ML20195J240: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 5
| page count = 5
| project = TAC:MA1102
| stage = Approval
}}
}}


Line 27: Line 29:
==Dear Mr. Terry:==
==Dear Mr. Terry:==


The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Internals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by letter dated December 11,1997, and was supplemented by letter dated September 8,1998. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure safety function integrity of the subject safety-related low pressure coolant injection (LPCI) couplings.
The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Internals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by {{letter dated|date=December 11, 1997|text=letter dated December 11,1997}}, and was supplemented by {{letter dated|date=September 8, 1998|text=letter dated September 8,1998}}. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure safety function integrity of the subject safety-related low pressure coolant injection (LPCI) couplings.
The staff has reviewed the BWRVIP-42 report and finds that, in the enclosed safety evaluation (SE), the guidance of the BWRVIP-42 report acceptable for inspection and flaw evaluation of the subject safety-related reactor pressure vessel (RPV) internal components, except where the                      l staff's conclusions differ from the BWRVIP's, as discussed in the enclosed SE. The staff has                        !
The staff has reviewed the BWRVIP-42 report and finds that, in the enclosed safety evaluation (SE), the guidance of the BWRVIP-42 report acceptable for inspection and flaw evaluation of the subject safety-related reactor pressure vessel (RPV) internal components, except where the                      l staff's conclusions differ from the BWRVIP's, as discussed in the enclosed SE. The staff has                        !
concluded that the licensee implementation of the guidelines in the BWRVIP-42 report will provide an acceptable level of quality for inspection and flaw evaluatim with modifications to address the staff's conclusions in the enclosed SE, of the safety-related components addressed.
concluded that the licensee implementation of the guidelines in the BWRVIP-42 report will provide an acceptable level of quality for inspection and flaw evaluatim with modifications to address the staff's conclusions in the enclosed SE, of the safety-related components addressed.
Line 73: Line 75:
==Dear Mr. Terry:==
==Dear Mr. Terry:==


The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Intemals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by letter dated December 11,1997, and was supplemented by letter dated September 8,1998. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure the integrity and safety function of the subject safety related low pressure coolant injecHon (LPCI) couplings.
The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Intemals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by {{letter dated|date=December 11, 1997|text=letter dated December 11,1997}}, and was supplemented by {{letter dated|date=September 8, 1998|text=letter dated September 8,1998}}. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure the integrity and safety function of the subject safety related low pressure coolant injecHon (LPCI) couplings.
The staff has reviewed the BWRVIP 42 report and,in the enclosed safety evaluation (SE),
The staff has reviewed the BWRVIP 42 report and,in the enclosed safety evaluation (SE),
discusses the NRC staff's findings. The guldance of the BWRVIP-42 report is acceptable for inspection and flaw evaluation of the subject safety related reactor pressure vessel (RPV) internal components, except where the staff's conclusions differ from the BWRVIP's, as discussed in the SE. Licensee implementation of the guidelines in the BWRVIP-42 report, with modifications to address the staff's conclusions in the SE, will provide an acceptable level of quality for inspection and flaw evaluation of the safety-related components addressed.
discusses the NRC staff's findings. The guldance of the BWRVIP-42 report is acceptable for inspection and flaw evaluation of the subject safety related reactor pressure vessel (RPV) internal components, except where the staff's conclusions differ from the BWRVIP's, as discussed in the SE. Licensee implementation of the guidelines in the BWRVIP-42 report, with modifications to address the staff's conclusions in the SE, will provide an acceptable level of quality for inspection and flaw evaluation of the safety-related components addressed.

