ML20148D929: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[LIC-97-0090, Forwards Listed EPIP & RERP Changes for Plant.Epip FC-EPF-21 Revised to Change Map Indicating Replacement of Lagoon W/ Parking Lot & Also to Indicate Placement of 161kV & 345kV Towers]]
| number = ML20148D929
| issue date = 05/22/1997
| title = Forwards Listed EPIP & RERP Changes for Plant.Epip FC-EPF-21 Revised to Change Map Indicating Replacement of Lagoon W/ Parking Lot & Also to Indicate Placement of 161kV & 345kV Towers
| author name = Gambhir S
| author affiliation = OMAHA PUBLIC POWER DISTRICT
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000285
| license number =
| contact person =
| document report number = LIC-97-0090, LIC-97-90, NUDOCS 9706020198
| package number = ML20148D935
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:'- *
        %Empn OEP7blicPowerDE 444 South 16th Street Mall Omaha NE 68102-2247 May 22, 1997 LIC-97-0090 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C.        20555
 
==Reference:==
Docket Nc. 50-285
 
==SUBJECT:==
Transmittal of Changes to Fort Calhoun Station Emergency Plan Implementing Procedures (EPIP) and Radiological Emergency Response Plan (RERP)
In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)(5)(iii), please find the following EPIP and RERP changes enclosed for the Document Control Desk (holder of Copy 165) and the NRC Region IV Administrator (holoer of copies 154, 155 and 156).
Please return the attached receipt confirmation forms using the enclosed pre-addressed envelopes by July 13, 1997.
REMOVE SECTION                                          INSERT Si.CIl0B FC-EPF Forms Index, issued 10/1/96                      FC-EPF Foras Index, issued 5/15/97 FC-EPF-21 R1, issued 12/2/94                            FC-EPF-21 R2, issued 5/15/97
,              RERP Section J. Pg. 25/26. R15.                          RERP Section J. Pg. 25/26, R15, issued 4/22/97                                            issued 4/22/97 Summary of Chanaes EPIP FC-EPF-21 was revised to change a map indicating replacement of a lagoon with a parking lot. The map was also revised to indicate the placement of 161kV and 345kV towers.
RERP Section J Page 25/26 was reissued to provide information that was inadvertently omitted from Page 25 during its original issue.
g(
                                                                                                        \
                                                                                                      \
9706020198 970522 PDR    ADOCK 05000285 l!,!
45.5124                                        Employment with EqualOpportunity j
 
V. S. Nuclear Regulatory Commission LIC-97-0090 Page 2 Please contact me if you have any questions regarding the enclosed changes.
Sincerely.
1
                    ,f W S.    . Gambhir Division Manager Engineering & Operations Support SKG/mah Enclosures I
c:      Winston & Strawn (w/o Enclosures)
E. W. Merschoff. NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager (w/o Enclosures)
W. C. Walker. NRC Senior Resident Inspector (w/o Enclosures) l l
l 4
4
                                        <v-wv,--}}

Latest revision as of 22:45, 11 December 2021