 1MC067 1SA129        0.0    10.0 11/01/90 1MC067 FLANGE        10.0    10.0 11/01/90 PRETEST FOR MWR D05469 (FOR ILRT ADJUSTMENTS)
IMC067 FLANGE        0.0    10.0 02/25/91 PMT FOR MWR D05469 I
1 I-51
 
    , -                                                            RF-2 ILRT/LLRT LEAKAGE REPORT-PENETR VALVE EIN                                    SCCM TOLER DATE                                  COMMENTS:                            !
NUMBER                                                              ANCE i
              **  1MC068 1MC068 1PS069                                    237.0              20.0 03/10/86 1MC068 1PS070                                          2.0              0.2 03/10/86 1MC068 1PS016                                      20.0                5.1 10/05/87 IMC068 1PS017                                      20.0                5.1 10/05/87 1MC068 1PS022                                      20.0                5.1 10/05/87 1MC068 1PS023                                      20.0                5.1 10/05/87 1MC068 1PS034                                      20.0                5.1 10/05/87 1MC068 1PS035                                      20.0                5.1 10/05/87 1MC068 iPS055                                      20.0                5.1 10/05/87 1MC068_1PS056                                      20.0                5.1 10/05/87 1MC068 1PS070                                      20.0                5.1 10/05/87 1MC068 1PS069                                    490.0                  5.1 10/05/87 1MC068 1PS034 20.0            10.0 08/09/89
              .1MC068 1PS035                                      20.0            10.0 08/09/89 1MC068-1PS069                                      20.0              10.0 08/09/89-1HC068 1PS070 20.0              10.0 08/09/89 1MC068 1PS055                                    280.0              10.0 08/09/89 1MC068 1PS056                                  270.0                10.0 08/09/89 L
1MC068 1PS016                                      20.0              10.0 08/16/89 1MC068 1PS017                                      20.0              10.0 08/16/89 1MC068 1PSO22                                      20.0              10.0 08/16/89 1MC068 1PS023                                      20.0              10.0 08/16/89 h
b I-52                                                        >
 
__ - _ _ _ . - _ _ . . _ _ . ~_ _ _ - . . . _                _ _ .-.          - . _      . . . _ _ _          . _ _ _ _ _ _ _ _ . ..
T RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                    SCCM TOLER DATE                COMMENTS:
NUMBER                                                      ANCE
    **  1MC069 1MC069 1RE022                                      290.0    S.1 10/13/87 1MC069 1RE021                                        80.0    S.1 10/13/87 1MC069 1RE021                                        90.0    10.0 06/21/89 1MC069 1RE022                                      300.0    10.0 06/21/89 1MC069 1RF021                                        90.0    10.0 06/27/89 1MC069 1RE022                                      300.0    10.0 06/27/89 1MC069.1RE021                                      220.0    10.0 01/05/91 IMC069 1RE022                                  2250.0 400.0 01/05/91
[
l 1
l 1-53
 
                - _ _ _..        ~                        _ = - . . - . . - -    --. . - ..- -. ..- ._ - - .._._- -                                    - -. .  .
f f
RF-2 ILRT/LLRT LEAKAGE REPORT                                                      r PENETR VALVE-EIN                                    SCCM TOLER DATE                        COMMENTS:
NUMDER                                                          ANCE
                          **  1MC070
                          - IMC070 1RF021                                      170.0          5.1 10/13/87 1MC070 1RF022                                        20.0          5.1 10/13/87 1MC070 1RF021                                      190.0        10.0 06/15/89 1MC070 1RF022                                      110.0        10.0 06/15/89 1MC070 1RF021                                      110.0        10.0 01/05/91                                                          ;
1MC070 1RF022                                      120.0        10.0 01/05/91                                                          :
t T
I-54
 
7.
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                                                                                                    SCCM TOLER DATE          COMMENTS:
NUMBER                                                                                                                          ANCE c*        1MC071 1MC071 1HG001                                                                                                190.0              5.1 01/12/88 1MC071 1HG016                                                                                                                    5.1 01/12/88 1MC071 1HG001 1MC071 1HG016 120.0  20.0      . 10.0 08/28/89 20.0      10.0 08/28/89 I-55
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE      COMMENTS:
NL'MBER                  ANCE 1MC072 1MC072 1HGGu    1032.0  20.0 03/03/86 1MC072 1HG004    920.0  22.5 10/23/87 1MC072 1HG017      20.0    5.1 10/23/87 1MC072 1HG004    500.0  45.0 08/08/89 1MC072 1HG017      20.0  10.0 08/08/89 I-56
 
W s RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE      COMMENTS:
NUMBER                  ANCE
    **  1MC078 1MC078 1CC073    10.0    5.1 11/08/87 1CC074 1MC078 1CC170    10.0    5.1 11/08/87 1MC078 1CC073    20.0  10.0 02/12/89 1CC074 1MC078 1CC170    20.0  10.0 02/12/89 1MC078 1CC073    20.0  10.0 12/06/90 1CC074 1MC078 1CC070    20.0  10.0 12/06/90 I-57
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE-EIN    SCCM TOLER DATE            COMMENTS:
. NUMBER                    ANCE
  **  1MC079 1MC079 1SF002    1000000    0.0 02/28/86
,'        1SF001 1MC079 1SF023      20.0    2.0 03/14/86 1MC079 ISF002      20.0    2.0 03/14/86 1SF001 1MC079 JSF001      20.0    5.1 04/13/87 1SF002 1MC079 ISF023      20.0    5.1 04/13/87 1MC079 1SF001      20.0  10.0 01/26/89 4
ISF002
;  1MC079 ISF023      90.0  10.0'01/26/89 1MC079 ISF001      20.0  10.0 09/05/90 1SF002 1MC079 1SF023      20.0  10.0 09/05/90 I-58
 
l RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN              SCCM TOLER DATE                  COMMENTS:                        ;
NUMBER                              ANCE
**    1MC081                                                                                      i
  -1MC081.1FP050                600.0  22.5 02/17/89                                              >
1FP092 1MC081 1FP129                20.0      5.1 02/17/88 1MC081-1FP129                20.0  10.0 01/23/90 1MC081 1FP050                150.0  10.0 01/23/90 1FP092
* 1MC081 1FP050                150.0  10.0 01/24/90 1FP092 1MC081 1FP129                20.0  10.0 01/24/90 1MC081 1F2: 29                10.0      5.0 01/26/91 1MC081-1FPobo                185.0  10.0 01/26/91 1FP092 I-59
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                    SCCM TOLER DATE                            COMMENTS:
NUMBER                                                ANCE
        **  1MC082 1MC082 1FP054                        65.0                  5.1 09/17/67 PMT FOR MWR C37657 1FP053 1MC082 1FP128                    350.0                    5.1 09/17/87 ;$? FOR MWR C37657 1MC082 1FP053                        70.0              10.0 08/17/89 1FP054 1MC082 1FP128                    170.0                10.0 08/17/89 1MC082 1FP053                    700.0                45.0 01/25/91 1FP054 1MC082 1FP128                    290.0                10.0 01/25/91
                                                                                                                          ?
I-60
- . . ,      .- ,-.-- __ , _.,=.                  . . . , _ _ , . . ~ . , , . , _  ._ -
 
