ML20154J690: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BECO-88-136, Responds to NRC Bulletin 85-003,Suppl 1 Requesting Reexam & Possible Expansion of Licensee Valve Testing Programs to Verify Torgue Switch Settings on safety-related motor-operated Valves]]
| number = ML20154J690
| issue date = 09/17/1988
| title = Responds to NRC Bulletin 85-003,Suppl 1 Requesting Reexam & Possible Expansion of Licensee Valve Testing Programs to Verify Torgue Switch Settings on safety-related motor-operated Valves
| author name = Bird R
| author affiliation = BOSTON EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-88-136, IEB-85-003, IEB-85-3, NUDOCS 8809230110
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 5
}}
 
=Text=
{{#Wiki_filter:.
NRC Bulletin 85-03                !
e'  <
h?
eosnwanson Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 September 17, 1988 Ralph G. Bird                                                          BECo 88 136 Senior Vice President - Nuclear U. S. Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555 1.icense DPR-35 Docket 50-293 BESPONSE TO ERC BULLETIN 85-03. SUPPLEMENT I This letter provides our response to NRC Bulletin 85-03, Supplement 1, which requested a re-examination and possible expansion of licensees' valve testing programs to verify the torque switch settings on safety related motor operated valves (H0Vs). Since the issuance of this Bulletin supplement, the NRC by
,          letter of August 8,1988 has accepted the revised Boiling Hater Reactor Owners Grcup (BHROG) report, NEDC 31322 Supplement 1, dated July 20, 1988.
He endorse the methodology of NEDC-31322 Supplement 1 for the selection of valves and their maximum expected diffe'ential pressure. Our endorsement results in no valves being added to the 21 H0V's reported to the NRC in our original Bulletin 85-03 response of December 31, 1986. It does result in a data change for two of the original 21 valves, which is reported in this letter's attaG1 ment.          The attachment also lists two new valves which we*e added to Pilgrim as a result of plant modifications made during this outage.
Boston Edison will complete Bulletin 85-03 activities in accordance with the schedule approved by the NRC letter dated April 14, 1988.
Attachri.ent PMK/amm/2454 cc:            M.. D. Mcdonald, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station PI-137 Washington, D. C.      20555 U. S. Nuclear Regulatary Conmission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident inspector Pilgrim Nuclear Power Station 8009230110 000917 PDR      ADOCK 0000          3                                                                    ,g
 
r Attachment to NRC Bulletin 85-03. Sucolement 1 Boston Edison provided data on 21 HOVs affected by Bulletin 85-03 in our letter of December 31, 1986. He have re-tvaluatad that data based on Supplement 1 and provided a data update on the following two pages. Changes are designated by a change bar in the right hand margin.
Changes to the original list are:
: 1) MO-2301-6 Maximum Openingz1 P rose from 25 psi to 40 psi.
: 2) H0-1301 -22 Maximum Opening /l P rose from 25 psi to 38 psi.
Two new valves were added to the list to reflect their addition to Pilgrim.
The new valves are shown on the attached schematic drawing of the HPCI Steam Lines Motor Operated Valves.
They are:
: 1) H0-2301-33 Vacuum Breaker Line Isolation Valve
: 2) H0-2301-34 Vacuum Breaker Line Isolation Valve
                                                                ,..----..,.,----,,e  ~ - . - -- - , . .- - - , , -- -n- --_--a ,
                            ----n._-.
                                    .  - . - g-          -
 
