#REDIRECT [[BECO-91-148, Reactor Containment Bldg Integrated Leakage Rate Test Rept]]
| number = ML20086E290
| issue date = 08/05/1991
| title = Reactor Containment Bldg Integrated Leakage Rate Test Rept
| author name = Davis G, Ellefeuille J, Manderino P
| author affiliation = BOSTON EDISON CO.
| addressee name = Murley T
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-91-148, NUDOCS 9111270159
| document type = TECHNICAL SPECIFICATIONS & TEST REPORTS, TEST REPORT
| page count = 112
}}
 
=Text=
{{#Wiki_filter:_                                                      ~
e      c 10CfR50 App. J.B        I
                                                              $5 d                                                                                        \
vl ,                              BOSTON EDISON 4                            Pugnm Nuclear Power Station Rocky Hdl Road I'lymouth Massachusetts 02360 George W. Davis                                                            November 7, 1991 sen or v.c. Pres. dent - Nuoear                                          BECo 91- 148 Mr. Thomas E. Hurley Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 License DPR-35 Docket 50-293 Reaclor_ Containment Buildina Intearated Lanka.ge Rate Test
 
==Dear Sir:==
 
In accordance with 10CFR50 Appendix J, Section V.B. Boston Edison Company is submitting the attached report on the Pilgrim Nuclear Power Station Primary Containnent Integrated Leakage Rate Test which was completed in August 1991.
This report includes a summary of the Periodic Types B and C Local Leak Rate Tests conducted since December 1987.
He understand that due to the "As-Found" Integrated Leak Rate Test results, we are required to follow the accelerated ILRT test schedule in accordance with 10CFR50 Appendix J.III.A.6(b),
gh 44Ls-        v
                                                                                    ) \  w-w nw ,
!              HTL/clc/6376 Attachment l
l cc:        Mr. R. Eaton, Project Manager l                          Division of Reactor Projects - I/II l                          Office of Nuclear Reactor Regulation l                          Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406                                                      d
(('              Senior NRC Resident Inspector j 9 31127g 7 gg 9 t ggc,Pilgrim Nuclear Power Station                                                        i I
pas neocx osooo m PDR                                                    ._        _
 
a'              ~
i                        PILGRIM I        ?hDLEAR POWER STATION .(.:ffhglff                                                                    . e-
        .. ' )p ; ;. .
                                          .,.              g7 y -                    .
] I        REACTOR CONTAINMENT BUILDING I        INTEGRATED LEAKAGE RATE TEST I                                                            REPORT l                                                      ,'
1 sin
                                                                                                                          ~
x, g
                          ~
                                                  ' ""        l oin      g                                                    /
s
* I,""
l                                  , , , ,
J g                              4        gf                '
e                                              w            >=
g                d; be un                                          w[i g
                                                                                                          ,,    f (f[c;%@      ,
u l
Y        .
h:                                                                                        ,
2                gu                                      R    EL  _.        L, M    '              '
Y
              'l                                                                          I                      i I
w.
: k. _,tj              %$[
o                                                  3      h.'
w      ,-                      ,i ll    && n
                                                                                                                                      .=
g                                                                                                                    I  --$
s              /
g j        .
g                                                                                                                \c m
              ^
QW I  w General Physics Corporation                                                                                        August 5,1991 I
 
                  '~
l      REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST I                BOSTON EDISON COMPANY I          PILGRIM NUCLEAR POWER STATION UNIT NO.1 I                    DOCKET NO. 50-293 l            OPERATING LICENSE NO. DPR-35 I
August 5,1991 I
l                      TEST DIRECTOR  d P. MAND'ERINO w)
BOSTON EDISON CO.
APPROVED BY        ///    h      /!f I                                        . ~B EEEFE)flLLE
                                          / BOSTON EDISON      .
h/Mfw E. S.,Adt AFT, JR.
N/Vf(
BOSTON EDISON CO.
lI I                                            .
 
      ,-A.,p
        )  s. N      o. W ) V
(    -y.)y,3:        g      /o    %          $            ,v        e          g
:s PILGRIM                    .                  x g                                          &
ENUCLEAR POMR STATION
                                                    .f                    SNIT 1 REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST lI                                                                          REPORT c'
f
                                                                                                                                                            }
                                                                                                                                  ~
p l
llll              \      n
: t.                                                                      )
                                                            ;                                        $ ,ill[                        '
i                                                                                i.
g                                            p        ..~
W            .
l'"                                                                    l                                      \
                                                                                                                    ,&'O    '.
                                                                                                                                            ,)
* g
                                                                                                                                        ,.-c'                      i l
EUl                    l                        ~. g I,;
i            .
IIIs                  = ~6                            i ,
mussmer s
                                                                                      ~
mummmmmmmmu          66
                                                                                                                                                ~~
g                                                                                                                                        .
N -
                                                                                                                                      \i yv'          '
l General Physics Corporation                                                                                                          August 5,1991 I
 
r
                                                            )
l  REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST g
I I            BOSTON EDISON COMPANY I        PILGRIM NUCLEAR POWER STATION UNIT NO.1 l                DOCKET NO. 50-293 l        OPERATING LICENSE NO. DPR-35
,I l                  August 5,1991 i
ll                    1esr DiRec10R d#[a P. M AND'ERINO BOSTON EDISON CO.
APPROVED BY        N// /h a/
l                                    .13E{.[EFE}IILLE
                                    /' BOSTON EDISON
                                    &#&,nL              de E. S.A AFT, JR.
BOSTON EDISON CO.
lI lI
!I                                          .
 
IlEACTOlt CONTAINA1ENT llUILDING INTEGitATED LEAKAGE ItATE TEST IlOSTON EDISON COS1PANY PILGillSt NUCLEAll POWEll STATION UNIT NO. I DOCKET NO. 50 293 OPERATING LICENSE NO. DPR 35                                                ,
l                                      August 5,1991
, I i                                    PitEPAllED llY:
I GENERAL PIIYSICS CORPORATION GP R.263118 I
I
 
TAlli.E OF CONTENTS I  1. INTRODUCflON
: 11. TEST SYNOPSIS l  111. TEST DATA SUhihiARY A. Plant Information B. Technical Data C. Type A Test Results g        D. Type B and C Test Results E. Integrated Leakage Rate hicasurement System I        F. Information Retained at Plant IV. ANALYSIS AND INTERPRETATION V. REFERENCES g
VI. APPENDICES I        A. Stabilization Phase Data l        B. 11old Test Data and Plots C. Verification Phase Data and Plots D. Instrument Selection Guide Calculations E. Sensor Locations l      F. Description of General Physics ILRT Computer Program G. Local Leakage Test Summaries
: 11. FAT Root Cause Analysis - Feedwater Check Valves I
I                                                                        l
 
1
: 1.            INTRODUCTION The Reactor Containment Huilding Integrated 1.cakage Rate " Type A" Test is performed to demonstrate that leakage through the primary teactor containment systems and components penetrating primary containment do not execed the allowable leakage rates specified in the Plant Technical Specifications.
The purpose of this report is to provide information pertinent to the activities related to the preparation, test performance, and reporting of the Pilgrim Nuclear Power Station Integrated Leakage Rate Test (ILRT).
The section of this report entitled Test Synopsis "Section II" presents the highlights of activities and events which occurred prior to and during the ILRT.
l                Test Data Summary "Section 111" contains data and results necessary to demonstrate containment atmosphere stabilization, acceptable leakage rate, and successful verification test, in addition, plots provided in Appendices B and C supply a visual history of containment atmospheric conditions beginning with the eight hour test period and ending with the verification test.
Information in Section IV, Analysis and Interpretation, supplies some of the technical detail associated with the ILRT computer program and its associated hardware as well as the instrumentation used during the ILRT.
Section V lists the documents referenced for the conduct of the ILRT.
The successful periodic Type A and verification tests were performed according to the requirements of the Pilgrim Nuclear Power Station, Technical Specifications and 10CFR50, Anpendix J. The test method utilized is the Absolute Method described in ANSl/ANS 56.81987, " Containment System Leakage Testing Requirernents".
Leakage rate was calculated using formulas from BN TOP 1, Revision 1,1972, (Total Time Analysis technique) during the Type A and verification tests.
Formulas from ANSI /ANS 56.81987 (Mass Point Analysis) were run concurrently for informational purposes only. Type A and verification test durations were conducted according to the criteria of Pilgrim Nuclear Power Station, Plant Technical Specifications.
The test results are reported in accordance with the requirements of 10CFR50, g                Appendix J, Section V.B.3.
I l
1 lI l
 
0 l
: 11. TEST SYNOPSIS A. Failed ILRT I                Prior to containment pressurization on July 26, 1991, Pilgrim Nuclear Power Station site test and maintenance personnel were engaged in activities l                related to containment leakage. Cor.taintnent leakage was identified through the Type 13 and C localleakage rate testing programs and reduced by repairs to those systems and containment components having excessive leakage.
I                The aesults of the localleakage rate tests are given in Appendix G.
I                The following discussion highlights some of the most significant activities encountered during test preparation and execution and presents these items in a chronological order.
: 1. Pre pressurization Activities Pre-pressurization activities included: Completing all Type 13 and Type C testingt          Type A test procedure review; final ILRT instrumentation operability checks; final ILRT computer program modifications; containment subvolume weighing factor calculation checks and sensor failure analysis. A few of these items are l                      discussed below to present pertinent information that impacted on Type A Test activities.
l                      The Type A test procedure review was conducted to ensure that all references to Plant Technical Specifications; 10CFR50, Appendix J; BN TOP 1, Rev.1,1972; ANSl/ANS 56.81987; and the FSAR were I                        accurate and current.
g                        A containment area temperature survey was conducted in 1987 to verify proper sensor placement for the proposed test ventilation as required by ANSI N45.41972 paragraph 7.4 and ANSI /ANS 56.8 l                        paragraph 5.5.1. The results of this survey were used to validate the ILRT measurement system sensors.
Final ILRT instrumentation operability checks were perforrned to ensure that all instrumentation was operating correctly. An in situ I                      check, as specified in ANSl/ANS 56.8-1987, Section 4.2.3.1, was conducted to verify that all ILRT instrumentation was working correctly. Calibration records for all ILRT measurement system l                      component calibrations, in situ loop checks, and for all field standards used are retained at the plant.
I                                                  2 I
 
local leakage rate testing at Pilgrim Nuclear Power Station were completed prior to the start of the ll.RT. The results of this program are summarized in Appendix G, " Local 12akage Test Summaries".
: 2. IlJIT Test Summary Time Line Phase                          Time Frame              Duration Pressurization                    From: 1744 on 7/26/91          10.05 hours l                                          To:  0347 on 7/27/91 Stabilization                    From: 0359 on 7/27/91          48.48 hours To:  0428 on 7/29/91 I        Depress                          From: 0428 on 7/29/91 To:    1800 on 7/29/91 13.53 hours I        3.      Containment Pressurization Containment pressurization started at 1744, on July 26,1991 using two compressors with a total rating of 2100 scfm. Pressurization I                proceeded at a rate which did not exceed the procedural limit of 5 psi /hr. Compressor discharge valves were manually throttled to maintain backpressure and flowrate. Aftercooler cooling water flow was manually throttled to maintain compressor air discharge temperature. No fans were running in the containment during the ILRT itself or verification test.
At 1930 hours on July 26,1991, a 5 psig containment walkdown was I                performed to identify any potentialleaking penetrations. Two minor body to bonnet water leaks were identified at valves CV 9068A and 2301 CK-40. The leakage rate of 2301-CK 40 was measured at 0.357 l                gpm and the lmkage at CV 906SA was estimated to be less than 0.125 gpm.
Containment test pressure of 60.959 psia was reached at 0347 hours on July 27,1991 and the compressors secured.
I 3
I
 
i
: 4. Containment Atmosphere Stabilization Stabilization was commenced at 0359 hours on July 27,1991.
I      Ily 0635 on July 27, 1991, the stabilization criteria of 13N TOP 1, Itev.1, and ANSI 56.8-1987, section 5.3.1.6 were met and the l      contained air mass had stabilized. The mass point and total time leakage rates were approximately 1.2 9F per day. Walkdowns were started to identify leakage. During the period from 0635 on July 27 until 1800 on July 29,1991, the following actions were taken:
g      Date          Time                                    Action 7/27          1000                            Smallleak identified past instrument Air check valve 31 CK 167.
7/27          1420                            One inch union in tubing to differential I                                                      pressure transmitters PTD 506713 and valve AO 5059 was leaking.
7/27          1600                            Valve 110112 was closed to isolate leak from one inch union.
7/27          1700                            Valves 110 2301-107,108, and 41 A were closed to isolate leakage from CV 9063A.
7/27          1730                            Relief vahe on non-operating RilR pump C was lifting due to a leaky pump discharge      check      valve. Operations switched to the "A" RilR pump and I                                                      isolated the flowpath to the "C" pump relief valve. Reactor vessel level had been dropping at a rate of approximately 1,5 l                                                      inches per hour. This was equivalent to a leakage rate of 0.373 96 per day.
7/27          2228                            CRD seal purge was isolated. No change in leakage rate was observed and the seal I-                                                    purge was restored at 2346.
4
 
e I
Date  Time          Action 7/28  0015    Pressurized to 44.5 psig between htSIVs on "A" hiain Steam Line. No change in leakage rate observed.
7/28  0149    Pressurized to 44.5 psig between htSIVs on "B" hiain Steam Line. No change in leakage rate obsened.
7/28  0215    Pressurized to 44.5 psig between hiSIVs on "C" hiain Steam Line. No change in leakage rate obsened.
l  7/28  0320  Pressurized to 44.5 psig between htSIVs on "D" hiain Steam Line. No change in leakage rate obsened.
7/28  0330  12akage observed at pressurization line I                vent valve 110-259. Valve 110 259 was closed. No change in leakage rate obsen ed.
7/28  0500  Pressurized to 44 psig between Torus 8 inch purge exSaust valves AU-5042A &
l                B. No change in leakage rate.
7/28  0530  Pressurized to 44 psig between Torus 2 inch purge exhaust valves AO-5041A &
B. No change in leakage rate.
7/28  0645  Pressurized to 44 psig between Drywell 8 inch purge exhaust valves AO 5044A &
B. No change in leakage rate.
7/28  0700  Superimposed leak of 7.5 scfm impost d to verify instrumentation.
I l      -
5
 
l e
Date      Tirne                Action 7/28      0907          Secured      from superimposed test.
Instrumentation responded properly to superimposed leak.
7/28      1055        CRD and RWCU systems placed in service to maintain reactor vessel water level constant.
7/28      1215          1.cakage rate dropped to approximately 0.5 % per day.
7/28      1515        Operations requested to raise water level l                          to original band of 80-88 inches.
7/28      1805        Reactor vessel water level at 82 inches.
CRD and RWCU secured.
7/28      1830        Pressurized to 44 psig between Drywell 2 inch purge exhaust valves AO 5043A &
H. No g                          change in leakage rate.
7/28      1850        Isolated CRD min flow bypass. leakage rate decreased from approximately 1.2 %
per day to 0.91 % per day.
7/28      2207        Isolated suction to CRD pumps. Irakage rate decreased from approximately 0.91
                          % per day to 0.86 % per day.
l  7/28      2245        Inspection of drywell head identified significant leakage.
7/29      0001        Eight bolts on the drywell head were found to be loose.
7/29      0125        Opened CRD pump suction valve and min flow bypass valve.
6
 
u l
Dale          Time                  Action 7/29          0330          lecal leak rate test of drywell head I                                                                          indicates a leakage rate of 5.25 scfm or 0.73 % per day.
7/29          0428          Depressurization of containment started.
7/29          1800          Depressurization completed.
: 13. Successful ILRT Following replacement of the drywell head bolt washers and successful completion of the drywell head seal local leak rate test, the ILRT I                                      prerequisites were re-verified and the containment was ready for pressurization. The root cause analysis of the drywell head bolt washer failures will be addressed by lloston Edison Company in a separate icport.
I                                      1. Test Summary Time l.ine Phase                      Time Frame                  Duration Pressurization              From: 1908 on 8/4/91                10.65 hours To:    0547 on 8/5/91 I                                      Stabilization                From: 0614 on 8/5/91                4 hours To:    1014 on 8/5/91 11old Test                  From: 1014 on 8/5/91                8 hours To:    1814 on 8/5/91 Leak Stab.                  From: 1820 on 8/5/91                1.5 hours Verif. Test                To:    1950 on 8/5/91 Verification                From: 1950 on 8/5/91                4 hours ll                                                        Test                        To:    2350 on 8/5/91 Depress (includes          From: 0030 on 8/6/91                13.92 hours performance of              To:    1425 on 8/6/91 drywell to torus g                                      vacuum breaker leak rate test )
I
 
o l
: 2. Containment Pressurization Containment pressurization started at 1908, on August 4,1991 using l                      two compressors with a total rating of 2100 scfm. Pressurization proceeded at a rate which did not execed the procedural limit of 5 psi /hr. Compressor discharge valves were manually throttled to maintain backpressure and flowrate. Aftercooler cooling water flow was    manually throttled to maintain compressor air discharge temperature.
Five and thirty psig containment walkdowns were performed to g                      identify any potentialleaking penetrations. No measurable leaks were observed from the penetration vents outside containment.
(                    No fans or area coolers were running in the containment during the ILitT itself or the verification test. The lineups for the second ILitT were identical 10 the first ILitT with the exception of the CitD I                    system. The CitD system was isolated for this ILitT.
Containment test pressure was reached at 0547 hours on August 5, 1991 and the compressors secured. Approximately 27 minutes were allowed for containment atmosphere "springback" before commencing l                    the stabilization phase. This period was allowed as the compressors were stopped at 61.16 psia due to the upper limit placed on ust pressure by procedure of 60.0 + 2.0,            0.0 psia.
: 3. Containment Atmosphere Stabilization 13y 1014 on August 5,1991, the stabilization criteria of 13N TOP-1, l                    Itev.1, and ANSI 56.8 1987, section 5.3.1.6 were met.
: 4. IIold Test Period I                    Subsequent to meeting the temperature stabilization criteria, leakage rate analysis began at 1014 on August 5,1991.
l I                    13y 1414 hours the measured mass point and total time leakage rates had stabilized at approximately 0.31% wt./ day.
l                    During the stabilization and hold test periods, the instrumentation was continuously monitored.
l                                                  8 l
 
l
,3            The ILRT was successfully completed at 1814 on August 5,1991.
5            The maximum allowable leakage rate (L ) for the primary containment is 1.096 wt./ day of contained air mass at peak test g              pressure.                                          The mass point and total time analysis were run concurrently on the General Physics ILRT Data hianagement Computer Program. The containment leakage data met all the l              requirements of 11N TOP.1, Rev.1 (except where it conflicts with Appendix J) necessary to end the hold test in less than 24 hours. The leakage rate results follow:
I                                                                                  hiass Point Analysif ._
Total Time Analysis l              Calculated leakage Rate fiom regression line 0.3150            0.3122' 9596 Upper Confidence                                              0.3184'            O.3322' Limit 20 Point hican leakage                                                              0.3093 I
* Does not include penalties for nonstandard alignments and water level changes.
: 5.          Verification Test g                A successful verification flow test was conducted following the ILRT.
At 1820, a leakage of 7.5 scfm was imposed on the primary containment and allowed to stabilize for about one and one-half hour.
l                The verification phase started at 1950 hours on August 5,1991, and was completed at 2350 hours on the same day. The 7.5 scfm leak imposed (L ) on the existing measured leakage was slightly larger than L (1.0 CL wt./ day) at 1.000396 wt./ day. The results stabilized (as shown on the graph contained in Appendix C) within the 12596 L, acceptance critelia and are summarized on the following page:
I I                                                                        9
~I
 
i l                                    Mass Point Analysis Total Time Analysis l      Imkage Rate (L, )            0.3150    0.3122 Imposed Leak (L )            1.0003      1.0003 Lower limit:
L, + L.,,, - 0.25 L,        10652      1.0625 g
Composite Leakage (13 )      1.5180    1.5115 I      Upper limit:
L, + L , + 0.25 L,          1.5652    1.5625 I
I I
I I
I I
I I
I I
I                              10 I
 
l g  111. TEST DATA SUhihi ARY l        A. Plant Information Owner                                    Boston Edison Company Plant                                    Pilgrim Nuc1 car Power Station Unit 1 location                                Plymouth, hiassachusetts I            Containment Type                        BWR hiark i NSSS Supplier, Type                      General Electric BWR 4 Date Test Completed                      August 5,1991 g        B. Technical Data
: 1. Containment l                    Net Free Air Volume              263,520 cu. ft.
: 2. Design Pressure, P                56 psig
: 3. Design Temperature, T            281'F
: 4. Calculated Peak                  45 psig Accident Pressure, P, I            5. Containment ILRT                  60-120*F Avg. Temp. Limits
: 6.      Calculated Peak                  281*F Accident Temperature jg        C. Test Results - Type A Test
: 1. Test hiethod                      Absolute
: 2.      Test Pressure                    45.99 psig 11 I
 