Latest revision as of 09:57, 9 December 2021

Forwards SER Accepting EPRI Proprietary Rept TR-108726, BWR Vessel & Internals Project,Lpci Coupling Insp & Flaw Evaluation Guideline (BWRVIP-42)
ML20195J240
Person / Time
Issue date: 06/14/1999
From: Strosnider J
NRC (Affiliation Not Assigned)
To: Terry C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20195J245 List:
References
TAC-MA1102, NUDOCS 9906180151
Download: ML20195J240 (5)


Text

fl -

Ctrl Terry, BWRVIP Chairman

, Niagara Mohawk Power Company

( Post Office Box 63 Lycoming, NY 13093 l

SUBJECT:

SAFETY EVALUATION OF THE *BWRVIP VESSEL AND INTERNALS PROJECT, "BWR VESSEL AND INTERNALS PROJECT, LPCI COUPLING INSPECTION l AND FLAW EVALUATION GUIDELINES (BWRVIP-42)," (TAC NO. MA1102)

Dear Mr. Terry:

The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Internals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by letter dated December 11,1997, and was supplemented by letter dated September 8,1998. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure safety function integrity of the subject safety-related low pressure coolant injection (LPCI) couplings.

The staff has reviewed the BWRVIP-42 report and finds that, in the enclosed safety evaluation (SE), the guidance of the BWRVIP-42 report acceptable for inspection and flaw evaluation of the subject safety-related reactor pressure vessel (RPV) internal components, except where the l staff's conclusions differ from the BWRVIP's, as discussed in the enclosed SE. The staff has  !

concluded that the licensee implementation of the guidelines in the BWRVIP-42 report will provide an acceptable level of quality for inspection and flaw evaluatim with modifications to address the staff's conclusions in the enclosed SE, of the safety-related components addressed.

The staff requests that the BWRVIP review and resolve the issues raised in the enclosed SE, and incorporate the staff's conclusions into revised BWRVIP-42 report. Please inform the staff within 90 days of the date of this letter of your proposed actions and schedule for revisions.

Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169, if you have any further questions regarding this subject.

Sincerely,

~

9906180151 990614 PDR TOPRP EMVGENE Jack R. Strosnider, Director C PDR Division of Engineering ,0)

Office of Nuclear Reactor Regulation y(\

Enclosure:

As stated . _

cc: See next page 1 a,

~

%IQ DISTRIBUTION: ~

EMCB R/F GHolahan WDLanning. R1 KAKavanagh PUBLIC MEMayfield BSMallet. R2 DGNaujock File Center TYChang JGrobe, R3 JRRajan <

ACRS KRWichman AHowell, R4 p g /(f

' I Document Name: G:\BWRVIP\ VIP 42SER.WPD b INDIC ATE IN BOX: "O"= COPY WlO ATTACHMENTIENCLOSURE,"E"= COPY WIATTIENCL, *N"=NO COPY EMCB: LPM E EMCB:SLS lf EMCB.BC DE:DD IDE:D RHWessman JRStrosnider CECarpenter , p RAHermannJ ' WHBateman 04/13/1999 7 0 [ /1999 1 / /1999 / /1999 / /1999 y Aj\Q OFFICIAL RECORD COPY

m i

  • C. Tcrry l*

l Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169, if you have any further questions regarding this subject.

j Sincerely,

[ original signed by:]

Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation l

Enclosure:

As stated cc: See next page l DISTRIBUTION:

EMCB R/F GHolahan WDLanning, R1 KAKavanagh PUBLIC MEMayfield BSMallet, R2 DGNaujock File Center TYChang JGrobe, R3 JRRajan j ACRS KRWichman AHowell, R4 l Document Name: G:\BWRVIPWIP42SER.WPD I INDICATE IN BOX:"C"= COPY W/O ATTACHMENT / ENCLOSURE "E"-COPY W/ATT/ ENCL,"N"-NO COPY /1 n l EMCB: LPM E EMCB:SLS, /y ',f, EMCB:BC g DE:DD _S DE:D [fg /

l CECarpenter .., j RAHerr6afjh] WHBateman[@HHWes%V JRStrosnidoff 04/13/1999 CF 05/ f/199b 05//g /1999 05/ f t/1999 M4 /1999/

F OFFICfAL RECORD COPY g GY i

l

\

p rarg g 1 UNITED STATES 3 g j

2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001

  • %*****/ June 14, 1999 Carl Terry, BWRVIP Chairman 3

N!agara Mohawk Power Company  !

