ML20138A899: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
Y CensumersEat}gy A CMS Eneqty Company Big Rott Pont NuclearPlant Kenneek n Peeners 10269IEr3I No@ Plant GeneralManager Ctarlevoux, MI49720 4 | Y CensumersEat}gy A CMS Eneqty Company Big Rott Pont NuclearPlant Kenneek n Peeners 10269IEr3I No@ Plant GeneralManager Ctarlevoux, MI49720 4 | ||
April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT. | April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT. | ||
A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by letter dated October 15, 1996. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50. | A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by {{letter dated|date=October 15, 1996|text=letter dated October 15, 1996}}. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50. | ||
The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired. | The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired. | ||
In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations | In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations | ||
Revision as of 03:53, 13 December 2021
| ML20138A899 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 04/22/1997 |
| From: | Addy R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20138A904 | List: |
| References | |
| NUDOCS 9704280281 | |
| Download: ML20138A899 (1) | |
Text
"ek. e,_
Y CensumersEat}gy A CMS Eneqty Company Big Rott Pont NuclearPlant Kenneek n Peeners 10269IEr3I No@ Plant GeneralManager Ctarlevoux, MI49720 4
April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT.
A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by letter dated October 15, 1996. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50.
The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired.
In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations
\
\
ad GM Robert J Addy Plant Manager KOf CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point ATTACHMENTS
[ $N!k b 5
} \ \ ((\ )kllk