0 l
: 3.      Integrated Leakage Rate Total Time Analysis (Calculated per 13N-T0;      Test Results:
I                  a.      Calculated Leakage Rate, from regression line, L.,                0.3122 wt.7c/ day
: b.      Upper 95Fe Confidence Limit                    0.3322 wt.CF/ day
: 4.      Integrated Leakage Rate Mass Poliit Analysis Test Results (Presented for information only):
: a.      Calculated Leakage g                          Rate, from regression line, L.,                0.3150 wt.9F/ day
: b.      Upper 9596 Confidence Limit                    0.3184 wt.0F/ day
: 5.      Maximum Allowable                1.000 wt.9F/ day 12akage Rate, L,
: 6.      ILRT Acceptance Criteria          0.750 wt.CF/ day (750F of L )
: 7.      Verification Test imposed        7.5 scfm Leakage Rate (L,)                (1,0003 wt.fc/ day)
: 8.      Verification Test Total Time Analysis Results and Limits I                a.      Upper Limit (I3+ L,, + 0.25 L )
1.5625 wt.7e/ day I                b.      Verification Test Total Time Results 1.5115 wt.7c/ day
: c.      Lower Limit                1.0625 wt 9F/ day (13 4 L,, - 0.25 L.)
I
;I l
12 I
 
1 9.
I              Verification Test hiass Point Analysis Results and Limits (Presented for information only)
: a.      Upper Limit                    1.5652 wt.fc/ day (13 + L,, + 0.25 L )
: b.      Verification Test              1.5180 wt.96/ day hiass Point Results l              c.      IAwer Limit (13 + L., - 0.25 L.)
1.0652 wt.9F/ day
: 10. Report Printouts g              The Report Printouts of the Type A and verification test calculations are provided for the Mass Point and Total Time Analysis (Appendices B and C). Stabilization data is also provided (Appendix A).
D. Test Results - Types B and C Tests A summary of local leakage rate test results since the last ILRT in December 1987 are provided in Appendix G.
E. Integrated I.rakage Rate Measurement System
: 1. Absolute Pressure (2 Sensors)
Type                              Mensor Quartz Manometer Range                            0100 psia I            Accuracy                        10.010Tc of reading 10.00206 F.S.
15 microns Repeatabili:y                  10.00057c F.S.
Sensitivity                    10,001 psi Resolution                      0.001 psi Calibration Date                3/8/91 l            Instrument Numbers:            RSP-906, RSP 907 I
13
 
I
: 2. Drybulb Temperature (18 Sensors) g Type                                                      100 ohm platinum RTDs Calibrated Range                                          60-120"F Accuracy                                                  10.5*F Repeatability                                            10.01 *F Sensitivity                                              10.001*F Resolution                                                0.00l*F g          Calibration Date                                          6/29/91 l      3. Dewpoint Temperature (10 Sensors)
Type                                                      Foxboro Lithium Chloride Dewcells Calibrated Range                                          37.5 100"F Accuracy                                                  i 1.5*F Repeatebility                                            10.5"F g          Sensitivity                                              10.001*F Resolution                                              0.00l*F l          Calibration Date                                          7/11/91
: 4. Verification Flow (1 Channel plus 1 Spare) g          Flow Meter                                                Datametrics Therrnal Mass Flowmeters Range                                                    O to 15 sefm l          Accuracy Sensitivity i1% FS i .1% FS Repeatability                                            101G FS Calibration Date                                          3/15/91 I
I                                                  14 I                                                                                                          '
 
o I                                                                                                    !
I              5.      Overall Instrumentation Selection Guide (1S0) Value from ANSI /ANS 56.81987 based on ILitT instrutnentation configuration at end of II.llT and an eight hour test = 0.0206% wt./ day (sec l                      Appendix D for calculations).
: 6.      Sensor Locations and Volume Fractions Appendix !!, Sensor Locations contains descriptions of the sensor locations as installed for the 1991 ILitT.
g        G. Information Retained at Plant The following infortnation is available for review at the facility:
I              1. Access controls that were established to limit ingress to containment during testing.
: 2.      A listing of all containment penetrations, including the total number g                    of like penetrations, penetration size, and function.
: 3.      A listing of normal operating instrumentation used for the leakage l                    rate test.
: 4.      A system lineup (at time of test), showing required valve positions I                    and status of piping systens.
I            5.      A continuous, sequential log of events from initial survey of containment to restoration of all tested systems.
: 6.      Documentation of instrumentation c:dibrations and standards, included with documentation is a failure analysis of instrumentation.
l            7.      Data to verify temperature stabilization criteria as established by test procedure (Appendix A).
: 8.      The working copy of tot procedure that includes signature sign off of procedural steps.
: 9.      The procedure and all data that verifies completion of penetrations l                      and valve testing (B&C type tests), including as-found leak rates, corrective action taken, and final leak rate.
ll 15 I
 
I
: 10. Computer printouts of Integrated Leakage flate Test Data and automated data accumulation along with summary description of computer program.
: 11. The Quality Assurance st rveillance checklist that was used to monitor llJIT with proper sign offs.
: 12. A listing of all test exceptions including changes in containtnent I              system boundaries instituted by licensee to conclude successful testing.
: 13. A review of confidence limits of test results with accompanying computer printouts where applicable.
l          14. Dese;iption of method of leakage rate verification of instrument measming system (superimposed leakage), with calibration info.trnation of flowmeters along with calculations that were used to measure the verification leakage rate (Appendix C).
l          15. Plot presenting ILitT data obtained during the test (Appendix II).
: 16. The P&lDs of pertinent systems.
I I
I I
I 16 I
 
i IV. ANA13 SIS AND INTL!RPRETATION Several corrections must be considered for addition to the calculated results of the l        ILRT.
A. Type 13&C Penalties The following corrections must be added for valves / penetrations which were not in their normal post accident condition:
Penetration          Description                        leakate (SCCM)
I                      9A            Feedwater (including                      233 RCIC and RWCU) 9 13          Feedwater (including IIPCI)                86 I                      12            Residual lleat Removal (Shutdown Cooling) 15 14            Reactor Water Clean 4,                    211 23            Reactor Building Closed                    37 Cooling Wate: Supply 24            Reactor 13uilding Closed                    5 Cooling Water Return 40Dc        Jet Pump Sensing - Post                    910 Accident Sampling 40Aa        Jet Pump Sensing - Post                    15 Accident Sampling I                      41A          Recire Sample                              3 46A          Reactor Recirc Seal                      582 g
46B          Reactor Recirc Seal                      1915 47            ILRT Instrumentation                      276 2280          Post Accident Sampling                    216 22811        Post Accident Sampling                      7 I                      which equates to an addition of 0.022 %wt./ day.
17 I
 
a l
g      13. Volume Change Corrections                                                      !
The following cotrections are made for any liquid level changes which l            resulted in an decrease in the net free volume of the containment:
: 1.      Reactor vessel volume change:                  0 1
: 2.      Equipment Drain Sump volume change:            +33.88 cu. ft./ day
: 3.      Floor Drain Surnp volume change:                0
: 4.      Torus volume change:                            +79.27 cu. ft./ day Total Water Level Change Volume Correction:            +113.15 cu. ft./ day This is equivalent to 0.0437c/ day increase in the leakage rate.
I C. Reported "As Left" ILRT Results The results of the ILRT to be reported including all corrections are:
Mass Point          Total Time Analysis            - Analysis
: 1.      Measured Leakage Rate            0.318496            0.33229h at 957c UCL (9'wt./
c    day)
I            2. Final water volume                0.0439h              0.0439h/ day level corrections
: 3. Corrections for valves            0.0229h              0.0229h not in Accident Positivns
: 4.      "As Left" leakage rate            0.38349h            0.39729h (7 cwt./ day) (Total of items 1 through 4)
I 18
 
D.    "As Found" Evaluation of the Containment The "as found" containment integrated leakage rate (on a minimum pathway basis) exceeded the acceptance criteria of 1% weight per day due to g        excessive leakage from Feedwater check valves 6 58A,6 62A,6 588, and 6 62B. The excessive leakage was due to misalignment of the valve discs relative to their seats.This misalignment was most likely a result of previous l        maintenance on the valves. The immediate corrective actions taken included:
: 1.      Installing a 1/32 inch radius on the leading edge of the seat rings to minimize the potential for cutting of the soft seat as the disc enters the valve seat.
g
: 2.      Replacement of all four discs (including the soft seats).
: 3.      Modification of the hinge pin / cover arrangement with an anti-rotation pin and new hinge pin cover.
: 4.      Machining of the bonnet pressure seal.
Long term corrective action will include the following:
: 1.      Revising the valve drawings to indicate the correct tolerance on the soft seat protrusion.
l        2.      Revising the applicable maintenance procedure to provide better guidance on disc alignment and tolerances.
: 3.      Establishing a prewntative maintenance program for the Feedwater check valves.
: 4.      Evaluating alternative means for Feedwater System containment isolation.
I The Feedwater check valve failures were analyzed through Boston Edison Company's LLRT Failure Analysis Team (FAT). The team is multi disciplinary, comprised of members from both the Nuclear Engineering and Nuclear Operations Departments. The FAT is chartered to determine root cause and recommend I corrective actions for each valve that has failed to pass a LLRT. Corrective action includes repair or modification to address the root cause of the excessive leakage, an evaluation of the impact of the root cause on valves of similar design, and a l review of the testing program for adequacy and frequency to detect these valve failures. The FAT Root Cause Analysis is enclosed in Appendix H.
l                                        19
 
l      V. REFERENCES A. Pilgrim Nuclear Power Station, FSAR.
I        B. Pilgrim Nuclear Power Station, Technital Specifications.
I        C. Pilgrim Nuclear Pov.er Station, Procedure 8.7.1.4.2 Rev. 9, Integrated leakage Rate Test Surveillance Procedure.
D. Code of Federal Regulations, Title 10, Part 50, Appendix J, Primary Reactor Containment leakage Testing for Water Cooled Power Reactors.
I        E. ANSl/ANS 56.81987, Containment System leakage Testing Requirements.
I        F. Bechtel Topical Report BN TOP 1, Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Revision 1,1972.
I        G. ANSI N45.41971, leakage Rate Testing of Containment Structures for Nuclear Reactors I
I I
I I                                          20 I
 
I I
I I
I I
I I
I                            al,1, . iim STAllil.lZATION l'lIASE DATA I
I I
I I
I I
I                                              l I
 
l  STABLIZATION MODE                                                                                                    TIME            1014 OPTIO!is                                                                                                        MODE
 
==SUMMARY==
 
I - MAliUAL DATA ENTRY                                                                                              # OF DATA POI!1TS :                        17 2 - PARAMATER GRAPHS                                                                                    MODE DURATION (114 HRS)                  :          4 3 - SEliSOR PLOTS                                                                                        TOT TIME MEASURED LEAK : 0.3017 4 - SE!1SOR DIFFERENTIALS                                                                              TOT TIME CALCULATED LEAK : 0.2519 5 - AliSI STABILIZATION CRITERIA                                                                                    TOT TIME 05% UCL : 0,3501 6 - Bli-TOP-I STAB. CRITERIA                                                                                                MASS PT LEAK : 0,2804 7 - /iliSI CRITERIA PRINTOUT                                                                                        MASS PT Ob% UCL = 0.2943 6 - B!i-TOP-I CRITERIA PRIliTOUT 9 - REPRIliT CURREliT DATA PolllT P - PASS WORD ME!4U 0 - FLASH OFF AllSI PRESSURE /TEMPERATUFE STABLE CRITERIA MET Bli-TOP TEMPERATURE CRITERIA MET DIliT
 
==SUMMARY==
:                CURREliT VALUE/ DIFFERENCE FROM PREVIOUS POI!1T 70.895/ -0.047                                                          AVG PRESS:                      00.373/ -0.007 IVG    ASS:TEMP: 79734.73/                                    -2.727                          AVG DEW PRESS:                  0.4665/-0.0007 9.2363,                ,
IJHIT 1::                          N
(
::                      'N g                                                              N.
s  .
                              .W
                                                                                      - -\          e
                              ..                                                                          s
{
                                                                                                                            ~.
          'F
                              ~
l                                                                                                                                                                ...
8.895          -
                                                                                                                              .                        -- - i N - a.
I            G614/ 217                                                                          TIME                                        1014/                          217 I
 
i DN-TOP-1 51AELIZATICN CRITERIA TIME                            1EMP                                          BN                        DN di                        dT2 4.00                        78.8954                                          -0.2537                    -0.2305
,            3.75                        78.9426                                          -0.2773                    -0.2471 l g 3.50                                78.9942                                          -0.3015                    -0.2646 g 3.25                          79.0400                                          -0.3201                    -0.2820 3.00                        79.1005                                          -0.3455                    -0.3045 2.75                        79.1559                                          -0.3761                    -0.3315 2.50                        79.2211                                          -0.4115                    -0.3579 2.25                        79.2865                                          -0.4542                    -0.3918 2.00                      79.3565                                          -0.b188                    -0.4368 i              .75                      79.4368                                            0.0000                    O.0000 1.50                      79.5235                                            0.0000                    0.0000 1.25                        79.6119                                          0.0000                    0.0000 1.00                        79.7095                                          0.0000                    0.0000 I0.750.50 79.8188 79.9370 0.0000 0.0000 0.0000 0.0000 0.25                      80.0702                                            0.0000                    0.0000 0.00                      80.2301                                            0.0000                    0.0000 I
I I
I I                                                                                                                                          .
I I
l                                                                                                                                                  .
 
i e
I ETABILIZATICN AN5156.8
      'IME  TEMP    $6.e    56.e        4-1                      rREss      56.0 1 HR    4 HR                          HR                dP F/HR    F/HR                                          P51/HR I
4.00  70.895  -0.205  -0.334          -0.129                60.373      .0303 70.943  -0.213  0.000                        0.213  60.381      .0326 I 3.75 3.50  78.994  -0.'27  0.000                        0.227  60.307      .0347 3.25  79.048  -0.239  0.000                        0.239  60.397      .0339 3.00  79.101  -0.236  0.000                        0.256  60.403      .0373 I2.7S      79.156  -0.281  0.000                        0.281  60.413      .0379 2.50  79.221  -0.302  0.000                        0.302  60.422      .0389 2.25  79.287  -0.325  0.000                        0.325  60.431      .0415 I2.00 1.75 79.356 79.437
                    -0.353
                    -0.382 0.000 0.000 0.353 0.382 60.441 60.451
                                                                                .044S
                                                                                .04BS 1.b0  79.D24 -0.414  0.000                        0.4*4    60.461    .Ob41 79.612 -0.450  0.000                        0.458    60.473    .059b I1.25 1.00  79.710 -0.S21    ') . 000                      0.521  60.4ES    .0600 0.75    79.819  0.000  0.000                        0.000  60.S00  0.0000 79.937  0.000  0.000                        0.000  60.S15    0.0000 IO.50 O.2S    80.070  0.000  0.000                        0.000  60.S32    0.0000 I
I I
I I
I I                                                                                    ,
I I
I
 
6 1
AVG. DATA VALUES                                  UNIT N 1 DATE                  TIME                        T(1)              P(l)                    D1(1)                      UP(!)      Mass (I) 217                      0.00              80.230                60.553                78.311                  0.479            79774.84 217                      0.25                80.070              60.532                70.348                  0.400            79770.40 217                      0.50                79.937              60. Sib                78.289                  0.479            79767.34 l                            217                      0.75                79.D19              60.SOO                78.225                  0.478            79764.01 217                      1.00                79.710              60.48b                78.137                  0.477            79762.16 i
I                  217 217 1.25 1.50 79.612 79.524 60.473 60.461 78.114 78.068 0.476 0.476 79759.77 79757.13 217                      1.75                79.437              60.451                77.967                  0.474            79757.36 I                  217 217 217 2.00 2.25 2.50 79.356 79.287 79.221 60.441 60.431 60.122 77.894 77.029 77.741 0.473 0.472 0.471 79755.64 797S3.10 79750.59 l
. gg                        217 217 2.75 3.00 79.156              60.',13                77.676                  0.470            79748.89 I
79.101                60.403                77.649                  0.469            79744.31 217                      3.25                79.048              60.397                77.471                  0.466            79743.71 217                      3.50              78.994                60.387                77.531                  0.467            79738.43 217                      3.75                78.943              60.301                77.464                  0.466            79737.45 1
217                      4.00              78.895                60.373                77.416                  0.466            79734.73 f
I I
I I
I I
1I 1I
:I
 