RF-2;ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN'    SCCM TOLER DATE        COMMENTS:
    -NUMBER-                    ANCE
  'od -1MC085 1MC085 1CYO15    3000.0 201.0 12/16/87 1CYO17 1MC085 1CYO19      ~20.0    5.1 12/16/87 1MC085 1CYO19      .20.0  10.0 02/10/89 1MC085 1CY016      400.0    45.0 02/10/89 PMT FOR MWR C49978 1CYO17 1MC085 1CYOl6    1750.0    45.0.09/20/90 1CYO17-AMC085 1CYO19      20.0    10.0 09/20/90 I-61
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN        SCCM TOLER DATE          COMMENTS:
NUMBER                            ANCE
  **    1MC086 1MC086 1G33F028        100.0      5.1 04/07/88 1MC086 1G33F034          60.0      5.1 04/07/88 1G33F070 1MC086 1G33F028            2.0    1.0 02/15/89 1G33F034 1MC086 1G33F070            2.0    1.0 02/15/89 1MC086 1G33F028          20.0    10.3 11/26/90 1MC086 1G33F034          20.0    10.3 11/26/90 PRETEST FOR MWR D16468 (REPAC[
1G33F070                                (CHESTERTON) AND MOVATS OF 1G33-F034).
1MC086 1G33F034          25.0    10.0 12/06/90 PMT FOR MWR D16468.
1G33F070 1MC086 1G33F028          10.0    10.0 12/07/90 I-62
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE        COMMENTS:
NUMBER                  ANCE
**  1MC088 1MC088 1CC071    20.0    5.1 04/03/88 1CC072 1MC088.1CC171    20.0    5.1 04/03/88 1MC088 1CC171    20.0  10.0 02/13/89 iMC088 iCC071    20.0  10.0 02/13/89 ACC072 1MC088 1CC171    45.3  10.0 12/06/90 ADJUSTED FOR PCC RESULTS.
1MC088 1CC071    142.9 1CC072          10.0 12/06/90 PCC PERFORMED ON 12/6/90 INDICATES THAT ROTAMETER FM1055 WAS READING 5.27 SCCM LOW AT 20 SCCM AND 12.895 SCCM LOW AT 130 SCCM. THE RECORDED LEAKAGES FOR THIS TEST WERE CORRECTED TO REFLECT THE ACTUAL LEAKAGES.
I-63
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE-      COMMENTS:
NUMBER                  ANCE
  **  1MC089 1MC089 1E12F074A  5.0  10.0 01/20/91 MWR D15219 MODIFIED THIS PENETRATION BY INSTALLING _A BLIND COUPLING AND CONVERTIN @
THIS PENETRATION TO A SPARE.
THE AS-FOUND DATA FOR        ;
ADJUSTING THE TYPE A TEST-    i RESULTS WAS DETERMINED BY THI TEST.  .
(REFERENCE LER 90-018).
4 l
l                                                                        l i
I-64                                      l 1
 
b RF-2 ILRT/LLRT LEAKAGE REPORT
      'PENETR VALVE'EIN                            SCCM=TOLER DATE        COMMENTS:
      -NUMBER                                                ANCE
    **    1MC101 1MCIO1 71VR001A.                    15000.0          22.5 12/09/86 FAILFD 1VR001B IVR002A IVR002B 1MC101 IVR001A                        2150.0        22.5 12/15/86 PMT FOR MWR C15546 (PACKING IVR001B                                              ADJUSTMENT TO IVR002A).
IVR002A 1VR002B 1MC101 1VR003                                20.0      5.1_12/15/86 1MC101 IVR001A                        6400.0        22.5 03/17/87 FAILED.              MWR C30516 WAS 1VR001B                                              WRITTEN TO ADJUST PACKING ON IVR002A                                                1VR001A.
IVR002B 1MC101 1VR001A                        1060.0 :22.5 03/17/87_PMT FOR MWR C30516 (ADJUSTED IVR001B                                              PACKING'ON IVR001A).
                    -1VR002A 1VR002B-                    '
f1MC101 1VR001A-                              800.0- 22.5 06/16/87 IVR001B 1VR002A-IVR002B 1MC101 1VR001A                        1200.0        22.5 09/08/87 1VR001B-1VR002A 1VR002B
    '1MC101 1VR001A                        1000.0        22.5 12/08/87 1VR001B
                  -1VR002A 1VR002B 1MC101.1VR002A                        1300.0          22.5 03/08/88
                '1VR002B
                  '1VR001A                                                                                          >
IVR001B 1MC101 1VR003                                  20.0      5.1 06/09/88 1MC101 1VR001A.                        1150.0        22.5 06/09/88 1VR002A 1VR001B IVR002B 1MC101.1VR001A                          1000,0        22.5 09/07/88 1VR002A 1VR001B IVR002B 1MC101 1VR001A                        1100.0          45.0 12/07/88 IVR001B IVR002A 1VR002B 1MC101 1VR001A                            700.0        45.0 02/08/89 1VR002A 1VR001B I-65
 
