ML20093G062: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20093G062 | | number = ML20093G062 | ||
| issue date = 04/06/2020 | | issue date = 04/06/2020 | ||
| title = Staff Slides for the April 7, 2020 SLR LLM | | title = Staff Slides for the April 7, 2020 SLR LLM 4 - 2nd Session | ||
| author name = Burton W | | author name = Burton W | ||
| author affiliation = NRC/NRR/DNRL/NLRP | | author affiliation = NRC/NRR/DNRL/NLRP |
Latest revision as of 22:47, 24 September 2022
ML20093G062 | |
Person / Time | |
---|---|
Issue date: | 04/06/2020 |
From: | William Burton NRC/NRR/DNRL/NLRP |
To: | |
Burton W | |
References | |
Download: ML20093G062 (18) | |
Text
Subsequent License Renewal (SLR)
Lessons Learned Public Meeting #4 Session 2 April 7, 2020
AGENDA
- Welcome and Introductions
- Followup from the March 25, 2020 Public Telecon
- Status of SLR-ISG Set 1
- Proposed Revisions to F-J Notes
- MRP-227 Rev 1A Gap Analysis
- Summary/Next Actions
- Next Lessons Learned Meeting
- Closeout and Adjourn 2
Followup from the 3/25 Telecon
- Vessel Supports
- Item #15 of the F-J list (aging effects in fiberglass tanks)
- XI.M42 (internal coatings)
- XI.S1 (IWE)
- XI.M16A (PWR vessel internals)
- XI.S8 (protective coatings)
- Approach to addressing F-J items
ISG Set 1
- Focus on revisions proposed by the industry
- Available for use and comment
- 4 ISGs
- Mechanical
- Structural
- Electrical
- PWR Vessel Internals
ISG Set 1
- Tentative Schedule
- May 15: complete revisions
- June 15: proposed ISGs publicly available for use and comment
- At least 2 public meetings during comment period
- July 15: public comments received
- September 15: Final revisions
- October 15: Final ISGs issued
Revisions to F-J Notes
- Diesel Fuel Oil
- Management of reduction of heat transfer in heat exchanger tubes
- Management of LOM for Ni alloy strainer components in fuel environment
- Management of cracking, blistering, and LOM in polymeric tanks exposed to fuel oil environment
Revisions to F-J Notes
- Compressed Air
- Management of loss of coating for compressed air steel tanks with internal coatings
- Management of LOM for compressed air steel tanks with internal coatings
Revisions to F-J Notes
- Auxiliary and Radwaste Area Ventilation
- Management of LOM/wear in elastomers exposed to condensation
- Management of LOM/pitting, crevice corrosion in zinc exposed to lubricating oil
Revisions to F-J Notes
- Open Cycle Cooling Water
- Management of LOM/general, pitting, crevice corrosion in zinc exposed to condensation environment
- Revise VII.C1.A-400 and VII.C3.A-400 to specify XI.M20 and XI.M38
Revisions to F-J Notes
- Chemical and Volume Control
- Management of LOM/general, pitting, crevice corrosion in carbon steel, stainless steel, and copper alloy exposed to treated water environment
Revisions to F-J Notes
- Electrical Components
- Revise VI.A.LP-32 and VI.A.LP-28 to manage LOM and reduced electrical insulation in high-voltage insulators
Revisions to F-J Notes
- Fire Protection
- Management of cracking or LOM in subliming compound fireproofing/fire barriers
- Management of cracking and LOM in cementitious fireproofing/fire barriers
- Management of cracking and LOM in aluminum silicate fireproofing/fire barriers
Revisions to F-J Notes
- Group 5 Structures
- TLAA management of stainless steel spent fuel pool liner plate fatigue
Revisions to F-J Notes
- Reactor Vessel Internals -
Westinghouse
- Revise RVI components to reflect primary, expansion, and existing component inspections by MRP-227 Rev 1-A. Note new materials for components with stellite wear surfaces
MRP-227 Rev 1A Gap Analysis Next Actions
- Proposed Industry Revisions (Set 1)
- Prepare Set 1 Draft ISGs for use and comment day comment period
- Public meetings will be scheduled during comment period
- ISGs will be revised, as needed, based on public comments
- Final ISGs will be issued 16
Next Actions
- Staff-Initiated Revisions (Set 2)
- Revisions will be addressed after the Set 1 ISGs are issued
Next Lessons Learned Meeting
- July
- Topics
- Embark Venture Studios
- Status of Set 1 ISGs
- Plans for Set 2 ISGs 18