ISTABLIZATION HODE                                                                    TIME - 1014 OPTIONS                                                                          MODE
 
==SUMMARY==
 
1 - HANUAL DATA ENTRY                                                                  # OF DATA POINTS :                                17 2 - PARAMATER GRAPHS                                                  MODE DURATION (IN HRS)                                  :        4 3 - SEllSOR PLOTS                                                      TOT TIME MEASURED LEAK : 0.3017 4 - SENSOR DIFFEREllTI ALS                                  TOT TIME CALCULATED LEAK : 0.2519 5 - ANSI STABILIZATION CRITERIA                                                        TOT TIME 95% UCL : 0.3591 6 - DN-TOP-1 STAB. CRITERIA                                                                        MASS PT LEAK : 0.2904 7 - ANSI CRITERIA PRINTOUT                                                              MASS PT 95% UCL : 0.2943 IB9 - REPRINT BN-TOP-1CURRENT  CRITERI        A PRIt1 TOUT DATA POINT P - EASS WORD MENU 0 - FLASH OFF ANSI PRESSURE / TEMPERATURE STABLE CRITERIA MET BN-TOP TEMPERATURE CRITERIA MET DINT
 
==SUMMARY==
:          CURREliT VALUE/DIFFERE!1CE FROM PREVIOUS POINT 78.895/ -0.047                        AVG PRESS:                                    60.373/ -0.007 IVGTEMP:
ASS:              79734.73/      -2.727          AVG DEW PRESS:                                0.4655/-0.0007 I O.2271 6
hMIT        1i                                                          fk'i, i,
                  -                                                    .i i        ',
t n
                  .  .I                                            .i            1                                                          a                          >
                                                                                      ;                                                    J ',
j                                            .i                                                                                                  j 'i f                      1,                          ,                                                ,! ';
                      -I                                                                                        ,/j
                  -                                                                                                                                                  i
                                                                ,i                        i                                                    j                                i, m                -    i                                    ,
                                                                                              .,                      t                3        i                  l            t
                  .. \i                                      i                                ' .. ,      -/        \                l        \                  )              \
f4              ..,                .-_ _ _ . . . - . ~. )
t 3            ;
i
                                                                                                                                                                    ,3 i,
k                -)              /                                                                                      \          {              l              l
                                  /
                  ~
bm                                                                                                                    \                          l            i "l
                                /
                                                                                                                            '.ill l
j i
Ij f                                                                                                )i jl                    ll
                  ..      I                                                                                                    i l                        ij l .-
(5.281 __                                                                                                                                                  i
                                              ,                                        ,                                        ,                                                    i u
G614/ 217                                    TIME                                                    1914/ 217
 
e 1
STABLIZATION MODE                                                            TIriE  -
1014 OPTIONS                                                                  MODE
 
==SUMMARY==
 
1 - MANUAL DATA ENTRY                                                        # OF DATA POINTS : 17 2 - PARAMATER GRAPHS                                                MODE DURATION (IN HRS) =4 13-SENSORPLOTS                                                        TOT TIME MEASURED LEAK = 0.3017 4 - SENSOR DIFFERENTIALS                                        TOT TIME CALCULATED LEAK : 0.2519 35 - ANSI STABILIZATION CRITERIA                                              TOT TIME 95% UCL      0.3591 F., - BN-TOP-1 STAB.C;:TFRIA                                                        MASS PT LEAK : 0.2804 7 - ANSI CRITERI A i'RI:. C OUT                                              MASS PT 95% UCL = 0.2943 8 - BN-TOP-1 CRITERI A FRINTOUT 19  - REPRINT CURRENT DATA POINT P - PASS WORD MENU 0 - FLASH OFF ANSI PRESSURE / TEMPERATURE STABLE CRITERIA MET
;            BN-TOP TEMPERATURE CRITERIA MET JINT
 
==SUMMARY==
:            CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT VG TEMP:    78.895/ -0.047                              AVG PRESS:                60.373/ -0.007 ASS:            79734.73/                -2.727        AVG DEW PRESS:            0.4655/-0.0007 b.5344:                    b, llNIT                        \
l 1::                                  ..,
                                                        '~
fOT.
                                    \                            -
IIII M E        "        !                  'p,*: p              .'N HAL.        --
j'                    l        __-            ''..
l      . . . _ ~ .y              .___            __
T'M
                  ~~
{                    l                    .'-
mAy            :: f                        I                      N . ,,_ _ ___. _... ~ ~s ' ~ ~--
N              --
                                            )                                  ~__. _
g              ..
TEGENDT        "
l I
    =    L      __
l
_i                I
                  .J                  l
                  -  d              l j'
k      0090 l
4 0614/ 217                                          TIME                            1814/ 217 I
 
i STABLIZATION MODE                                                                                  TIME      -
1014 OPTIONS                                                                                          MODE
 
==SUMMARY==
 
1 - mat 10AL DATA ENTRY                                                                              u 0F DATA POINTS :          17 MODE DURATION (IN HRS)          :      4 12-PARAMATERGRAPHS 3 - SENSOR PLOTS                                                                          TOT TIME HEASURED LEAK : 0.3017 4 - SENSOR DIFFERENTIALS                                                            TOT TIME CALCULATED LEAK : 0.2519 TOT TIME 95% UCL : 0.3591 MASS PT LEAK        0.2604 IS6 -- BN-TOP-I ANSI STABILIZATION    STAB. CRITERIA                              CRITERI A                    MASS PT 95% UCL : 0.2943 7 - ANSI CRITERIA PRINTOUT 8 - BN-TOP-1 CRITERIA PRINTOUT 9 - REPRINT CURREllT DATA POINT P - PASS WORD MENU 0                    FLASH OFF ANSI PRES 3URE/ TEMPERATURE STABLE CRITERIA MET BN-TOP TEMPERATURE CRITERIA MET DINT
 
==SUMMARY==
:                          CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:                      78.895/ -0.047                                  AVG PRESS:                  60.373/ -0.007 ASS:                              79734.73/                -2.727              AVG DEW PRESS:              0.4655/~0.0007 b.4513-                                      j F
                                                                      \  '
l1 NIT 1".                            .                i, i
                                                                    ., ~
N..
ppgg                              --
                                                      )
                                                                                . _}.
                                                                                    ~~
hMA L.
                                                      !                                          N.
                                    ~~                                                        ..' '          ..~~'    __ _    _ _ _
hTV./
                                                                                                        ~~~                                  '~-~
JAY                              ::              i                                                                  ..__
l                                -
f lEGEND" L    __
i l                                  --
it I                                  __
j i
b . 080G." r                                                            ,
3 0614/ 217                                              TIME                              1014/              217 l
 
e iTABLIZATIO!1 MODE                                                                  TIME    -
1014 PTIONS                                                                        MODE
 
==SUMMARY==
 
1 - MANUAL DATA ENTRY                                                                # OF DATA POINTS :            17
      - PARAMATER GRAPHS                                                    MODE DURATIO!1 (19 HRS)            =  4 3 - SENSOR PLOTS                                                          TOT TIME MEASURED LEAK : 0.3017
      - SENSOR DIFFERENTIALS                                            TOT TIME CALCULATED LEAK                  0.2519 5 - A11SI STABILIZATIO!1 CRITERIA                                                    TOT TIME 95% UCL : 0.3591 3 - BN-TOP-1 STAB. CRITERIA                                                                MASS PT LEAK : 0.2804 R7 - ANSI CRITERI A PRINTOUT                                                            MASS PT 95% UCL : 0.2943 8 - BN-TOP-1 CRITERI A PRINTOUT
      - REPRINT CURREllT DATA POINT
  ' - PASS WORD MENU
      - FLASH OFF ANSI PRESSURE / TEMPERATURE STABLE CRITERI A MET BN-TOP TEMPERATURE CRITERIA MET INT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:      78.895/ -0.047                                    AVG PRESS:              60.373/ -0.007 SS:              79734.73/                    -2.727        AVG CEW PRESS:          0.4055/-0.0007 l 1. 0331 gHiT 1~ N        _
                                              ~
s s.-
hSIA              "
                                                                                      ~
l l                  ..
N_....
                                                                                                                            ~
[0.839
                                                                                                                  ,            .q e614/ 217                                                TINE                                1014/          217 I
 
I TIME      -
1014 I"TADLIZATIONMODE OPTIONS                                                                        MODE
 
==SUMMARY==
 
I - MANUAL DATA ENTRY                                                              # OF DATA POINTS :                        17 I2 - PARAMATER GRAPHS                                                        MODE DURATION (IN HRS)                            4 3 - SENSOR PLOTS                                                          TOT TIME MF ASURED LEAK = 0.3017 4 - SENSOR DIFFERENTIALS                                                TOT TIME CALCULATED LEAK : 0.2519 I5-ANSISTABILIZATIONCRITERIA                                                          TOT TIME 95% UCL = 0.3591 6 - BN-TOP-1 STAB. CRITERIA                                                                MASS PT LEAK : 0.2804 7 - ANSI CRITERIA PRINTOUT                                                            MASS PT 95% UCL : 0.2943 IB9 -- REPRINT BN-TOP-1      CURRENT                      CRITERI  A PRINTOUT DATA POINT P - PASS WORD MENU 0 - FLASH OFF ANSI PRESSURE /TEMPEP.ATURE STABLE CRITERIA MET BN-TOP TEMPERATURE CRITERIA MET TOINT
 
==SUMMARY==
:                                  CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT 78.895/ -0.047                                        AVG PRESS:            60.373/ -0.007 IVGTEMP:
ASS:                            79734.73/            -2.727      AVG DEW PRESS:        0 . 4 6 5 T,/ - 0 . 0 0 0 7 0 . 48 GV'.                                    .
bHIT        1                                          N
(
                                                                          ~,
                                                                                                ~
                                                                                                                  ~
f_                                                                                          .,
t t  S' '
O.466,                                                    ,                    ,                                ,
                                                                                                                                            ~.
3 I    G614/                                      217                  TIME                              1G14/                    217 I
 
STABLIZATION MODE                                                                              TIME        -
1014 OPTIONS                                                                                    MODE
 
==SUMMARY==
 
1 - MANUAL DATA ENTRY                                                                          # OF DATA POINTS :                        17 MODE DURATION (IN HRS) = 4 12-PARAMATERGRAPHS 3 - SENSOR PLOTS                                                                    TOT TIME MEASURED LEAK : 0.3017 4 - SENSOR DIFFERENTIALS                                                        TOT TIME CALCULATED LEAK : 0.2519 S - ANSI STABILIZATION CRITERIA                                                                TOT TIME 95% UCL = 0.3591 I6 - BN-TOP-1 STAB,CRITERI A                                                                                MASS PT LEAK : 0.2804 7 - ANSI CRITERI A PRINTOUT                                                                          MASS PT 95% UCL : 0.2943 8 - BN-TOP-1 CRITERIA PRINTOUT 19P --PASS REPRINT WORD MENU                    CURRENT DATA POINT 0 - FLASH OFF ANSI PRESSURE / TEMPERATURE STABLE CRITERI A MET BN-TOP TEMPERATURE CRITERIA MET DINT
 
==SUMMARY==
:                          CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT ASS                    79J4.7N                      2.727            A                  ;ESS:          0465/-0 BOO 7 b.7977~<                              T llMI T      1:: \, s
                                                -s 11 ASS
                ..                                      ~. .
                "                                              ~
E_BM            -
'X10^5                    -
s
                  ..                                                                                    ~.
                                                                                                                ~.
I g                ..
                    .                                                                                                                  s_ _ _.
I I).79?3                                    _                  ;                                  ,
l    0614/ 217                                                          TIHE                                              1G14/ 217 I
 
      ._- - ... - -  . -            -          - _ _ - - . . . . = -        _ . - . . . . . _    _ _  .
                                                                                                          )
I I
I I
I I
'I E                                Appetidix 11 I                      IIOLD TEST DATA AND l' LOTS
:I I
I I
I I
I I
I                                          _.                        ._ _                  ..    -
 
7 CST MODE PLEASE SELECT THE OPTION YOU WISH TO USE:                                            TEST DATA    1814 1  -
MANUAL DATA ENTRY                        tt OF DATA POINTS =    33 2  -
PARAMETER GRAF HS                MODE DURATION (IN HOURS) = 8 3  -
SENSOR PLOTS                        TOT TIME MEASURED LEAK = 0.3168 4    -
TREND ANALYSIS                    TOT TIME CALCULATED LEAK = 0.3122 5  -
REPRINT CURRENT DATA PT                    TOT TIME 95% UCL = 0.3322 6  -
SENSOR DIFFERENTIALS                        MASS POINT LEAK = 0.3150 MASS POINT 95% UCL = 0.3184 75% La =    .75 P    -
PASS WORD MENU                                      MASS =    79650.52 SELECTED OPTION =
DINT
 
==SUMMARY==
:          CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:            78.187 / -0.007      AVG PRESS:        60.230 / -0.003 79650.52 / -2.89B        AVG DEW PRESS:    O.4561 /-0.0001 I ASS:
k . 0000~_
INIT 1"          ..
1S AHAL.
s!T x /          ~
f"AY l_=EG      L END  ::          s~' ._ _--
x+, . ,__      s__._==~~.-.-----
_f      7s,_r
                    .  .I      i l                      l    /
                    -i      l anan s . u a u u +t 2                      J    ,        ,      ,        ,        ,        ,          , i g    1014/ 217                              TIME                    1814/ 217 l
l
 
ITEST MODE PLEASE SELECT THE OPTION YOU W]SH TO USE:                                                    TEST DATA      1814 1      -
MANUAL DATA ENTRY                              H OF DATA POINTS = 33 2      -
PARAMETER GRAPHS                      MODE DURAT1ON (IN HOURS) = 8 3      -
SENSOR PLOTS                            TOT TIME MEASURED LEAK = 0.3168 4      -
TREND ANALYSIS                        TOT TIME CALCULATED LEAK = 0.3122 5      -
REPRINT CURRENT DATA PT                        TOT TIME 95'/. UCL = 0.3322 6      -
SENSOR DIFFERENTIALS                            MASS POINT LFAK = 0.3150 MASS POINT 95*/. UCL = 0.3184 1                                                                        7 5'/. L a =    .75 P  -
PASS WORD MENU                                              MASS =      79650.52 SELECTED OPTION =
OINT
 
==SUMMARY==
:              CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT 78.187 / -0,007      AVG PRESS:          60.230 / -0.003 ASS:            79650.52 /          -2.898  AVG DEW PRESS:        0.4561 /-0.0001 IVGTEMP:
k.OGGG llNIT            1::
1 ASS 4INA L . ::
IITX/                "
  " DAY                ..
m.
_EGEND"            "        b.
L          ..
                                  '\
::                            =m=_                    -~~-                  -
{-h=s:==
g                                                                ,,-
l h
l                      -
                              )
1
                        -- a b . 0809-
                          ~
                                      .        .      .        .          ,          ,        .      i.
1014/ 217                                TIME                        1814/          217 1
 
e I                          AVG. DATA VALUES                      UNIT # 1 I DATE              TIME              T(I)              P(!)                  DT(1)              VP(I)                      MASS (1) 217                0.00        78.895            60.373            77.416              0.466                  79735 217                0.25        78.849            60.366            77.389              0.465                79732 I 217 217 0.50 0.75 78.807 78.766 60.359 60.353 77.350 77.297 0.46S 0.464 79729 79727 217                1.00        78.729            60.347            77.244              0.463                79725 217                1.25        78.692            60.341            77.173              0.462                79722 1 217                1.50        78.658            60.335            77.151              0.461                79720 217                1.75        78.627            60.329            77.179              0.462                  79716 217                2.00        78.594            60.324            77.090              0.461                  79714 217                2.25        78.567            60.318            77.122              0.461                  79711 217                2.50        78.536            60.314            77.054              0.460                  79710 217                2.75        78.508            60.309            77.013              0.4S9                  79708 I  217 217 3.00 3.25 78.481 78.460 60.305 60.300 76.973 76.984 0.459 0.459 79706 79703 217                3.50        78.438            60.296            76.967              0.459                  79700 217                3.75        78.416            60.292            76.931              0.458                  79698 l    217                4.00        78.400            60.286            76.983              0.459                  79693 l
217                4.25        78.380            60.283            76.989              0.459                  79691 l .g 217                4.50        78.363            60.280            76.952              0.458                  70690 3 217                4.75        78.350            60.275            76.943              0.458                  79686 217                5.00        78.329            60.271            76.955              0.459                  79683 g 217                5.25        78.316            60.267            76.944              0.458                  79680 (g  217 217 5.50 5.75 78.300 78.286 60.263 60.259 76.899 76.898 0.458 0.45e 79678 79675 l
l    217                6.00        78.270            60.256            76.862              0.457                  79672 217                6.25        78.255            60.253            76.851              0.457                  79671 217                6.50        78.244            60.249            76.857              0.457                  79668 217                6.75        78.232            60.245            76.866              0.457                  79663 217                7.00        78.221            60.243            76.762              0.456                  79663 217                7.25        78.211            60.239            76.833              0.457                  79659 217                7.50        78.200            60.237            76.791              0.456                  79657 217                7.75        78.193            60.233            76.802              0.456                79653 217                8.00        78.187            60.230            76.796              0.456                79651 l
I l
I
:I I
I I
 
t                        TREND REPORT        UNIT M 1 LMCALC          SL        LAM        L95 l'  DATE 217 TIME 0.00 TTLM 0.0000        0.0000      0.0000    0.0000    0.0000 217    0.25      0.3036        0.0000      0.0000    0.0000    0.0000 I  217 217 0.50 0.75 0.3332 0.3108 0.0000 0.3194 0.0000 0.5248 0.3943 0.3336 0.3160 0.3040 0.4781 0.3519 0.3278 217    1.00    0.3006        0.3073 I  217 217 217 1.25 1.50 1.75 0.2971 0.2991 0.3244 0.2999 0.2973 0.3077 0.3556 0.3395 0.3544 0.2981 0.2961 0.3110 0.3143 0.3069 0.3291 0.3001    0.3221 I  217 217 217 2.00 2.25 2.50 0.3050 0.3226 0.3003 0.3C62 0.3119 0.3081 0.3463 0.3500 0.3437 0.3152 0.3093 0.3286 0.3217 217    2.75    0.2976        0.3045      0.3379    0.3042    0.3157 I    217 217 3.00 3.25 0.2932 0.2984 0.3006 0.2991 0.3323 0.3288 0.3259 0.2992 0.2982 0.2970 0.3101 0.3075 0.3051 217    3.50      0.2984        0.2980 I  217 217 217 3.75 4.00 4.25 0.2948 0.3109 0.3062 0.2963 0.2986 0.2995 0.3228 0.3253 0.3254 0.2953 0.2988 0.3004 0.3026 0.3063 0.3072 217    4.50      0.2988        0.2988      0.3236    0.2995    0.3056 217    4.75      0.3073        0.2998      0.3241    0.3016    0.3073 217    5.00      0.3113        0.3014      0.3256    0.3038    0.3094 217    5.25      0.3145        0.3034      0.3276    0.3063    0.3121 217    5.50    0.3117        0.3046      0.3284    0.3075    0.3130 217    5.75    0.3152        0.3062      0.3297    0.3095    0.3148 217    6.00    0.3131        0.3072      0.3303    0.3108    0.3158 217    6.25    0.3081        0.3074        0.3298  0.3104    0.3151 217    6.50    0.3112        0.3079        0.3299  0.3110    0.3153 217    6.75    0.3194        0.3096        0.3315  0.3129    0.2173 217    7.00    0.3091        0.3097        0.3311  0.3124    0.3166 I  217 217 7.25 7.50 0.3147 0.3104 0.3104 0.3106 0.3315 0.3312 0.3132 0.3133 0.3172 0.3170 217    7.75      0.3158        0.3114        0.3316    0.3141  0.3176
                                                                                =
217    8.00      0.3168        7.3122      0.3322    0.3150    0.3184 I
I I
I I
I I
 
