ML20154C737: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 1: Line 1:
{{Adams
#REDIRECT [[RBG-27839, Revised Monthly Operating Rept for June 1987]]
| number = ML20154C737
| issue date = 06/30/1987
| title = Revised Monthly Operating Rept for June 1987
| author name = Booker J, Cole R
| author affiliation = GULF STATES UTILITIES CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000458
| license number =
| contact person =
| document report number = RBG-27839, NUDOCS 8805180290
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
}}
 
=Text=
{{#Wiki_filter:_ _ _ _ _ _
\
DOCKET NO. 50/458-RIVER BEND STATION UNIT 1 REPORT NO. R-87-006, Rev.              1-DATE          April 22, 1988 COMPLETED BY  R. E. Cole TITLE        Sr. Systems Engr.
TELEPHONE    635-6094 X4826 MONTH  JUNE, 1987 DAY AVERAGE DAILY POWER LEVEL    DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                        (MWe-Net)
: 1.            613              17,          616
: 2.            603              18.            87
: 3.            610              19.              0
: 4.            615              20.              0
: 5.            617              21.              0
: 6.            616              22.              0 23.
: 7.            611                              0
: 8.            612              24.              0
: 9.            613              25.              0
: 10.            614              26.              0
: 11.            612              27.              0
: 12.            611              28.              3 i    13.            612              29.          557
: 14.              614              30.          923 1
: 15.              614              31.          N/A
: 16.              617 i
b
                                                                  \                j i    i              l 8805180290 870630 PDR  ADOCK 05000458 R                DCD
 
DOCKET NO.        50/458 RIVER BEND STATION UNIT 1 REPORT NO.            R-87-006, Rev. 1 DATE                  April 22, 1988 COMPLETED BY R. E. Cole TITLE                  Sr. Systems Engr.
TELEPHONE              635-6094 X4826 PAGE    1    OF          2 l
OPERATING STATUS
: 1. REPORTING PERIOD: JUNE, 1987_ GROSS HOURS IN REPORTING PERIOD:                  720
: 2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt) :      2894 MAX. DEPEND CAPACITY (MWe-Ne t) :    N/A DESIGN ELECTRICAL RATING (Mwe-Ne t) :    936 i
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Ne t) :      N/A                                                  i
: 4. REASONS FOR RESTRICTION (IF ANY) :    N/A                                                                        l l
THIS          YR TO                CUMU-MONTH          DATE                  LATIVE
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL...      482.9        4,017.1            10,265.1
: 6. REACTOR RESERVE SHUTDOWN HOURS.........        0.0              0.0                        0.0
: 7. HOURS GENERATOR ON LINE...............        460.3        3,952.2              8,646.3
: 8. UNIT RESERVE SHUTDOWN HOURS...........          0.0                0.0                        0.0
: 9. GROSS THERMAL ENERGY GENERATED (MWH) . .      951,123    10,"03,959            20,704,515
: 10. GROSS SLECTRICAL ENERGY GENERATED (bWm)      310,607.4 3,683,319.4              7,003,274.8                    i
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) .      287,702.0 3,455,656.0              6,546,423.0
 
4 DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.      R-87-006, Rev. 1 DATE            April 22, 1988 COMPLETED BY    R. E. Cole TITLE          Sr. Systems Engr.
TELEPHONE      635-6094 X4826 PAGE    2    OF    2 OPERATING STATUS THIS        YR TO    CUMU-MONTH        DATE    LATIVE
: 12. REACTOR SERVICE FACTOR        ........... 67.1        92.5      74.1
: 13. REACTOR AVAILABILITY FACTOR ......          67.1        92.5      74.1
: 14. UNIT SERVICE FACTOR ..............          63.9    __91.0        70.6
: 15. UNIT AVAILABILITY FACTOR .........          63.9        91.0      70.6
: 16. UNIT CAPACITY FACTOR (Using MDC) . .          N/A    _
N/A        N/A
: 17. UNIT CAPACITY FACTOR (Using Design MWe) ......................          42.7        85.0        65.4
: 18. UNIT FORCED OUTAGE RATE        .......... 33.9          8.5        14.2
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, September 15, 1987, 60 days
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:              N/A
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :
FORECAST          ACHIEVED INITIAL CRITICALITY                          N/A            10-31-85 INITIAL ELECTRICITY                          N/A            12-03-85 COMMERCIAL OPERATION                        N/A              6-16-86 1
 
