ML20135F181: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 26: | Line 26: | ||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
As requested in NRC letter dated January 15, 1985, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List , | As requested in NRC {{letter dated|date=January 15, 1985|text=letter dated January 15, 1985}}, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List , | ||
of Vogtle harsh environment safety-related equipment by systems. It also provides Systes Component Evaluation Work Sheets, which summarize r qualification of this equipment. The report indicates that the Vogtle | of Vogtle harsh environment safety-related equipment by systems. It also provides Systes Component Evaluation Work Sheets, which summarize r qualification of this equipment. The report indicates that the Vogtle | ||
, qualification program is approximately 92% complete and installation l (mounting) is approximately 61% complete of which 19% is ready for service. | , qualification program is approximately 92% complete and installation l (mounting) is approximately 61% complete of which 19% is ready for service. | ||
Revision as of 06:21, 14 December 2021
| ML20135F181 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/13/1985 |
| From: | Bailey J SOUTHERN COMPANY SERVICES, INC. |
| To: | Adensam E, Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20135F185 | List: |
| References | |
| GN-701, NUDOCS 8509170185 | |
| Download: ML20135F181 (1) | |
Text
. . _ - . . . _ . -- - . _ ,. .. - ~
Scuthem Company Servces. Inc Post 0"ce Box 2625 l Bnningham, Atabama 3$202 Telephone 205 870 6011 i
Vogtle Project ,
September 13, 1985 i
l Director of Nuclear Reactor Regulation Files X3BL01 Attention: Ms. Elinor G. Adensas, Chief Logs GN-701 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 i CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l V0GTE EECTRIC CENERATING PLANT - UNITS 1 AND 2 !
SER OPEN ITEM 1: EQUIPMENT QUALIFICATION {
Dear Mr. Denton:
As requested in NRC letter dated January 15, 1985, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List ,
of Vogtle harsh environment safety-related equipment by systems. It also provides Systes Component Evaluation Work Sheets, which summarize r qualification of this equipment. The report indicates that the Vogtle
, qualification program is approximately 92% complete and installation l (mounting) is approximately 61% complete of which 19% is ready for service.
Two copies of the report are being suanitted directly to your consultant.
r If your staff requires any additional information, please do not hesitate to call me.
l Sincerely.
.h.
J. A. Bailey Project Licensing Manager Enclosure JAB /JHW/sm xc D. O. Foster J. E. Joiner, Esquire M. A. Miller (3) B. W. Churchill, Esquire j R. A. Thomas B. Jones, Esquire (w/o encl.)
l C. Bockhold, Jr. T. Johnson (w/o encl.)
L. T. Gucwa C. D. Teper (w/o encl.)
L. Fowler Clarke Kido Jag Singh Vogtle Project File p'2mP.! F=)lp . g