0 EST MODE PLEASE SELECT THE OPTION YOU WISH TO USE:                                                                              TEST DATA          1814 1      -
MANUAL DATA ENTRY                                                  *t    OF DATA POINTS            =      33 2      -
PARAMETER GRAPHS                                        MODE DURATION (IN HOURS)                    =      8 3      -
SENSOR PLOTS                                              TOT TIME MEASURED LEAK                    =  0.3168 TREND ANALYSIS                                          TOT TIME CALCULATED LEAK                    =  0.3122 145      -
REPRINT CURRENT DATA rT                    3                            TOT TIME 95% UCL            =  0.3322 6      -
SENSOR DIFFERENTIALS                                                    MASS POINT LEAK            =  0.3150 MASS POINT 95'/. UCL              =  0.3184 1                                                                                                  75% La        =      .75 P    -
PASS WORD MEf10                                                                      MASS r          79650.52 SELECTED OPTION =
DINT
 
==SUMMARY==
:              LURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP                78.187 / -0.007                      AVG PRESS:                    60.230 / -0.003 ASS:            79650.52 /          -2.898                  AVG DEW PRESS:                  0.t'561 /-0.0001 k8.8953                    t, llHIT 1 : \
(
      .A                --
N  y
                                                          \
aus              am                                  ,
                        **                                    e 41N G
ete ae                                                e, 3                    ..
6                                                                                  *-
A edW                                                                      w W4                                                                                      #,
                                                                                                                        "g.
                                                                                                                                ~~~~
l'8.187_
                            ~
                                        ,                                  ,                  .          .                ,        ,  ~
                                                                .          ,                  ,          .                ,        ,    i, l        1014/ 217                                              TIHE                                  1814/                217 I
 
9 TEST MODE l      ' LEASE SELECT THE OPTION YOU WISH TO USE:                                                                          TEST DATA        1814 1
MANUAL DATA ENTRY                                                M OF DATA POINTS            =    33 2      -
PARAMETER GRAPHS                                        MODE DURATION (IN HOURS)              =    8 3      -
SENSOR PLOTS                                              TOT TIME MEASURED LEAK            =  0.3160 TREND ANALYSIS                                          TOT TIME CALCULATED LEAK              =  0.3122 5      -
REPRINT CURRENT DATA PT                                            TOT TIME 95*. UCL        =  0.3322 6      -
SENSOR DIFFERENTIALS                                                MASS POINT LEAK          =  0.3150 I                                                                                  MASS POINT 95*/. UCL            0.3184
                                                                                                                    =
7 5'/. L a    =      .75 P      -
PASS WORD MENU                                                                  MASS =          79650.52 SELECTED OPTION =
JINT
 
==SUMMARY==
:              CLWRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMPS                78.187 / -0.007                      AVG PRESS:                  60.230 / -0.003 SS:            79650.52 / -2.898                          AVG DEW PRESS:              0.4561 /-0.0001 Ie.373~.              ..
gNIT 1::                      .
x me on                            .,
s WW t
B8                                m WW                                    .
Wu.                                                p
                            **                                                      +
4W                                                        k a
s a
                              ..                                                                              ... W O&                                                                                      M MQ                                                                                            w
                                                                                                                                    'e le.33e                            t x.,
                                                                                                                                            +
T GT    da /                                            TIEfC'                          Aut,t/
                                                                                                            'I O i O19 I        AvA                O m 1 *7                                        nu                                          c
 
i TEST MODE PLEASE SELEET THE OPTION YOU WISH TO USE:                                                                                                                  TEST DATA            1814 1    -
MANUAL DATA ENTRY                                                                                          H OF DATA POINTS                  =    33 2    -
PARAMETER GRAPHS                                                                            MODE DURATION (IN HOURS)
* 8 SENSOR PLOTS                                                                                    TCT TIME MEASURED LEAK                      =  0.3168 13  4    -
TREND ANALYSIS                                                                              TOT TIME CALCULATED LEAK                          =  0.3122 5    -
REPRINT CURRENT DATA PT                                                                                      TOT TIME G5*/. UCL              =  0.3322 6    -
SENSOR DIFFERENTIALS                                                                                            MASS POINT LEAK              =    0.3150 MASS POINT 95*/. UCL                =    0.3184 75*/. La      =    .75 P    -
PASS WORD MENU                                                                                                                  MASS =          79650.52 SELECTED OPTION =
OINT GUMMARY:          CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT VG TEMP:          78.187 / -0.007                                                        AVG PRESS:                          60.230 / -0.003 ASS:          79650.52 / -2.898                                                          AVG DEW PRESS:                          0.4561 /-0.0001
    ?7.416~2.,
                          ~
llNI T          1~..        .,
g                ..
N 1        .
                      ..                                                      . p
(
                                                                                            \sf,.
      .              ...                                                                            a,.
                      **                                                                                    '* . * * * .        n '" ''
                                                                                                                          ~.              . .. . , ..
                                                                                                                            ..,                      g
                                                                                                                                                          "~
lF
                        ~~
s
                        ..                                                                                                                                                  s  ...
                                                                                                                                                                                    '^-
k' 6 . 7 6 2 -~                                                  ,
l      1G14/ 217                                                                                  TIME                                          1814/              217 I
 
1 l
I TEST MODE I PLEASE SELECT THE OPTION TEST DATA    1814 YOU WISH TO USE:
1  -
MANUAL DATA ENTRY                                            # OF DATA POINTS    :      33 2  -
PARAMETER GRAPHS                                    MODE DURATION (IN HOURS) =8 E3    -
SENSOR PLOTS                                            TOT TIME MEASURED LEAK = 0.3168 E    -
TREND ANALYSIS                                      TOT TIME CALCULATED LEAK : 0.3122 5  -
REPRINT CURRENT DATA PT                                      TOT TIME 95% UCL = 0.3322 S  -
SENSOR DIFFERENTIALS                                          MASS POINT LEAK = 0.3150 I                                                                      MASS POINT 95% UCL : 0.3184 75% La : .75 P  -
PASS WORD MENU                                                          HASS :    79650.52 SELECTED OPTION:
DINT
 
==SUMMARY==
-        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT VG TEMP:          78.187 / -0.007                  AVG PRESS:              60.230 / -0.003 ASS:          79650.52 /            -2.898          AVG DEW PRESS:            0.4561 /-0.0001 IO      4663, llNI T 1"..\              .
gj              ..
p                ..              \
e
                                            ?.
('              ..
                                                    .,jg
                  ..                                    A.
s 1
(
                                                                  . ...~ x,f    \_ .. _
g                ::
s      . .
                                                                                                              ,    m I O .456T.        i
                                                                                                                      -'~~i.
l 1014/                217                                TIME                          1814/ 217 I
 
TEST MODE PLEASE SELECT THE OPTION                                                                                                                    l YOU WISH TO USE:                                                              TEST DATA              1814                                    I l
1  -
MANUAL DATA ENTRY                                          H OF DATA POINTS                  =          33                        ;
2  -
PARAMETER GRAPHS                                MODE DURATION (IN HOURS)                    =          8                          !
3  -
SENSOR PLOTS                                        TOT TIME MEASURED LEAK                  =      0.3160                          ,
1A    -
TREND ANALYSIS                                  TOT TIME CALCULATED LEAK = 0.3122 S  -
REPRINT CURRENT DATA PT                                      TOT TIME 95% UCL = 0.3322 6  -
SENSOR DIFFERENTIALS                                            MASS POINT LEAK              =      0.3150 MASS POINT 95% UCL                  =      0.3184 75% La            =          .75 P  -
PASS WORD MENU                                                                MASS =              79650.52 SELECTED OPTION =
OINT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT VG TEMP:          70.187 / -0.007                AVG PRESS:                60.230 / -0.003 ASS:        79650.52 /          -2.898          AVG DEW PRESS:              0.4561 /-0.0001 b.7973X IfNIT        1 ~.
                            ~
                              ~ ~_
s
.                                    s .,
l [;ggs                                  x __
x.__
l_BM          "
                                                          's X10^5                                                        '. .
l
                                                                          ~
: s. .
                ..                                                                                .s.
                                                                                                        ..' ~_
                                                                                                                        ~
i 1                  s                                                                                                              -
, h3. 7 9 6 5        -
                                                              ,            t            .
                                                                                                                              .          s a.
l      1814/ 217                                        TIME                              1814/                        217
'I
 
I I
I I
I I
I I
I                  Appendix C VERIFICATION PIIASE DATA AND PLOTS I
I I
I I
I I
I I
 
e ERIFICATION MODE                                            TIME = 2350 OPTIONS:                                                        TEST
 
==SUMMARY==
 
1  -
MANUAL DAiA ENTRY                                # OF DATA POINTS      =  17 2  -
PARAMETER GRAPHS                      MODE DURATION (IN HOURS)          =  4 3  -
SENSOR PLOTS                            TOT TIME MEASURED LEAK          = 1.5343 4  -
TREND ANALYSIS                        TOT TIME CALCULATED LEAK          = 1.5115 s  -
REPRINT CURRENT DATA PT                                  MASS PT LEAK  = 1.5180 SENSOR DIFFERENTIALS                                      IMPOSED LEAK  = 1.0003 TOT T!r.E UPPER LIMIT    = 1.5625 P  -
PASS WORD MENU                                TOT TIME LOWER LIMIT      = 1.0625 MASS PT      UPPER LIMIT  = 1.5652
      'LECTED OPTION        e                              MASS PT      LOWER LIMIT  = 1.0652 TOT TIME VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS BEEN MET INT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:    78.009/ --O.008              AVG PRESS:              69.004/ -0.013 SS:            79377.91/ -16.172        AVG DEW PRESS:          0.4537/+0.0020 k.7652;.
    $ NIT 1" r._  --
_  ,- -      --=._                    _ __ _ _ ._ _ _ _ -...-. . - - -
ii'OT.
FIME          "!
ANAL.          "!
                  ~                      '
4TX/          ~
i              I AY        -
l
                      -l I
EGEND      "
I L
I=            El l
l
_;          i
                      .,          (
1          1 E.GGGS                        J                              ,
i i
;                    t                                                                                    >
l        1950/ 21?                            TIME                          235G/ 217 lI
 
e iERIFICATIONMODE                                              TIME = 2350 OPTIONS:                                                      TEST
 
==SUMMARY==
 
1  -
MANUAL DATA ENTRY                                tt OF DATA POINTS r      17 2  -
PARAMETER GRAPHS                        MODE DURATION (IN HOURS)    =    4 3  -
SENSOR PLOTS                              TOT TIME MEASURED LEAK    =  1.5343 4  -
TREND ANALYSIS                          TOT TIME CALCULATED LEAK    =  1.5115 5  -
REPRINT CURRENT DATA PT                              MASS PT LEAK  =  1.5180 6        SENSOR DIFFERENTI AL S                                IMPOSED LEAK  =  1.0003 I
TOT TIME UPPER LIMIT    =  1.5625 P  -
PASS WORD MENU                              TOT TIME LOWER LIMIT    =  1.0625 MASS PT UPPER LIMIT    =  1.5652 ELECTED OPTION =                                      MASS PT LOWER LIMIT    =  1.0652 TOT TIME VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS BEEN MET DINT
 
==SUMMARY==
:      CURRENT VALUE/DIFFERENEE FROM PREVIOUS POINT
  " AVG TEMP:    78.009/ -0.008                  AVG PRESS:        60.004/ -0.013 MASS:              79377.91/ -16.172          AVG DEW PRESS:    0.4537/+0.0020
[.7652 MIT 1" MASS            "
                                    /
IINA L .        ..
1' Tx/        "                f
    >AY            ..
j l
                  ..            j EGEND"      ~~
l
      =L          -
l l
                  ..        l f
l
,                          1 I                ::    !
i l
s b tNbb                              ,                ,                  ,                        t 1950            217                      TIHE                        2350/ 217
 
AVG. DATA VALUES                                                                                  UNIT 4 1 11MC                                                                                                                    DT(I)    VP(1)    MAGE (1)
I  DATE                                T(1)                                      P(I) 217                  0.00        78.127                      60.171                                                                  76.748    0.455    79581.42 217                  0.25        78.121                      60.161                                                                  76.731    0.455    79568.72 217                  0.50        78.114                      60.1S1                                                                  76.630    0.454    79556.96 217                  0.75        78.104                      60.140                                                                  76.705    0.455    79543.66 217                  1.00        78.087                      60.129                                                                  76.703    0.455    79532.09 I  217 217 217 1.25 1.50 1.7S 78.079 78.068 78.064 60.118 60.109 60.099 76.701 76.718 76.693 0.455 0.455 0.455 79518.61 79507.87 79495.05 2.00        78.057                        60.089                                                                76.697    0.455    79482.52 I
217 217                2.25        78.051                        60.078                                                                76.653    0.434    79469.56 217                2.50        78.04S                        60.068                                                                76.663    0.454    79456.92 217                2.7S        70.039                        60.058                                                                76.666    0.454    79444.43 217                3.00        70.035                        60.048                                                              76.66a    O.454    79431.72 217                  3.25        78.027                        60.037                                                              76.613    0.453    79418.53    _
217                3.50        78.022                        60.027                                                              76.622    0.433    79405.76 I    217 217 3.75 4.00 70.017 78.009 60.017 60.004
: 76. SOS 76.639 0.452 0.454 79394.08 79377.91 I
I I                                                                                                                                                                          .
I I                                                                                                                                                                          -
I I
I I
I I
I
 
IRIFICATION MODE                                                                TIME = 2350 OPTIONS:                                                                              TEST
 
==SUMMARY==
 
I    1    -
MANUAL DATA ENTRY                                                  tt OF DATA POINTS =
MODE DURATION (IN HOURS) = 4 17 2    -
PARAMETER GRAPHS 3    -
SENSOR PLOTS                                                TOT TIME MEASURED LEAK = 1.5343 14      -
TREND ANALYSIS                                          TOT TIME CALCULATED LEAK = 1.5115 5    -
REPRINT CURRENT DATA PT                                                      MASS PT LEAK = 1.5180 SENSOR DIFFERENTIALS                                                        IMPOSED LEAK = 1.0003 IS                                                                          TOT TIME UPPER LIMIT = 1.562S P    -
PASS WORD MENU                                                TOT TIME LOWER LIMIT = 1.062S MASS PT UPPER LIMIT = 1.5652 ILECTED CPTION =                                                      MASS PT LOWER LIMIT = 1.0652 TOT TIME VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS DEEN MET INT
 
==SUMMARY==
:            CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT
        .vG TEMP:      78.009/ -0.008                              AVG PRESS:                60.004/ -0.013 ASS:                79377.91/ -16.172                    AVG DEW PRESS:            0.4537/+0.0020 l8.18T';.                  ..
HIT        1~~ ..
s..
                                                                . %~
n                                                            N..,
f
                                                                                                            ^''
IF                  ~~
I
                                                                                                                              #w _
7                                                                                                                            x. ,
l8, gag 1950/ 217                                              TIME                                  2350/          217 I
I
 
iIRIFICATIONMODE                                                                      TIME = 2350 OPTIONS:                                                                                  TEST
 
==SUMMARY==
 
1~  ~
MANUAL DATA ENTRY                                                      4 OF DATA POINTS = 17 2  -
PARAMETER GRAPHS                                        MODE DLIRATION (IN HOURS) = 4 3  -
SENSOR PLOTS                                                  TOT TIME MEASURED LEAK = 1.5343 14    -
TREND ANALYSIS                                          TOT TIME CALCULATED LEAK = 1.5115 5  -
REPRINT CURRENT DATA PT                                                          MASS PT LEAK        =    1.5180 g6    -
SENSOR DIFFERENTIALS                                                              IMPOSED LEAK        =    1.0003 g                                                                          TOT TIME UPPER LIMIT = 1.5625 P  -
PASS WORD MENU                                                    TOT TIME LOWER LIMIT = 1.0625 MASS PT UPPER LIMIT = 1.5652 LECTED OPTION =                                                        MASS PT LOWER LIMIT := 1.0652 TOT TIME VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS BEEN MET INT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:    78.009/ -0.008                                AVG PRESS:                    60.004/ -0.013
  " SS:            79377.91/ -16.172                        AVG DEW PRESSr                O.4537/+0.0020
  $G.62T..'. .... '  .
g" HIT      1.".                .... -
                                          ~. ._
                ..                                      N. ,
                ..                                                              s l>s I A        ::                                                                                  'x,.
: s. .
  =
E
                  ..                                                                                                                  s I
gO.458,"        g i
i                          a
                                                                                                                                        .i 8
1950/ 217                                            TIME                                    235G/                  217
 
e iVERIFICATION MODE                                                                                                  TIME = 2350 OPTIONS:                                                                                                                      TEST
 