RF-2 ILRT/LLRT LEAKAGE REPORT                  ~*
PENETR VALVE EIN      SCCM TOLER DATE      COMMENTS:
NUMBER                        ANCE
            -1VR002B 1MC101 1VR003        20.0  10.0 02/08/89 1MC101 1VR003        20.0  10.0 05/10/89 1
1MC101 1VR001A    1850.0    45.0 05/10/89 IVR001B IVR002A JVR002B 1MC101 IVR001A      1400.0    45.0 08/09/89 1VR002A IVR001B 1VR002B IMC101 1VR003          20.0  10.0 08/09/89 1MC101 1VR001A      1450.0    45.0 11/08/89 IVR002A 1VR001B IVR0028
    - 1MC101 1VR001A    1650.0    45.0 02/08/90 1VR001B IVR002A 1VR002B 1MC101 1VR001A      3500.0 400.0 03/12/90 1VR001B IVR002A 1VR002B 1MC101 1VR001A      2500.0 400.0 03/14/90 PMT FOR CLEANING SEAT OF IVR001B                            IVR001A (MWR D15012) 1VR002A 1VR002B 1MC101 1VR001A      2500.0 400.0 06/14/90 1VR002A 1VR001B IVR002B 1MC101 1VR001A      2250.0 400.0 09/11/90
,            1VR001B IVR002A 1VR002B 1MC101 1VR001A      2300.0 400.0 10/15/90 1VR002A 1VR002B IVR001B 1MC101 IVR003          20.0  10.0 10/15/90 1MC101 1VR003          5.0  10.0 01/15/91 1MC101 1VR001A      3000.0 400.0 01/15/91 1VR001B IVR002A 1VR002B 1MC101 1VR001A      2500.0 400.0 02/09/91 1VR002A 1VR001B IVR002B I-66
 
RP-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                SCCM TOLER DATE      COMMENTS:
NUMBER                                  ANCE 1MC101 1VR003                    0.0  10.0 02/09/91 1MC101 1VR001A        2500.0 400.0 03/01/91 1VR001B IVR002A 1VR002B 1MC101 1VR001A        2500.0 400.0 03/02/91 THIS TEST WAS PERFORMED DUE TO IVR001B                                  OPS OPENING THE 36" VALVES 1VR002A                                  IMMEDIATELY AFTER COMPLETION IVR002B                                  OF THE TEST. IT WAS INTENDED TO LEAVE THESE VALVES SilUT UNTIL RF-3 AT THE COMPLETION OF THIS TEST I-67
 
s ! > ;-        m          l          9        l
              ., k        ,
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN      SCCM TOLER DATE      COMMENTS:
NUMBER                      ANCE
          **    1MC102 1MC102 IVQOO4A      1400.0  22.5 12/09/86 1VQOO4B IVQ006A 1VQOO6B                                                      1 1MC102 1VQ007        20.0    5.1 12/09/86 1MC102 1VQ007        20.0    5.1 03/11/87 1MC102 IVQOO4A      1600.0  22.5 03/11/87 1VQOO4B IVQo06A IVQOO6B 1MC102 1VQ004A      1420.0  22.5 09/03/87 1VQ004B IVQOO6A 1VQ006B 1MC102 1VQ004A      1350.0  22.5 12/04/87 1VQ004B IVQOO6A 1VQ006B 1MC102 1VQ004A      1300.0  22.5 03/03/88 IVQOO4B IVQ006A 1VQ006B 1MC102 1VQOO4A      1400.0  22.5 06/02/88 1VQOO4B IVQOO6A 1VQ006B 1MC102 IVQo07        20.0    5.1 06/02/88 1MC102 1VQ007        20.0    5.1 09/06/88 1MC102 1VQ004A    1360.0  22.5 09/06/88 1VQ004B IVQ006A 1VQOO6B 1MC102 1VQOO6A    1400.0    45.0 12/06/88 IVQ006B 1VQ004A 1VQOO4B iMC102 IVQOO7        20.0    10.0 02/07/89 1MC102 1VQOO4A    5000.0 400.0 02/07/89 MWR D2602 (ADJUSTED 1VQ004A 1VQ004B                          PACKING).
IVQOO6A 1VQOO6B 1MC102 1VQ004A    3000.0 400.0 02/11/89 1VQ004B IVQ006A 1VQOO6B 1MC102 1VQ004A    2000.0 400.0 05/15/89 IVQOO4B IVQOO6A 1VQ006B I-68
 
1 RF-2 ILRT/LLRT LEAKAGE REPORT PENETR-VALVE-EIN                    SCCM TOLER DATE                COMMENTS:
          --NUMBER                                              ANCE D
          -1MC102 1VQOO7'                        20.0          10.0 05/15/89 1MC102 1VQ006A                    1500.0          45.0 08/14/89 1VQOO6B IVQ004A 1VQOO4B 1MC102 1VQOO4A                    1150.0          45.0 11/13/89 IVQOO4B 1VQ006A 1VQOO6B 1MC102'1VQOO4A                    19000.0 400.0 02/12/90 CR 1-90-02-029 WRITTEN FOR IVQOO4B                                            1MC102 FAILURE. THIS EXCEEDED 1VQ006A                                            BYPASS      LEAKAGE AND THE TECH IVQOO6B SPEC FOR THE VQ 36 INCH VALVE.
MWR D12948 WRITTEN TO REPAIR THE VALVE.
1MC102 1VQOO4A                        20.0        10.0 02/20/90 THIS TEST WAS CONSIDERED TO BE IVQOO4B A FAILURE DUE TO PRESERVATIVE IVQOO6A                                            (COSMOLINE) LEFT ON THE IVQOO6B                                            SEATING SURFACE. VALVE SEAT CLEANED BY        MWR D12948.
        '1MC102 IVQOO4A                        20.0      10.0 03/12/90 PMT FOR MWR D12948.            -(REWORKED IVQOO4B IVQOO6A                                            ACTUATORS AND LIMIT SWITCH).
1VQ006b 1MC102 IVQOO4A                        20.0      10.0 06/13/90 1VQOO6A 1VQOO4B IVQOO6B 1MC102 1VQOO4A                        20.0      10.0 09/11/90 1VQOO4B IVQOO6A 1VQOO6B 1MC102 1VQ004A.                      20.0 IVQOO4B 10.0 10/16/90 AS-FOUND LEAK RATE TEST AT THE START OF RF-2 1VQ006A 1VQ006B 1MC102 IVQ007                          20.0 10.0 10/16/90
~
1MC102 1VQ006A                      6000.0 400.0 01/15/91 IVQOO6B 1VQ004A IVQOO4B 1MC102 1VQOO6A                        350.0    10.0 01/15/91 AFTER PERFORMING THE VALVE IVQ006B                                              LINEUP TO TEST,-TESTING IVQOO4A                                              1VQ007, AND BEGINING TO 1VQ004B                                              TROUBLE SHOOT THESE VALVES, IT WAS DISCOVERED THAT THE LEAKAGE DIMIhISHED. TEST DATA WAS TAKEN AND NO WORK WAS PERFORMED, I-69
 
