L-98-066, Submits Response to non-cited Violations Noted in NRC Insp Repts 50-266/98-11 & 50-301/98-11.Corrective Actions:Ler Was Submitted Which Contains Detailed Description of Circumstances Surrounding Identification of Event & C/As: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NPL-98-0669, Submits Response to non-cited Violations Noted in NRC Insp Repts 50-266/98-11 & 50-301/98-11.Corrective Actions:Ler Was Submitted Which Contains Detailed Description of Circumstances Surrounding Identification of Event & C/As]]
| number = ML20237B611
| issue date = 08/14/1998
| title = Submits Response to non-cited Violations Noted in NRC Insp Repts 50-266/98-11 & 50-301/98-11.Corrective Actions:Ler Was Submitted Which Contains Detailed Description of Circumstances Surrounding Identification of Event & C/As
| author name = Reddemann M
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000266, 05000301
| license number =
| contact person =
| document report number = 50-266-98-11, 50-301-98-11, NPL-98-0669, NPL-98-669, NUDOCS 9808190105
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:,
e Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Plant                                                                  (920) 755-2321 6610 Nuclear Rd.. Two Ruers. W154241 NFL 98-0669                                                                  10 CFR 50.110 August 14,1998 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 REPLY TO A NON-CITED VIOLATION NRC INSPECTION REPORT NOS. 50-266/98011 AND 50-301/98011 POINT BEACll NUCLEAR PI ANT. UNITS 1 AND 2 In a letter from Mr. Geoffrey Grant dated July 29,1998, the Nuclear Regulatory Commission forwarded the results of an inspection conducted by your staff at our Point Beach Nuclear Plant.
The inspection was conducted from May 26,1998, through July 6,1998. The inspection report in91uded one Non-Cited Violation of NRC requirements. The Non-Cited Violation pertains to vendor environmental qualification specifications for the Unit 1 and Unit 2 containment hydrogen              ;
monitors not being incorporated into routine maintenance procedures.
This letter provides a written response to the Non-Cited Violation, as requested by your letter of July 29,1998.
Licensee Event Report (LER) 1998-019-00, " Containment Hydrogen Monitor Inoperability," was submitted to the Commission for Point Beach Nuclear Plant, Units I and 2 on July 14,1998. The LER contains a detailed description of the circumstances surrounding the identification of this event and of the corrective actions that have been taken to prevent recurrence.                                    1 If you have any questions or require additional information regarding this respon e, please contact me.                                                                                                          :
Sincerely,                                                                                            ,
Sh                                                                                      l0 i          tark E teddemann Site Vice President Point Beach Nuclear Plant; 3.c sJ "o ,
FAF/dms                                                                                              x, cc:      NRC Resident Inspector                NRC Project Manager                                -
i                NRC Regional Administrator            PSCW l
l    9008190105 900814 PDR    ADOCK 05000266 o                        PDR          . danANkonswEmyOpden}}