==SUMMARY==
 
1    -
MANUAL DATA ENTRY                                                                                  # OF DATA POINTS = 17 PARAMETER GRAPHS                                                                        MODE DURATION (IN HOURS) =                          4 123    -
SENSOR PLOTS                                                                                TOT TIME MEASURED LEAK = 1.S343 4    -
TREND ANALYSIS                                                                          TOT TIME CALCULATED LEAK = 1.5115 S    -
REPRINT CURRENT DATA PT                                                                                        MASS PT LEAK = 1.5100 I6      -
SENSOR DIFFERENTIALS                                                                                            IMPOSED LEAK TOT TIME UPPER LIMIT
                                                                                                                                                    =
                                                                                                                                                    =
1.0003 1.5625 PASS WORD MENU                                                                                  TOT TIME LOWER LIMIT                =    1.0625 MASS PT UPPER LIMIT                =      1.5652
_ LECTED OPTION =                                                                                            MASS PT LOWER LIMIT                =      1.06S2 TOT TIME VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS BEEN MET
    ^] INT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT AVG TEMP:        78.009/ -0.008                                                              AVG PRESS:                      60.004/ -0.013 SSt              79377.91/ -16.172                                                      AVG DEW PRESS:                  0.4537/+0.0020 k 6 . 7 487;'.s.
                        ~
  $ NIT 1-              . k i
                                                                                                          .s
                              ;                      e-                                        .-.-        ~
t
                                                                                                                ,p  ~t, i                  /                                                                    ',
i 1                                                                                        s n              l1 I            (                                                                              .,    ,
                                        ,      ,                                                                                                      s i  ,                                                                                                          ,
1l                                                                                                              %
g Y                                                                                                                \                            i I
(
1              j
(
                                                                                                                                                                        'y i
j-i lF
                        ~~
                                                                                                                                                                          \<
                                                                                                                                                                                ,/
__                                                                                                                                                  i, ,'
I6 . 5 05 ~~                                        ,
l        195G/ 217                                                                            TINE                                      235G/ 217                                          I I
 
I VERIFICATION MODE                                                                                          TIME = 2350 OPTIONS:                                                                                                          TEST
 
==SUMMARY==
 
MANUAL DATA ENTRY                                                                            # OF DATA POINTS =                                                                    17 PARAMETER GRAPHS                                                                MODE DURATION (IN HOURS)                =                                                          4 3    -
SENSOR PLOTS                                                                        TOT TIME MEASURED LEAK = 1.5343 4    -
TREND ANALYSIS                                                                  TOT TIME CALCULATED LEAK = 1.5115 REPRINT CURRENT DATA PT                                                                                MASS PT LEAK = 1.5180 SENSOR DIFFERENTIALS                                                                                    IMPOSED LEAK = 1.0003 TOT TIME UPPER LIMIT = 1.5625 PASS WORD MENU                                                                        TOT TIME LOWER LIMIT = 1.0625 MASS PT            UPPER LIMIT = 1.5652 LECTED OPTION          =                                                                      MASS PT LOWER LIMIT = 1.0652 TOT TIMC VERIFICATION CRITERIA HAS BEEN MET MASS PT VERIFICATION CRITERIA HAS EEEN MET JINT
 
==SUMMARY==
:            CUnRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT G TEMP:      78.009/ -0.008                                                          AVG PRESS:                60.004/ -0.013 ASS:                79377.91/ -16.172                                                AVG DEW PRESS:            0.4537/+0.0020 I O . 45 5~ .      .    ....
IHIT            1::        )          t                                                  /s r
7-  __f y        . . - ,
8                                                i                                                          ,
l                          ,
i                      ,.1                                s.
                                                          >                  >                                    ~.
i,              I                                      s,    ._ ___,
1/  )
y                                              g
{
                                                                          't                                                                                                                    \
                      ..                                              y                                                                                                                          s s -,                                            j
(
                      ..                                                                                                                                                                                i, 3
                                                                                                                                                                                                                                        )
i h
h                      --
3 J
                        ..                                                                                                                                                                                      'g        f i
1 I
j Il I G . 45 2--      _
l        1950/ 21?                                                                        TIME                              235G/ 217
.I
 
ERIF1 ATION MODE                                                      TIMEe 2350 OPTIONS:                                                                    TEST
 
==SUMMARY==
 
a  -
MANUAL DATA ENTRY                                            # OF DATA POINTS =                    17 2    -
PARAMETER GRAPHS                              MODE DURATION (IN HOURS)                        =    4 3  -
SENSOR PLOTS                                    TOT TIME MEASURED LEAK                      =  1.5343 4  -
TREND ANALYSIS                                TOT TIME CALCULATED LEAK                        =  1.5115 5  -
REPRINT CURRENT DATA PT                                            MASS PT LEAK              =  1.5180 6  -
SENSOR DIFFERENTIALS                                                IMPOSED LEAK              =  1.0003 TOT TIME UPPER                  LIMIT    =  1.5625 P  -
PASS WORD MENU                                      TOT TIME LOWER                  LIMIT    =  1.0625 MASS PT UPPER                  LIMIT    =  1.5652 ELECTED OPTION =                                            MASS PT LOWER                  LIMIT    =  1.0652 TOT TIME VERIFICATION CRITERIA HAS EEEN MET MASS PT VERIFICATION CRITERIA HAS BEEN MET POINT
 
==SUMMARY==
:        CURRENT VALUE/ DIFFERENCE FROM PREVIOUS POINT VG TEMP:  78.009/ -0.008                    AVG PRESS:                  60.004/ -0.013 MASS:              79377.91/ -16.172            AVG DEW PRESS:              0.4537/+0.0020 I
          ,7958-* s.
                              ~
      ,LINI T 1 ".      .      N.... .
5 msg          -
                                        's LBM          T F"'10^5        .-
                                                                  .s. ..
s.
                    ..                                                        x I
                                                                                                        .~%
l l              "
?
l              .  ".                                                                                                      .
          . 7938"                              ,                            ,                              ,
x, 1950/ 217                                TIME                                        235G/ 217 I
 
g    -
I I
I I
I I
I E
Appendix D E    INSTRUMENT SELECTION GUIDE CALCULATIONS I
I I
I lI lI I
I
 
I I                                                                        Page 1 of 7
                                                            "'""'^''"'^''"
I            ' " S'" "" '*'^" " s ' '" " "
l    A. Instrument Specifications
: 1. Total, Absolute Pressure
: a. Mensor Quartz Manometer Pressure Gages
: b.      No. of sensors used in calculation: 2
: c.      Range: 0-100 psia (direct reading)
: d.      Accuracy: 10.010% Rdg.; i 0.002% F.S.; i 5 microns g              e.      Sensitivity: 10.001 psi
: f.      Repeatability: 10.001% F.S.
l              g.      Resolution: 0.001 psi
: 2. Water Vapor Pressure
: a. Foxboro Lithium Chloride Dewcells I              b. No. of sensors: 10
: c. Calibrated range: 37.5 - 100"F
: d. Accuracy: 1 1.5 F g              e.      Sensitivity: i 0.001 F l        3. Drybulb Temperature
: a.      1(X) ohm platinum RTD's
: b.      No. of sensors: 18
: c. Calibrated range: 60 - 120 F
: d. Accuracy:      05F
: e. Sensitivity: 10.001"F I
 
t Page 2 of 7
: 4. Data Acquisition System
: a. Fluke Model 2285 I
: b. Drybulb Signal Conditioning / Readout
: 1)    Repeatability: 10.001*F
: 2)    Resolution: 0.001*F I            c. Dewpoint Signal Conditioning / Readout
: 1)    Repeatability: 10.001*F
: 2)    Resolution: 0.001*F I
B. Instrument and Measurement System Errors I
: 1. Definitions
: a. e=    the error associated with the measurement of change in a given l                          parameter.
l            b. E=    the error associated with the sensitiv..y of the sensor.
: c.      e=    the error associated with the measurement system readout and signal conditioning (excludes sensor), including resolution and l                          repeatability.
: 1)    Instrumentation errors (e.g., repeatability and resolution) are combined using a root-sum-square formula (per ANSI /.ANS 56.8-1987, Appendix G).
I                    2)    In cases where repeatability is tested and specified for both the
!                              sensor and the readout device, the largest source of error is l                              used to calculate e.
lI l
 
Page 3 of 7 I
g C. Instrument Errors
: 1. Total, Absolute Pressure
: a.      Sensitivity E, = 10.001 psia (per manufacturer spec.)
I          b.      Resolution and Repeatability cp = i [(0.001)2 + (0.001 psia)2jin
                        = i [1 x 104+1x10*]''2 4
                        = 1 [2 x 10 ]'8 t, = 1 1.414 x 10'3 psia 1
I
: c.      Measurement System Error e=p      [(7dp)2 , (gp)2)in/[no. of sensors]''
                        = i [(0.001)2 + (1.414 x 10'3)2)i 2j(3)n2
                        = 1 [1 x 104 + 2 x 104]v2ji,414
                        = 1 [3 x 10 4]v2ji,434 e=p      1.225 x 10~3 psia I
I I
 
0 l
I Page 4 of 7 I
l                2.      Drybulb Temperature Sensitivity a.
Fy = 10.001'F g
I                        b.                Resolution and Repeatability or = 1 [(0.001)' + (0.01)2]''
d g                                                  = i [1 x 104 + 1 X 10 ]'S d
                                                      = 1 [1.01 X 10 ]tr2 I                                            c1 = 10.010*F I
: c.                Measurement System Error e2 = i [(E 3)2 , (c1)2] 2/(no. of sensors) '
I                                                  = 1 [(0.001): + (0.01)']'*/(18)''
f                                                  = 1 [1 x 104 + 1 x 10']''/4.243
                                                      = i [1.01 x 10 "]'*/4.243
                                                      = 10.010/4.243 er = 10.002"F I                                                                                                                                          >
I                                                                                                                                      . -
 
I I                                                                                                                              Page 5 of 7
: 3.            Water Vapor Pressure
(
: a.            Sensitivity En= 10.001*F l                                                    b.            Resolution and Repeatability t
r = 1 [(.5"F)2 + (0.001)2]''2 I                                                                        =      i [.25#F + 1 X 10') '
                                                                            =
1 [.25]'''
tr =            0.5"F g
l                                                    c.            At 80#F dewpoint, water vapor pressure change /'F is 0.0167 psiat'F (from the steam tables)
: d.            Measurement System Error e
r = 1 [(Er)2 + (t r)2]'? /(no. of sensors)'''
l l                                                                        = 1 [(.001)2 + (.5)2]''/(10) '
                                                                            = 1 [0.25]''/3.162
                                                                            = 1 5/3.162
                                                                            = 10.1581'F x 0.0167 psia /'F en= 12.64 x 10* psia g
I I
 
I                                                                                                              Pap,e 6 of 7 I
l    D. Instrumentation Selection Guide Formula (24 hr. Test) 2400 isG=.1                                                    2(
                                                                                            )' 4 2( 'l)2 42(h)2 I
j3g ,,2400 2 ( 1.225x10-3)242( 2.64x10-3.)242(0.002)2 24 h                                                    60.2        60.2    545 I
l            = 1100 [2(2.035 x 10 )2 + 2(4.385 x 10 )2 + 2(3.670 x 10'')']'?
5            5
              = 1100 [2(4.141 x 10 "') + 2(1.923 x 10') + 2(1.347 x 10 ")] 2
                = 1 100[8.282 x 10 "' + 3.846 x 10' + 2.694 x 10 "]'?
                = 11(X) [4.701 x 10*]''
l              = 1100 [6.856 x 10 ]
5 ISG = + 0.00689/ day I
E. ISG at 8 hours:
l        ISO = 1 24 0[6.856 x 10 )
4
                    =  300 [6.856 x 10 ]
g ISG = 10.0204%/ day I
I
 
I Page 7 of 7 l                                F. ISG Acceptance Criteria
: 1.      ISO must be s 257c L, I
: 2.      257c (17e wt/ day) = .257c/ day
: 3.      ISG = 0.0068% 5 0 257c/ day l                                          for 24 hours 4,      ISG = 0.02047o 5 0 25%/ day g
for 8 hours I
I l
I
!I
.I I
I I
I I
 
I 2
I                                                                                                          i
:I                                                                                                              1 I
I I
i 4
Apperidix E i
SENSOlt LOCAT!ONS I
!I I
I I
1
 
I y , E LEVATION AZiWUT H 100' 3 3/4" 94' ME A 3;                                              ;        _g              ,/,                    y,
                                                                                                          .[                    A*---  ,
1BO' I
f[
                                                                                                                                          ,f/    ,/                                    E L. 81' 6 1/4" N
N
                                                                                                                          ;                :-  N g
N
::. N N
                                                                                                            \            -
                                                                                                                                          ;N I                                                                                                      ,
                                                                                                                          ?
                                                                                                                          /
4
                                                                                                                                          /
                                                                                                                                          /
N                                        E L . 5 0'+ 6" ut c    ,*,'n, 20el 2                , . ,    -
                                                                                                                                                \ ZONE 2
                                                                                            \ \\                        "
                                                                                                                                        =      \\N            N                          E L. 31' 6"
                  ~E %                                                                            ,l                      -                                              "' ' ' A's'-
ifNl'h!l
                                                                                                /' 70NE
                                                                                                  ,f// A//G 3e                      .'y 3
lll,f, ME Ky
                                                                                                                                                  'jZONE
                                                                                                                                                    / do //3,/'j/ /
                                                                                                            / Sb            IO        .X          Y/'    /                    ,~D              E L . 9'* t"
            /,/'                                                                                                                                                                            s f'
{!)l',i,'l,$'                              '
Ih$/ ,6xfW{\
g                                                                                                                                                                                            3
          \                                                                                                              w ug .n .'E.                                    \
            \    ZONES                                                                                                          ie0*                                      \      gout 3        /
I            paw          Y                                                                                            PROFILE VIEW sn gg ,; 120'                                                                                                                                                          9E x h NOT ES:
I                1. ZONE BOUNDARIES ARE APPROKIM ATE, REFERENCE PNPS CALC. No MB 009.
: 2. INSTRUMENT ELEVATION AND AZtWUTH POSifl0NS ARE APPROXIM ATE.
I                                                                                                                              ILRT DEWP0lNT TEMPERATURE I                                                                                                                              SENSOR LOCATIONS PILGRIM NUCLEAR POWER STATION-UNIT No.1 I
 
I I
E L E V AT IO N
                    ~
A ZIMUT H                                                                                            E L 106'- 3 3/4" 20 I                                      p
                                                          // /r[ A'/'s
                                                          ,/                                    s                            EL  91 3 5/4.
TE C ,3g, %                                          s s
I                              7g.a    87' # 9N LONE L/pa NhN
                                                                                  .\
ZONEB N TE 05'  ,
E L. 81* 6 1/4" 8#
                                                            '/    ,
f        N TE B 100'
                                                                                              , /,
                                                              /,
                                                                  ~
I                                      '
60' 90' \.' / ,
                                                              /
b
                                                                                            ''/' ,    TE-E 2
60 bC                                ' ZONE                                EL. 50' 6" TE G 27
* ZONE D                                        ZON      - 10. K 32                                                                              .gg y              180*        E L . 31,- 6..
T E J gg-                      D**          w)., .    * ==.th L_
I                                                                        W"
                                                                                              '                          y y.
2 2 ' __                t,                    ,
ZONE H -                            -TE L yy
                                                      ' EE .                                  /''"h                                IL 'b''10"
!                        12'                                                  .
                ''"'z$* NjDNs j#~~'
QZONE      W iife .,        ZONE 0, ,
('Miifl;Z0%J,g{sy, Sgs TE a3 6 3
* N E L. 9' 2" 1
                        # $,$)h I
l TE-N2 '70*
I        \      ZONE J 15,                                      g
                                                                                                                    \      ZONE J sg/                                                                                                    \g-T                                        PROFILE VIEW                                            TE-0h
            - TE $
12 0 '
I                  NOTES:
: 1. ZONE BOUND ARIEC ARE APPROXIM ATE, I                        REFERENCE PNPS CALC No MB-009.
: 2. INSTRUMENT ELEVATION AND AZiWUTH PostTIONS ARE APPROXIMATE.
I I                                                                        ILRT RESISTANCE TEMPERATURE DETECTOR LOCATIONS PILGRIM NUCLEAR POWER STATION UNIT No.1 I
 
I I
I I
I I
I I
I                            Appemlix F DESCitil' TION OF GENEIRAI,I'lIYSICS II.itT COMPUTElt 1*llOGitAM I
I I
I I
I I
I I
 
        ..            -      . .-      ~ _ - _ - _ _              _            - ___        .
I                                                                                                I DESCRIPTION OF GENEllAL PilYSICS ILitT COMPUTElt PROGRAM l The following paragraphs describe the various features and attributes of the General Physics ILRT Data Management computer program and the process used to certify it each application.
I IEDUNDANCY l The General Physics ILRT team was equipped with two fully operational IBM compatible rnicrocomputers (Samsung S500 and SD700) during the ILRT for on site data reduction and analysis. The computer software and hardware interfaced directly with the Fluke Model 2285B Data Acquisition System for the test, Two computers were brought on site for 100% redundancy, as each computer and its software was capable of independently performing the ILRT. The General Physics ILRT Data Management Software is also capable of accepting manualinput of raw sensor data and performing all required sensor data conversions if the data logger would cease to function. The program installed on each computer was designed to write to the hard drive and the back-up disks in the "A" and "B" drives to protect against the unlikely event of l
l a disk " crash."
The General Physics ILRT Data Management Computer Program is written in IBM's
:  BASICA. BASICA is a high level programming language which combines programming case with user oriented command functions to create an easy to use and understand lg  program. In order to increase speed of operation the program was then compiled into an executable command file. Compiling was accomplished using the IBM Basic Compiler.
l  SECURITY l
l In addition to execution speed, compiling has the added benefit of making the program I more secure as compiled programs cannot be edited or changed. Also, as the program does not need to be attended to operate, a password is required to change modes of operation, start times or to enter the data editing routine. The data editing routine itself is purposely designed to be extremely user un-friendly and implementable only by the GP programmers as General Physics believes that the integrity of the raw data files is paramount.
l I
1
 
FEATURES The program itself is designed to be a menu driven program consisting of five separate, menu driven operating modes. These are the:
: 1.      Pressurization hiode
: 2.      Stabilization hiode
: 3.      Test hiode
: 4.      Verification hiode
: 5.      Depressurization hiode These modes correspond to the phases of the ILRT. hienu driven means that the user is l        presented with a list of options that the prograrn can perform and from which the user can choose, it allows for interactive information exchange between the user and the computer and prevents invalid information or user mistakes from crashing the program. Program organization consists of a master menu which controls access to the five operating modes chained to the individual menus which control these modes. The data processing, information display capabilities and function of each mode is as follows:
: 1.      Pressuri7ation hiode: All data reduction, graphic displays of average temperatme, dewpoint,and corrected pressure.
g
: 2.      Stabili7ation biode:        All data reduction, automatic comparison of data l                        against ANSI 56.8 and BN TOP-1 temperature stabilization criteria, notification when criteria is met, graphic displays of average temperature, dewpoint, and corrected pressure.
: 3.      Test hiode: All data reduction, calculation of leakage rates using mass point, total time and point-to point analysis techniques, display of trend report information required by BN-TOP-1, graphic display of average temperature, dewpoint, pressure and mass, as well as graphic display of mass l                        point measured leakage, 95% UCL; total time measured and calculated leakage and the total time leakage rate at the 95% UCL (as calculated by BN-TOP-1), including a superimposed acceptance criteria line).
: 4.      Verification Test hinde: With input of imposed leakage in SCFM automatically calculates and displays on graph and trend report the I                        acceptance criteria band, plus all graphics displays available in test mode.
: 5.      Depressuri7ation hiodt : All data and graphics capabilities of Pressurization hiode.
I I
 
o Other reduction and analysis capabilities of the General Physics ILRT computer program include:
: 1.      Containment total pressure conversion from counts to psia (if requited), and averaging.
I              2.      Containment drybulb temperature weighted averaging and conversion to absolute units.
: 3.      Containment dewpoint temperature weighted averaging and conversion to partial pressure of water vapor (psia).
: 4.      Data storage of ILRT measurement system inputs for each data point.
I              5.      Weight (mass) point calculations using the ideal gas law.
l              6.      Automated Data . Acquisition and/or Manual Data Entry.
Sensor performance and deviation information for sensor failure criteria, I              7.
graphic display of individual sensor performance for selected operating mode.
: 8.      Calculation of ISO formula at beginning of test; acceptance critria based on number of sensors remaining and actual test duration.
I              9.      Computer System Error Functions automatically checks for error in incoming data, printer or disk drive faults.
COMPUTER PROGRAM CERTIFICATION l      The computer program used by General Physics and has been previously certified for six tests at the San Onofre Nuclear Generating Station and over a dozen other ILRT's.
The initial certification required verification of the program through hand calculations and an independent review by Bechtel Power Corporation. After certification was completed a calibration set of raw data was established from the data which is used to verify l        performance of the program prior to usage.
,        Additionally, a hand calculated data set was entered into the program to further verify l
l      performance, as configured for the ILRT. Acceptable agreement was obtained between the hand calculated results and the computer results, within the limits of truncation and round-off error.
 
