#REDIRECT [[ST-HL-AE-5538, Special Rept on 961204,nonvalid Failure of Sdg 11 Occurred. Caused by Lack of Knowledge of Indications Available to Verify Sdg Output Breaker Completely Rack In.Training Bulletin Was Issued to Operations Personnel]]
| number = ML20133C070
| issue date = 12/31/1996
| title = Special Rept on 961204,nonvalid Failure of Sdg 11 Occurred. Caused by Lack of Knowledge of Indications Available to Verify Sdg Output Breaker Completely Rack In.Training Bulletin Was Issued to Operations Personnel
| author name = Parkey G
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000498
| license number =
| contact person =
| document report number = ST-HL-AE-5538, NUDOCS 9701070027
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 4
}}
 
=Text=
{{#Wiki_filter:-
                  .                                                                                                            1
:        The Light company Houston Lighting & Power ut  esas mject lectrc nerat og tat on          . x289 Wmorth, Texas 77483 l
l                                                                                        December 31, 1996
!                                                                                        ST-HL-AE-5538 File No.: G02                          l I
10CFR50 1
I i
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Unit 1 Docket No. STN 50-498 Special Report Regarding a Nonvalid Failure of Standbv Diesel Generator #11 on December 4.1996 l
Pursuant to South Texas Project Technical Specifications 4.8.1.1.3 and 6.9.2, the South Texas Project submits the attached Special Report regarding a nonvalid failure of Standby                    -
Diesel Generator #11 on December 4,1996.                                                                              l If you should have any qt;estions on this matter, please contact either Mr. S. M. Head at (512) 972-7136 or me at (512) 972-7800.
G. L. Parkey Plant Manager, Unit 1 9701070027 961231                                                                                              ,
l PDR      ADOCK 05000498 S                          PDR                                                                J py g              l DNB/
 
==Attachment:==
Special Report Regarding a Nonvalid Failure of Standby Diesel Generator #11 on December 4,1996 sREP-96\5538      000047                                                                        s u wis25i2 Project Manager on Behalf of the Participants in the South Texas Project
 
Houston Lighting & Power Company South Texas Project Electric Generating Station                        ST-HL-AE-5538 File No.:G02 Page 2 Leonard J. Callan                                Rufus S. Scott Regional Administrator, Region IV                Associate General Counsel 4
U. S. Nuclear Regulatory Commission              Houston Lighting & Power Company
;        611 Ryan Plaza Drive, Suite 400                  P. O. Box 61067 Arlington, TX 76011-8064                          Houston, TX 77208 Thomas W. Alexion                                Institute of Nuclear Power l      Project Manager, Mail Code 13H3                  Operations - Records Center l      U. S. Nuclear Regulatory Commission              700 Galleris Parkway Washington, DC 20555-0001                        Atlanta, GA 30339-5957                      ,
l David P. Loveless                                Dr. Bertram Wolfe
;        Sr. Resident Inspector                            15453 Via Vaquero c/o U. S. Nuclear Regulatory Comm.                Monte Semno, CA 95030 P. O. Box 910
;        Bay City, TX 77404-0910                          Richard A. Ratliff Bureau of Radiation Control J. R. Newman, Esquire                            Texas Department of Health Morgan, Lewis & Bockius                          1100 West 49th Street                        !
l800 M Stmet, N.W.                              Austin, TX 78756-3189                        '
Washington, DC 20036-5869 J. R. Egan, Esquire M. T. Hardt/W. C. Gunst                          Egan & Associates, P.C.
City Public Service                              2300 N Street, N.W.
P. O. Box 1771                                  Washington, D.C. 20037 San Antonio, TX 782%
J. C. Lanier/M. B. Lee                          U. S. Nuclear Regulatory Commission City of Austin                                  Attention: Document Control Desk Electric Utility Depanment                      Washington, D.C. 20555-0001 721 Banon Springs Road Austin, TX 78704 Central Power and Light Company                  J. W. Beck A7TN: G. E. Vaughn/C. A. Johnson                Little Harbor Consuhants, Inc.
P. O. Box 289, Mail Code: N5012                  44 Nichols Road Wadswonh, TX 77483                              Cohassett, MA 02025-1166
 
o    .
i Attachment ST-HL-AE-5538                      j Page 1 of 2                        '
Special Report Regarding a Nonvalid Failure of                              ,
Standbv Diesel Generator #11 on December 4.1996 Description of Event:
At 1402 on December 4,1996, Unit I was at 100% power. Standby Diesel Generator (SDG)                  :
        #11 had been removed from service to adjust the field generator brushes. Upon completion of the brush adjustment, SDG #11 was being tested to demonstrate its operability. During the          -
operability test, the output breaker for SDG #11 did not close as expected when the control          ,
room handswitch was placed in the closed position.                                                    l 1
Personnel sent to inspect the breaker found that the breaker was not completely racked in to the " connected" position. The breaker was then racked in and at 1427, the breaker was j
closed, SDG #11 was loaded to 25%, and subsequently declared operable.
When this event occurred, SDG #1I was already considered inoperable due to maintenance.              ;
SDG #1I was retumed to service within the 72 hours allowed by the LCO action statement of l
the Technical Specifications.                                                                        '
Cause of the Event:
l i
I This event occurred because the non-licensed operator did not completely rack in the output '
breaker for SDG #11 following maintenance. The root cause is the operator's lack of                  ,
knowledge of indications available to verify the SDG output breaker is completely racked in l
to the " connected" position.                                                                        :
Event Analysis:                                                                                      ;
i This event occurred because the non-licensed operator did not completely rack in the output          !
breaker. Per the criteria in Regulatory Guide 1.108, this event has been classified as a non-valid failure.                                                                                        !
Corrective Actions:
A Training Bulletin was issued to Operations personnel describing the event and the secondary indications available for ensuring Class IE 4160V breakers are racked completely            -
in to the " connected" position.                                                                      t Non-licensed operators will be trained on the intemal workings of the Class IE 4160V                  i breakers in initial and requalification training by June 30,1997.
I SREP-%\5538                                                                          sTI: 30152512
 
4-    .
Attachment                      1 ST-HL-AE-5538 Page 2 of 2                      i Additional Information:                                                                                !
A mechanical interlock prevented the breaker from closing during this event. When the                  l breaker is completely racked in, this interlock is disengaged. Closing the breaker for the            ;
operability test further demonstrates that the rechanical interlock has been disengaged.
There has been 1 valid failure in the last 20 valid tests and 3 valid faibres in the last 100          i valid tests of SDG #11. Therefore, the testing frequency of SDG #11 remains at once per 31            ,
days.
1 i
[
i t
sREP-96\5538                                                                            sTI: 30152512}}