ML20101C899: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20101C899
| number = ML20101C899
| issue date = 05/23/1984
| issue date = 05/23/1984
| title = FOIA Request for Insp Rept 50-142/83-03 & Five Categories of Documents Re Preliminary Versions of Rept,Handwritten Notes, Insp Plan Used,Correspondence Between NRC & Ucla & Records of Site Tours Regarding Emergency Preparedness
| title = FOIA Request for Insp Rept 50-142/83-03 & Five Categories of Documents Re Preliminary Versions of Rept,Handwritten Notes, Insp Plan Used,Correspondence Between NRC & UCLA & Records of Site Tours Regarding Emergency Preparedness
| author name = Aftergood S
| author name = Aftergood S
| author affiliation = COMMITTEE TO BRIDGE THE GAP
| author affiliation = COMMITTEE TO BRIDGE THE GAP

Latest revision as of 00:59, 24 September 2022

FOIA Request for Insp Rept 50-142/83-03 & Five Categories of Documents Re Preliminary Versions of Rept,Handwritten Notes, Insp Plan Used,Correspondence Between NRC & UCLA & Records of Site Tours Regarding Emergency Preparedness
ML20101C899
Person / Time
Site: 05000142
Issue date: 05/23/1984
From: Aftergood S
COMMITTEE TO BRIDGE THE GAP
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-84-437 NUDOCS 8412210240
Download: ML20101C899 (1)


Text

1 COMMITTEE TO BRIDGE THE GAP 1637 BUTLER AVENUE #203 LOS ANGELES, CAUFORNIA 90025 (213) 478-0829 May 23, 1984 Director Office of Administration FftEEDOM OF INFORMATION US Nuclear Regulatory Commission ACT ftEQUEST Washington, D.C. 20555

@g .,_ p y . g 7 (SLt 'd 3-30-2

Dear Sir:

This is a request under the Freedom of Information Act, as amended.

I would like to obtain a copy of Inspection Report Number 50-142/83-03 (IE-V-589), reporting on an inspection of emergency preparedness at the UCLA reactor facility which occurred in August of 1983.

I would also like to obtain:

(a) any and all correspondence between NRC and UCLA relating to thir Report or to the August inspection.

(b) any and all preliminary versions of the Report.

(c) any and all handwri tten notes made during the inspection and/or used in preparation of the Report.

(d) any inspection plan used in the inspection.

(e) any and all records of site tours or other inspections related to emergency preparedness at UCLA in 1983 and 1984 The Committee to Bridge the Gap, a non-profit organization, is the Intervenor in the UCLA reactor relicensing proceeding, and we are requesting this material solely for use in that proceeding.

We therefose request a public interest fee waiver on production costs.

Thank you.

l Sincerely, l

,- r

(

l Steven Aftergood ,

240 840523 PDR 004",437 E