ML20080K536: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20080K536 | | number = ML20080K536 | ||
| issue date = 09/14/1983 | | issue date = 09/14/1983 | ||
| title = Forwards Rev 1 to PORV Reliability Study & Setpoint Analysis for TVA & | | title = Forwards Rev 1 to PORV Reliability Study & Setpoint Analysis for TVA & WPPSS, Responding to NUREG-0737,Items II.K.3.1,II.K.3.2 & II.K.2.10 | ||
| author name = Sorensen G | | author name = Sorensen G | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Latest revision as of 19:22, 26 September 2022
ML20080K536 | |
Person / Time | |
---|---|
Site: | Washington Public Power Supply System |
Issue date: | 09/14/1983 |
From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | Adensam E Office of Nuclear Reactor Regulation |
Shared Package | |
ML20080K540 | List: |
References | |
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.2.10, TASK-2.K.3.01, TASK-2.K.3.02, TASK-TM GO1-83-0442, GO1-83-442, NUDOCS 8309290216 | |
Download: ML20080K536 (1) | |
Text
= .
Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-460 September 14, 1983 G01-83-0442 Director of Nuclear Reactor Regulation Attention: Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Comuission W.;shington, D. C. 20555
Subject:
NUCLEAR PROJECT N0. 1 RESPONSE TO NUREG 0737 ITEMS II.K.3.1, II.K.3.2 AND II.K.2.10
References:
- 1) Letter, G.D. Bouchey, Supply System to Harold R.
Denton, NRC, same subject, dated September 9, 1982.
With reference 1 we transmitted copies of a report titled, "PORV Reliability Study and Setpoint Analysis for Tennessee Valley Authority and Washington Public Power Supply System," BAW-1740. The report responded to the subject NUREG-0737 items.
Enclosed are copies of revision 1 to the report. This revision includes minor corrections to the report. The basic system descrip-tions, analyses and conclusions presented are not changed. The conclusions of reference 1 are also unchanged.
In accordance with reference 2, 40 copies of the report are enclosed.
- W G. C. Sorensen, Acting Manager Nuclear Safety & Regulatory Programs (340)
GCS:AGH:pp Attachment cc: MC Thadani, NRC M)-ll6 w/a i RR Steinke, B&W w/o l HW Kwan, UE&C, PA (8U6) w/o l HG O'Brien, TVA w/o I NS Reynolds, D&L w/o ORM (847) w/a hg\
FDCC (899) w/a i
i g
i 8309290216 830914 PDR ADDCK 05000460 A PDR $
- FINAL REPORT -
PORY RELIABILITY STUDY AND SETPOINT ANALYSIS FOR TENNESSEE VALLEY AUTHORITY AND WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTRACT NO. 600-5253 BAW-1740, Rev.1 Babcock &Wilcox MAY 1983 .............,