4 RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE      COMMENTS:
NUMBER                    ANCE 1MC102 1VQ007        0.0  10.0 01/15/91 IMC102.1VQOO4A    520.0    45.0 02/09/91 1VQ006A IVQ004B IVR006B 1MC102 IVQOO7        0.0  10.0 02/09/91 1MC102 1VQOO4A-  450.0    10.0 03/01/91 1VQ004B IVQOO6A IVQOo6B i.
1 1-70
 
RF-2 ILRT/LLRT LEAKAGE REPORT
_PENETR VALVE EIN  SCCM TOLER DATE          COMMENTS:
LNUMBER                    ANCE                                            i
**  1MC103 1MC103 IWOOO1B    20.0    5.1 04/14/88 1MC103 1WOOO1A    20.0    5.1 04/14/88 1MC103 1WOOO1B    20.0    10.0 03/23/89 1MC103 1WOOO1A    20.0    10.0 03/23/89 1MC103 IWOOO1A    20.0    10.0 03/16/90 1MC103 1WC001B    80.0    10.0 03/16/90 1MC103'1WOOO1A. 105.0    10.0 11/22/90 Tl!IS PRETEST WAS PERFORMED TO ADJUST THE TYPE A TEST RESULTS. MWR D03762 REPACKED IWOOO1A.
1MC103 1WOOO1B    0.0  10.0 11/22/90 1MC103 1WOOO1B  210.0  10.0 12/03/90 1MC103 IWOOO1A  250.0 '10.0 12/03/90 PMT FOR MWR D03762 I-71
 
                    . . .. .      . - .    - . . . . . - . .  .    .  ~ . - . ._- - . . .
RF-2 ILRT/LLRT LEAKAGE REPORT
. PENETR VALVE EIN        SCCM TOLER DATE                  COMMENTS:
NUMBER                            ANCE-e  **  IMC104 1MC104 1WOOO2B          31.0        5.1 04/14/88 1MC104 1WOOO2A          31.0        5.1 04/14/88 1MC104 IWOOO2A          20.0      10.0 03/23/89 1MC104 IWOOO2B          20.0      10.0 03/23/89 1MC104 1WOOO2B          20.0      10.0 12/04/90
;    1MC104 1WOOO2A          20.0      10.0 12/04/90 t
i                                                                                          9 t
4                                                                                          %
a 4
2 4
d i
J I
d a
I-72
: n. ..  . . - - ,. _              . ~  . - -    . - - . -        _ . _ _ . _ _ -
RF-2 ILRT/LLRT LEAKAGE REPORT
    ~ PENETR VALVE EIN                SCCM TOLER DATE              COMMENTS:
NUMBER                                      ANCE
    '**    IMC106
* 1MC3 06 1VR007A                115.0        5.1 04/14/88 1VR007B 1HC106.1VR011
              ~
35.0        5.1 04/14/88 1MC106 IVRO11                    20.0 10.0 02/26/89 1MC106'1VR007A              3000,0 400.0 02/26/89
                .1VR007B
: 1HC106 .VR007A          17500.0 400.0 12/01/90 AS FOUND LEAKAGE USED TO IVR007B                                            ADJUST TYPE A TEST RESULTS.
* THIS WAS A PRETEST FOR MWR D15884 WRITTEN FOR EXCESSIVE LEAKAGE THROUGH IVR007A.
1MC10ti - 1VR007A-        .6900.0 400.0 12/02/90 THIS TEST WAS PERFORMED AS AVR007B                                            TROUBLE SHOOTING TO DETERMINE WHICH VALVE NEEDED REPAIR.
THIS TEST WAS PERFORMED IMMEDIATELY AFTER THE THE FIRST TEST. NO CREDIT WAS TAKEN FOR THIS TEST IN ADJUSTING        THE ILRT-LEAKAGE RATE.
1MC106 1VkO 11.                    0.0    .10.0 12/02/90 1MC106 IVR007A                  170.0      10.0 01/10/91 PMT FOR MWR D15884 1VR007B b
1-73
          =--            ,                    .-      ,.    .                    - ,  .-                . , - _    -.
 
l RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE            COMMENTS:
NUMBER                        ANCE
**  1MC107 1MC107 1VP004B    20.0        5.1 04/16/88 IVPO44B IVP023B IVP077D IMC107 IVP005B    20.0        5.1 04/16/88 PMT FOR IVP005B PER MWR C3095 (REPLACED BODY TO BONNET GASKETS). FINISHED WORK 4/12/88.
1MC107.1VP005B    40.0      10.0 03/11/89 1MC107 1VP004B    40.0      10.0 03/11/89 IVPO44B IVP023B IVP077D IMC107 1VP005B    25.0      10.0 12/05/90 1MC107 IVP004B    60.0      10.0 12/06/90 1VPO44B IVP023B IVP077D I-74
 
RF-2 ILRT/LLRT LEAKAGE; REPORT PENETR VALVE EIN  SCCM TOLER DATE      COMMENTS:
-NUMBER                    ANCE-
**- 1MC108 1MC108 1VP015B    20.0    5.1 04/16/88 1VPO47B 1VP027B 1VP077B 1MC108 IVP014B    20.0    5.1~04/16/88 1MC108 1VP015B    40.0    10.0 03/11/89 1VPO47B 1VP027B IVP077B 1MC108 IVP014B    70.0    10.0 03/11/89 1MC108-IVP027B    40.0    10.0 03/11/89 1VPO47B 1MC108 IVP077B-  40.0    10.0 03/11/89 1VP015B 1MC108 1VP015B    50.0    10.0 12/06/90 1VP047B
        '1VP027B' 1VP077B 1MC108 IVP014B    50.0    10.0 12/06/90 I-75
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN                    SCCM TOLER DATE                        COMMENTS:
NUMBER                                      ANCE
      **  1MC109 1MC109 1VP004A                    -31.0      5.1 04/14/88 IVPO44A 1VP023A IVP077C 1MC109 IVP005A                      20.0    10.0 03/11/89 1MC109 1VP004A                    300.0      10.0 03/11/89 1VPO44A 1VP023A IVP077C 1MC109 1VP005A                    330.0      10.0 11/06/90 1MC109 IVP004A                    400.0      10.0 11/06/90 1VPO44A 1VP023A 1VP077C I-76 I
t I., ; .      -
 