, I Once the computer was linked to the data acquisition device and a complete data stream was available, the input function of each mode of the program was verified by comparing g  the data logger's output to the computer's printed data point summary.
General Physics also provided printouts of the installed constants foi the test such as:
I          1. Volume Fractions for IU(T hicasurement System Sensors
: 2. Installed Calibration Constants The microcomputer hardware and software remains the property of General Physics.                          l I  Genen! Physics supplied Hoston Edison Cornpany with certification documents for the IUlT rnicrocomputer software for the llJtT in accordance with paragraph 4.2 of General Physics Corporation's CLitT Project Procedures hianual and the Purchase Order l  requirements.
I I
I I
t 1
I
 
I I
I I
I I
I I
I Appendix G I    LOCAL LEAKAGE TEST SUMMAltlES I
I I
I I
I I
I I
 
I I                          1991 LOCAL 1.EAK RATE
 
==SUMMARY==
 
l                          TYPE B DOUBLE GASKETED SEALS AS FOUND AS LEIT      MAINTENANCE I  PEN.
NO. DESCRilTION LEAKAGE (SCCM)
LEAKAGE (SCCM)
IMPROVEMENT (SCCM)    COMMENTS N/A  GlBS MANWAY                6 0 ,45 ,90 ,135 N/A  GIBS MANWAY                6 180",225",270 ,
l      315 N/A  DRYWELL llEAD              42            21        21 I  1  EQUIPMENT llATCil          7            8 l  2    AIRLOCK INNER SEAL          2            8 AIRLOCK OUTER SEAL          2            8 I  4    DRYWELL llEAD            132 ACCESS IIATCil 6    CRD REMOVAL IIATCil        4 25  AO 5044A INBOARD FLANGE                      4 AO.5044B INBOARD FLANGE                      3              4 AC 5044B OUTBOARD FLANGE
* TESTED I                                                                  WITil AO SN4B ND\RD llANGE I
I I
I
 
1991 LOCAL 1.EAK RATE
 
==SUMMARY==
 
l                      TYPE 13 DOUBLE GASKETED SliALS AS FOUND AS LEFT          MAINTENANCE PEN.                        LEAKAGE I.EAKAGE          IMPROVEMENT NO,  DESCRilrrlON          (SCCM)          (SCCM)    (SCCM)        COM Ml!NTS 26  AO-503511 INBOARD FLANGE
* TESTED WITil AO 5035A NG\RD11NGI I      AO 5035 A IN110ARD FIANGE                    6 AO 5035A OUTBOARD FLANGE
* TESTED WITil AO 5035A l                                                                      N D\RDllM Gi 35A  TIP DRIVII FLANGES 3513 5 INNER                  6 35C 35D  TIP DRIVE FLANGES 35E  5 OlJrER                30 43  DRYWELL TEST CONN.
FLANGE                    5 47  ILRT SUPP TEST COhN. FLANGE          1520                3        1517 200A TORUS ACCESS llATCil.
EAST                      5                3          2 I 200B TORUS ACCESS IIATCil.
NORTIl                  28              24          4 l
I
 
I I                          1991 LOCAL LEAK RATE
 
==SUMMARY==
 
l                          TYPE B DOU13LE GASKI:TED SEALS AS FOUND AS LEFF                          MAINTENANCl!
PEN.                        LEAKAGE                      LEAKAGE      IMPROVEMENT No. DESCRIPTION            (SCCM)                      (SCCM)        ISCCM)    COMMENTS 205  AO 5036B INBOARD
* TESTED WITil FLANGE AO 5036A I                                                                                        Mn\RD11RCE AO 5036A INI30ARD FLANGE                    4 I        AO 5036A OLTTI30ARD FLANGE
* TESTED WITil AO 5036A ND\RD 11ANGli 223 IIPCI STEAM TO TORUS l        INBOARD FLANGE &
OUTBOARD FLANGE            6                          3              3 l    223 2301 74 INBOARD &
OUTBOARD FLANGE          5 225  1301-64 INBOARD &
OUTBOARD FLANGE            7 RCIC STEAM TO TORUS INBOARD FLANGE &
OUTI30ARD FLANGE          3                          5 I
I I
I I
 
I                      19911.OCAL LEAK RATE
 
==SUMMARY==
 
l                      TYPE 13 DOUBLE GASKETED SEALS AS FOUND AS LEIT          MAINTENANCE PEN,                      LEAKAGE  LEAKAGE          IMPROVEMENT b'Oa  DESCRirTION          (SCCM)    ISCCM)            (SCCM)      COMMENTS 227  AO.5040A INBOARD &
OUTBOARD FLANGE
* TESTED WITil I                                                                      AO 504013 INBOARD &
OUTBOARD FIANGE AO 504013 INBOARD &
OUTBOARD FLANGE        5
* TESTED WITil 227A  X 212A SEAT FIANGE AO 5040B INBOARD &
OUTBOARD l                                                                      FLANGE 22713 X 212B SEAT FLANGE
* TESTED WITil AO 5040B INBOARD &
OUTBOARD IlANGE 227  AO 5042A INBOARD I      FLANGE AO 5042B INBOARD &      8 OUTBOARD FLANGE AO 5025 INBOARD FLANGE 230  TORUS TEST CONN.
FLANGE                  3 I
I I
 
I I                            1991 LOCAL LEAR RATE SUhihiARY l                            TYPE 13 TESTABLE PENETRATIONS AS FOUND AS LEIT  hiAINTENANCE I  PEN.
NO,      DESCRilTION LEAKAGE (SCCM) 1.EAKAGE (SCCM)
IMPROVEMENT (SCCM)    COMMENTS 2        AIRLOCK INTEGRATED      725      690        35 I  7A 53 MAIN STEAM &
RCIC STEAM TO TURBINE                    17 7B      MAIN STEAM (2) 7C                                76 7D      hiAIN STEAM &
8        MAIN STEAM l          DRAIN                    333 9A      FEEDWATER (2) l  9B                                  7 12      RilR SUCrlON FROM RECIRC 51A      RilR RETURN TO RECIRC                735 14      CLEANUP SUPPLY 16A    CORE SPRAY                7 16B    CORE SPRAY                  4 17      RX VESSEL llEAD SPRAY              625 51B    RIIR RETURN 2010    TO RECIRC g          VENT LINE                  9 52      11PCI STEAM TO l    20111  TURB VENT LINE              8 I
I
 
O 1991 LOCAL LEAK RATE SUhihfARY TYPE 13 TESTABLE PENETRATIONS AS FOUND AS LEIT              hiAINTENANCE I PEN.
NO.      DESCRIPTION LEAKAGE (SCCM)
LEAKAGE (SCCM) lhiPROVEhiENT (SCCM)      COMAiENTS 100A/13 101B      NEUTRON hiON (4)            55 104E 100C 104G/J    NEUTRON h10N (4)            12 10513 I 100D 102A      NEUTRON hiON (4)            14 103A l 10411 100E l 102B 103B NEUTRON hiON ELECTRICAL (3)              102 105A      CRD POSITION (2) l 104A/B/C 101A      ELECTRICAL 104D/F    CRD POSITION (2)            39 106B      DRYWELL IIUhilDITY 101C      ELECTRICAL                  17 201A      VENT LINE                    4 201B      VENT LINE                    7 201C/D    VENT LINE (2)                8 1
l g 231E/F    VENT LINE (2)                4 202A      ELECTRICAL                  17 202B      ELECTIUCAL                  112 II I
 
            .            -    -  . . _ .        _  . - . _ _ - =        . _- _        .. ._ -
1 i
1991 LOCAL LEAK RATE
 
==SUMMARY==
 
TYPE C TESTS AS FOUND AS 1.EIT                    MAINTENANCE PEN.                        1.EAKAGE LEAKAGE                    IMPROVEMENT NO. DESCRilrTION        (SCCM)              (SCCM)            (SCCM)      COMMENTS 7A    MAIN STEAM AO 2031A                    101 1
AO 203 2A                    629 7B    MAlN S'IT:AM AO 2031B                    755 AO 203 2B            10930                  484            271 I 7C    MAIN STEAM AO 2031C                  5933 AO 203 2C                    824 E 7D    MAIN STEAM E        AO 2031D                3121 AL a)3 2D                  1082 8      MAIN STEAM DRAIN MO 2201                        3 MO 220 2                      71 I 9A    FEEDWATER 6 58A                394000                  233          21967 6-62A                    22200              820 RWCU RETURN MO 120180                    468 RCIC DISCIIARGE MO-1301-49                    2 9B    FEEDWATER 6 58B                218000                    86          217914 I        6-62B                493000                2070 I
I
 
1991 LOCAL LEAK RATE
 
==SUMMARY==
 
TYPE C TESTS AS l'OUND AS LEFT                        MAINTENANCli I PEN.
NO. DESCRIPTION LEAKAGE (SCCM) l_EAKAGli (SCCM)
IMPitOVEMl!NT (SCCM)                      COMMENTS 9 13 IIPCI DISCllARGE MO 2301-8                                            11 12  RilR SUCrlON 11 TOM RECIRC I      MO 1(X11-47 MO.1001 50                                      6180 15 427 14  RWCU INLET MO 12012                                        8369                5010                    23 MO 1201-5                                          211                  188 15E  110 2 2 ANALYZER l      "B" SV 5065 3511                                          2 SV 5065-31B                                          2 16A  CORE SPRAY                                                                                                            TESTED IN TO REACTOR                                                                                                              PARALLEL MO 1400 24A                                          4 MO 1400-25A 16B  CORE SPRAY                                                                                                            TESTED IN TO REACTOR                                                                                                  ,          PARALLEL I      MO-1400-2413 MO 1400 25B 875 ll  17  RX llEAD SPRAY                                                                                                        TESTED IN
! 5      MO ;00160                                            2                                                                PARALLEL l        MO 1001-63 l
l I
 
i
                                                                                    \
l 1991 LOCAL Li!AK RATE
 
==SUMMARY==
 
TYPE C TESTS AS FOUND AS LEFF      hiAINTENANCE I PEN.
Q F_O , DESCRIPTION Ll!AKAGE LEAKAGE (SCCM)        (SCChj]
lhtPROVEh1ENT (SCChi)    Coh1 Nil!NTS 18    DRYWELL FLOOR DRAIN I      AO 7017A AO 7017B 1026 28 I 19    DRYWELL EQUIP.
hiENT DRAIN AO 7011A                16 AO 7011B                871 22    INSTRUh1ENT AIR I      TO DRYWELL 31 CK 167              812 l 23    RBCCW SUPPLY 30-CK-432                37 l 24    RBCCW RETURN MO 4002                  5 25    DRYWELL PURGE EXilAUST AO 5044A                40 I      AO 5044B TESTED IN I 25    DRYWELL VENT EXIIAUST AO 5043A              1039 PARALLEL l        AO-5043B POST ACCIDENT                                            TESTED IN I      PURGB & VENT SV-5082A SV-5081B 4
PARALLEL I
 
I I                      1991 LOCAL LEAK RATE SUhihiARY l                                              TYPE C TESTS AS FOUND AS LEFF                hiAINTENANCE PEN.                    LEAKAGE LEAKAGE                  lhiPROVEhiENT
    &    DESCRIPTION        (SCChi)                  (SCChi)    (SCChi)    COhihiENTS 25  POST ACCIDENT                                                      TESTED IN PARALLEL I        PURGE & VENT SV 5081 A SV 5082D 2
26  DRYWELL PURGE                                                      TESTED IN INLET                                                              PARALLEL I      AO 5035A AO-5035B 1306 AO 5033B TORUS PURGE                                                        TESTED IN INLET (X-205)
PARALLEL I      AO 5036A AO 5036B WITH AO 5035A, AO-5035B, &
l                                                                          AO-5033B POST ACCIDENT                                                      TESTED IN l        PURGE & VENT SV 5085A                            4 PARALLEL SV-5085B I
POST ACCIDENT                                                      TESTED IN I      PURGE & VENT SV 5086A                            2 PARALLEL SV-5086B DRYWELL MAKEUP                                                    TESTED IN I      GAS 9-CK-340                            48 PARALLEL I      DRYWELL hiAKEUP GAS TESTED IN PARALLEL AO-5033A                      1058 I
I
 
o 1991 LOCAL LEAK RATE SUhiMARY TYPE C TESTS AS FOUND AS LEFT    htAINTENANCE I PEN.
NO. DESCRWTION LEAKAGE LEAKAGE (SCCM)      (SCCM)
IMPROVEMENT (SCChD    COMMENTS 29E  1102 2 ANALYZER "A"
SV-5065 37A            1998 SV-5065 33A            373 32A  C-19 RLTURN TO DRYWELL CV 5065 91              152 CV-5065 92              276 35A  TIP BALL VALVE 4 45 300D                  "6          3      83 35B  TIP BALL VALVE 3 45 300C                  76          68        8 35C  TIP BAl.L VALVE 1 45 300A                180          2      138 I 35D  TIP BALL VALVE 2 45-300B 4368          5    4363 35E  TIP N2PURGE CHECK                    30 l 39A  CONTAINMENT SPRAY TESTED IN PARALLEL MO-1001-23A              28 MO-1001-26A 39B  CONTAINMENT                                            TESTED IN j I      SPRAY MO-1001-23B            4380 PARALLEL MO 100126B i
I
 
e l
l 1991 LOCAL LEAK RATE
 
==SUMMARY==
 
g                                TYPE C TESTS AS FOUND AS LEIT    hiAINTENANCE                !
l PEN.
NO. DESCRI} TION LEAKAGE (SCCM)
LEAKAGE (SCChD IMPROVEMENT (SCCM)        COMMENTS 40Aa JET PUMP SENSING LINE-PASS SV-5065 63            15 SV 5065-64            115 I 40Dc JET PUMP SENSING LINE-PASS SV-5065 85            910 SV-5065 86          1342 41  RECIRC PUMP B I      DISCil SAMPLE AO 220-44 AO 220-45 3
231 42  STANDBY LIQUID CONTROL 1101 16                9 43  DRYWELL TEST l      CONN.
45 110 106            160 46A  RECIRC PUMP SEAL 262 F013A            582 262-F017A          37600          1802 46B  RECIRC PUMP SEAL 262 F013B            2360 262-F017B            1915 I
I
 
I I                    1991 LOCAL LEAK RATE
 
==SUMMARY==
 
l                                TYPE C TESTS AS FOUND AS LEFT          MAINTENANCE PEN.                      LEAKAGE LEAKAGE          IMPROVEMENT NO. DESCRitTION          (SCCM)          (SCCM)    ffFCM)      COM MiiNTS 46F  11:02 ANALYZER
        'A" RETURN SV 5065 26A            61 SV 5065 24A              9 47  DRYWELL TEST                                                  TESTED IN 45 110 102            167                                    PARALLEL 45 110 104 45 110 103            109                                    TESTED IN 45 110 105                                                    PARALLEL SOAd 110 2 2 ANALYZER "B"
SV-5065-13B            166 SV 5065 20B            235 SIA  RilR VESSEL RETURN MO 100128A              82 MO 1001-29A            52 51B  RIIR VESSEL RETURN MO 1001-28B              5 MO-1001-29B              6 52  11PCI STEAM                                                  TESTED IN TO TURBINE                                                    PARALLEL MO 2301-4              27 MO 23015 53  RCIC STEAM                                                    TESTED IN TO TURBINE                                                    PARALLEL i
MO 1301-16            28 MO-1301-17 i
 