Post Office Box 63 l

Lycoming, NY 13093

SUBJECT:

SAFETY EVALUATION OF THE *BWRVIP VESSEL AND INTERNALS PROJECT, *BWR VESSEL AND INTERNALS PROJECT, LPCI COUPLING INSPECTION AND FLAW EVALUATION GUIDELINES (BWRVIP-42),"(TAC NO. 1 MA1102)

Dear Mr. Terry:

The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR 108726 *BWR Vessel and Intemals Project, LPCI Coupling Inspection and Flaw Evaluation Guideline (BWRVIP-42)." This report was submitted by letter dated December 11,1997, and was supplemented by letter dated September 8,1998. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure the integrity and safety function of the subject safety related low pressure coolant injecHon (LPCI) couplings.

The staff has reviewed the BWRVIP 42 report and,in the enclosed safety evaluation (SE),

discusses the NRC staff's findings. The guldance of the BWRVIP-42 report is acceptable for inspection and flaw evaluation of the subject safety related reactor pressure vessel (RPV) internal components, except where the staff's conclusions differ from the BWRVIP's, as discussed in the SE. Licensee implementation of the guidelines in the BWRVIP-42 report, with modifications to address the staff's conclusions in the SE, will provide an acceptable level of quality for inspection and flaw evaluation of the safety-related components addressed.

The staff requests that the BWRVIP review and resolve the issues raised in the enclosed SE and incorporate the staff's conclusions into a revised BWRVIP-42 report. Please inform the staff within 90 days of the date of this letter of your proposed actions and schedule for revisions.

2W !

C. Terry t r.

t Please contact C, E. (Gene) Carpenter, Jr., of my staff at (301) 415 2169, if you have any  !

further questions regarding this subject. '

Sincerely, t C

\

A&o wtY1 J?.ck R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page .

)

,e

, cc:

Karl W. Singer, Executive Chair Steve Lewis, Technical Chairman

[ BWRVIP Assessment Task BWRVIP Assessment Task

/ Tennessee Valley Authority Entergy PO Box 2000 P. O. Box 756 Decaltur, AL 35602-2000 Waterloo Road Port Gibson, MS 39150 Bill Eaton, Executive Chair inspection Committee Carl Larsen, Technical Chairman Entergy Operations, Inc. BWRVIP Inspection Task PO Box 756, Waterloo Rd Yankee Atomic Port Gibson, MS 39150-0756 580 Main Street Bolton, MA 01740 H. Lewis Sumner, Executive Chairman BWRVIP Mitigation Task John Wilson, Technical Chairman Southern Nuclear Operating Co. BWRVIP Mitigation Task M/S BIN B051, PO Box 1295 Clinton Power Station, M/C T-31C 40 Invernt ss Center Parkway P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 Harry P. Salmon, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task New York Power Authority Carolina Power & Light Company 123 Main St., M/S 11 D One Hannover Square 9C1 White Plains, NY 10601-3104 P.O. Box 1551 Raleigh, NC 27612 George T. Jones, Executive Chair BWRVIP Repair Task Bruce McLeod, Technical Chairman Pennsylvania Power & Light, Inc. BWRVIP Repair Task M/S GEN A 61 Southern Nuclear Operating Co.

2 N 9 Street Post Office Box 1295 Allentown, PA 18101-1139 40 inverness Center Parkway l Birmingham, AL 35201 Robert Carter, EPRI BWRVIP Assessment Manager Tom Mulford, EPRI BWRVIP I EPRI NDE Center integration Manager P. O. Box 217097 Raj Pathania, EPRI BWRVIP 1300 W. T. Harris Blvd. Mitigation Manager I Charlotte, NC 28221 Ken Wolfe, EPRI BWRVIP Repair Manager Greg Selby, EPRI BWRVIP Electric Power Research Institute inspection Manager P. O. Box 10412 EPRI NDE Center 3412 Hillview Ave.

P. O. Box 217097 Palo Alto, CA 94303 1300 W. T. Harris Blvd.

Charlotte, NC 28221 James P. Pelletier, BWRVIP Liaison to EPRI Nuclear Power Council Joe Hagan, BWRVIP Vice Chairman Nebraska Public Power District PEPCO Energy Co. 1200 Prospect Avenue MC 62C-3 PO Box 98 965 Chesterbrook Blvd Brownville, NE 68321-0098 i Wayne, PA 19807-5691 l i L  !