                                                . , _ . .    , _ . . _ -    ~
RF-2 ILRT/LLRT_ LEAKAGE REPORT PENETR VALVE EIN-  SCCM TOLER DATE      col'.MENTS :
NUMBER                      ANCE
    **- IMC110 1MC110 IVP014A      20.0    2.0 04j04/86 1MC110 1VP015A      2.0    0.2 04/04/86 1VPO47A 1VP027A IVP077A iMC110 1VP014A      20.0      5.1 04/14/88
    -1MC110 1VP015A      20.0      5.1 04/14/88 1VPO47A-1VP027A
            '1VP077A 1MC110 1VP015A      20.0    10.0 03/11/89 1VPO47A 1VP027A 1VP077A' 1MC110 1VP014A      20.0    10.0 03/11/89 1MC110.-1VP015A    175.0    10.0 11/06/90' IVPO47A 1VP027A 1VP077A 1MC110 1VP014A      190.0    10.0 11/06/90 I-77
 
RF ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN    SCCM TOLER DATE          COMMENTS:
NUMBER                      ANCE
**- 1MC113 1MC113 1VR006A    8000.0 201.0 04/18/88 IVR006B 1MC113 IVR012        20.0    5.1 04/18/88 1MC113 1VR006A    2500.0 400.0 02/26/89 1VR006B 1MC113 IVR012        20.0    10.0 02/26/89 1MC113 IVR006A    1000000    0.0 01/03/91 AS FOUND LEAKAGE DETERMIMED 1VR006B                              BE 34000 SCCM THROUGH IVR006B TPD WRITTEN TO PROCEDURE TO DETERMINE MIN PATH LEAKAGE RATE. MWR'S WRITTEN TO REPAIR [
BOTH VALVES.
1MC113 1VRO12        0.0    10.0 01/03/91 1MC113 1VR006A      60.0    10.0 01/16/91 PMT FOR MWR D23157 (REPLACED 1VR006B                              SEAT, CHESTERTON PACKING, MOVATS FOR IVR006A) & MWR D16973 (CLEANED SEAT AND CHESTERTON PACKING, MOVATS OF; IVR006B).
V b
I-78
 
RF-2 ILRT/LLRT LEAKAGE REPORT                                                            ,
PENETR VALVE EIN ~    SCCM TOLER DATE                COMMENTS:
NUMBER                        ANCE C*  :1MC116                                                                                                      '
1MC116 1C41F340B      20.0  10.0 01/04/88 1C41F340A 1C41339 1C41F342 1MC116 1C41F341B      20.0  10.0 01/04/88 1MC116 1C41F322        20.0    5.1 01/04/88                                                                      ,
IMC116 1C41F341B      20.0  10.0 08/11/89 1MC116 1C41F339        20.0  10.0 08/11/89 1C41F340B 1C41F342 1C41F340A 1MC116 1C41F322        30.0  10.0 08/11/89 9
1 0
I 8
j__
e I-79
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE                                COMMENTS:
NUMBER                  ANCE
**  1MC151 1MC151 1CM076    20.0    5.1 09/08/88 1MC151 1CM072    20.0    5.1 09/08/88 1MC151 1CM073    20.0    5.1 09/08/88 1MC151 1CM072    20.0  10.0 07/17/90 1MC151 1CM073    20.0  10.0 07/17/90 1MC151 1CM076    20.0  10.0 07/17/90 I-80
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN  SCCM TOLER DATE      COMMENTS:
NUMBER                  ANCE 00  1MC152 1MC152 1CM081B    20.0    5.1 10/08/87
-1MC152 1CM080B    20.0    5.1 10/08/87                      '
1MC152_1CM080C    20.0    5.1 10/08/87 1MC152 1CM081C    20.0    5.1 10/08/87 1MC152 1CM080A    20.0    5.1 10/28/87
-1MC152 1CM081A-  20.0    5.1 10/28/87 1MC152.1CM081A  -20.0 10.0 01/28/89 1MC152 1CM080A    20.0. 10.0 01/28/89
'1MC152 1CM080B    23.0    4.0 07/27/89 1MC152 1CM081B    20.0    4.0 07/27/89-AMC152 1CM080C    31.0    4.0 07/27/89 1MC152 1CM081C-  38.0-  4.0 07/27/89 1MC152.1CM081A    5.0- 10.0 10/30/90 1MC152 1CM080A    5.0 10.0 10/30/90 1MC152 1CM081B  30.0 10.0 10/30/90 1MC152 1CM080B    10.0 10.0 10/30/90 1MC152 1CM080C    20.0 10.0 10/30/90 1MC152 1CM081C    20.0 10.0 10/30/90 I-81
_ ~_ - -
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE      COMMENTS:
NUMBER                  ANCE
**  1MC153 1MC153 1CM022    55.0    5.1 10/29/87 1MC153 1CM023    45.0    5.1 10/29/87 1MC153 1CM025    20.0    5.1 10/29/87 1MC153 1CM026    20.0    5.1 10/29/87 1MC153 1CM023    21.3    2.0 08/30/89 1MC153 1CM022    21.0    2_0 08/30/89 1MC1S3 1CM025    20.0    2.0 08/30/89 1MC133 1CM026    ?C.0    2.0 08/30/89 I-82
 
RF-2 ILRT/LLRT LEAKAGE REPORT PE!1ETR VALVE EIll SCCM TOLER DATE                    COMME!1TS:
l liUMBER                          A!1CE
      **  1MC160 1MC160 1CM074    20.0          10.0 09/20/88 1MC160 1CM07L    20.0          10.0 09/20/88 1MC160 1CM074      5.4            0.2 07/18/90 3MC160 1CM075      3.2            0.2 07/18/90 l
l t                                        18, J
 
i RF-2 ILRT/LLRT LEAKAGE REPORT PE!1ETR VALVE EIli                          SCCM "'OLER DATE      COMMEllTS :
liUMBER                                            alice
    **        IMC166 1MC166 111G005        1000000                      0.0 03/05/86 Mh'R C00034 DECLUTCl! LEVER STUCK VALVE DID liOT CLOSE FULLY IMC166 111G005                  110.0              5.1 03/15/88 1MC166 111G018                              20.0    5.1 03/20/88 1MC166 111G005                              20.0  10.0 02/07/90 1MC166 1110018                              20.0  10.0 02/07/90 1MC106 111G005                              20.0  10.0 02/09/90 1MC1G6 111G018                              20.0  10.0 02/09/90 1-84
 
