ML20133A720: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-600266, Forwards High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co. Rept Suppls Independent Design Review.All Issues Satisfactorily Addressed]]
| number = ML20133A720
| issue date = 09/30/1985
| title = Forwards High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co. Rept Suppls Independent Design Review.All Issues Satisfactorily Addressed
| author name = Spangenberg F
| author affiliation = ILLINOIS POWER CO.
| addressee name = Butler W
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000461
| license number =
| contact person =
| document report number = U-600266, NUDOCS 8510020288
| package number = ML20133A723
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
 
=Text=
{{#Wiki_filter:-...
U-600266 L40-85(09-30)-L 8G.150a ILLINDIS POWER COMPANY IP    CLINTON PCMER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 i
Se'ptember 30, 1985 Docket No.50-461 Director of Nuclear Reactor Regulation Attention: Mr. W. R. Butler, Chief                  I Licensing Branch No.2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555
 
==Subject:==
Clinton Power Station Unit 1 Independent Design Review
 
==Dear Mr. Butler:==
 
As a supplement to the Clinton Independent Design Review (IDR),
Bechtel has reviewed additional Sargent & Lundy work on high energy line break (HELB) and moderate energy line break (MELB) analysis. This review is documented in the attached report by Bechtel Power Corporation. This report concludes that all HELB/MELB issues have been resolved satisfactorily, subject to NRC review and acceptance.
With the submittal of this report, Illinois Power believes that we have provided all of the'information needed by the NRC to close out the HELB/MELB issues.
If you have any further comments or requests for information.
please advise.                                                                              h00{
Sincerely yours
                                                                                                      ,  il A)              N CA,i                                                          p.
F. A. pangenberg                          g@@
Director - Nuclear Licensing                                  IC'i Nuclear Station Engineering                      T-
                                                                                          -    sumo DW/kaf E            g 'CN S. 6oW            g c.4 Attachment                                                                                  $
3C@
cc:  B. L. Siegel, NRC Clinton Licensing Project Manager                            A(.6              gq NRC Resident Office                                                            ggr,            l'N Regional Administrator, Region III USNRC                                        g Illinois Department of Nuclear Safety                                                  44,      )C 4 pc(L h
A                                                                                                              __}}

Latest revision as of 04:26, 10 August 2022