1991 LOCAL LEAK RATE SUhthiARY TYPE C TESTS AS FOUND AS LEIT        MAINTENANCE                    I PEN.                        LEAKAGE      LEAKAGE    lh1PROVEhiENT                  !
NO,  DESCRilrrlON          (SCChi)      (SCChi)      (SCCAD          COhihiENTS  l 106Ab 110 2 2 ANALYZER "A"
I      SV 506514A SV-05065-21A 6
2 205  TORUS MAKEUP GAS 9-CK-341                  3 AO 5033C                87 POST ACCIDENT                                                    TESTED IN I      PURGE & VENT SV 5087A                257 PARALLEL SV-5087B POST ACCIDENT                                                    TESTED IN PURGE & VENT                                                    PARALLEL SV-5088A                265 SV-5088B 211A  RIIR TO TORUS                                                    TESTED IN SPRAY                                                            PARALLEL MO 1001-34A              57 MO-1001-37A 211B  RilR TO TORUS                                                    TESTED IN t
i I      SPRAY h101001-34B              23 PARALLEL l        MO 100137B 219  11PCI VACUUM BREAKER MO 230133              391 MO 2301-34              243
 
e 1991 LOCAL LEAK RATE
 
==SUMMARY==
 
l                                  TYPE C TESTS AS FOUND AS LEFT    MAINTENANCE PEN.                      LEAKAGE LEAKAGE    IMPROVEMENTS NO. DESCRIPTION          (SCCM)      (SCCM]   (SCCM)    COMMENTS 223  IIPCI EXilAUST 2301-74              1529000        2      431 2301-45                433 2301 218                530 CV-9068A                                              TESTED IN I      CV-9068B 530 PARALLEL 227A TORUS VACUUM                                          TESTED IN BREAKERS                                              PARALLEL AO 5040A                41 X-212A 227B TORUS VACUUM                                          TESTED IN BREAKERS                                              PARALLEL AO-5040B                29 X-2128 227  TORUS EXilAUST                                        TESTED IN VALVE BYPASS                                          PARALLEL AO 5041 A              1177 AO-5041B l      TORUS MAIN EX11AUST &
TESTED IN PARALLEL DIRECT VENT AO 5042A AO 5042B              1105 AO 5025 POST ACCIDENT                                          TESTED IN PURGE & VENT                                          PARALLEL I      SV-5084A SV-5083B 105 I
 
E I                                        1991 LOCAL LEAN RNTE
 
==SUMMARY==
 
TYPE C TESTS AS FOUND AS LEFT                                                        MAINTENANCE l                      PEN.
NO. DESCRIPTION LEAKAGE LEAKAGE (SCCNO                            (SCChD IMPROVEMENTS (SCChD COMMENTS
                                                                                                                                                                                  )
1 227  POST ACCIDENT                                                                                                                        TESTED IN      i PURGE & VENT                                                                                                                          PARALLEL        I SV-5083A              104 I                          5.V-5084B H202ANALYZER I                      228C "B"
SV-5065-15B          136 SV-5065-22B          156 226E AIR TO TORUS VACUUM BREAKERS CV 5046              2800 31-CK-434          61000                                    1682                                                              1118 12SG GAS SAMPLu RETURN P ' SF SV-5065-77            449 SV-5065-78            216 228H GAS SAMPLE RETURN-PASS SV-5065-71              7 SV-5065-72            37 228J ILO2ANALYZER "A"
SV-5065-11 A          27 SV-5065-18A            73 228K H202ANALYZER
,                          "B" RETURN SV-5065-25B          706 SV-5065 ~27B          657 I
I
 
4
  $t N
1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                    'ITPE      VALVE      LEAKAGE (SLM)/
NO. DESCRIPTION        TEST      TESTED      DATE TESTED        NOTES N/A  GIBS MANWAY        B        SOUBLE      0.1/6-13-88 0 ,45 ,90 ,135                t.< R N G  0.28/5-7-89 0.005/4 9-90 l  N/A  GIBS MANWAY 180 ,225 ,270 ,
B        DOUBLE 0-RING 0.1/6-13-88 0.28/5-7-89 315                                      0.025/4-9-90 I  N/A  DRYWELL            B        DOUBLE      0.1/11-30-88 HEAD                          O RING 1    EQUIPMENT          B          DOUBLE      0.1/6-6-88 HATCH                        0 RING      0.28/5-6-89 I                                                ').008/4-3-90 AIRLOCK            B        DOUBLE      TESTED 58 TIMES I  2 INNEk SEAL                    O-RING      FROM 10-30-88 TIIROUGH 9-24-90.
LEAKAGE RANGED FROM 0.001 TO 0.28 I      AIRLOCK OUTER SEAL B        DOUBLE O-RING TESTED 59 TIMES FROM 10-30-88 THROUGli 9-24 90.
LEAKAGE RANGED FROM 0.001 TO 0.28 AIRLOCK            B                    0.5/10 30-88 INTEGRATED                                0.75/12-30-88 TEST                                      2.78/4-27-89 2.0/10-14-89 1.913/3 11 90 0.714/4-21-90 1.895/7.10-90 4.21/9-7-90 0.778/3-7-91 I
I
 
1988/1989/1990 LOCAL LEAK RATE TEST DATA
'I                                        EQUIPMENT /
PEN.                    TYPE      VALVE      LEAKAGE (SLM)/
l    NO. DESCRil' TION      TEST      TESTED      DATE TESTED    NOTES 4    DRYWELL            B        DOUBLE      0.1/11-29-88    IIEAD l          HATCH 5                      O RING ACCESS 6    CRD REMOVAL        B        DOUBLE      0.1/9-9-88 HATCH                        0-RING      0.005/3-20-90
      . 7A    MAIN STEAM        B        BELLOWS      0.1/8-19-88 0.023/3 17 90 7B    MAIN STEAM (2)    B        BELLOWS      0.1/8-19-88 7C                                              0.069/3-18-90 7D    MAIN STEAM &        B        BELLOWS    0.1/8-19-88 8    MAIN STEAM                                0.329/3-18-90 DRAIN 9A  FEEDWATER (2)      B        BELLOWS    0.1/8-19-88 l    9B                                            0.003/3-18-90 12    RHR SUCTION        B        BELLOWS    0.3/8-23-88 l          FROM RECIRC                              0.726/3-20 90 14  RWCU SUPPLY        B        BELLOWS      0.1/8-24-88 16A  CORE SPRAY                                0.003/3-21-90 0.004/3-21-90 l      16B  CORE SPRAY        B        BELLOWS      0.1/8-24-88 RX VESSEL          B        BELLOWS I      17 HEAD SPRAY 0.1/8-31-88 0.1/5-11-89 I
I I
I
 
1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                  TYPE      VALVE      LEAKAGE (SLM)/
NO. DESCRil' TION      TEST      TESTED      DATE TESTED    NOTES 25  AO-5044A          B        DOUBLE      0.1/9 13-88 INBOARD                      O RING FLANGE AO-5044B INBOARD FLANGE I      AO 5044B OUTBOARD FLANGE AO-5044A          B        DOUBLE      0.006/3-20-90 INBOARD                      O-RING FLANGE AO-5044B          B        DOUBLE      0.004/3-20-90 I      INBOARD FLANGE O RING l      AO-5044B OUTBOARD B        DOUBLE O-RING 0.002/3-20-90 FLANGE 26  AO-5035B          B        DOUBLE      0.1/9 12-88 INBOARD                      O RING FLANGE AO-5035A                                0.006/3-27-90 INBOARD FLANGE AO-5035A I      OUTBOARD FLANGE 35A  TIP DRIVE          B        DOUBLE      0.1/9-7-88 35B  FLANGES                      O-RING      0.320/3-30-90  10 FLANGES 35C                                          0.009/3-30-90  5 INNER &
I 35D 35E 5 OUTER
 
      ~
I I                  1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                  TYPE        VALVE      LEAKAGE (SLM)/
NO. DESCRil' TION    TEST        TESTED      DATE TESTED    NOTES DRYWELL TEST I 43 CONN. FLANGE B          DOUBLE O-RING 0.1/9 9-88 0.28/5-9-89 47  ILRT SUPP.        B          DOUBLE      0.1/9 13-88 TEST CONN.                    O-RING FLANGE                                    0.28/5-10-89 51A  RIIR RETURN        B          BELLOWS    0.0/8 23-88    TESTED WITil P12 TO RECIRC                                0.003/3-20-90 51B  RIIR RETURN        B          BELLOWS    0.1/8-22-88 l      TO RECIRC 52  IIPCI                                    0.01/3-19-90
'  I 53  RCIC STEAM        B          BELLOWS    0.0/8-19-88    TESTED WITIIP7A TO TURBINE                                0.0/3 17-90    TESTED WITIl P7A
,    100A NEUTRON            B          DOUBLE      0.1/12-14-88 l    100B MONITORING                    O-RING      0.053/3-21-90 100C NEUTRON MON        B          DOUBLE      0.1/12-9-88 104G CRD POSITION                  0-RING      0.03/3-22 90 g 104J CRD POSITION l u  105B ELECTRICAL l
l    100D NElTTRON MON.      B          DOUBLE      0.1/12-12-88 102A ELECTRICAL                    O-RING      0.033/3-22-90 l    103A ELECTRICAL l    104H CRD POSITION I
I I
 
i 1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                                EQUIPMENT /
PEN.                                  TYPE VALVE      LEAKAGE (SLM)/
l      NO. DESCRIIrrlON                  TEST TESTED      DATE TESTED    NOTES 100E    NEUTRON MON.                  B    DOUBLE      0.1/12-8-88 102B    ELECTRICAL                        O-RING      0.002/3 20-90 104B    CRD POSITION 105A    ELECTRICAL 101A    ELECTRICAL                    B    DOUBLE      0.1/12-14-88 104D    CRD POSITION                      0-RING      0.036/3-21-90 I      104F 106B CRD POSITION DRYWELL HUMIDITY & TEMP 101C  ELECTRICAL                    B    DOUBLE    0.1/12-7-88 O RING      0.039/3-21-90 103B  ELECTRICAL                    B    DOUBLE      0.1/12-8-88 I      104A 104C CRD POSITION CRD POSITION 0-RING      0.033/3-20 90 200A  TORUS ACCESS                  B    DOUBLE      0.1/10-3-88 HATCH-EAST                          O-RING      0.003/4-6-90 0.008/9-4-90 l                                                            0.002/9-7-90 200B    TORUS ACCESS                  B    DOUBLE      0.1/11-18-88 HATCH-NORTH                        0-RING      0.28/7-20-89 201A    VENT LINE                    B    BELLOWS      0.1/8-23-88 I                                                              0.002/3-19-90 VENT LINE                    B    BELLOWS I      201B                                                  0.1/8-23-88 0.006/3-19 90 I      201C 201D VENT LINE                      B    BELLOWS    0.1/8-23-88 0.011/3-20-90 0.006/3-20-90 201C 201D I
I I
 
    . o I                    1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                        EQUIPMENT /
PEN.                  TYPE        VALVE      LEAKAGE (SLM)/
l    NO. DESCRIITION      TEST        TESTED      DATE TESTED    NOTES 201E  VENT LINE        B          BELLOWS    0.1/8-19-88 201F                                          0.004/3-18-90 201G  VENT LINE        B          BELLOWS    0.1/8-22-88 I    20111                                          0.002/3-19-90 ELECTRICAL                  DOUBLE I    202A                  B O RING 0.1/11-17-88 0.022/4-13 90 I    202B  ELECTRICAL      B          DOUBLE O-RING O.1/11-18-88 0.1/7-21-89 I    205  AO-5036B INBOARD FLANGE B          DOUBLE O-RING 0.1/9 12-88 I          AO-5036A INBOARD FLANGE                                    0.007/3-27-90 l          AO-5036A OUTBOARD FLANGE I    223  HPCI STEAM      B          DOUBLE      0.1/10-3-88 TO TORUS                    O-RING INBOARD                                  0.008/4-6-90
            & OUTBOARD FLANGE 223  2301-74          B          DOUBLE      0.1/9-16-88 I          INBOARD
            & OUTBOARD FLANGE O-RING 0.004/4-3-90 225    1301-64          B          DOUBLE      0.1/12-9-88 INBOARD                      O-RING I          & OUTBOARD FLANGE I
I
 
I I                                                1988/1989/1990 LOCAL LEAR RATE TEST DATA I                                                                EQUIPMENT /
PEN.                                                TYPE      VALVE      LEAKAGE (SLM)/
I  NO.                    DESCRIPTION                  TEST      1TG RED    DATE TESTED    NOTES 225                    RCIC STEAM                  B        DOUBLE      0.1/12-9-88 I                          TO TORUS INBOARD &
O-RING 0.1/10-17-89 I                          OUTBOARD FLANGE 227                      AO-5040A                  B        DOUBLE      0.1/9-9-88 I.                            INBOARD &                          0-RING OUTBOARD                                        0.007/3-29-90 I                            FLANGE AO-5040B INBOARD I                            & OUTBOARD FLANGE l  227                        AO-5042A INBOARD B        DOUBLE O-RING 0.1/9-16 88 FLANGE l                              AO-5042B INBOARD FLANGE                                      0.005/3-29-90
                                  & OUTBOARD FLANGE
                                                                                                        ^
AO-5025              B        DOUBLE      0.1/10-14-88 I                                  INBOARD FLANGE O-RING 227.A                          X-212A SEAT        B        DOUBLE      0.5/9-7-88 FLANGE                      O-RING 227B                            X-2128 SEAT        B        DOUBLE      0.1/9-7-88 FLANGE                      O-RING      0.007/3 29-90  COMBINED 230                              TORUS TEST        B        FLANGE      0.1/11-18-88 CONN. FIANGE                            0.28/7-20-89 I
I I
 
9 I                1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                  TYPE      VALVE      LEAKAGE (SLM)/
I NO. DESCRIPTION      TEST      TESTED      DATE TESTED    NOTES 7A  MAIN STEAM        C        AO-203-1 A  1.26/5 31-88  TESTED IN AO-203-2A  2.05/3-14 90  PARALLEL MAIN STEAM I 7B                    C        AO-203-1B AO 203-2B 0.13/6-1-88 0.012/3 14-90 TESTED IN PARALLEL 7C  MAIN STEAM        C        AO 203-1C  0.13/6-1-88    TESTED IN AO-203-2C  0.008/3-14-90  PARALLEL 7D  hiAIN STEAM      C        AO-203-1D  1.89/6-1-88    TESTED IN AO-203-2D  4.8/3-14-90    PARALLEL I 8    MAIN STEAM DRAIN C        M O-220-1 M O-220-2 0.1/6-8-88 0.28/5-6-89 1.1/7-9 90 l                                              0.1/6-8-88 2.03/5-6-89 0.045/3-14-90 I 9A  FEEDWATER        C        6-58A      0.1/6-8-88 460.58/3-13-90 0.035/3-31-90 C        6-62A      0.1/6-10-88 g                                              16.44/3-16 90 3                                              0.245/4-3-90 RvVCU RETURN      C        MO-1201-80  0.1/6-14-88 g                                              0.1/12-5-88 LE                                              0.28/5 21-89 l        RCIC DISCH        C        MO-1301-49  0.1/6 10-88
!                                                0.0/3-16-90    TESTED WITH 6-62A l
I I
I I
 
I I                1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                  TYPE      VALVE      LEAKAGE (SLM)/
I NO. DESCRIPTION      TEST      TESTED      DATE TESTED    NOTES
-g  9B  FEEDWATER        C        6-58B      0.1/6-9-88 5                                              0.213/3 13 90 C        6-62B      2.5/6-10-88 1,604/3-16-90 12  RHR SUCTION      C        MO-10rl-47  0.1/6-21-88 I      FROM RECIRC C        MO-1001-50 0.9/11-28-88 2.5/6-20-88 1.5/11-28-88 I      HPCI DISCH        C        M O-2301-8  0.2/1 20-88 0.1/5-26-88 TESTED 0.0/3-16-90 WITH 6-62B 14  RWCU INLET        C        M O-1201-2  0.5/6-14-88    TESTED IN MO-1201-5  0.1/12-5-88    PARALLEL 0.28/5-21-89 l 15E  H202ANALYZER "B"
C        SV-5065-35B 0.1/8-2-88 0.042/3-28-90 SV 5065-31B 0.1/8-2-88 0.050/3-28-90
                              ~
16A  CORE SPRAY        C        MO-1400-24A 0.1/7-1-88 TO REACI'OR                            0.1/12-15-83 0.28/5-15-89  TESTED WITII MO-1400-25A C        MO-1400-25A 0.1/7-1-88 0.1/12-15-88 16B  CORE SPRAY        C        MO-1400-24B 0.1/7-13-88 I      TO REACTOR                              0.1/12-15-88 0.28/5-20-88  TESTED WITH I                                  MO-1400-25B 0.1/7-13-88 MO-1400-25B 0.1/12-15-88
 
4 1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                EQUIPMENT /
PEN.                  TYPE      VALVE      LEAKAGE (SLM)/
l NO. DESCRIPTION      TEST      TESTED      DATE TESTED    NOTES 17  RX IIEAD SPRAY C          M O-1001-60 0.28/5-11/89 l                                MO-1001-63  0.1/5-27-88    TESTED IN PARALLEL 18  DRYWELL          C        AO-7017A    2.9/6-27-88 FLOOR DRAIN                            4.0/6 30-88 2.5/12-6-88 I                      C        AO 7017B 6.5/3 19-90 0.2/6 27-88 0.5/12-6-88 2.37/3-19-90 19  DRYWELL          C        AO-7011 A  0.1/6-27-88 I      EQUIPMENT DRAIN C        AO-7011B 0.1/12-6-88 0.002/3-19-90 0.1/6-27-88 0.1/12-6-88 0.005/3 19-90 22  INSTRUMENT      C        31-CK-167  0.5/6-28-88 AIR TO                                0.1/12-2-88 DRYWELL                                2.84/3-26-90 I 23  RBCCW SUPPLY    C        30-CK-432  0.1/6-17-88 0.1/1'2-19-88 24  RBCCW RETURN    C        MO-4002    0.1/6-17-88 0.1/12-19-88 l
1 lI lI
'I I
 
1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                  EQUIPMENT /
PEN.                TYPE      VALVE      LEAKAGE (SLM)/
l  NO. DESCRIFFION    TEST      TESTED      _DATE TESTED  NOTES 25  DRYWELL          C        AO 5044A    0.1/8-4-88    TESTED IN PURGB                      AO-5044B    0.038/3-29-90  PARALLEL EXIIAUST DRYWELL VENT    C        AO-5043A    0.4/8-4-88    TESTED IN EXHAUST                    AO-5043B    1.167/3-20-90  PARALLEL EXHAUST POST ACCIDENT    C        SV-5082A    0.1/8 3-88    TESTED IN PURGE & VENT              SV-5081B    0.003/3-20-90  PARALLEL POST ACCIDENT    C        SV-5081A    0.1/8 3-88    TESTED IN PURGE & VENT              SV-5082B    0.003/3-20-90  PARALLEL 26  DRYWELL          C        AO 5035A    1.0/8-1-88    TESTED IN I      PURGE INLET AO-5035B AO-5033B 0.775/4-25-89 1.534/4-4 90 PARALLEL POST ACCIDENT    C        SV-5085A    0.1/8-1-88    TESTED IN I_      PURGE & VENT              SV-5086B    0.038/4-4-90  PARALLEL l      POST ACCIDENT PURGE & VENT C        SV-5086A SV-50S5B 0.1/8-1-88 0.061/4-4-90 TESTED IN PARALLEL l      DRYWELL MAKEUP GAS C        9-CK-340    0.1/8-1-88 0.041/4-4-90 l
l      DRYWELL MAKEUP GAS C        AO-5033A    0.1/8-1-88 1.275/4-4-90 l
29E  H2 0 ANALYZER    C        SV-5065-37A 1.5/8-17-88 "A"                                    1.94/3-28-90 C        SV-5065-33A 0.1/8-17-88 lI l
0.44/3-28-90 1
I I
I
 