RF-2 ILRT/LLRT LEAKAGE REPO9T PE!1ETR VAL'/E EIN  SCCM TOLER DATE      COMME!1TS :
NUMBER                    ANCE
**  IMC169 1MC169 IVR035      20.0    5.1 10/18/87 IMC169 IVR036      20.0    5.1 10/18/87 1MC169 IVR040      120.0    5.1 06/10/88 1MC169 1VR041      20.0    5.1 06/10/88 1MC169 1VR041      10.0    5.0 03/12/89 1MC169 IVR040      120.0  10.0 03/12/89 1MC169 1VR036      130.0  10.0 03/18/89 1MC169 1VR035      120.0  10.0 03/18/89 IMC169 1VR040      10.0    5.0 03/12/90 1MC169 1VR041      120.0  10.0 03/12/90 1MC169 IVR035      20.0  10.0 01/07/91 1HC169 1VR036      20.0  10.0 01/07/91 1MC169 IVR040      20.0  10.0 01/07/91 IMC169 IVR041      20.0  10.0 01/07/91 1-85
 
l RF-2 ILRT/LLRT LEA 1(AGE REPORT PEllETR VALVE Elli                              SCCl4 TOLER DATE      COMME!1TS :
liUMBER                                                AllCE
  **  1MC172 IMC172 1E12F074B                                0.0  10.0 02/05/91 AS FOUllD TEST FOR ADJU'd TIliG TYPE A TEST RESULTS. MWR D15220 MODITIED TilIS PEllETRATIOli FOR LER 90-010.
I-86
 
RF-2 ILRT/LLRT LEAKAGE REPORT PEllETR VALVE EI!1                    SCCM TOLER DATE              COMMCliTS :
11 UMBER                                    alice
    **    1MC173 1MC173 1CM047                        20.0    5.1 10/29/87 1MC173 1CM048                        20.0    5.1 10/29/87
<    1MC173 1CM011                        20.0    5.1 10/29/87 1MC173 1CM047                          9.4    0.2 09/23/89 1MC173 1CM048                          7.3    0.2 09/23/89 1MC173 1CM011                          2.0    0.2 09/23/89 1MC173 1CM012                          2.0    0.2 09/23/89 1-87
 
_ , . . _ _ _ - . - . . .          ....d.( . . . - . - . . . - . . . . . .... .. .        -      ' '-                              ^ ^ ' ~ '
RF-2 ILRT/LLRT LEARAGE REPORT PEllETR VALVE Elli                                      SCCM TOLER DATE            C0!UiEllTS :
11 UMBER                                                          AllCE
                              **    1MC177 1MC177 1E51F437D                                        20.0      5.1 04/11/88 1MC177 1E51F437A                                        20.0      5.1 04/11/88 1MC177 1E51F437B                                        20.0    10.0 03/21/90 1MC177 1E51F437A                                        20.0    10.0 03/21/90 1
4-
~
1-86
 
l RF-2 ILRT/LLRT LEAKAGE REFORT PEllETR VALVE EIN  SCCM TOLER DATE          COMME!JTS :
liUMBER                      ANCE
  **  1MC179 1MC179 ISM 027B  110.0      10.0 04/02/88 1MC179 1SM027A    80.0        S.1 04/02/88 MODIFICATIOli F-2 1MC179 1E22F381B  20.0        S.1 04/02/88 MODIFICATION M-2 1MC179 1E22F381A  20.0        5.1 04/02/88 MODIFICATIO!1 M-2 1MC179 1E22F381A  20.0      10.0 01/31/90 1MC179 1E22F381B  20.0      10.0 01/31/90 1MC179 1SM027A    20.0      10.0 01/31/90 1MC179 ISM 027B    20.0      10.0 01/31/90 1MC179 1E22F381A  20.0      10.0 02/02/90 1MC179 1E22F381B  20.0      10.0 02/02/90 1-89
 
RF-2 ILRT/LLR*' LEAKAGE REPORT I
PEllETR VALVE Elli SCCM TOLER DATE      COMME!1TS:
liUMBER                  AllCE                    '
**  IMC181 1MC181 ISM 026A  20.0    5.1 04/09/88 1MC181 ISM 026B  20.0    S.1 04/09/86 1MC181 ISM 026A  20.0  10.0 02/21/90 1MC181 ISM 026B  20.0  10.0 02/21/90 I-90
 
RF-2 ILRT/LLRT LEAKAGE REPORT PENETR VALVE EIN SCCM TOLER DATE        COMMENTS:
NUMBER                  ANCE
  **  1MC183 1MC183 1CM1008  20.0    5.1 03/27/88 1MC183 1CM100A  20.0    5.1 03/27/88 1MC183 1CM100A  20.0  10.0 02/05/90 1MC183 1CM100B  20.0  10.0 02/05/90 1-91
 
RF-2 ILRT/LLRT LEAKAGE REPORT PEllETR VALVE EIll SCCM TOLER DATE      COMME!1TS :
liUMBER                  A!!CE
**  1MC203 1MC203 1CM077    13.4    0.2 09/22/88 1MC203 1CM077      9.0    2.0 07/17/90 1-92
 
1 RF-2 ILRT/LLRT LEAKAGE REPORT PEllETR VALVE Elli SCCM TOLER DATE                                      COMME!JTS :
liUMBER                                      alice
  **  1MC204 1MC204 ISXO968    20.0                                    5.1 02/16/88 IMC204 ISXO97B    20.0                                    5.1 02/16/88 1MC204 ISXO96B    20.0                        10.0 03/02/89 PMT FOR !!WR D03272 (REPLACE TORQUE SWITi!Cil AllD MOVATS) .
1MC204 ISXO97B    20.0                        10.0 03/02/89 PMT FOR MWR D03272 (MOVATS A11D REPLACED TORQUE SWITCll).
1MC204 ISXO968    0.0                        10.0 02/10/91 1MC204 1SXO9CE    10.0                          10.0 02/10/91 4
1-93
 
l RF-2 ILRT/LLRT LEAKAGE REPORT PE!1ETR VALVE Elli                                                                                                  SCCl4 TOLER DATE                    COM!4E!1TS :
11U14BER                                                                                                                                A11CE
                **                IMC205 1MC205 1SX088D                                                                                                        20.0              5.1 09/20/87 1MC205 1SX089B                                                                                                          20.0              5.1 09/20/87 1MC205 ISXO89B                                                                                                          20.0            10.0 03/02/89 PMT FOR MWR D03271 (REPLACED TORQUE SliITCl! AllD MOVATS) .
1MC205 ISX088B                                                                                                          20.0            10.0 03/02/89 1MC205 ISXO89                                                                                                                      0.0  10.0 02/10/91 1MC205 ISX088                                                                                                            10.0          10.0 02/10/91 1-94
 
