ML20117M544: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-600011, Forwards Final Draft Environ Protection Plan, for Review. Response Requested by 850801]]
| number = ML20117M544
| issue date = 05/14/1985
| title = Forwards Final Draft Environ Protection Plan, for Review. Response Requested by 850801
| author name = Spangenburg F
| author affiliation = ILLINOIS POWER CO.
| addressee name = Siegel B
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000461
| license number =
| contact person =
| document report number = U-600011, NUDOCS 8505170122
| package number = ML20117M548
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
 
=Text=
{{#Wiki_filter:_ . _ _ _ .                    _-_                                                              _-
c.
'                                                              U-600011                                                    i
* 058-85(05-14)-L 1A.120 ILLIN018 POWER COMPANY IP      CLINToN POWER STATION. P.o. Box 678. CLINToN. ILLINoi$ 61727 May 14, 1985 Docket No.'50-461 Director of Nuclear Reactor Regulation Attention: B. L. Siegel, Project Manager Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
 
==Subject:==
Clinton Power Station Unit i Environmental Protection Plan (Appendix B to Operating License)
 
==Dear Mr. Siegel:==
 
Illinois Power is enclosing a copy of the final draft of the Environmental Protection Plan for Clinton Power Station. A review of the document and a response are requested by the NRC on or before August 1, 1985.
t                  The Environmental Protection Plan addresses Illinois Power's obligations to meet the Rules and Regulations administered by the Environmental Protection Agency.
If any comments develop, do not hesitate to bring them to my attention.
Sincerely yours.
(./.0%
F.A.dpangMtherg i
Director - Nuclear Licensing and Configuration Nuclear Station Engineering RW/ lab Enclosure cct NRC Resident Office Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety p                                                                            k 50517hk L
y}}

Latest revision as of 00:38, 23 September 2022