{{Adams
#REDIRECT [[CY-00-004, 2020 Commitment Revision Summary Report]]
| number = ML20014D619
| issue date = 12/31/2019
| title = 2019 Summary of Regulatory Commitment Changes
| author name = Shultz B
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000220, 05000410
| license number = DPR-063, NPF-069
| contact person =
| case reference number = NMP1L 3249, RIS 2000-17, SECY-00-0045
| document type = Letter type:CY
| page count = 3
}}
 
=Text=
{{#Wiki_filter:Exelon Generation~
SECY-OO-Q045 RIS 2000-17 NMP1L 3249 December-31, 2019 U.S. Nuclear Regulatory Commission Attn: Qocument Control Desk Washington, DC 20555-0001 Nine Mlle Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-41 o            *    * -
 
==Subject:==
2~19 Summary of Regulatory Commitment Changes There Is <;>ne regulatory commitment change requiring NRC notification In accordance with the guidance contained in NEI 99-04, "Guidelines for Managing NRC Commitment Changes,"
Revision O, for ttie period of October 1, 2918 to September 30, 2019. NEI 99-04 was approved by the NRC for licensee use via- SECY-00-0045, "Acceptance of NE/ 99-04, 'Guidelines for Managing NRG Commitments," and licensees were, Informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the Issuance of Regulatory Issue Summary (RI$) 2000-17, "Managing Regulatory_Commftments made by Power Reactor Licensees to the NRG Staff," on September 21, 2000.
The attachment to this letter contains a Regulatory Commitment Change Summary..
This letter contains no NRC com-mltments. Should you have arJy questions- regarding the information in this submlttal, please contact me at (315) 349-7012.
* Sincerely, Brandon K. Shultz Manager Site Regulatory Assurance, Nine Mlle Point Nuclear Station Exelon Generation Company, LLC BKS/RMD cc:    NRC Regional Administrator, Region I NRC Resident Inspector NRC Project Manager
 
Attachment Regulatory Commitment Change Summary
 
  ,v-'
Document Control Desk December 31, 2019 The following commitment change was Implemented during the period from October 1, 2018, to September 30, 2019.
Commitment change no. NL-2011-000008-021
 
==Subject:==
 
Commitment to enhance Boraflex Monitoring Program no longer necessary.
Statement of commitment:
The Boraflex Monitoring Program for Unit 1 will be enhanced to perform periodic In-situ neutron attenuation testing and measurement of boron areal density for those Boraflex racks tliat remain in use during the period of extended operation. It will also be enhanced to create a new actMty which provides instruction for the trending of silica levels, coupon results, and the results of in-situ testing. Enhancements will be completed prior to the period of extended operation.
Change to commitment:
Commitment terminated with approval of Amendment 234.
Justification for change:
Approved License Amendment 234 Remove Boraflex Credit REDACTED In the background of the LAA It states: "With the elimination of reliance on Boratlex for SFP reactivity control, the Boraflex Monitoring Program and the License Renewal commitment to enhance the program will no longer be necessary and wlll terminate with Implementation of the approved license amendment. a In Section 3.1 of the amendment It states, "As a result, continued performance of the Boraflex monitoring program and the license renewal commitment to enhance the program wlll no longer be necessary. It is the licensee's intent to terminate the monitoring program with implementation of the approved license amendment.*}}