MIT SIfUIDOG4S MO POWER RHXCTIWS                                                  '.
TIPE          TDE START        REKINER OF  MUt    DERATIN      TYPE      REASW    PEIMD  CORRECTIVE ACTIONS /GMENTS                  .
NO.      IWIE                          OOCURRANCE OOCERRANCE (HOURS)                                  NDIE (1)    NUIE (2) NC7IE (3) 87-03 870601                                                          0000          0322      0.0          S          P        4    Reduced power to 70% to conserve 870618                                            fuel for pk sunmar demand.
87-04 870618                                                          0322          2355    236.55        F          A        3    Correct high vessel level due to 870627                                            loss of feedwater level control.
LER-87-012.
870627                                                        2355          2305      23.17        S          B        2    During startup manually scrimmd 870628                                            reactor to repair leaks in Drywell.
 
==SUMMARY==
NOIE (1) TYPE OF OCCURRVEE: FNTER CODE                                                                                                                DOCKEP NO. 50/458 F: FORCED                                                                                                                              RIVER BEND STATION UNIT 1 S: SCHEDULED REPORT NO. R-87-006, Rev. I NOTE (2) PEASON FOR OCCURRANCE: ENTER CODE A: EQUIINENT FAIIIIRE (EXPIAIN IN CORRECTIVE ACTIONS /CD1MENTS)                                                                        REPORT MONHI March, 1988 B: MAIITTHJANCE OR TEST C: PEFUELING D: REGUIATORY RESTPICTIm E: OPERA'IOR TRAINING AND LICDJSE EXMiTNATION                                                                                          DATE    April 22, 1988 F: MMINISTRATIVE G: OPERATIONAL ERROR (EXPIAIN IN CORRECTIVE ACTIONS /COffEffS)                                                                                R. E. Cole H: OHIER (EXPIAIN IN CORRECTIVE JETIONS/Cata7PS)                                                                                                  RED BY:
NOIE (3) METHOD OF SHUTTING DOhN REACIOR OR REDUCING PWER: ENTER CODE 1: MANUAL                                                                                                                              '
SIGNA'IURE 2: MANUAL SCRV1 3: AUITATIC SCRV1                                                                                                                        Sr. Systems Engineer 4: OHIER (EXPIAIN IN CORRELTIVE ACTICN/00bNENTS)                                                                                              TITLE TELEPHONE 504 635-6094 extension 4826
: a.                                                                                                                            7{
g  b                                                                                                                4 GULF STATES                          UTILITIES COMPANY RivtA DEND STADON    POST OrFICE isOX 220    ST 8 AANCISVILLC LoutszANA #0775 ARE A CODE 604    635 6094    346 8651 May 13, 1988 RBG- 27839 File Nos. G9.5, C9.25.1.5 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Centlemen:
River Bend Station - Unit 1 Docket No. 50-458 Enclosed is Gulf States Utilities Company's Revised Monthly Operating Report for June 1987 for River Bend Station (RBS) - Unit 1.                                This report is revised to correct forced outage hours, scheduled outage hours, and the unit forced outage rate and is subtaitted in accordance with RBS Technical Specification 6.9.1.6.
Sincerely, N J. E. Booker Manager-River Bend &c- .aght River Bend Nuclear Group JEB/LAE/              ch Enclosure cc:  U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 INPO Records Center 1100 circle 75 Parkway Atlanta, CA 30339                                                                                  g            I Cajun Electric Power Coop., Inc.                                                            dh
                                                                                                                /
i \
l}}

Latest revision as of 11:34, 10 December 2021