ML21036A028: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:February 8, 2021 MEMORANDUM TO: Sabrina Atack, Director Division of Security Operations Office of Nuclear Security and Incident Response Signed by Ruffin, Steve FROM: Steve Ruffin, Acting Chief on 02/08/21 Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response | ||
==SUBJECT:== | |||
MEETING | |||
==SUMMARY== | |||
FOR THE PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF, NUCLEAR ENERGY INSTITUTE, ENTERGY, NEXTERA, AND INDUSTRY STAKEHOLDERS CONCERNING THE 2021 FORCE-ON-FORCE INSPECTION HARDSHIP CRITERIA On February 3, 2021, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting. The purpose of this meeting was to discuss the 2021 force-on-force hardship criteria with representatives from the Nuclear Energy Institute (NEI), NextEra, Entergy, and other relevant stakeholders. Enclosed is a summary of the meeting and the presentation slides. | |||
==Enclosures:== | |||
Public Meeting Summary Presentation Slides CONTACT: Rebecca Stone, NSIR/DSO/SPEB 850-496-4581 | |||
ML21036A029; Memo ML21036A028 OFFICE NSIR/DSO/SPEB OEDO NAME RStone RS SRuffin SR DATE Feb 8, 2021 Feb 8, 2021}} |
Latest revision as of 19:26, 20 January 2022
ML21036A028 | |
Person / Time | |
---|---|
Issue date: | 02/08/2021 |
From: | Steve Ruffin Security Performance Evaluation Branch |
To: | Sabrina Atack Division of Security Operations |
Stone R | |
Shared Package | |
ML21036A029 | List: |
References | |
Download: ML21036A028 (2) | |
Text
February 8, 2021 MEMORANDUM TO: Sabrina Atack, Director Division of Security Operations Office of Nuclear Security and Incident Response Signed by Ruffin, Steve FROM: Steve Ruffin, Acting Chief on 02/08/21 Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
SUBJECT:
MEETING
SUMMARY
FOR THE PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF, NUCLEAR ENERGY INSTITUTE, ENTERGY, NEXTERA, AND INDUSTRY STAKEHOLDERS CONCERNING THE 2021 FORCE-ON-FORCE INSPECTION HARDSHIP CRITERIA On February 3, 2021, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting. The purpose of this meeting was to discuss the 2021 force-on-force hardship criteria with representatives from the Nuclear Energy Institute (NEI), NextEra, Entergy, and other relevant stakeholders. Enclosed is a summary of the meeting and the presentation slides.
Enclosures:
Public Meeting Summary Presentation Slides CONTACT: Rebecca Stone, NSIR/DSO/SPEB 850-496-4581
ML21036A029; Memo ML21036A028 OFFICE NSIR/DSO/SPEB OEDO NAME RStone RS SRuffin SR DATE Feb 8, 2021 Feb 8, 2021