L-97-466, Forwards TS Pages Affected by Suppl to TS Change Request 191.Pages Edited W/Proposed Revs Indicated by Strikeout of Replaced Wording & Double Underlining of Revised Wording: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NPL-97-0466, Forwards TS Pages Affected by Suppl to TS Change Request 191.Pages Edited W/Proposed Revs Indicated by Strikeout of Replaced Wording & Double Underlining of Revised Wording]]
| number = ML20210J025
| issue date = 08/07/1997
| title = Forwards TS Pages Affected by Suppl to TS Change Request 191.Pages Edited W/Proposed Revs Indicated by Strikeout of Replaced Wording & Double Underlining of Revised Wording
| author name = Johnson D
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000266, 05000301
| license number =
| contact person =
| document report number = NPL-97-0466, NPL-97-466, NUDOCS 9708140308
| package number = ML20210J030
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:. _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                  -  ..
              ,          e e
(                              Wisconsin Electnc POWER COMPAN1' Porit Beoch Nuclear Ibnt                                                                        (414) M2321 6610 Nuclear Rd . Two RNett WI 54241 NPL 97 0466                                                                                10 CFR 50.4 10 CFR 50.90 August 7.1997 Document Control Desk U S. NUrLE t.R llEGUI ATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DOCKETS 50 266 AND 50 301 SUPPI,EMENT TO TEri!NICAL SPECIFICATIONS CilANGE REOUEST 191 POINT BEACil NUCI. EAR PI. ANT. UNITS 1 AND 2 In a {{letter dated|date=January 16, 1997|text=letter dated January 16,1997}}, Wisconsin Electric submitted Technical Specifications Change Request 191. This submittal proposes o change the minimum baron concentration required in storage tanks during normal operation, and proposes to change the minimum boron concentration of,nrimary coolant during refueling conditions. These changes are required to maintain the design basis nuidown eriteria when Point Beach Nuclear Plant units transition to 18-month core designs.
In a {{letter dated|date=February 28, 1997|text=letter dated February 28,1997}}, the NRC Oftice of Nuclear Reactor Regulation requested additional, information related to Technical Specifications Change Request 191. By {{letter dated|date=April 17, 1997|text=letter dated April 17,1997}},y :
submitted a reply to that request.                                                                          //
Based upon our extended Unit 2 refueling outage (U2R22), we have revised our plans for loading 18 month cores. Therefore, we are proposing to change the existing footnotes and add new footnotes in the proposed amendment to better describe the implementation schedule of the amendment. Also, we are proposing to revise Technical Specification Table 153.2-1 so the current limits on boric acid storage tank minimum volume are applicable until an 18-month core is loaded. We performed minor editing on the previously proposed amendment to clarify these schedule changes.
The Technical Specification pages affected by this supplement are attached. These pages have been edited with the proposed revisions indicated by strikeout of replaced wording and double underlining of
              - the revised wording.
9708140309 970007                                                                    i PDR    ADOCK 05000266 P                        PDR 1300 m
                                                    %amuu,om n, uw
 
. NPl.97 0466 Page 2 We have determined that the revised implementation schedule and editorial changes do not involve a significant hantrd, authorize a significant change in the types or total amounts of any elliuent release, or result in any significant increase in individual or cumulative occupational exposure. Therefore, we conclude that the proposed amendments meet the requirements of 10 CI:lt 51.22(c)(9) and that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared. The original "No Significant llazards" determinations for operation under the proposed Technical Specifications remain applicable.
Please contact us if you have any questions.
Sincerely, G.            .1=-    -
1)ouglas l', Johnson hianager, llegulatory Services & I.icensing Attaciunent cc:      NitC llesident inspector Nite itegional Administrator PSCW Subscribed and sworn before me on this 8*'        day of _Augusf_,1997-
      . L -K;'              -
CnesAw.a Notary Public, St. e of Wisconsin hly commission expires 5[39/_9E'              .}}
 
=Text=
{{#Wiki_filter:. _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                  -  ..
              ,          e e
(                              Wisconsin Electnc POWER COMPAN1' Porit Beoch Nuclear Ibnt                                                                        (414) M2321 6610 Nuclear Rd . Two RNett WI 54241 NPL 97 0466                                                                                10 CFR 50.4 10 CFR 50.90 August 7.1997 Document Control Desk U S. NUrLE t.R llEGUI ATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DOCKETS 50 266 AND 50 301 SUPPI,EMENT TO TEri!NICAL SPECIFICATIONS CilANGE REOUEST 191 POINT BEACil NUCI. EAR PI. ANT. UNITS 1 AND 2 In a {{letter dated|date=January 16, 1997|text=letter dated January 16,1997}}, Wisconsin Electric submitted Technical Specifications Change Request 191. This submittal proposes o change the minimum baron concentration required in storage tanks during normal operation, and proposes to change the minimum boron concentration of,nrimary coolant during refueling conditions. These changes are required to maintain the design basis nuidown eriteria when Point Beach Nuclear Plant units transition to 18-month core designs.
In a {{letter dated|date=February 28, 1997|text=letter dated February 28,1997}}, the NRC Oftice of Nuclear Reactor Regulation requested additional, information related to Technical Specifications Change Request 191. By {{letter dated|date=April 17, 1997|text=letter dated April 17,1997}},y :
submitted a reply to that request.                                                                          //
Based upon our extended Unit 2 refueling outage (U2R22), we have revised our plans for loading 18 month cores. Therefore, we are proposing to change the existing footnotes and add new footnotes in the proposed amendment to better describe the implementation schedule of the amendment. Also, we are proposing to revise Technical Specification Table 153.2-1 so the current limits on boric acid storage tank minimum volume are applicable until an 18-month core is loaded. We performed minor editing on the previously proposed amendment to clarify these schedule changes.
The Technical Specification pages affected by this supplement are attached. These pages have been edited with the proposed revisions indicated by strikeout of replaced wording and double underlining of
              - the revised wording.
9708140309 970007                                                                    i PDR    ADOCK 05000266 P                        PDR 1300 m
                                                    %amuu,om n, uw
 
. NPl.97 0466 Page 2 We have determined that the revised implementation schedule and editorial changes do not involve a significant hantrd, authorize a significant change in the types or total amounts of any elliuent release, or result in any significant increase in individual or cumulative occupational exposure. Therefore, we conclude that the proposed amendments meet the requirements of 10 CI:lt 51.22(c)(9) and that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared. The original "No Significant llazards" determinations for operation under the proposed Technical Specifications remain applicable.
Please contact us if you have any questions.
Sincerely, G.            .1=-    -
1)ouglas l', Johnson hianager, llegulatory Services & I.icensing Attaciunent cc:      NitC llesident inspector Nite itegional Administrator PSCW Subscribed and sworn before me on this 8*'        day of _Augusf_,1997-
      . L -K;'              -
CnesAw.a Notary Public, St. e of Wisconsin hly commission expires 5[39/_9E'              .}}