I 1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPhiENT/
PEN.                    TYPE      VALVE        LEAKAGE (SLhi)!
NO. DESCRIPTION      TliST    T11STED      DATil TESTI!D  NOTliS 32A    C-19 RETURN      C        CV-5065 91  0.1/8-10-88 l          TO DRYWELL C        CV 5065 92 0.143/3 27 90 0.1/8-10-88 0.06/3 27-90 35A    TIP BALL        C        45-300D      0.10 6-88      TESTED IN 3513    VALVES                    45-300C      0.825/4 3 90    PARALLEL 35C                                45 3(X)A 35D                                45 3008 35E    TIP N2PURGE      C        CilECK      0.10-688 0.006/4 3 90 39A    CONTAINhiENT      C        MO 1001-23A  0.1/62388      TESTED IN SPRAY                      MO-1001-26A  0.1/12-1-88    PARALLEL 0.008/3 15 90 39B    CONTAINMENT      C        MO-1001-23B  0.1/6-21-88    TESTED IN SPRAY                      MO-1001-26B  1.94/3-22-90  PARALLEL 40Aa    JET PUMP        C        SV-5065-63  0.1D 22-88 l          SENSING LINE-PASS            C          SV-5065-64 0.28/5-9-89 0.lD 22-88 40Dc    JET PUMP        C          SV-5065-85  0.10-26-88 SENSING LINE-                            0.28/5-9-89 PASS              C        SV 5065-86  0.10-26 88 I                                                    0.28/5 9-89 41A    RECIRC PUMP B    C        AO-220-44    0.1/10-3-88 I          DISCil SAMPLE                            0.1/2-26 89 0.007/3 17 90 C        AO 220-45 I                                                  0.1/2-26 89 0.012/3-17 90 I
I
 
    ~
I 1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                                                        EQUIPMENT /
PEN.                                                      TYPE      VALVE        LEAKAGE (SLM)/
NO.                                  DESCRIPTION          TEST      TESTED        DATE TESTED    NOTES 42                                  STANDBY              C        1101-16      0.10-29 88 LIQUID                                        0.007/4-9-90 CONTROL 43                                  DRYWELL TEST          C        1(0-106      0.1,7-7-88 CONN.                                        0.28/5-9.'N 46A                                  REC 1RC PUMP          C        262 F013A    0.1/6-23/88 SEAL                                          0.005/3-12 90 I                                                            C C
262-F017A/B 26217A 0.1/6-15-88 0.012/3-12-90 I  46B                                  RECIRC PUMP SEAL C        262-F013B    3.25/6-16-88 2.68/3-12 90 C        262-F017B    0.007/3-12-90 I  46F                                110  2 2 ANALYZER      C        SV-5065-24A  0.2D 22-88 "A" RETURN                                    0.057/3 28-90 l                                                              C        SV-5065 26A  0.2D-22-88 0.081/3 28-90 4_7                                  DRYWELL TEST          C        45-110-102    0.1 9-8-88      TESTED IN 45-110-104    0.28/5-10-89    PARALLEL 45-110-103    0.1R-8-88      TESTED IN 45-110-105    0.28/5-10-89    PARALLEL SOAd                                  110 2 2 ANA. M    C          SV-5065-13B  0.1/8-11-88
                                          '' B
* 0.107/3-27 90 C        SV-5065-20B  0.1/8-11 88 I                                                                                      0.516/3-27-90 I
I I
I
 
1988/1989/1990 LOCAL LEAK RATE TEST DATA I                                    EQUIPMENT /
PEN.                    TYPE      VALVE        LEAKAGE (SLM)/
NO. DESCRITTION      TEST      T2STED      DATE TESTED    NOTES 51A  RHR VESSEL        C        MO-1001-28A  0.1/9-8-88 I      RETUIU4                                  0.1/12-1-88 0.035/3-16-90 C        MO-1001 29A I                                                0.1/6 24-88 0.1/12-1-88 0.392/3-15-90 51B  RHR VESSEL        C        MO-1001-28B  4.25/9-2-88 RETURN                                    2.74/3-23-90 C        MO 1001-29B  5.00/9-21-S8 32.82/3-23-90 1.823/4-7 90 52    HPCI STEAM        C        MO-2301-4    0.1/3-18-88    TESTED IN TO TURBINE                  MO 2301-5    0.4/12-16-88  PARALLEL l                                                0.1/2-27-89 0,023/3-17-90 53    RCIC STEAM        C        MO-1301-16  0.1/6-3-88    TESTED IN TO TURBINE                  MO-1301-17  0.1/12-16-88  PARALLEL 0.42/3 17-90 106Ab H 2 0, ANALYZER    C        SV-5065-14A  0.2/7-2248 "A"                                      0 003/3-28 90 I                          C        SV-05065-21A 0.2/7-22-88 0.003/3-28-90 I
I I
I
 
1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                    TYPE      VALVE      LEAKAGE (SLM)/
NO. DESCRINION      TEST      TESTED      DATE TESTED      NOTES 205    TORUS MAKEUP    C          9-CK-341    0.1 0-29-88 GAS                                    0.245/4-4 90 C          AO-5033C    0.1/9-16-88 0.273/4-4-90 POST ACCIDENT    C          SV-5087A    0.1/7-29-88      TESTEDIN l        PURGE & VENT                S\ -5087B                    PARALLEL POST ACCIDENT    C          SV-5088A    0.1D-29-83 PURGE & VENT                SV-5088B POST ACCIDENT    C          SV-5087A    0.136/4-4-90      TESTED IN PURGE & VENT                SV-5088B                      PARALLEL POST ACCIDENT    C          SV-5087B    0.129/4-4-90 PURGE & VENT                SV-5088A TORUS PURGE      C          AO-5036A    0.8/8-1-88        TESTED IN INLET (X-205)              AO-5036B    0.850/4-4-90      PARALLEL I 211A  RHR TO TORUS
        - SPRAY C          MO-1001-34A MO-1001-37A 0.1/6-23-88 0.1/10-1-88 TESTED IN PARALLEL 0.029/3-15-90 I 211B  RHR TO TORUS      C          MO-1001-348 0.1/6-22-88      TESTED IN SPRAY                        MO-1001-37B 0.002/3-22-90    PARALLEL I 219    HPCI VACUUM      C          MO 2301-33  0.2/5-24-88 BREAKER                                  0.161/3-17-90 C          MO-2301-34  1.5/5-24-88 0.248/3-17-90 lI I
 
I                1988/1989/1990 LOCAL LEAK RATE TEST DATA EQUIPMENT /
PEN.                  TYPE      VALVE        LEAKAGE (SLM)/
NO. DESCRINION      TEST      TESTED        DATE TESTED    NOTES 223  HPCI EXHAUST    C        2301-74      0.1/9-28-88 0.143/4-1-90 C        2301-45      1.5/9-28-88 I                      C        2301-218 2.62/4-1-90 0.1/9-28-88 3.39/4-2-90 I                      C        CV-9068A CV-9068B 0.1/9-28-88 0.018/4-3-90 TESTED IN PARALLEL I 227A TORUS VACUUM C BREAKERS AO-5040A X 212A 0.10-28-88 0.1/2-7-89 0.061/3-29-90 TESTED IN PARALLEL 227B TORUS VACUUM C            AO-5040B      0.1R-29-88    TESTED IN BREAKERS                  X-212B        0.1/2 8-89    PARALLEL 0.068/3-29 90 227  TORUS EXHAUST      C      AO.5041A      0.1/7-26-88    TESTED IN VALVE BYPASS              AO-5041B      1.23/3-29-90  PARALLEL TORUS MAIN      C        AO-5042A      0.1/10-17-88  TESTED IN l      EXHAUST &
DIRECT VENT AO 5042B AO-5025 0.74/3-29-90  PARALLEL POST ACCIDENT    C        SV-5084A      0.1/7-27 88    TESTED IN PURGE & VENT              SV-5083B      0.64/3-29-90  PARALLEL POST ACCIDENT    C        SV-5083A      0.1R-27-88    TESTED IN PURGE & VENT              SV-5084B      0.147/3-29-90  PARALLEL 228C H202ANALYZER    C        SV-5065-15B  0.10-14-88 "B"                                      0.022/3-27-90 C        SV-5065-22B  0.19-14-88 0.048/3-27-90 I
I
 
1988/1989/1990 LOCAL LEAK RATli TEST DNFA I                                                                    EQUIPMENT /
PEN.                                              TYPE      VALVE        LEAKAGE (SLM)/
l-      NO.                              DESCRlirrION      E.ST      TESTED        DATE TESTED    NOTES 228E                            AIR TO TORUS      C        CV 5046      1 M/h.16 88 VACUUM                                    1.5/12 2-88 BREAKERS                                  0.005/3 26-90 C        31-CK-434 I                                                                                  0.1/8 16-88 0.1/12-2-88 0.360/3 26 90 228G                            GAS SAMPLE        C        SV 5065-77    0.1/8 9-88 RETURN-PASS                              0.28D-19-89 I                                                          C        SV-5065-78    0.1/8-9-88 0.28R-19-89 I        22811                          GAS SAMPLE RETURN-PASS C
C SV-5065-71    0.1/8-9-88 0.28R-19-89 SV-5065-72    0.t/8 9-88 0.28/7 19-89 228J                            11:02 ANALYZER    C        SV-5065-II A  0.1/7-15 88 "A"                                      0.28R-20-89 C        SV-5065-18 A  0.1D-15-88 0.28/7-20-89 I          228K                          11:02 ANALYZER    C        SV-5065-25B  0.lD-12-88 "B" RETURN                                0.28R-20-89 C        SV-5065 27B  0.1D 12-88 0.28R-20-89 I
I I
I I
I
 
I I
I I
I I
I I
I Appendix 11 I                                  FAT ROOT CAUSE ANALYSIS - FEEDWATER CIIF.CK VALVES I
I I
I I
I I
I I
 
d F.A,T. ROOT CAUSE ANAL 151S_SEMMM1 I
FOR FEEDWATER CH[CK VA(y[S Synynary of Ohgrved Problem:
Feedwater check valved 58A, 588, 62A and 62B failed their respective LLRT's (Ref.1) during RF0 #8. Leakage rates were as follows:
58A-      394 SLM 588 -    218 SLM i  I      62A -
62B -
22.2 SLM 493 SLM The acceptable leak rate for each of the four valves is 7.89 SLM. Failure and malfunction reports (F&MR) 91-241, 236, 254 and 253, respectively, were issued to address the problems. This report will identify root causes of those failures and corrective actions taken to date.
Root Cause Summary:
The primary root cause of the LLRT failures of all four feedwater check valves k  , the misalignment of the discs relative to their valve seats.          The l misalignment was a result of previous maintenance on the valves (particularly realignment following sof t seat modification and lapping of the seats) and not maintaining proper clearances between hinge pin shoulders and the respective disc bushings. It has been learned that proptr alignment of the discs is I critical to achieving acceptable and repeatable LLRT results.
PrinciDief of Ooeration:
The principle parts of a tilting disc check valve are the body, bonnet, disc and hinge pin assembly.            The body, bonnet and hinge pin closures retain the fluid within the system. The disc is supported by, and rotates about the hinge pins, which are contained in thru-body bores. The pivot axis is located above the center line and near the center of gravity of the disc and in such a geometric position to allow the conical seating surface of the disc to rotate into the matching cone of the body seat without interference.
Flow in the narmal direction creates a force on the disc, which because of the offset pivot axis, causes the disc to rotate away from the seat.
Upon cessation of forward flow or reversal of flow, the force holding the disc open is no longer present and the weight of the disc combined with the force of the reverse flow causes the disc to return to the seat.
Page 1 of 4 I
 
I Sealing between the disc and the seat results solely from the differential I  pressure across the disc forcing the cone of the disc into the matching cone of the seat. Hence, the difficulty in maintaining a tight seal at low pressures.
I RgqLfause Discussion:
After failure of the LLRT's, each valve was opened and inspected to determine the failure mechanism. Findings on three of the valvts (58A, 62A and 628) were very similar. All the soft seats were degraded throughout the bottom 257.
I  to 507. of the disc seating area. The degradation appeared to be a chipping or cutting of the soft seat material. These findings are indicative of the valve discs being seated slightly low such that they drag as they enter the valve I  seat and catch on the sharp edge of the valve seat ring. No evidence of thermal aging damage was observed on the soft seats.
I  The other valve (588) showed no signs of soft seat degradation. The disc was misaligned (set back and low) allowing it to over rotate such that the soft seat retaining ring was contacting the valve seat at the bottom. The soft seat was making good contact with the valve seat when initially installeJ I  resulting in acceptable LLRT's. As the retaining ring wore, it allowed the disc to travel past the seat resulting in unacceptable contact between the soft seat and the valve seat. These findings were determined based on wear I  and corrosion marks evident on both the valve seat and the soft seat retaining ring.
I  The misalignment on all four valves was most likely a result of previous maintenance on the valves. Documentation on the original installation of the soft seats on the 62A and 628 valves in 1976 indicates the procedure used then had steps that are now inconsistent with current Anchor Darling alignment I  practice. Anchor Darling had developed these alignment practices after the soft seats were installed at PNPS. PNPS was the first plant to utilize the Anchor Darling Soft seat modification. The steps would result in the discs l  being seated slightly low and misaligned. No offset'was incorporated to account for the clearance between the hinge pin outside diameter and the disc bushing inside diameter. Also, the alignments were made with the soft seats I  installed on the discs. Alignment should be performed with the soft seats removed to ensure optimal seat to disc contact and verified with a light check. Aligning with soft seats installed would mask any slight misalignment. The same steps were included in TP80-38 which was used to I  overhaul the check valves and incorporate soft seats on the 58A and 58B valves in 1980. A maintenance hi wry search on the valves also indicates the valves have been repaired numerou, times in the past including lapping of the seats.
After valves are initially aligned with new parts at the factory, whenever the seats are lapped dimensions change and the alignment would be affected.
I l
Page 2 of 4 lI
 
I Also contributing to the misalignment were c>ut of specification clearancos between hinge pin shoulders and ditc bushir.gs found on the 58A, 62A and 628 check valves. This was most likely a resu:t of previous fitups and 3.H.4-49 (Ref 4) not specifying the correct position of the valve disc when the I clearances are measured. The disc should be in the closed position fully seated when the clearances are measured.
Additionally, the tolerance in soft seat protrusion above the stellite seat on tae disc was discussed with Anchor Darling (AD). While BECo DWG Hl!7A-33-1 (Ref. 6) and PNPS 3.H.4-49 (Ref. 4) allow a protrusion of 0.030 1 0.010 inches, AD allows a protrusion of 0.030 + 0.005, -0.010 inches and recommends installation at the lower end of the tolerance. This would minimize the potential for the soft seat to drag as it enters valve seat.
Contributina Root Causes:
Contributing root causes for the 58A and 62A check valve LLRT failures were hinge pin cover leaks (one per valve) which were identified during plant operation. Inspection of the cover seating areas showed degraded surfaces due to steam cuts and corrosion which provided leakage paths.
Other Findinos of Note:
The pressure seal areas on the 58A and 62A valves did not meet the tolerance dimensions on the valve drawing (Ref. 2). The diameters were above the specified dimension by 0.020 and 0.033 inches respectively. This was most likely a result of previous machining in the areas during maintenance to clean them up to achieve an acceptable seal. This did not represent a leakage path.
Indications were noted in the stellite surfaces on the 58A, 62A and 628 valve discs. Stellite is a very hard and brittle material and indications are not uncommon on valve seats with stellite facing. This does not appear to be related to the LLRT failures.
Corrective Actions:
: 1. All valve seats were lapped and blue checked with a true lapping plate to I      ensure that they were in the best achievable condition prior to valve rebuild. In addition, a 1/32 inch radius was installed on the leading edge of the seat rings to minimize the potential for cutting of the soft seat as the disc enters the valve seat.
I Page 3 of 4 ID:  557
 
l I  2. All four discs (including soft seats) were replaced. During the replacement the new discs were installed in the valve seats without the soft seats, gagged in place and the locations for the hinge pin holes were determined (with allowance given for diametral clearance between hinge pin I        0.0. and bushing 1.0.). The fitup of the new discs achieved alignments in accordance with factory tolerances provided with a new valve. The fitup was performed under the direction of the Anchor Darling factory specialist.
: 3. A modification to the hinge pins / cover arrangement documented in FRN's against PDC 91-03 (Rei. 3) was incorporated. The modification deleted the I        pressure seal, increased the length of the hinge pins ar.d installed an anti-rotation pin and a new design hinge pin cover with a fleritallic gasket.          Anchor Darling provided tM new design.
: 4. The hinge pin cover seating surface areas on all four valves were machined to eliminate all steam cuts and corrosion that could affect the sealing capabilities of the gaskets.
: 5. The bonnet pressure seal areas were machined on three of the four valvn and new pressure seals were installed. Over size seals were required ori the 58A and 62A valves.
: 6. Revisions to BECo DHG No Mil 7A-33-1 have been initiated to change soft seat protrusion tolerance to 0.030 +0.005, - 0.010 inches and add note I        recommending installation at lower end of tolerance.
: 7. Establishment of a project team to evaluate alternate means of meeting the I        containment isolation requirements for Reactor feedwater. The LLRT Failure Analysis Team is of the opinion that the maintenance performed during RF0 #8 was the most complete to date and if the results are not satisfactory, alternate means on containment isolation should be pursued.
I        Plant Management has directed that a project team be established to evaluate alternate means of containment isolation for Reactor Feedwater to support implementation during RF0 #10, if required.
 
==References:==
 
I    1. PNPS Procedure 8.7.1.5 " Local Leak Rate iesting of Containment Penetration and Isolation Valves".
I    2. BECo OHG. No, Mil 7A-1-4, SH. 2, " Nuclear Boiler System feedwater Check i'a l v e s ' .
: 3. Pbc 91-03, " Standing Mechanical PDC".
: 4. PNPS Procedure 3.H.4-49, "Feedwater Check Valve Maintenance".
I    5. LER 86-017-01, " Local Leak Rate Test Results of Appendix "J" related Valves in Excess of Limits".
I    6. BFCo DHG. No. M117A-33-1 " Disc Mod. for soft seal installation for feedwater Check Valve.        18-900 #T/D Check Valve" Page 4 of 4 I}}