#REDIRECT [[B11047, Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned]]
| number = ML20081B633
| issue date = 02/24/1984
| title = Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned
| author name = Counsil W, Opeka J
| author affiliation = NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
| addressee name = Miller J
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000336
| license number =
| contact person =
| document report number = B11047, NUDOCS 8403090257
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:. _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
e V
General Offices
* Selden Street, Berhn. Connecticut q                                                                                                                            P.O. BOX 270 C Z Z 7 " ""                                                                                                      HARTFORD CONNECTICUT 06141-0270 L  t  ; """Z","""",","",                                                                                                    (203) 6469H February 24,1984 Docket No. 50-336 B11047 Director of Nuclear Reactor Regulation Attn: Mr. James R. Miller Operating Reactors Branch #3 U. S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==References:==
(1) W. G. Counsil letter to J. R. Miller, dated September 15, 1933.
Gentlemen:
l L.                            Millstone Nuclear Power Station, Unit No. 2                                                                                            l Thermal Shield Disposal
                                                                                                                                                                      )
l By Reference (1), Northeast Nuclear Energy Company (NNECO) provided the                                                                                    l NRC Staff with a general discussion of the plans for ultimate disposal of the                                                                                l Millstone Unit No. 2 thermal shield. The following information is provided                                                                                  I concerning the details of our plans to accomplish this task.                                                                                                I Currently, the thermal shield is being stored on site. As was reported in Reference (1), it was cut into six, sixty degree (600) segments. Four (4) segments are being stored in the Millstone Unit No. 2 cask laydown area in the spent fuel pool. The remaining two (2) segments are stored in one of the two onsite transport casks in the railway access area.
Preparations are underway for the disposal of the thermal shield segments at the low level waste disposal site at Barnwell, S. C. NNECO intends to cut each of the remaining six segments into three strips, each being a twenty degree (200) segment of the shield. The cutting operation will be performed in the cask washdown pit located in the vicinity of the Millstone Unit 2 spent fuel pool. The cask washdown pit will be appropriately modified through the installation of a stainless steel liner to ensure its integrity. A mechanical cutting process similar to that utilized to remove the shield from the core barrel will be used to make the additional cuts.
The thermal ,hield strips will then be shipped to Barnwell in a spent fuel railroad transportation cask. The cask liner will be replaced with a design suitable for shipping the shield segments. Three shipments to the disposal site will be necessary.
kh              OS P                                                                                                                                              I f
h
 
W The cask is currently licensed for spent fuel transport. The following data for the cask are provided.
Owner                                              General Electric IF-300 Docket No.                                          71-9001 Certificate of Compliance                          USA /9001/B( )F NNECO anticipates that the' thermal shield cutting and shipment will be completed by October,1984.
If you have any questions, my staf f remains available to assist you.
Very truly yours,
[
NORTHEAST NUCLEAR ENERGY COMPANY
(
(N , 4 dr Y W. G. Counsil
)                                                          Senior Vice President kbbb By: 3rf, OpekF l
'                                                          Vice President Nuclear Operations t'