tiOV DATA SUMMADJ                                                                    ,'-
Tcrquy Size (in)    Limitorque                            DesignIBasis      Max Operating 2        Switch          '
HPCI Systes Valve Ratina(Ib)        Oserator      Valvo Function            AP (PSI)      A P(PSI) Open/Close      Jussered -
M0-2301-3            10x8          SMB-1    Steam Admission Valve            1150                1104/1104          Open Valan - Gate          600 MO-2301-4            10x8          SMB-2    Steam Lin.e Isolation Valve      1150                1104/1104          Open Velan - Gate          900 MO-2301-5            10x8          SMB-1    Steam Line Isolation Valve      1150                1104/1104          Open Velan - Gate          600 MD-2'01-6            16            SMB-0    Condensate Storage Tank          60                  40/38              Open Powell - Gate        150                    Suction Valve MD-2301-8            14x10        SMB-1    Injection Valve                  1500                1230/1302          Open Anchor - Gate        900 MO-2301-9            14x10        SM8-1    Injection Test Valve            1E'O                1230/1302          Open Anchor - Gate        900 MO-2501-10            10            SMB-2    CST Test Return Valve            1500                1290/1337          Open Velan - Gir,oe        900 M0-2301-14            4            SMB-0    Minimus Flow Bypass              1500                1327/1355          Open Valan - Globe        900                    Isolation Valve MO-2301-33            4            SMB-000  Vacuum Breaker Liae              135                  45/45              Open Powell-Gate          150                    Isolation Valve MO-2301-34            4            SMB-000  Vacuum Breaker Line              135                  45/45              Open -
Powell-Gate          150                    Ise!ation Valve MO-2301-35            16            SMB-0    Suppression Pool Suction        60                  263/26              Open Powell - Gate        150                    Isolation Valve M0-2301-36            16            SMB-00    Suppression Pool Suction        60                  273/27              Open Anchor - Gate        150                    Isolation Valve 1 Values are for both open and close positions.
2 Calculated maxirwm operating pressures based on BW"        ner's Group Report.                                                      '
3 For additional conservatism, increasing pressure due. to check valve leakage will be assumed resulting in a suction line pressure of 97 psi. Realizing this possibility, the suction line relief valve will be set lower, er the val-?s/ operators will be readjusted for 100 psi differential.
 
m MOV GATA StEMARY (Cont'd)                                              .
Torque      ','
Size (in)    Limitorque                              DesignlBasis  Max Operating 2        Switch    -
RCIC System Valve Ratina(Ib)      Operator      Yalve Function          A P (PSI)      A P(PSI) Ooen/Close  _Jumpertd_ _
M0-1301-16            3            SMB-00    Steam Line Isolation Valve        1250          1104/1104            Open Westinghouse - Gate 600 MO-1301-17            3            SMB-000  Steam Line Isolation Vaive        1250          : 04/11')4            Open Velan - Gate          600 MG-1301-22            6            SMB-000  Condensate Storage Tank          60            38/36                Open Pcwell - Gata        150                    Suction Valve M0-1301-25            6            SMB-000    Suppression Pool Suction        60            273/27                Open Valan - Gate          150                    Isolation Valve M0-1301-26            6            SMB-000    Suppression Pool Suction        60            263/26                Open Powell - Gate        150                    Isolation Valve MD-1301-48            4            SMB-00    Injection Tect Vaive            1500          1238/1345            Open Powell - Gate        900 M0-1301-49            4            SMB-00    Injection Valve                  1400          1238/1345            Open Powell - Gate        900 MD-1301-53            4            SMB-0      CST Test Return Valve            1400          1301/1358            Open Pow 211 - Globe      900 H0-1301-60          2            SMB-00    Minimum Flow Bypass              1500          1340/1377            Open Powell - Globe      600                    Isolation Valve M0-1301-61          3            SMB-00    Steam Admission Valve            1150          1104/1104            Open Powell - Globe        600 M0-1301-62          2            SMB-000    Cooling Water to Turbine        75            604/28                Open Powell - Globe        600                    Accessories                                                                        )
I Values are for both open and close positlocs.
2 Calculated maximum operating pressures based on BHR Owner's Group Report.
3 Fcr 7 5.tlonal conservatism, increasing pressure due to check valve leakage will be assumed resulting in a suction line pressure of 95 psi. Realizing this possibility, the suction line relief valve will be set lower or the valves / operators will be readjusted for 100 psi differential.
4 This value is based on demonstrated operability during pump survelliance testing, and a control valve located upstream.
 
s
                                                                  <%s 1
F R0ed RAAIN 3 STEAM UNE 5                                                  e iii asov is M0-2301-4                      M0-2301-5 AM v,
U            m,
                                                                    ~ ~ - *
                            ~'                                                      MO-2301-3 weci Tuneens MOV VIII
,                                            0-2301-33 ll J
'                                                V VII 10-2301-34                                          '
l
                ~~w y                                                                ,
sverntssion i
POOL t
i i
HPCI System Steam Lines Motor Ooeroted Valv. ;                      ,
I f
t
                                  . . - - . -.-.- -_-_                                        --}}

Latest revision as of 05:46, 10 December 2021