ML20206B376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-99-016, 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with ]]
| number = ML20206B376
| issue date = 12/31/1998
| title = 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with 990421 Ltr
| author name = Moery D
| author affiliation = SOUTHERN NUCLEAR OPERATING CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000348, 05000364
| license number =
| contact person =
| document report number = NEL-99-0166, NEL-99-166, NUDOCS 9904290227
| document type = ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC, TEXT-ENVIRONMENTAL REPORTS
| page count = 5
}}
 
=Text=
{{#Wiki_filter:r.
D va Morey                S:uth:rn Nucirr Vice President            Oper: ting Comp:ny. inc.
;              Farley Project -          Post Office Box 1295 Binningham. Alabama 35201 l
i-  .                          Tel 205 992.5131 SOUTHERN COMPANY Energy to Serve Your%rld" Docist Nos.:      50-348                                              NEL-99-0166 50-364 U. S. Nuclear Regulatory Commission ATIN: Docenent Control Desk Washington, D. C. 20555 0001 Joseph M. FarleyNuclear Plant 1998 Annual Envuonmental Operatmg Report O(carasological)
W and Gamrlmmen-I la accordance with subeedian 5.4.1 of the Joseph M. Farley Nuclear Plant Environmadal          !
Protection Plan (Units 1 & 2), Appen&x B to Facety Operating License Nos. NPF-2 and NPF-8, please find anda==i the Annual Environmental Operating Report for 1998.                  1 If >eu have any questions, please advise.                                                    ;
RWelly subautted, Dave Morey AHM/maf%#11. doc Attadament.
: 1. Annual Envuonmental Operatag Report for 1998 l
l
                                      ,4a f          99o4290227 Apocn 9s1231  o500034a ,
poR l          R                        PM s l
l'
 
i  .
i Page 2
,              U. S. Nuclear Regulatory Commission l
l l
l l              cc:  Southern Nuclear Opending Company Mr. L. M. St      , General Manager- Farley U. S. Nebe R        '-*w C = '--6    W- "e=        D. C, l                    Mr. J. I. Zhnmerman, Licensing Project Manager - Farley U. S. N-he Rela *w C          i==6 F=6 II Mr. L. A. Reyes, Regional Ad.Ceor Mr. T. P. Johnson, Senior Resident Inspector - Farley 1
l
 
                                                            }
4 SOUTHERN NUCLEAR OPERATING COMPANY JOSEPH M. FARLEY NUCLEAR PI4 ANT - UNITS 1 AND 2 NRC DOCKET NOS. 50-348 AND 50-364 FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 i
1 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1998    i (NONRADIOLOGICAL)                  i l
l
 
JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1998 (NONRADIOLOGICAL)
INTRODUCTION in accoh with Sah-*w= 5.4.1 of the Joseph M. Farley Nuclear Plant Envuonmental Protection Plan, Appendix B to Facility Operatung License Nos. NPF-2 and NPF-8, this nyort is subnutted sununanzing unpicaw=enth of the Environmental Protection Plan for calmdar year 1998.
REPORTING REOUIREMENTS A.      Summaries and Analyses of Results of EnviroM Protection Activities Requiral by Subsection 4.2 of the Envira====tal Protection Plan (EPP) for the Repoding Period
: 1. Aenal Remote Sensag - Aenal Remote Seamag is no longer required
: 2. Hertncide Application - Ibere is no reporting requimnent associated with this conditaon.
: 3. Imd Management - There is no nyorting requirement associated with this condition.
B.      Comparison of the 1998 Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Non-Radiological Monitoring Reports
                  'Ihese comparisons were not required Wa= no nonradiological enviv-          ^=1 monitonng programs were conducted during the reportmg penod beyond those im fo...d in accordance with NPDES Permit No. AL0024619.
C.      Ama*===*=r of the Observed Impacts of Plant Operation on the Environment                  i There were no significant adverse envuonmcatal enpacts mawintM with plant operation during 1998.
D.      EPP Noacr7=-x and Corrective Actions
                  'Ihere were no EPP nancornphances during 1998.
A-1
 
i I
1 E. Changes im Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Section 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in statson design or operation, tests, or r.apeii.rsas in 1998 which involved a potentially significant unreviewed environmental question.
F. Noaroutine Reports Subanitted in Accordance with EPP Section 5.4.2
            'Ihere were no nonroutine reports submitted in 1998.
1 I
I I
A-2
_                    __}}

Latest revision as of 15:33, 6 December 2021