                              -2 ILRT/LLRT LEAKAGE REPORT 2CM TOLER DATE                                          COMMEllTS:
AllCE 99.!i    2.0 03/18/87 20000.0    0.0 04/12/88 AS FOUllD TEST RESULTS MWR l                                                                                    C46034 WRITTEli TO REPLACE VALVE 4/16/88 18
                    ,A 20.0    5.1 04/12/88 110.0    5.1 04/12/88 J79 mA085
                .042A    850.0    5.1 04/16/88 PMT FOR MWR C46034 (REPLACED IIA 042A).
A042A    950.0    45.0 03/01/89
[
              .A013B      30.0    10.0 03/01/89
              ,IA013A    170.0    10.0 03/01/89 1 PSIA 085 1PTIA079 e6 IIA 013B      30.0    10.0 03/01/89
        ,06 1 PSIA 085 0.0    0.0 09/23/89 1r._206 IIA 042A    18000.0 400.0 01/30/91 MWR D10161 WRITTEli TO REl' AIR Tile 1821F041D 'B' SOLL!lo) D TilIS IS 110T A CO!4 TAI!iME!!T ISOLATIoli VALVE.
1MC206 IIA 0133        55.0    10.0 01/30/91 1MC206 IIA 013A    16250.0 400.0 01/30/91 MWR D10161 WAS WRITTEli TO REPAIR Tile LEAKIllG 'B' SPV SOLE!10ID FOR Ti!E IV*1F0410 SRV. TilIS WAS A LARGE PORTIOli 0F Tile LEAKAGE FOR TilIS TEST AllD IS 170T A PART OF Tile C0!!TAlliMEllT PEliETRTIO!1 BOUllDARY OllLY Tile TEST BOUllDARY .
1MC206 IIA 013A      100.0    10.0 02/05/91 PMT FOR MWR D10161 1MC206 IIA 013B        30.0    10.0 02/05/91 1MC206 IIA 042A      1900.0    45.0 02/05/91 L
I-95
 
RF-2 ILRT/LLRT LEAKAGE REPORT PEllETR VALVE EI!1  SCCM TOLER DATE                                                    COMME!1TS :
liUMBER                                                                AllCE
  **    1MC208 1MC208 ISXO97A    320.0                                                5.1 02/10/88 1MC208 1SXO96A      20.0                                                5.1 02/10/88 1MC208 ISXO96A      20.0                                              10.0 09/19/89 1!iC208 ISX097A    20.0                                              10.0 09/19/89 1MC208 1SXO96A      20.0                                              10.0 10/09/90 1!4C208 1SXC97A      20.0                                              10.0 10/09/90 1-96
 
RF-2 ILRT/LLRT LEAKAGE. REPORT PENETR VALVE EIN                  SCCM TOLER DATE                                                  COMMENTS:
NUMBER                                                                    ANCE
                      **                        IMC210 1MC210 1PS004                    20.0                                    5.1 10/21/87 1MC210 1PS005                    20.0                                    5.1 10/21/87 1MC210 1PS009                    20.0                                    5.1 10/21/87 1MC210 1PS010                    20.0                                    5.1 10/21/87 1MC210 1PS037                    20.0                                    5.1 10/21/87 1MC210 1PS038                    20.0                                    5.1 10/21/87 1MC210 1PSO47                    20.0                                    5.1 10/21/87 1MC210 1PSO48                    20.0                                    5.1 10/21/87 1MC210 1PS021                    20.0                                    5.1 10/21/87 1MC210 1PS032                    20.0                                    5.1 10/21/87 1MC210 1PSO47                    20.0                                    10.0 01/18/89 1MC210 1PSO48                    20.0                                    10.0 01/18/89 1MC210 1PS037                    20.0                                    10.0 01/18/89 1MC210 1PS038                    20.0                                    10.0 01/18/89 1MC210 1PS004                    20 0                                    10.0 01/22/89 1MC210 1PS005                    20.0                                    30.0 01/22/89 1MC210 1PS009                    20.0                                    10.0 01/22/89 1MC210 1PS010                    20.0                                    10.0 01/22/89 1MC210 1PS031                    20.0                                    10.0 01/22/89 1MC210 1PS032                    20.0                                    10.0 01/22/89 1MC210 1PS004                    40.0                                    10.0 01/11/91 1MC210 1PS005                    40.0                                    10.0 01/11/91 1MC210 1PS009                    10.0                                    10.0 01f 11/91 1MC210 1PS010                    10.0                                    10.0 01/11/91 1MC210 1PS037                    10.0                                    10.0 01/11/91 1MC210 1PS038                    170.0                                    10.0 01/11/91 1MC210 1PSO47                    10.0                                    10.0 01/11/91 1MC210 1PS048                            5.0                            10.0 01/11/31 1MC210 1PS031                    15.0                                    10.0 01/12/91 1MC210 1P3032                    10.0                                    10.0 01/12/91 1-97
_ ___ _ _ __------_-- _ _ --------- -- --- - - - - --                                                      - - - - - - - - - -            ------ ^--
 
1 RF-2 ILRT/LLRT LEAKAGE REPORT PE11ETR VALVE EI!1                                                  SCCM TOLER DATE                            COMME!iTS:
NUMBER                                                                            ANCE
                                  **                SPL SPL                                                  1E22F330      10.0          10.0 11/04/90 Ti1E FOLLOWIllG TEST ARE SPECI ONE TIME TEST PERFORMED IN RF-2.
PRETEST FOR REPLACEMENT I                                                                                                                                                      1E22F330 EXCESS FLOW CliECK VALVE.
SPL                                                  1E22F330      0.0          10.0 12/09/90                    THIS IS A POSTEST FOR REPLACEMENT OF 1E22F330 EXCE FLOW CHECK VALVE.
SPL                                                    1PTCM063    30.8          10.0 01/11/91                    THIS IS A PRETESS FOR Til PERFORMANCE OF REPLACEMENT O THE 1CMO51 EXCESS FLOW Cl!ECK VALVE. PER MWR D23160.
SPL                                                  IPTCM063T    0.0          10.0 01/11/91                    TilIS IS A PRETEST FOR Tli PERFORMANCE OF REPLACE!!ENT O THE 1CM051 EXCESS FLOW CHECK VALVE. PER MWR D23160.
SPL                                                  1PTCM064    36.0          10.0 01/11/91                    TilIS IS A PRETEST FOR MW D23161 REPLACEMENT OF 1CM053 EXCESS FLOW CHECK VALVE. PE MWR D23161.
SPL                                                  1PTCM064T    0.0          10.0 01/11/91                      THIS IS A PRETEST FOR TH REPLACEMENT OF 1CM053 EXCESS FLOW CHECK VALVE.      PER MWR D23161.
SPL                                                    1E12F011B  410.0          10.0 02/03/91                      THIS IS AN AS FOUND TEST 1E12F064B                                              FOR IMC020 AND WILL NOT BE 1E12F024B                                              REPERFORMED ON A ROUTINE 1E12F426                                                BASES. THIS WAS USED TO DETERMINE THE AS FOUND LEAKA FOR THE ILRT PERFORMED IN RF-2.
SPL                                                    1PTCM063  30.8          10.0 02/08/91                    THIS IS THE POST TEST FO THE REWORK OF 1CM051.
SPL                                                    1PTCM063T  20.5          10.0 02/08/91                    THIS IS THE POST TEST FO THE REWORK OF 1CM051.
SPL                                                    1PTCM064T  0.0          10.0 02/08/91                    THIS IS THE POST TEST FO
  ,                                                                                                                                                    THE REWORK OF 1CM053.
SPL                                                    1PTCM064  15.4          10.0 02/08/91                    THIS IS THE POST TEST FO THE REWORK OF 1CM053.
1-98
 
