ML20202B460: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20202B460 | | number = ML20202B460 | ||
| issue date = 02/06/1998 | | issue date = 02/06/1998 | ||
| title = Ack Receipt of | | title = Ack Receipt of Which Transmitted Changes to REP for Fort Calhoun Station Submitted Under Provisions of 10CFR50,Appendix E & 10CFR50.4(b)(5)(iii).NRC Approval Not Required | ||
| author name = Murray B | | author name = Murray B | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9802120022 | | document report number = NUDOCS 9802120022 | ||
| title reference date = 03-19-1997 | |||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
| Line 26: | Line 27: | ||
==SUBJECT:== | ==SUBJECT:== | ||
CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY Pl.AN This letter acknowledges receipt of your letter dated March 19,1997, which transmitted changes to the Radiological Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(ill). | CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY Pl.AN This letter acknowledges receipt of your {{letter dated|date=March 19, 1997|text=letter dated March 19,1997}}, which transmitted changes to the Radiological Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(ill). | ||
Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan, and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates that they are in accordance with 10 CFR 50.54(q). | Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan, and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates that they are in accordance with 10 CFR 50.54(q). | ||
Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room. | Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room. | ||
Revision as of 20:16, 7 December 2021
| ML20202B460 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/06/1998 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 9802120022 | |
| Download: ML20202B460 (3) | |
Text
-- _ _ - _ _ _ _ _ _.
1 t Avt. UNIT E D sT ATES
- g. t NUCLEAR REGULATORY COMMISSION REOloNiv
{
'g 611 RYAN PLAZA drive,sulTE 400 AR LINGToN, T E XAS 760118064 t, , ,+
February 6, 1998 S. K. Gambhir, Division Manager Engineering & Operations Support ,
Omabs Public Power District Fort Calhoun Station FC 2-4 Adm.
P.O. Box 399 Hwy. 75 North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
SUBJECT:
CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY Pl.AN This letter acknowledges receipt of your letter dated March 19,1997, which transmitted changes to the Radiological Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(ill).
Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan, and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates that they are in accordance with 10 CFR 50.54(q).
Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, P%
Blaine Murray, Chief Plant Support Branc Division of Reactor fety Docket No.: 50 285 License No.: DPR-40 t
DO O 285
- l !
F PDR '
i Omaha Public Power District 2-cc:
James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2 4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 5007
Omaha Public Power District 3 I
Regional Administrator DRS Director DRS Deputy Director DRS PSB DRP Director Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector MIS System (Elko)
RIV File DRS Action item File (97 E-0013)
DOCUMENT NAME: G:\DRSLTRS\FC9801EP. LOO TAC #XO3385 G:\DRSLTRS\FC9801EP. MOO -
To receive copy of document, Indicate in bar: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy RIV:PSB - C:DRS\PSB THAndrews:nhgic BMurray%
02/5798 /
02Af/98 OFFICIAL RECORD COPY
_ _ _ _ _ _ _ - _ - .