K TYPE D ELECTHICAL PENPTRATIU SU!O'ARY                                        .
ALL LEAK RATES DELOW ARE AS-LEFT LEAKAGE RATES ELECTRICAL      TEST      LEAK RATE        TEST              LEAK RATE            TEST PENETRATION      DATE        SCCM            DATE                                          LEAK RATE SCCM              DATE      SCCM FLOWiTOL                            FLOW 1TOL                  FLOWiTOL 1EE01E        10/11/86            010 1EE02E                                    09/13/88~ .021.2                        06/15/90 10/11/86            010  09/16/88                                            .Sb2.2 1EE03E        10/11/86              010
                                                                  .151.2          08/23/90    .51.2 1EE04E                                  09/13/88                .021.2          08/15/90 10/11/86              010  09/16/88                                            .551.2 1EE05E        10/11/86              010  09/13/88
                                                                  .151.2          08/23/90    .51.2 1EE06E        10/11/86              010
                                                                  .021.2          08/15/90  .551.2 1EE07E                                  09/16/88                .151.2          08/23/90 10/11/86              010  09/13/88                                              .51.2 1EE08E        30/11/86              010
                                                                  .021.2          08/15/90  .551.2 1EE09E                                  09/16/88                .151.2          08/23/90    .5i.2 10/11/86              010  09/14/88 1EE10E        10/11/86              010
                                                                  .071.2          08/21/90  .491.2 1EE11E                                    09/15/88                  .01.2          08/23/90 10/11/86              00  09/15/88                  .01.2
                                                                                                .51.1 1EC12E        10/11/86              010                                          08/23/90    .51.2 1EE13E                                    09/13/88                .02i.2          08/15/90  .551.2 10/11/86              010  09/16/88 1EE14E        10/11/86            010
                                                                  .151.2            08/23/9^    .51.2 1EE15E                                    09/13/88              .02i.2            08/15/90 10/11/86            010  09/16/88              .151.2
                                                                                              .551.2 1EE16E        10/11/85            010    09/13/88 08/23/90    .5  .2 1EE17E                                                          .021.2            08/15/90 10/11/86            010    09/16/88              .151.2
                                                                                              .551.2
'EE18E        10/11/86            010                                            08/23/90    .51.2
  .EE19E                                  09/14/88              .071.2            08/21/90  .49i.2 10/11/06          Gio    09/15/88                .01.2 1EE20E          10/11/86          DiO    09/14/88                                08/23/90    .51.2 1EE21E                                                            .071.2            08/21/90 1EE22E 10/11/86          010    09/15/88                .0!.2
                                                                                              .491.?
10/11/06          010                                              08/23/9C    .5  .2 1EE23E                                    09/14/88              .071.2            08/21/90  .491.2 10/11/86          Oi0      09/15/88                .01.2 1EE24E          10/11/86        010                                                08/23/90    .51.2 1EE25E                                    09/14/88              .07i 2          08/21/90 10/11/86          010      09/15/88                .01.2
                                                                                              .491.2 1EE26E        10/11/86          010                                              08/23/90    .51.2 EE27E                                  09/13/88              .021.2          08/15/90  .551.2 10/11/86          010      09/16/88              .151.2 EE28E      10/11/86          010                                              08/23/90    .51.2 EE29E                                  09/13/88                .021.2          08/15/90 10/11/86          010      09/16/88                .15i.2
                                                                                            .551.2 EE30E      10/11/86        010                                                08/23/90    .51.2 EE31E                                  09/14/88                .011.2          08/15/90 10/11/86        010      09/16/88                                          .551.2 EE32E        10/11/86        010
                                                                  .151.2          08/23/90    .51.2 EE33E                                  09/14/88                .071.2          08/21/90  .491.2 10/11/86        010      09/15/88                  .0i.2 EE34E        10/11/86        010                                                08/23/90    .51.2 EE35E                                  09/15/88                  .01.2          08/23/90 10/11/86        010      09/15/88                  .01.2
                                                                                              .51.2 EE36E        10/11/86        010                                                08/23/90    .51.2
,EE37E                                    09/11/88              .021.2            08/15/90  .551.2 10/11/G6        010        09/14/88              .07 .2
,EE38E 10/11/86        010                                                08/21/90  .491.2 (EE39E                                    09/14/88              .071.2            08/21/90
,EE40E        10/11/86        00        09/15/88                .21.2
                                                                                            .491.2 10/11/86        010                                                08/24/90  .431.2
.EE41E                                  09/14/88              .231.2            08/21/90 10/11/86        00        09/15/88                .21.2
                                                                                            .45i.2
.EE42E      -
10/11/86        010        09/15/88 08/22/90  .441.2
.EE43E        10/11/86        010
                                                                  .21.2          08/22/90  .441.2 EE44E                                  09/14/88              .071.2            08/21/90 10/11/86        010        10/06/88                .11 2
                                                                                            .491.2 EE45E        10/11/86        010        09/19/88 08/21/90  .491.2 EE46E                                                          .08i.2            08/23/90 10/12/06        010        09/16/88              .081.2
                                                                                              .51.2 EE47E        10/12/86        OiO                                                08/24/90    .41.2 EE40E                                  09/16/88              .081.2            08/24/90 10/12/06        010        09/16/88              .071.2
                                                                                              .41.2 EE49E        10/12/86        010                                                08/24/90  .35i.2 09/16/88              .07!.2            08/24/90  .351.2 1-99
__----                                    - -- - --}}

Latest revision as of 13:44, 27 September 2022